CN101709577A - 一种冻土地基快速解冻方法 - Google Patents
一种冻土地基快速解冻方法 Download PDFInfo
- Publication number
- CN101709577A CN101709577A CN200910184975A CN200910184975A CN101709577A CN 101709577 A CN101709577 A CN 101709577A CN 200910184975 A CN200910184975 A CN 200910184975A CN 200910184975 A CN200910184975 A CN 200910184975A CN 101709577 A CN101709577 A CN 101709577A
- Authority
- CN
- China
- Prior art keywords
- pipe
- frozen
- hot water
- thawing
- outer tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种冻土地基快速解冻方法,其特征在于:它是经放线、定孔位,制解冻管,钻孔,下解冻管,通循环热水,拔管完成解冻。本发明由于采取直接在桩基进行解冻,针对性强,解冻效果好,且内外管是一体,可全部回收,重复利用,因此不仅提高了施工质量和速度,提高了施工效率,而且施工材料、热水用量和施工费用少,解冻时间短,大大节约人力和财力,成本低廉。
Description
技术领域
本发明涉及一种建筑施工用的桩基冻土快速解冻施工方法。
技术背景
目前建筑施工中对冻土多采用传统的解冻方法,即将全部需解冻桩范围内的冻土以一定间距均匀布设解冻管,解冻管的间距根据每根管的热量辐射范围来确定,然后通热水进行解冻;传统的解冻方法采取大面积解冻势必需要较多钻孔和解冻管,施工材料多和施工费用高,且解冻时由于连接的解冻管较多,温度不宜控制,冻土解冻不均匀和彻底,桩径范围以外的冻土也相应进行了解冻,需要大量热水,同时解冻时间达2-3个月才能施工桩基,时间长,且解冻效果不好,影响施工进度和造成较大的热能浪费,经济效益差,并内外管不能回收,造成极大浪费。
发明内容
本发明目的针对传统方法现存问题,给人们提供一种不仅提高了施工质量和速度,提高施工效率,而且内外管是一体,可全部回收,重复利用,施工材料、热水用量和施工费用少,解冻时间短,大大节约人力和财力,成本低廉的建筑施工用的桩基冻土快速解冻施工方法。
本发明特征在于:它是经放线、定孔位,制解冻管,钻孔,下解冻管,通循环热水,拔管完成解冻,具体步骤如下:
(1)放线、定孔位:首先确定需要解冻的桩基,根据施工控制轴线定位出需要解冻的桩基中心位置,即为下解冻管钻孔的中心位置;
(2)制作解冻管:解冻管由外管和内管两部分组成,外管采用外径Φ100-110mm钢管,下端焊成倒锥形封堵,上端的侧面有一出水口;内管采用Φ30-50mm钢管,套入外管内,下端至外管底部,上端作为进水口,与外管间焊接封堵,解冻管长度同钻孔深度;
(3)钻孔:根据定出的钻孔中心位置,进行钻孔,钻孔机械根据当地土质特点进行选择,一般选用冲击钻机垂直钻孔,钻孔直径大于解冻管的外径50-100mm,便于放入解冻管和以免造成解冻范围偏离桩基,钻孔深度同需解冻的冻土深度;
(4)下解冻管:首先检查解冻管,确定其无漏渗现象后利用吊车或塔吊设备将解冻管吊入钻好的孔内,直至达到设定的深度后固定,再将内管上端与热水系统的进水管连接,外管出水口与热水系统的回水管连接;
(5)通循环热水:当解冻管与热水循环系统的连接检查合格后,利用循环增压泵将温度为70~80度的热水从进水管注入,通过解冻内管注到解冻管底部,从下而上循环,开始解冻,再通过解冻外管的出水口和回水管重新循环到热水系统,如此通过热水的循环,吸收冻土的冷量,使冻土解冻;
(6)拔管:通过循环热水解冻5~6天后通过钻孔检查桩基直径范围内的冻土解冻合格,则停止通热水,拔出解冻管的内、外管,即可进行下一道工序桩基施工。
本发明的效果
本发明由于采取直接在桩基进行解冻,针对性强,解冻效果好,且内外管是一体,可全部回收,重复利用,因此不仅提高了施工质量和速度,提高了施工效率,而且施工材料、热水用量和施工费用少,解冻时间短,大大节约人力和财力,成本低廉。
附图说明
图1为桩基冻土快速解冻示意图。
图2为解冻管串联的剖视图。
具体实施方式
实施例1:
参见图1,本发明它是经放线、定孔位,制解冻管,钻孔,下解冻管,通循环热水,拔管完成解冻,具体步骤如下:
(1)放线、定孔位:首先确定需要解冻的桩基1,根据施工控制轴线定位出需要解冻的桩基中心位置,即为下解冻管钻孔的中心位置;
