CN101660296B - 连续梁悬臂浇筑混凝土0#块支撑方法 - Google Patents
连续梁悬臂浇筑混凝土0#块支撑方法 Download PDFInfo
- Publication number
- CN101660296B CN101660296B CN2009101872853A CN200910187285A CN101660296B CN 101660296 B CN101660296 B CN 101660296B CN 2009101872853 A CN2009101872853 A CN 2009101872853A CN 200910187285 A CN200910187285 A CN 200910187285A CN 101660296 B CN101660296 B CN 101660296B
- Authority
- CN
- China
- Prior art keywords
- steel
- shelf bracket
- iron
- bar
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
连续梁悬臂浇筑混凝土0#块支撑方法,其步骤如下:1)制作三角托架:每个三角托架由水平杆、斜撑,槽钢竖撑、槽钢斜撑、加强钢板和加强钢板I组成;2)预埋支撑:每组支撑由预埋钢板、平钢板、三个立钢板、预埋钢筋和钢筋网组成;3)预埋精轧螺纹钢筋:每四根精轧螺纹钢筋为一组,每根精轧螺纹钢筋外面套装PVC管,每组精轧螺纹钢筋两端装钢箱及加强钢板II,用螺帽紧固,将四组精轧螺纹钢筋水平排列,预埋在墩帽混凝土中;4)安装三角托架:将三角托架中的水平杆分别焊接在钢箱和加强钢板II上,三角托架中的斜撑焊接在支撑中的平钢板上;优点:该方法不占用桥下空间,所用材料较钢管支架用量少,结构简便,易于安装、拆卸。
Description
技术领域:本发明创造是用于跨越公路、铁路或河流的桥梁工程中悬臂浇筑钢筋混凝土连续梁0#块支撑方法。
背景技术;随着技术进步及新材料的应用,大跨度的混凝土连续梁被广泛运用在跨越公路、铁路、河流的桥梁工程中。在连续梁悬臂浇筑施工过程中,0#块作为墩顶上部的梁体结构,是挂篮的反力作用点和安装挂篮的作业平台。0#块的混凝土必需在搭设的支架平台上进行浇筑。按照以前的施工方法,施工平台采用钢管支架,将支架搭设在承台或临时浇筑的混凝土基础上,这种方法使用的支架材料比较多,并且仅适用于高度较低的桥梁,对于高墩桥梁钢管支架非常不经济,并且搭设困难,支架刚度难以保证。
发明内容:本发明创造的目的是提供一种节省支架材料,搭设方便的连续梁悬臂浇筑混凝土0#块支撑方法;本发明创造的目的是通过下述的方法实现的:连续梁悬臂浇筑混凝土0#块支撑方法,其步骤如下:
1)、制作三角托架:每个三角托架由三角托架工字钢水平杆、三角托架工字钢斜撑,三角托架槽钢竖撑、三角托架槽钢斜撑、加强钢板和加强钢板I组成,三角托架工字钢斜撑上端与三角托架工字钢水平杆焊接,构成三角形,在三角托架工字钢斜撑与三角托架工字钢水平杆之间焊接三角托架槽钢竖撑和三角托架槽钢斜撑,在三角托架工字钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆两侧焊接加强板,在三角托架槽钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆的两侧焊接加强板I;
2)、预埋支撑:每组支撑由预埋钢板、平钢板、三个立钢板、预埋钢筋和钢筋网组成,将三个立钢板上端与平钢板焊接,将三个立钢板侧端与预埋钢板焊接,将预埋钢筋与预埋钢板焊接,钢筋网与预埋钢板平行,钢筋网安放三层,并将支撑中的预埋钢筋和钢筋网预埋在墩身的混凝土中;
3)预埋精轧螺纹钢筋:每四根精轧螺纹钢筋为一组,每根精轧螺纹钢筋外面套装PVC管,每组精轧螺纹钢筋一端装钢箱,用螺帽紧固,另一端装加强钢板II,用螺帽紧固,将四组精轧螺纹钢筋水平排列,预埋在墩帽混凝土中,其中中间的两组精轧螺纹钢筋与两边的两组精轧螺纹钢筋两端对调;
