CN101666088A - Construction method of large-diameter expanded bore pile based on PCC pile - Google Patents

Construction method of large-diameter expanded bore pile based on PCC pile Download PDF

Info

Publication number
CN101666088A
CN101666088A CN200910183524A CN200910183524A CN101666088A CN 101666088 A CN101666088 A CN 101666088A CN 200910183524 A CN200910183524 A CN 200910183524A CN 200910183524 A CN200910183524 A CN 200910183524A CN 101666088 A CN101666088 A CN 101666088A
Authority
CN
China
Prior art keywords
stake
pcc
pile
major diameter
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910183524A
Other languages
Chinese (zh)
Inventor
丁选明
刘汉龙
孔纲强
陈育民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hehai Technology Co Ltd
Hohai University HHU
Original Assignee
Nanjing Hehai Technology Co Ltd
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hehai Technology Co Ltd, Hohai University HHU filed Critical Nanjing Hehai Technology Co Ltd
Priority to CN200910183524A priority Critical patent/CN101666088A/en
Publication of CN101666088A publication Critical patent/CN101666088A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种基于PCC桩的大直径扩底桩施工方法,主要步骤包括先进行PCC桩施工和养护,再采用高压水冲将桩芯土取出,并取出部分桩底土,在PCC桩桩底形成扩底,然后下放钢筋笼、浇注混凝土,形成大直径扩底桩。本发明方法将PCC桩与大直径扩底桩结合形成新桩型,技术成熟,比普通的大直径扩底桩具有更大的承载力,且本发明方法施工效率高、安全性好。

Figure 200910183524

The invention discloses a construction method of large-diameter bottom-expanding piles based on PCC piles. The main steps include firstly carrying out the construction and maintenance of PCC piles, and then using high-pressure water flushing to take out the pile core soil, and take out part of the bottom soil of the piles. The bottom is formed to expand the bottom, and then the steel cage is lowered and concrete is poured to form a large-diameter expanded bottom pile. The method of the invention combines PCC piles with large-diameter expanded-bottom piles to form a new pile type. The technology is mature, and it has greater bearing capacity than ordinary large-diameter expanded-bottom piles. The method of the invention has high construction efficiency and good safety.