(2)制作解冻管:解冻管2由外管3和内管4两部分组成,外管采用外径Φ100-110mm钢管,下端焊成倒锥形封堵,上端的侧面有一出水口;内管采用Φ30-50mm钢管,套入外管内,下端至外管底部,上端作为进水口,与外管间焊接封堵,解冻管长度同钻孔深度;
(3)钻孔:根据定出的钻孔中心位置,进行钻孔,钻孔机械根据当地土质特点进行选择,一般选用冲击钻机垂直钻孔,钻孔直径大于解冻管的外径50-100mm,便于放入解冻管和以免造成解冻范围偏离桩基,钻孔深度同需解冻的冻土深度;
(4)下解冻管:首先检查解冻管,确定其无漏渗现象后利用吊车或塔吊设备将解冻管吊入钻好的孔内,直至达到设定的深度后固定,再将内管上端与热水系统的进水管5连接,外管出水口与热水系统的回水管6连接;
(5)通循环热水:当解冻管与热水循环系统7的连接检查合格后,利用循环增压泵8将温度为70~80度的热水从进水管注入,通过解冻内管注到解冻管底部,从下而上循环,开始解冻,再通过解冻外管的出水口和回水管重新循环到热水系统,如此通过热水的循环,吸收冻土的冷量,使冻土解冻;
(6)拔管:通过循环热水解冻5~6天后通过钻孔检查桩基直径范围内的冻土解冻合格,则停止通热水,拔出解冻管的内、外管,即可进行下一道工序桩基施工。
当需对桩基冻土快速解冻时,可利用本发明的方法单个桩基进行快速解冻也可参见图2采用多个解冻管串联的方式对多个桩基进行快速解冻。
Claims (1)
1.一种冻土地基快速解冻方法,其特征在于:它是经放线、定孔位,制解冻管,钻孔,下解冻管,通循环热水,拔管完成解冻,具体步骤如下:
(1)放线、定孔位:首先确定需要解冻的桩基,根据施工控制轴线定位出需要解冻的桩基中心位置,即为下解冻管钻孔的中心位置;
(2)制作解冻管:解冻管由外管和内管两部分组成,外管采用外径Φ100-110mm钢管,下端焊成倒锥形封堵,上端的侧面有一出水口;内管采用Φ30-50mm钢管,套入外管内,下端至外管底部,上端作为进水口,与外管间焊接封堵,解冻管长度同钻孔深度;
(3)钻孔:根据定出的钻孔中心位置,进行钻孔,钻孔机械根据当地土质特点进行选择,一般选用冲击钻机垂直钻孔,钻孔直径大于解冻管的外径50-100mm,便于放入解冻管和以免造成解冻范围偏离桩基,钻孔深度同需解冻的冻土深度;
(4)下解冻管:首先检查解冻管,确定其无漏渗现象后利用吊车或塔吊设备将解冻管吊入钻好的孔内,直至达到设定的深度后固定,再将内管上端与热水系统的进水管连接,外管出水口与热水系统的回水管连接;
(5)通循环热水:当解冻管与热水循环系统的连接检查合格后,利用循环增压泵将温度为70~80度的热水从进水管注入,通过解冻内管注到解冻管底部,从下而上循环,开始解冻,再通过解冻外管的出水口和回水管重新循环到热水系统,如此通过热水的循环,吸收冻土的冷量,使冻土解冻;
(6)拔管:通过循环热水解冻5~6天后通过钻孔检查桩基直径范围内的冻土解冻合格,则停止通热水,拔出解冻管的内、外管,即可进行下一道工序桩基施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910184975A CN101709577A (zh) | 2009-10-23 | 2009-10-23 | 一种冻土地基快速解冻方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910184975A CN101709577A (zh) | 2009-10-23 | 2009-10-23 | 一种冻土地基快速解冻方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101709577A true CN101709577A (zh) | 2010-05-19 |
Family
ID=42402383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910184975A Pending CN101709577A (zh) | 2009-10-23 | 2009-10-23 | 一种冻土地基快速解冻方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101709577A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264657A (zh) * | 2014-09-12 | 2015-01-07 | 东南大学 | 处理公路冻土地基的方法 |
CN104565531A (zh) * | 2014-12-26 | 2015-04-29 | 中国石油天然气股份有限公司 | 一种管道修复作业坑冻土处理方法 |
CN106120507A (zh) * | 2016-08-11 | 2016-11-16 | 张锐 | 一种过湿土路基快速施工方法 |