4)、安装三角托架:将步骤1)制成的三角托架焊接在支撑中的平钢板和步骤3)中的钢箱及加强钢板II上;即三角托架中的三角托架工字钢水平杆分别焊接在钢箱和加强钢板II上,三角托架中的三角托架工字钢斜撑焊接在支撑中的平钢板上。
本发明创造的优点:该方法不占用桥下空间,所用材料较钢管支架用量少,结构简便,易于安装、拆卸。
附图说明:
图1是连续梁悬臂浇筑混凝土0#块支撑方法构成的支撑结构示意图;
图2是图1的左视示意图;
图3是连续梁悬臂浇筑混凝土0#块支撑方法中构成的钢箱与精轧螺纹钢筋安装示意图。
图中的:1、0#块混凝土2、支撑垫木3、三角托架工字钢水平杆4、墩帽5、三角托架工字钢斜撑6、立钢板7、平钢板8、预埋钢板9、精轧螺纹钢筋10、钢箱11、加强钢板II 12、预埋钢筋13、钢筋网14、PVC管15、墩身16、加强钢板17、加强钢板I 18、三角托架槽钢斜撑19、三角托架槽钢竖撑
具体实施方式:连续梁悬臂浇筑混凝土0#块支撑方法,其步骤如下:
1)、制作三角托架:每个三角托架由三角托架工字钢水平杆、三角托架工字钢斜撑,三角托架槽钢竖撑、三角托架槽钢斜撑、加强钢板和加强钢板I组成,三角托架工字钢斜撑上端与三角托架工字钢水平杆焊接,构成三角形,在三角托架工字钢斜撑与三角托架工字钢水平杆之间焊接三角托架槽钢竖撑和三角托架槽钢斜撑,在三角托架工字钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆两侧焊接加强板,在三角托架槽钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆的两侧焊接加强板I;
2)、预埋支撑:每组支撑由预埋钢板、平钢板、三个立钢板、预埋钢筋和钢筋网组成,将三个立钢板上端与平钢板焊接,将三个立钢板侧端与预埋钢板焊接,将预埋钢筋与预埋钢板焊接,钢筋网与预埋钢板平行,钢筋网安放三层,并将支撑中的预埋钢筋和钢筋网预埋在墩身的混凝土中;
3)预埋精轧螺纹钢筋:每四根精轧螺纹钢筋为一组,每根精轧螺纹钢筋外面套装PVC管,每组精轧螺纹钢筋一端装钢箱,用螺帽紧固,另一端装加强钢板II,用螺帽紧固,将四组精轧螺纹钢筋水平排列,预埋在墩帽混凝土中,其中中间的两组精轧螺纹钢筋与两边的两组精轧螺纹钢筋两端对调;
4)、安装三角托架:将步骤1)制成的三角托架焊接在支撑中的平钢板和步骤3)中的钢箱及加强钢板II上;即三角托架中的三角托架工字钢水平杆分别焊接在钢箱和加强钢板II上,三角托架中的三角托架工字钢斜撑焊接在支撑中的平钢板上。
实施例:依哈大客运专线北沙河特大桥施工为例:
每个三角托架由1根用I 56工字钢制成的三角托架工字钢水平杆,1根用I 40工字钢制成的三角托架工字钢斜撑,1根用]40槽钢制成的三角托架槽钢竖撑和1根用]40槽钢制成的三角托架槽钢斜撑组成,其中三角托架工字钢水平杆长为5.5m,三角托架工字钢斜撑长为5.0m,在距三角托架工字钢水平杆一端4.2m处将三角托架工字钢斜撑与三角托架工字钢水平杆焊接,形成约43°夹角,焊缝要求无缺陷、满焊,宽度不于1cm,三角托架槽钢竖撑和三角托架槽钢斜撑是对三角托架加强支撑,考虑到三角托架受力较大,易发生局部扭转变形,在三角托架工字钢水平杆与三角托架工字钢斜撑焊接处,在三角托架工字钢水平杆两侧的1m范围内焊接加强钢板,在三角托架槽钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆的两侧焊接加强板I;加强钢板和加强钢板I采用2cm厚的钢板,制成长1m、宽与三角托架工字钢水平杆等高的构件。
在浇筑墩身时,根据设计高度预埋支撑,预埋支撑前先制完支撑,每组支撑由预埋钢板、平钢板、三个立钢板、预埋钢筋和钢筋网组成,在预埋钢板的一面焊接长度为0.5m的Φ25预埋钢筋,间距为0.1m,预埋钢筋与预埋钢板焊接时要求为双侧焊缝,每侧焊缝长度不小于5cm,在预埋钢筋中分别设置三层Φ10钢筋网,钢筋网在0.5m长的 预埋钢筋上平行预埋钢板安放三层,防止墩身混凝土被局部压裂,将三个立钢板上端与平钢板焊接,将三个立钢板一个侧端与预埋钢板焊接,将支撑中的预埋钢筋和钢筋网预埋在墩身的混凝土中。