Figure 200910183524

Description

A kind of major diameter pedestal pile constructing process based on the PCC stake
Technical field
The present invention relates to a kind of job practices of pile foundation, particularly a kind of major diameter pedestal pile constructing process based on the PCC stake.
Background technology
China is vast in territory, and weak soil distributes very wide, and coastal area, particularly Yangtze River Delta Region exist the soft foundation of many complexity.When on soft foundation, building works such as highrise building, bridge, generally all to adopt pile foundation.Pile foundation generally all will be passed weak soil layer, with soil property preferably soil layer as bearing course at pile end.The major diameter expanded bore pile can make full use of pile side friction and end resistance, thereby has higher capacity, is widely used in various building foundations.The major diameter expanded bore pile mostly adopts the form of construction work of manually digging hole.In soft layer, during manually digging hole, often occur the situations such as hole, infiltration of collapsing in the construction easily, therefore need precast concrete casing in advance, imbed casing while excavate, and extract the underground water that infiltrates in the hole out with water pump at any time.The workman need stay in the hole for a long time during manually digging hole, is absolutely unsafe, and therefore bans use of in a lot of areas.Only owing to safety problem but not technical problem limits this superior extensive use of stake type in engineering, be one very big sorry.
The cast-in-situ concrete large-diameter tubular pile (is called for short the PCC stake; the patent No. 02112538.4 and 01273182.X); adopt mode of vibration with steel internal and external double-layer cavity structure under the flap valve shoe protection of closure; sink to the ground projected depth; evenly inject concrete by the concrete current divider to this structural cavities, this cavity structure is transferred in vibration then, and the flap valve shoe separates when this cavity structure is transferred to automatically; concrete wherein injects cavity structure to be transferred in the cannelure of back formation, forms the PCC stake.PCC stake external diameter is generally 1.0~1.5 meters, and wall thickness is 10~15 centimetres, 20~30 meters of the pile sinking degree of depth.The PCC stake obtains bigger bearing capacity with less concrete amount, is the superior stake type of a kind of economical rationality, cost performance therefore.This technology quick construction, cheap has been successfully applied in the large tracts of land treatment of soft foundation engineerings such as speedway, high-speed railway.The PCC stake belongs to semi-rigid semiflexible stake type on stricti jurise, generally use as clump of piles composite foundation.The PCC stake is a kind of large diameter thin wall pile tube, and sectional area itself is less, and the load that the pile body of single stake can bear is limited, can not as highrise building, bridge etc. independently pile foundation use, so its range of application is restricted.
Summary of the invention
The object of the present invention is to provide a kind of major diameter pedestal pile constructing process based on the PCC stake, overcome the defective of major diameter pedestal pile constructing process, make full use of PCC pile driving construction characteristics and the high advantage of major diameter expanded bore pile bearing capacity efficiently, develop a kind of major diameter pedestal pile constructing process based on the PCC stake.
The technical solution used in the present invention is:
A kind of major diameter pedestal pile constructing process based on the PCC stake may further comprise the steps:
1) PCC pile driving construction and maintenance;
2) adopt the water under high pressure punching method to take out the stake core soil of PCC stake;
3) adopt the water under high pressure punching method to take out the stake subsoil of PCC stake, until at the bottom of stake, forming the bottom outlet that the aperture enlarges;
4) transfer reinforcing cage, fluid concrete, form the major diameter expanded bore pile.
The inventive method can form the new stake type of PCC stake and major diameter expanded bore pile be combined into based on PCC stake technology.
Described PCC pile driving construction and maintenance, comparatively ripe in the prior art.As indicated above, the PCC pile driving construction can be undertaken by method of the prior art.General maintenance is more than 15 days, and the pile concrete of PCC stake reaches certain intensity.
The stake core soil of PCC stake adopts the water under high pressure punching method to take out, and promptly washes a core soil repeatedly with water under high pressure, makes it to form mud, with slush pump mud is extracted out.
The method that pore-forming can adopt water under high pressure to dash equally at the bottom of the PCC stake stake, after stake core soil is extracted out fully, use high pressure water washing PCC stake stake subsoil again, behind the formation mud stake subsoil is extracted out, until form the bottom outlet that the aperture is expanded greatly than PCC stake external diameter at the bottom of stake, bottom diameter is determined according to designing requirement.A dregs at the bottom of described bottom outlet can be repaired and remove.
Behind the fluid concrete, concrete fills up the bottom outlet and the PCC stake stake core of enlarged-diameter, forms integral body with the PCC stake of having poured into a mould.
Described PCC stake penetrates soft layer, and the head of expanded bore pile is positioned at the soil property that adheres to specification bearing course at pile end preferably.