CN107687321A (zh) * | 2017-07-29 | 2018-02-13 | 中国地质调查局油气资源调查中心 | 一种冰冻钻孔通孔设备及其使用方法 |
CN109372426A (zh) * | 2018-12-29 | 2019-02-22 | 中国地质调查局油气资源调查中心 | 一种冰冻钻孔通孔设备及其使用方法 |
-
2009
- 2009-10-23 CN CN200910184975A patent/CN101709577A/zh active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264657A (zh) * | 2014-09-12 | 2015-01-07 | 东南大学 | 处理公路冻土地基的方法 |
CN104264657B (zh) * | 2014-09-12 | 2016-03-16 | 东南大学 | 处理公路冻土地基的方法 |
CN104565531A (zh) * | 2014-12-26 | 2015-04-29 | 中国石油天然气股份有限公司 | 一种管道修复作业坑冻土处理方法 |
CN106120507A (zh) * | 2016-08-11 | 2016-11-16 | 张锐 | 一种过湿土路基快速施工方法 |
CN106120507B (zh) * | 2016-08-11 | 2018-05-01 | 长沙理工大学 | 一种过湿土路基快速施工方法 |
CN107687321A (zh) * | 2017-07-29 | 2018-02-13 | 中国地质调查局油气资源调查中心 | 一种冰冻钻孔通孔设备及其使用方法 |
CN109372426A (zh) * | 2018-12-29 | 2019-02-22 | 中国地质调查局油气资源调查中心 | 一种冰冻钻孔通孔设备及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587365B (zh) | 旋进式壁后注浆地源热能转换预制桩装置埋入地层的方法 | |
AU2016306883B2 (en) | Heat transfer pipe embedded in a prefabricated pipe pile and embedding method | |
CN104695964B (zh) | 地铁盾构隧道冰冻进洞方法 | |
US20050061472A1 (en) | Heat source or heat sink unit with thermal ground coupling | |
CN108166486B (zh) | 深层埋管式预制型能源管桩及其施工工艺 | |
CN101709577A (zh) | 一种冻土地基快速解冻方法 | |
CN202543904U (zh) | 旋进式壁后注浆地源热能转换预制桩装置 | |
CN101768967B (zh) | 一种土层锚杆快速施工方法及其锚杆 | |
CN105113498A (zh) | 高强劲芯复合桩施工方法 | |
CN104895059A (zh) | 冻结水泥土搅拌桩及其施工方法 | |
CN104234047A (zh) | 一种竹节桩与管桩共同嵌入水泥土搅拌土钉桩的复合桩 | |
CN111042112A (zh) | 一种新型布管形式的钻孔灌注能量桩及其施工方法 | |
CN202039368U (zh) | 预应力管桩桩芯补强简易手动螺旋取土装置 | |
CN203569561U (zh) | 一种新型随钻跟进钢管护壁灌注桩的成桩装置 | |
CN206110124U (zh) | 一种灌注桩桩端后压浆装置 | |
CN105297732B (zh) | 超厚黏土层正循环灌注桩排渣促进装置及其施工方法 | |
CN205369234U (zh) | 冻结高压旋喷桩 | |
CN108625388B (zh) | 一种适用于浅基岩地质条件的套筒组合式大直径单桩基础及其施工方法 | |
CN106979635A (zh) | 一种地源热泵系统地下传热管施工方法 | |
CN103410529B (zh) | 一种用于软弱围岩的隧道支撑拱脚加固结构及施工方法 | |
CN206144587U (zh) | 一种异形截面中空自钻式锚杆 | |
CN205475710U (zh) | 钢管柱混凝土顶升接口周转装置 | |
CN107642329A (zh) | 一种中深层u型对接地热井套管管路密封运行的工艺方法 | |
CN106120714A (zh) | 一种提高空心桩承载力的装置及其使用方法 | |
CN104863596B (zh) | X形冻结管及其在冻结施工中的应用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100519 |