在浇筑墩帽时,根据设计高度预埋精轧螺纹钢筋,每四根精轧螺纹钢筋为一组,采用Φ32精轧螺纹钢筋,每根精轧螺纹钢筋外面套装Φ50mmPVC管,便于拆卸精轧螺纹钢筋,每组精轧螺纹钢筋一端装钢箱,用螺帽紧固,钢箱的结构尺寸为0.66m×0.4m×0.2m的无盖箱体,采用20mm厚钢板焊接成,将箱口朝向精轧螺纹钢筋端头方向安装,每组精轧螺纹钢筋另一端装加强钢板II,用螺帽紧固,将四组精轧螺纹钢筋水平排列,预埋在墩帽混凝土中,其中中间的两组精轧螺纹钢筋与两边的两组精轧螺纹钢筋两端对调。
安装三角托架时,将预先制好的三角托架吊装在预埋支撑中的平钢板上和预埋精轧螺纹钢筋中的钢箱及加强钢板II上,将三角托架工字钢水平杆与钢箱焊接,将三角托架工字钢斜撑与平钢板焊接,要求满焊焊接,焊缝宽度不小于1cm。当三角托架安装就位焊接牢固后,按照设计的张力张拉精轧螺纹钢筋。此时支撑安装完毕。此方法还在福厦客运专线、八担立交桥、太子河特大桥等多处连续梁施工中得到应用。
这种方法不占用桥下空间,所用材料较钢管支架用量少,结构简便,易于安装、拆卸。
Claims (1)
1.连续梁悬臂浇筑混凝土0#块支撑方法,其步骤如下:
1)、制作三角托架:每个三角托架由三角托架工字钢水平杆、三角托架工字钢斜撑,三角托架槽钢竖撑、三角托架槽钢斜撑、加强钢板和加强钢板I组成,三角托架工字钢斜撑上端与三角托架工字钢水平杆焊接,构成三角形,在三角托架工字钢斜撑与三角托架工字钢水平杆之间焊接三角托架槽钢竖撑和三角托架槽钢斜撑,在三角托架工字钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆两侧焊接加强板,在三角托架槽钢斜撑与三角托架工字钢水平杆焊接处的三角托架工字钢水平杆的两侧焊接加强板I;
2)、预埋支撑:每组支撑由预埋钢板、平钢板、三个立钢板、预埋钢筋和钢筋网组成,将三个立钢板上端与平钢板焊接,将三个立钢板侧端与预埋钢板焊接,将预埋钢筋与预埋钢板焊接,钢筋网与预埋钢板平行,钢筋网安放三层,并将支撑中的预埋钢筋和钢筋网预埋在墩身的混凝土中;
3)预埋精轧螺纹钢筋:每四根精轧螺纹钢筋为一组,每根精轧螺纹钢筋外面套装PVC管,每组精轧螺纹钢筋一端装钢箱,用螺帽紧固,另一端装加强钢板II,用螺帽紧固,将四组精轧螺纹钢筋水平排列,预埋在墩帽混凝土中,其中中间的两组精轧螺纹钢筋与两边的两组精轧螺纹钢筋两端对调;
4)、安装三角托架:将步骤1)制成的三角托架焊接在支撑中的平钢板和步骤3)中的钢箱及加强钢板II上;即三角托架中的三角托架工字钢水平杆分别焊接在钢箱和加强钢板II上,三角托架中的三角托架工字钢斜撑焊接在支撑中的平钢板上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101872853A CN101660296B (zh) | 2009-09-08 | 2009-09-08 | 连续梁悬臂浇筑混凝土0#块支撑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101872853A CN101660296B (zh) | 2009-09-08 | 2009-09-08 | 连续梁悬臂浇筑混凝土0#块支撑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101660296A CN101660296A (zh) | 2010-03-03 |
CN101660296B true CN101660296B (zh) | 2011-01-26 |
Family
ID=41788539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101872853A Expired - Fee Related CN101660296B (zh) | 2009-09-08 | 2009-09-08 | 连续梁悬臂浇筑混凝土0#块支撑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101660296B (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102051859B (zh) * | 2010-12-14 | 2012-05-30 | 中铁大桥局集团第二工程有限公司 | 悬浇连续梁桥0号块与下部结构同步快捷施工方法及装置 |
