CN101666160B CN2009100634063A CN200910063406A CN101666160B CN 101666160 B CN101666160 B CN 101666160B CN 2009100634063 A CN2009100634063 A CN 2009100634063A CN 200910063406 A CN200910063406 A CN 200910063406A CN 101666160 B CN101666160 B CN 101666160B
Authority
CN
China
Prior art keywords
screw sleeve
screw
concrete
tie rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100634063A
Other languages
Chinese (zh)
Other versions
CN101666160A (en
Inventor
和建生
何雄飞
汤用泉
黎学皓
黄远华
周巧端
邸书茵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN2009100634063A priority Critical patent/CN101666160B/en
Publication of CN101666160A publication Critical patent/CN101666160A/en
Application granted granted Critical
Publication of CN101666160B publication Critical patent/CN101666160B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a brace screw sleeve and a pouring construction method adopting the same, relating to the field of concrete construction. A cylindrical screw sleeve made of foamed plastic or rubber is sleeved on a screw connected with a brace, a winding layer is wrapped outside the cylindrical screw sleeve so as to separate the screw from concrete, therefore, the screw sleeve can be conveniently taken down after the pouring, the screw is cut off, the brace and the screw are sealed in the concrete, and the influence on the concrete quality, which is caused by corrosion produced by the brace contacting with air and water, is avoided. The invention has low manufacture cost, convenient operation and reliable quality, is suitable to the concrete construction of small and medium sized water-power engineering, and can be also used for other concrete structures without allowing and exposing braces.