Major diameter pedestal pile constructing process based on the PCC stake of the present invention combines the PCC stake and to form new stake type with the major diameter expanded bore pile, have bigger bearing capacity than common major diameter expanded bore pile, and the inventive method efficiency of construction height, safety are good.Advantage of the present invention and technique effect specifically are:
(1) PCC stake and major diameter expanded bore pile technology are all very ripe, both are combined form new stake type, do not have the difficulty on the construction technology;
(2) have soil compaction effect during the PCC pile driving construction, can make stake week soil compacted, increase pile side friction, therefore the major diameter expanded bore pile based on the PCC stake has bigger side friction than common major diameter expanded bore pile, therefore has bigger bearing capacity;
(3) in PCC stake stake core when excavation soil, adopt water under high pressure to dash, and extracts out with slush pump after making a core soil form mud again, avoided hand excavation's danger, and the efficiency of construction height;
(4) the PCC stake that construction earlier is good penetrates soft layer, plays support action after stake core soil takes out, and has effectively prevented the hole of collapsing.No longer need prefabricated casing, PCC pile driving construction speed is fast, has saved the time;
(5) PCC stake pile body diameter is big, can be directly when supporting capacity height, pore-forming are checked the workman be transferred to the hole by lifting rope at the bottom of, at the bottom of the hole, check the hole quality of enlarged footing part, the clear hole slagging-off of the stake end thoroughly, clean, easily guarantee the concrete pouring quality.
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described in detail.Protection scope of the present invention is not exceeded with the specific embodiment, but is limited by claim.
Description of drawings
Fig. 1 PCC pilework schematic diagram;
Fig. 2 PCC stake stake core soil water under high pressure punching method schematic diagram that fetches earth;
The major diameter expanded bore pile that Fig. 3 the inventive method forms based on the PCC stake;
Fig. 4 major diameter expanded bore pile vertical view.
The specific embodiment
As Fig. 1~shown in Figure 4, a kind of major diameter pedestal pile constructing process based on the PCC stake, its major technique step is as follows:
(1) construction of PCC stake 1 and maintenance
The construction technology of PCC stake 1 is comparatively ripe; its key step comprises; adopt mode of vibration with steel internal and external double-layer cavity structure under the flap valve shoe protection of closure; sink to the ground projected depth; evenly inject concrete by the concrete current divider to this structural cavities, this cavity structure is transferred in vibration then, and the flap valve shoe separates when this cavity structure is transferred to automatically; concrete wherein injects cavity structure to be transferred in the cannelure of back formation, forms the PCC stake.Because support action is mainly played in PCC stake 1 in this type, so its quality control standard can suitably relax, to accelerate efficiency of construction, to reduce cost.
PCC stake general maintenance is more than 15 days, after the pile concrete for the treatment of PCC stake 1 reaches certain intensity, can excavate a core soil 3.
(2) take out stake core soil 3
Adopt water under high pressure to wash a core soil 3 repeatedly, make it to form mud 9, mud 9 is extracted out with slush pump 8.
(3) take out stake subsoil 4, and form the major diameter bottom outlet
After stake core soil 3 is extracted out fully, with high pressure water washing part stake subsoil 4, behind the formation mud stake subsoil 4 is extracted out again.Stake subsoil 4 is extracted not necessarily rule of back bottom shapes out, at this moment can adopt lifting rope that one workman is transferred at the bottom of, the stake subsoil is suitably repaired, make it to form the shape of enlarged footing part 5 shown in Figure 3, and remove a stake end dregs.
(4) transfer reinforcing cage, fluid concrete
Transfer the good reinforcing cage of prior colligation behind the pore-forming immediately.After reinforcing cage is transferred, fluid concrete at once, concrete pouring should be carried out behind pore-forming as early as possible, in case the bottom outlet of stake end enlarged footing part 5 is out of shape under soil pressure and seepage pressure effect.After concrete fills up enlarged footing part 5 and pile body part 6, form integral body with the PCC stake 1 of having poured into a mould, finish based on the major diameter expanded bore pile construction of PCC stake this moment.
PCC stake 1 is arranged in soft layer 2, and its outer wall contacts with soil layer, and side friction is provided, and enlarged footing part 5 is positioned at soil property bearing course at pile end 7 preferably, and bigger end resistance is provided.This major diameter expanded bore pile bearing capacity based on the PCC stake is made up of side friction and end resistance, bears upper load jointly.Because the soil compaction effect of PCC stake 1 and bigger external surface area, major diameter expanded bore pile side friction can be not fully exerted, again because enlarged footing part 5 has bigger floor space, therefore major diameter expanded bore pile end resistance also can be not fully exerted, therefore, the major diameter expanded bore pile based on the PCC stake is a kind of superior stake type that can give full play to side friction and end resistance.