CN102505636B (zh) * | 2011-10-28 | 2014-09-10 | 中铁十六局集团有限公司 | 一种双薄壁墩连续刚构桥0号块施工方法 |
CN103374885A (zh) * | 2012-04-13 | 2013-10-30 | 中铁十局集团第五工程有限公司 | 一种穿孔对拉铰支座型托架 |
CN102691266B (zh) * | 2012-06-03 | 2014-04-16 | 中交第四公路工程局有限公司 | 桥梁边跨现浇段超高组合支架施工方法 |
CN102953344B (zh) * | 2012-12-12 | 2015-01-07 | 广东省长大公路工程有限公司 | 爬锥式三角悬臂支架 |
CN103382700B (zh) * | 2013-06-03 | 2015-05-06 | 四川公路桥梁建设集团有限公司 | 适应大宽度单边变宽箱梁施工的移动模架主梁装置及其操作方法 |
CN103452049B (zh) * | 2013-09-15 | 2015-08-19 | 中铁一局集团有限公司 | 桥墩顶现浇混凝土施工用牛腿支架 |
CN104894980B (zh) * | 2015-04-09 | 2017-03-08 | 中铁第五勘察设计院集团有限公司 | 一种装配式倾角可调自落架墩旁托架及其施工方法 |
CN104831639B (zh) * | 2015-05-13 | 2016-10-12 | 中建六局土木工程有限公司 | 一种超宽变截面连续梁0#块固结及解除施工方法 |
CN105226593A (zh) * | 2015-09-26 | 2016-01-06 | 国网青海省电力公司 | 一种输电线卡头支持架 |
CN106049298B (zh) * | 2016-07-22 | 2018-02-27 | 北京中交桥宇科技有限公司 | 桥梁加固装置及其安装方法 |
CN108677722A (zh) * | 2018-05-23 | 2018-10-19 | 五冶集团上海有限公司 | 空心薄壁高墩柱墩顶段施工工艺 |
CN109468953A (zh) * | 2018-10-22 | 2019-03-15 | 广西路桥工程集团有限公司 | 一种t型盖梁施工方法 |
CN110593099B (zh) * | 2019-08-12 | 2021-10-29 | 中铁十局集团第五工程有限公司 | 一种桥梁施工支撑托架 |
CN110700102B (zh) * | 2019-10-12 | 2024-01-09 | 重庆建工建筑产业技术研究院有限公司 | 一种预应力钢结构前拉后锁现浇平台施工方法 |
CN111364371B (zh) * | 2020-04-03 | 2021-09-24 | 朱云龙 | 一种用于路桥施工的高架桥梁托举装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1580413A (zh) * | 2003-08-08 | 2005-02-16 | 北京建达道桥咨询有限公司 | 无落地支架的连续刚构桥边跨合拢的方法 |
CN101210419A (zh) * | 2007-12-21 | 2008-07-02 | 中铁大桥局股份有限公司 | 小半径曲线混凝土箱梁施工用内外梁系统造桥机及其施工方法 |
CN101413251A (zh) * | 2008-11-21 | 2009-04-22 | 中国葛洲坝集团股份有限公司 | 高墩大跨连续刚构桥0号块防裂施工方法 |
-
2009