Description

A kind of pouring construction method and tie rod screw sleeve that adopts the tie rod screw sleeve
Technical field
The present invention relates to concrete pouring construction method and isolated plant, particularly a kind of pouring construction method and tie rod screw sleeve that adopts the tie rod screw sleeve.
Background technology
According to the concrete construction code requirement, upstream face or the concrete that forever exposes the w face should not adopt the tie rod fixed form, because these are exposed in the water or airborne tie rod, the easy corrosion of screw rod, quality of concrete is caused damage, and form the passage of seepage.Therefore, in the construction of present major works, adopt many snap gauges plate or cantilever form usually.But construction for medium and small project; It is very uneconomic adopting many snap gauges plate or cantilever form; And the construction of many snap gauges plate or cantilever form needs higher specialized capability; Especially the position of locating cone or sleeve bolt needs accurately control, also needs big machinery to cooperate simultaneously and installs and stripping.
Summary of the invention
Technical problem to be solved by this invention provides a kind of pouring construction method and tie rod screw sleeve that adopts the tie rod screw sleeve, can after building, tie rod, screw rod be sealed in the concrete.
For solving the problems of the technologies described above, the technical scheme that the present invention adopted is: a kind of pouring construction method that adopts the tie rod screw sleeve may further comprise the steps:
1) carry out the pre-buried of earth anchor during concreting in last storehouse, mounting template is reinforced template with tie rod, screw rod, perpendicular waling, horizontal waling, chevron card, pad and nut then, and screw sleeve is installed at last;
2) twine at screw sleeve external application winding layer;
3) after building, when taking out screw sleeve, winding layer is pulled out in manual work, and screw sleeve is taken out of simultaneously, cuts off screw rod to projected depth, and it is flat to concrete surface to adopt the preshrunk mortar that hole is mended then;
Through above step, tie rod and screw rod all are sealed in the concrete.
Necessary and the template proximate of screw sleeve, the termination of screw sleeve must tightly wrap with winding layer, guarantees that concrete separates with screw rod fully.
Screw sleeve is cylindrical, in manhole is arranged, screw sleeve is provided with winding layer outward.
Screw sleeve is made up of two semicircles up and down.
Screw sleeve adopts flexible material to process.
Described flexible material comprises foamed plastics and rubber.
Described winding layer is the plastic glue strip of band gum.
Described plastic glue strip comprises polytetrafluoroethylene (PTFE).
A kind of pouring construction method and tie rod screw sleeve that adopts the tie rod screw sleeve disclosed by the invention; Through the cylindrical screw sleeve that adopts foamed plastics or rubber to make; On the screw rod that it is enclosed within tie rod is connected, and superscribe winding layer outside, screw rod and concrete are separated; After building, just can take off screw sleeve very easily like this; Cut off screw rod, tie rod and screw rod are sealed in the concrete, avoided tie rod ingress of air and water generates corrosion that concrete quality is impacted.Screw sleeve adopts two semicircles up and down; Being convenient to the installation and the taking-up of screw sleeve, is that the plastic glue strip of material carries gum with the polytetrafluoroethylene (PTFE), is convenient to sealing between screw sleeve and screw rod and the template; And the polytetrafluoroethylene (PTFE) material is difficult for and the concrete adhesion; Be convenient to take out, the shape of winding can make that to build the endoporus that the back concrete forms comparatively coarse, is convenient to the later stage hole is sealed.
The present invention is simple in structure, low preparation cost, easy and simple to handle, reliable in quality.Be applicable to the concrete construction of medium and small-scale water and electricity engineering, also can be used for the concrete structure that other do not allow and should not expose tie rod.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
Fig. 1 is the embodiment of the present invention sketch map;
Fig. 2 is a flexible material cross sectional representation among the present invention;
Fig. 3 is the whole cross sectional representation of the present invention.
The specific embodiment
Like Fig. 1, Fig. 2 and shown in Figure 3, a kind of pouring construction method that adopts the tie rod screw sleeve may further comprise the steps:
1) carry out the pre-buried of earth anchor 1 in last storehouse during concreting, mounting template 5 then, reinforce with tie rod 2, screw rod 3, perpendicular waling 6, horizontal waling 7, chevron card 8 and pad and 9 pairs of templates 5 of nut, and screw sleeve 4 is installed at last;
2) twine at screw sleeve 4 external application winding layers 11;
3) after building, when taking out screw sleeve 4, winding layer 11 is pulled out in manual work, and screw sleeve 4 is taken out of simultaneously, cuts off screw rod 3 to projected depth, and it is flat to concrete surface to adopt the preshrunk mortar that hole is mended then;
Through above step, tie rod 2 all is sealed in the concrete with screw rod 3.
Screw sleeve 4 must be close to template 5, and the termination of screw sleeve 4 must tightly wrap with winding layer 11, guarantees that concrete separates with screw rod 3 fully.
Screw sleeve 4 is cylindrical, in manhole is arranged, the outer winding layers 11 that are provided with of screw sleeve 4.
Screw sleeve 4 is made up of two semicircles up and down.
Screw sleeve 4 adopts flexible material to process.
Described flexible material comprises foamed plastics and rubber.
Described winding layer 11 is the plastic glue strip of band gum.
Described plastic glue strip comprises polytetrafluoroethylene (PTFE).
In Fig. 1; Concrete blinding form of construction work according to general is carried out formwork erection; At first carry out the pre-buried of earth anchor 1 during concreting in last storehouse; Mounting template 5 then, reinforce with tie rod 2, screw rod 3, perpendicular waling 6, horizontal waling 7, chevron card 8 and pad and 9 pairs of templates 5 of nut, and screw sleeve 4 is installed at last.
In Fig. 2, customize the foamed plastics and the rubber of solid shape on request, its length, thickness, center bore can confirm as required, the flexible material cross section that customization is good be two semicircles up and down, is convenient to installation and takes off.
In Fig. 3, screw sleeve 4 is enclosed within on the screw rod 3, the outside uses polytetrafluoroethylene (PTFE) to twine as the winding layer 11 of material.Be noted that screw sleeve 4 must be close to template 5, the termination of screw sleeve 4 must tightly wrap with winding layer 11, guarantees concrete and screw rod 3 and separates fully, is convenient to screw sleeve 4 is taken out.
When taking out screw sleeve 4, winding layer 11 is pulled out in manual work, can screw sleeve 4 be taken out of simultaneously, if any residual, can adopt iron wire that its hook is gone out.After screw sleeve 4 takes out, will stay the hole of rule on the concrete surface, and the hole inner wall coarse.Adopt cutter that screw rod 3 is cut off to projected depth, it is flat to concrete surface to adopt the preshrunk mortar that hole is mended then.

