CN105625435B - Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method - Google Patents

Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method Download PDF

Info

Publication number
CN105625435B
CN105625435B CN201410595308.5A CN201410595308A CN105625435B CN 105625435 B CN105625435 B CN 105625435B CN 201410595308 A CN201410595308 A CN 201410595308A CN 105625435 B CN105625435 B CN 105625435B
Authority
CN
China
Prior art keywords
section
foundation
zhi
molding method
shaped equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410595308.5A
Other languages
Chinese (zh)
Other versions
CN105625435A (en
Inventor
于淼
邱战武
於东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201410595308.5A priority Critical patent/CN105625435B/en
Publication of CN105625435A publication Critical patent/CN105625435A/en
Application granted granted Critical
Publication of CN105625435B publication Critical patent/CN105625435B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

A kind of sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method, it is characterised in that comprise the following steps:A excavation of foundation pit, the antitemplate of b branch and c cast C20 concrete, 24 hours can form removal, the formwork of basic side completes, and foundation ditch shaping is firm.Sea product island multi-section, the multi-level special-shaped equipment deep basal pit quick molding method of the present invention have solves the problems, such as section it is more, it is high and low layered more than special-shaped Equipment Foundations formwork difficulty; Zhi Fanmo Concrete Filled methods; complicated foundation formwork is set to become simple easy and Zhi Fanmo quick; also solidify quickly after Concrete Filled; foundation pit walls can be closed rapidly; ensure that foundation ditch shaping is fast, open-assembly time is short, the advantages of improving efficiency of construction.