- 2009-09-08 CN CN2009101872853A patent/CN101660296B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1580413A (zh) * | 2003-08-08 | 2005-02-16 | 北京建达道桥咨询有限公司 | 无落地支架的连续刚构桥边跨合拢的方法 |
CN101210419A (zh) * | 2007-12-21 | 2008-07-02 | 中铁大桥局股份有限公司 | 小半径曲线混凝土箱梁施工用内外梁系统造桥机及其施工方法 |
CN101413251A (zh) * | 2008-11-21 | 2009-04-22 | 中国葛洲坝集团股份有限公司 | 高墩大跨连续刚构桥0号块防裂施工方法 |
Non-Patent Citations (1)
Title |
---|
李志明等.挂篮在预应力混凝土连续梁悬臂浇筑施工中的应用.《工业建筑》.2002,第32卷(第1期), * |
Also Published As
Publication number | Publication date |
---|---|
CN101660296A (zh) | 2010-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101660296B (zh) | 连续梁悬臂浇筑混凝土0#块支撑方法 | |
CN201473892U (zh) | 连续梁悬臂浇筑混凝土0#块支撑装置 | |
CN101824800B (zh) | 一种桥位现浇预应力混凝土连续梁的施工方法 | |
CN203904851U (zh) | 一种连续梁边跨直线段吊架系统 | |
JP5302195B2 (ja) | 橋の折曲げ工法 | |
CN102888815A (zh) | 一种大角度v型墩及0#块箱梁的浇筑施工方法 | |
CN202347446U (zh) | 钢筋混凝土连续梁零号块施工支撑结构 | |
CN202954299U (zh) | 用于连续刚构桥的大角度v型墩及0#块模板的支撑结构 | |
CN105839516B (zh) | 一种桥梁横向防落梁装置及其施工方法 | |
CN102277835A (zh) | 单柱盖梁采用抱箍与三角支架组合体系施工方法 | |
CN202830785U (zh) | 高墩桥梁悬臂浇筑混凝土0#块墩顶托架 | |
CN103233426A (zh) | 一种软基中无支墩的贝雷梁支架及其支护方法 | |
CN103835238B (zh) | 一种高墩斜拉桥0号块无支架施工方法及施工中的结构 | |
CN203795315U (zh) | 一种高墩斜拉桥0号块无支架施工结构 | |
CN104562944B (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 | |
CN106758839A (zh) | 一种墩顶现浇节段施工的支架体系及其安装方法 | |
CN209907208U (zh) | 波形钢腹板连续梁桥边跨合拢现浇支架结构 | |
CN205711703U (zh) | 一种桥梁横向防落梁装置 | |
CN211815595U (zh) | 用于索塔的下塔柱拉压结构 | |
CN209584813U (zh) | 框架桥系统 | |
CN201786040U (zh) | 一种适用于钢筋混凝土板梁的临时支撑结构 | |
CN112323647B (zh) | 刚构桥挂篮悬浇体系及其施工方法 | |
CN204530507U (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 | |
CN201924600U (zh) | 梁式转换层现浇大梁施工模板支撑系统 | |
CN203113908U (zh) | 围墙与广告牌合一全装配结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110126 Termination date: 20210908 |