Claims (2)

1. pouring construction method that adopts the tie rod screw sleeve is characterized in that may further comprise the steps:
1) carries out the pre-buried of earth anchor (1) during concreting in last storehouse; Mounting template (5) then; With tie rod (2), screw rod (3), perpendicular waling (6), horizontal waling (7), chevron card (8), pad and nut (9) template (5) is reinforced, screw sleeve (4) is installed at last;
2) twine at screw sleeve (4) external application winding layer (11);
3) after building, when taking out screw sleeve (4), winding layer (11) is pulled out in manual work, and screw sleeve (4) is taken out of simultaneously, cuts off screw rod (3) to projected depth, and it is flat to concrete surface to adopt the preshrunk mortar that hole is mended then;
Through above step, tie rod (2) and screw rod (3) all are sealed in the concrete.
2. a kind of pouring construction method that adopts the tie rod screw sleeve according to claim 1; It is characterized in that: screw sleeve (4) must be close to template (5); The termination of screw sleeve (4) must use winding layer (11) to tightly wrap, and guarantees that concrete separates with screw rod (3) fully.
CN2009100634063A 2009-07-31 2009-07-31 Brace screw sleeve and pouring construction method adopting same Expired - Fee Related CN101666160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100634063A CN101666160B (en) 2009-07-31 2009-07-31 Brace screw sleeve and pouring construction method adopting same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100634063A CN101666160B (en) 2009-07-31 2009-07-31 Brace screw sleeve and pouring construction method adopting same

Publications (2)

Publication Number Publication Date
CN101666160A CN101666160A (en) 2010-03-10
CN101666160B true CN101666160B (en) 2012-01-18

Family

ID=41802925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100634063A Expired - Fee Related CN101666160B (en) 2009-07-31 2009-07-31 Brace screw sleeve and pouring construction method adopting same

Country Status (1)

Country Link
CN (1) CN101666160B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383411B (en) * 2011-08-23 2014-03-05 中国葛洲坝集团股份有限公司 Method for positioning template corner

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈旦生等.新型塑料套管在大模板施工中的应用.《工程质量》.2006,(第1期),《工程质量》2006年第1期第45页第1栏,第46页第1、2栏. *

Also Published As

Publication number Publication date
CN101666160A (en) 2010-03-10

Similar Documents

Publication Publication Date Title
CN100529275C (en) Method for erecting a tower
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN104805870A (en) Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement
CN101691739A (en) Composite type self-adhesion water stop band, manufacturing method and construction method
JP2008127897A (en) Mold holder, construction method of concrete structure using mold holder, and concrete structure constructed by the method
CN104727552A (en) Construction method for reserving water feed pipe grooves in prefabricated shear wall
CN101666160B (en) Brace screw sleeve and pouring construction method adopting same
CN104234057A (en) Polymer grouting curtain and prestressed pipe pile combined foundation pit supporting structure
JP2011094443A (en) Method for constructing wall surface work by using bag body
CN201486142U (en) Brace screw sleeve
CN114174610B (en) Method and connecting device for mounting a prefabricated structural element to another structural element
CN106381883B (en) Bar Seepage method through walls
CN102434005A (en) Precast beam component construction process
CN210482733U (en) Prefabricated wallboard with embedded sleeve
CN201554042U (en) Installer for diaphragm wall connector flexible water stops
CN207092104U (en) A kind of steel-pipe pile attachment structure
CN204570749U (en) Underground anti-seepage jointing and sealed underground percolator
CN113944242A (en) Waterproof method for outer wall post-cast strip
CN208328970U (en) A kind of environmentally friendly connection structure of precast concrete foundation and steel-pipe pile
CN101122174A (en) Architecture pipeline preformed hole production method
CN204001334U (en) Be applicable to first seal the in-situ reinforced concrete slab punching afterwards
JP2008202304A (en) Waterproof panel and construction method of wall using the same
CN204252171U (en) The rubber fastening band at basement shrinkage joint installs fixing special tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: He Jiansheng

Inventor after: He Xiongfei

Inventor after: Tang Yongquan

Inventor after: Li Xuehao

Inventor after: Huang Yuanhua

Inventor after: Zhou Qiaoduan

Inventor after: Di Shuyin

Inventor before: He Jiansheng

Inventor before: Huang Jing

Inventor before: Tang Yongquan

Inventor before: Li Xuehao

Inventor before: Zhou Qiaoduan

Inventor before: Di Shuyin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HE JIANSHENG HUANG JING TANG YONGQUAN LI XUEHAO ZHOU QIAODUAN DI SHUYIN TO: HE JIANSHENG HE XIONGFEI TANG YONGQUAN LI XUEHAO HUANG YUANHUA ZHOU QIAODUAN DI SHUYIN

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20210731