Description

Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method
Technical field
The present invention relates to a kind of construction method of deep foundation ditch for installing equipment, specifically, be it is a kind of on sea product island Area's multi-section, multi-level special-shaped equipment deep basal pit quick molding method.
Background technology
Zhanjiang East Sea Island geological stratification accumulates island for sea, and geological stratification is mud area, whaleback region in region(Flour sand area)、 Small part is clay and flour sand mixed zone, has the violent rain of strong gale to attack often on island, is highly detrimental to deep foundation pit construction.Because flour sand is dredged Pine, mobility feature, it is extremely fragile using mortar bank protection, mortar bank protection often because when heavy rain is to attack flour sand flowing cause side slope failure, The characteristics of always following high wind because of heavy rain again, also it is turned over quickly with plastic cloth covering is domatic.It is more, high and low layered particularly with section More and crisscross complicated foundations(Such as uncoiling, coiling machine, planisher basis), and carry what is cheated in deeper hole in hole Basis, because formwork is complicated, difficulty is big, cycle length, foundation ditch be present and collapse risk.
The present inventor team disclosed a kind of underground depth base in Chinese patent CN102817372A on December 12nd, 2012 Plinth concrete reverse construction method, be directed to foundation ditch it is narrow can not formwork when with concrete foundation under reverse method construction ground.Should The underground deep foundation concrete reverse construction method of invention, which has to increase among adjacent construction of structures, builds new deep foundation, excavates The advantages of neighbouring construction of structures is not subjected to displacement and destroyed is can guarantee that during construction.The present inventor team further creates on this basis Newly, to adapt to multi-section, multi-level complicated foundation quick template supporting needs, consolidate foundation ditch and reduce foundation ditch open-assembly time.
The content of the invention
The purpose of the present invention, it is to propose that a kind of solution section is more, high and low layered more special-shaped Equipment Foundations formwork is difficult Topic, set become simple readily sea product island multi-section, multi-level abnormal shape of complicated foundation formwork with Concrete Filled with Zhi Fanmo Standby deep basal pit quick molding method.
It is another object of the present invention to propose that a kind of Zhi Fanmo fast, after Concrete Filled can close rapidly by fast solidify Foundation pit walls, it is ensured that foundation ditch shaping is fast, open-assembly time is short, improves the sea product island multi-section of efficiency of construction, multi-level special-shaped equipment Deep basal pit quick molding method.
A kind of sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method, it is characterised in that including with Lower step:
A, excavation of foundation pit
First by basis top outline position unwrapping wire excavation, point 2~3 grades of slopes are excavated, when machinery is dug to close special-shaped basis Stop excavating during the absolute altitude of bottom, measure again, the sideline of sole plate, each section of dell is accurately released, the sideline is branch The datum line of antitemplate, then by different high and low layered, manually continue to cut the earth in measurement, after digging absolute altitude, in plane position Putting from sideline to expand outward digs wide to 500mm, and the width is arranged to reverse concrete thickness;
B, branch antitemplate
Supporting module on sideline in step a, make width 500mm between template and the soil body, with steel pipe, wood on the inside of basis Side and the unilateral drawknot of chevron card are fixed, and with brace bracing reinforcement;It is padded that 100mm hassock blocks are continued to use under template, make reverse coagulation Soil is connected with bed course, and one-time-concreting is completed;
C, pour into a mould C20 concrete, 24 hours can form removal, the formwork of basic side completes, and foundation ditch shaping is firm.
Sea product island multi-section, the multi-level special-shaped equipment deep basal pit quick molding method of the present invention can also use following Technical measures further realize.
Foregoing method, wherein in the step a, mechanical shoveling can be aided with when manually continuing and cut the earth in measurement, but need Pay close attention to backbreak.
After adopting the above technical scheme, sea product island multi-section, the multi-level special-shaped equipment deep basal pit of the present invention are rapid-result soon Type method has advantages below:
1st, solve the problems, such as that section is more, high and low layered more special-shaped Equipment Foundations formwork difficulty, Zhi Fanmo Concrete Filleds Method, complicated foundation formwork is set to become simple easy;
2nd, Zhi Fanmo is quick, also solidifies quickly after Concrete Filled, can close foundation pit walls rapidly, it is ensured that foundation ditch shaping is fast, Open-assembly time is short, improves efficiency of construction.
Brief description of the drawings
Fig. 1 is the template erection structural representation of the branch antitemplate of the embodiment of the present invention.
In figure:1 foundation ditch, 2 steel pipes, 3 flitches, 4 templates, 5 reverse concrete, 6 soil bodys, 7 bed courses.
Embodiment
With reference to embodiments and its accompanying drawing illustrates further to the present invention.
Embodiment 1
Sea product island multi-section, the multi-level special-shaped equipment deep basal pit quick molding method of the present invention, it is characterised in that bag Include following steps:
A, excavation of foundation pit
First excavated by basis top outline position unwrapping wire, such basis is big and deep, and excavation must divide 2~3 grades of slopes, work as machine Tool stops excavating when digging to close to special-shaped basic bottom absolute altitude, measures again, and the sideline in each section such as sole plate, dell is accurate Release, this sideline is the datum line of branch antitemplate, then by different high and low layered, manually continues to cut the earth in measurement(Can It is aided with mechanical shoveling, but need to pays close attention to backbreak), after digging absolute altitude, on plan-position from sideline outward expand digging to The wide left and right of 500mm(This is the thickness of reverse concrete).
B, branch antitemplate
Referring now to Fig. 1, Fig. 1 is the template erection structural representation of the branch antitemplate of the embodiment of the present invention.In previous step Supporting module on rapid sideline, make width 500mm or so between template and the soil body, steel pipe, flitch and chevron card are used on the inside of basis Unilateral drawknot is fixed, and with brace bracing reinforcement;It is padded that 100mm hassock blocks are continued to use under template, reverse concrete is connected with bed course Logical, one-time-concreting is completed, and speed is faster.
C, pour into a mould C20 concrete, 24 hours or so can form removal, the formwork of basic side completes, and foundation ditch shaping is firm.
The present invention has substantive distinguishing features and a significant technological progress, sea product island multi-section of the invention, different at many levels The innovative point of type equipment deep basal pit quick molding method is at following three aspects:
1st, take Zhi Fanmo different without working face from the narrow foundation ditch in CN102817372A patents, operating mode of the present invention, which has, appoints The working face for size of anticipating, for no other reason than that crisscross basic section can not shape quickly after making excavation of foundation pit, it is especially loose The factor such as silty sand ground and rain drop erosion causes instability of foundation pit, formwork difficulty, flower duration, and uses Zhi Fanmo fill concretes With fast shaping and it can consolidate.
2nd, CN102817372A patents are directed to and once beat the basis that concrete can just be completed, and the present invention is directed to large complicated depth Basis, 2~3 ability need to be divided to have broken concrete, Zhi Fanmo is only used in the substructure such as hole in the bottom plate of deep foundation, hole, on Portion's foundation structure still routinely Zhi Zhengmo.
3rd, CN102817372A patents use C10 concrete, but need to be mixed as firm foundation ditch with the higher C20 of intensity Solidifying soil.
Above example is used for illustrative purposes only, rather than limitation of the present invention, the technology people about technical field Member, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, it is all equivalent Technical scheme should also belong to scope of the invention, should be limited by each claim.