Claims (6)

1, a kind of major diameter pedestal pile constructing process based on the PCC stake may further comprise the steps:
1) PCC pile driving construction and maintenance;
2) adopt the water under high pressure punching method to take out the stake core soil of PCC stake;
3) adopt the water under high pressure punching method to take out the stake subsoil of PCC stake, until at the bottom of stake, forming the bottom outlet that the aperture enlarges;
4) transfer reinforcing cage, fluid concrete, form the major diameter expanded bore pile.
2, major diameter pedestal pile constructing process according to claim 1 is characterized in that: described water under high pressure punching method is to adopt water under high pressure to wash a core soil or stake subsoil repeatedly, makes it to form mud, with slush pump mud is extracted out.
3, major diameter pedestal pile constructing process according to claim 1, it is characterized in that: the aperture of described bottom outlet is greater than the external diameter of PCC stake.
4, major diameter pedestal pile constructing process according to claim 1 is characterized in that: step 3) comprises repairs and removes dregs to described bottom outlet.
5, major diameter pedestal pile constructing process according to claim 1 is characterized in that: the concrete of step 4) cast fills up bottom outlet and PCC stake stake core, forms integral body with the PCC stake.
6, major diameter pedestal pile constructing process according to claim 1 is characterized in that: described PCC stake penetrates soft layer, and the head of expanded bore pile is positioned at bearing course at pile end.
CN200910183524A 2009-09-14 2009-09-14 Construction method of large-diameter expanded bore pile based on PCC pile Pending CN101666088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910183524A CN101666088A (en) 2009-09-14 2009-09-14 Construction method of large-diameter expanded bore pile based on PCC pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910183524A CN101666088A (en) 2009-09-14 2009-09-14 Construction method of large-diameter expanded bore pile based on PCC pile

Publications (1)

Publication Number Publication Date
CN101666088A true CN101666088A (en) 2010-03-10

Family

ID=41802854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910183524A Pending CN101666088A (en) 2009-09-14 2009-09-14 Construction method of large-diameter expanded bore pile based on PCC pile

Country Status (1)

Country Link
CN (1) CN101666088A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859034A (en) * 2017-11-14 2018-03-30 中铁十局集团第工程有限公司 Large diameter pile foundation spillage immediate processing method
CN113957883A (en) * 2021-11-11 2022-01-21 李汗 Concrete prefabricated foundation pile and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859034A (en) * 2017-11-14 2018-03-30 中铁十局集团第工程有限公司 Large diameter pile foundation spillage immediate processing method
CN113957883A (en) * 2021-11-11 2022-01-21 李汗 Concrete prefabricated foundation pile and construction method thereof
CN113957883B (en) * 2021-11-11 2023-01-24 浙江荣森建设有限公司 Concrete prefabricated foundation pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN105970993B (en) The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN110485468A (en) A kind of water rich strata presets the permanent round-seal reservoir and its construction method of push pipe door opening
CN106759295A (en) The quiet combined pile and its construction method for boring extruding-enlarging branch tray and pile tube
CN103343534A (en) Closed precipitation method for foundation pit construction
CN101666088A (en) Construction method of large-diameter expanded bore pile based on PCC pile
CN102220764A (en) Deep foundation pit bracing system and construction method thereof
CN209958408U (en) Underground structure using row piles to resist groundwater buoyancy
CN108396728B (en) Construction device and construction method of multifunctional pipe pile for sea filling and island building and capable of draining water
CN106638646A (en) Secondary bottom sealing structure of open caisson and construction method
CN103114602A (en) Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method
CN110984352A (en) Steel shell type reinforced concrete water collecting well structure of soft soil foundation pump station and construction method thereof
CN212656252U (en) A new type of transmission line tower foundation
CN208578025U (en) A construction device for multifunctional pipe piles used for reclamation and island construction
CN210086253U (en) A composite pile structure for water-rich and ultra-thick sand and pebble foundation pits
CN209603148U (en) A kind of breast wall apparatus of bored concrete pile
CN105625435B (en) Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method
CN203559413U (en) End-expanded type long spiral drilling hole pressure pouring pile and construction device thereof
CN106592586A (en) Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof
CN206319314U (en) A kind of additional cuff back-up sand building stones prefabricated pile
CN206570799U (en) A kind of grouting behind shaft or drift lining end cone formula bored concrete pile
CN201908303U (en) Square frame-shaped steel cavity concrete cast-in-situ well sinking protecting wall
CN101200900A (en) Construction method of water-stopping combined continuous wall prefabricated by centrifugal process
CN206110155U (en) Open caisson secondary back cover structure
CN112252312A (en) Construction method for enhancing integral stress performance of PHC pipe pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100310