Claims (2)

1. a kind of sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method, it is characterised in that including following Step:
A, excavation of foundation pit
First by basis top outline position unwrapping wire excavation, point 2~3 grades of slopes are excavated, when machinery is dug to close special-shaped basic bottom mark Stop excavating when high, measure, the sideline of sole plate, each section of dell is accurately released, the sideline is Zhi Fanmo again The datum line of plate, then by different high and low layered, manually continue to cut the earth in measurement, after digging absolute altitude, on plan-position From sideline outward expand dig it is wide to 500mm, the width is arranged to reverse concrete thickness;
B, branch antitemplate
Supporting module on sideline in step a, make width 500mm between template and the soil body, on the inside of basis with steel pipe, flitch and The unilateral drawknot of chevron card is fixed, and with brace bracing reinforcement;It is padded that 100mm hassock blocks are continued to use under template, make reverse concrete with Bed course is connected, and one-time-concreting is completed;
C, pour into a mould C20 concrete, 24 hours can form removal, the formwork of basic side completes, and foundation ditch shaping is firm;
Wherein:Multi-section, multi-level special-shaped equipment deep basal pit operating mode have the working face of arbitrary size, because crisscross basis Section can not shape quickly after making excavation of foundation pit, especially loose silty sand ground and rain drop erosion factor cause instability of foundation pit, Formwork is difficult, flower duration, and uses Zhi Fanmo fill concretes fast shaping and consolidate:For large complicated deep foundation, 2 need to be divided ~3 ability have broken concrete, and Zhi Fanmo is only used in the bottom plate of deep foundation, hole and cheats substructure, and middle and upper part foundation structure is still Routinely Zhi Zhengmo.
2. product island multi-section in sea as claimed in claim 1, multi-level special-shaped equipment deep basal pit quick molding method, its feature It is, in the step a, mechanical shoveling can be aided with when manually continuing and cut the earth in measurement, but need to pay close attention to backbreak.
CN201410595308.5A 2014-10-30 2014-10-30 Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method Active CN105625435B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410595308.5A CN105625435B (en) 2014-10-30 2014-10-30 Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410595308.5A CN105625435B (en) 2014-10-30 2014-10-30 Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method

Publications (2)

Publication Number Publication Date
CN105625435A CN105625435A (en) 2016-06-01
CN105625435B true CN105625435B (en) 2018-02-16

Family

ID=56040745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410595308.5A Active CN105625435B (en) 2014-10-30 2014-10-30 Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method

Country Status (1)

Country Link
CN (1) CN105625435B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518703B (en) * 2019-01-15 2021-07-02 内蒙古工业大学 Microbial mineralization and cementation treatment fluid and treatment method of sandy slope
CN109576193B (en) * 2019-01-15 2021-06-18 内蒙古工业大学 Microbial remediation liquid and application method thereof in protection of sandy foundation pit slope

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160557A (en) * 1998-11-27 2000-06-13 Taisei Corp Landslide protection construction method
CN100585094C (en) * 2008-07-18 2010-01-27 华丰建设股份有限公司 Construction method of circular deep foundation pit support
CN102031781A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit reinforcing technology from shallow position to deep position for group pit construction
CN102817372A (en) * 2011-06-09 2012-12-12 五冶集团上海有限公司 Construction method of underground deep foundation concrete by reverse formworks
CN103195067A (en) * 2013-03-29 2013-07-10 中国十七冶集团有限公司 Deep foundation pit muddy-silty clay cushion layer construction method

Also Published As

Publication number Publication date
CN105625435A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103195158B (en) Municipal drainage pipeline slurry balance pipe-jacking construction method
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN103758134A (en) Combined double-row pile supporting system and construction method thereof
CN104988907A (en) Construction method of concrete pile
CN104264688A (en) Manual hole digging non-uniform pile support construction technology
CN107313431A (en) Close on not contour foundation ditch method for synchronously constructing
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN102561361A (en) Ultra-deep T-shaped trench-wall pile in soft-toped hard-bottomed soil layer and trench forming method
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN111733842A (en) Cofferdam construction method and cofferdam structure
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN105625435B (en) Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN109779640A (en) A kind of shield launching portal breaking construction method
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN203213131U (en) Open caisson combining water drainage sinking and water-drainage-free sinking
CN104563104A (en) Linkage type wall protecting device for pile driving drilling machine and construction method for using linkage type wall protecting device for pile driving drilling machine
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant