CN101655336A - 一种加氢反应流出物空冷器系统注水的优化方法 - Google Patents

一种加氢反应流出物空冷器系统注水的优化方法 Download PDF

Info

Publication number
CN101655336A
CN101655336A CN200910101294A CN200910101294A CN101655336A CN 101655336 A CN101655336 A CN 101655336A CN 200910101294 A CN200910101294 A CN 200910101294A CN 200910101294 A CN200910101294 A CN 200910101294A CN 101655336 A CN101655336 A CN 101655336A
Authority
CN
China
Prior art keywords
water
delta
water injection
hydrogenation reaction
optimization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910101294A
Other languages
English (en)
Other versions
CN101655336B (zh
Inventor
偶国富
郑智剑
曹晶
洪惠芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sci Tech University ZSTU
Original Assignee
Zhejiang Sci Tech University ZSTU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sci Tech University ZSTU filed Critical Zhejiang Sci Tech University ZSTU
Priority to CN2009101012946A priority Critical patent/CN101655336B/zh
Publication of CN101655336A publication Critical patent/CN101655336A/zh
Application granted granted Critical
Publication of CN101655336B publication Critical patent/CN101655336B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

本发明公开一种加氢反应流出物空冷器系统注水的优化方法。包括注水点的优化、注水方式的优化和注水量的优化部分。通过DCS控制系统数据库读取加氢反应流出物空冷器系统的运行参数,结合加氢反应流出物空冷器系统的化验分析数据,针对加氢反应流出物空冷器系统变工况运行过程NH4Cl和NH4HS的沉积温度,结合空冷器的出入口温度和加氢反应流出物注水前后的相对湿度,对注水点、注水方式和注水量进行优化,避免因NH4Cl和NH4HS的沉积所引发的REAC系统管道和管束的垢下腐蚀和局部冲蚀,供操作人员对REAC系统的注水进行优化,有效避免REAC系统失效引发的非计划停工事故,确保REAC系统的安全、稳定、长周期运行。

Description

一种加氢反应流出物空冷器系统注水的优化方法
技术领域
本发明涉及石油化工领域,具体地说是一种加氢反应流出物空冷器系统注水的优化方法。
背景技术
加氢裂化是重质油轻质化的核心技术,是石化企业中重要的二次加工手段。近年来,高质量、高柴汽比的产品结构需求变化进一步促进了加氢技术的迅速发展。自从加氢裂化工艺投用以来,加氢反应流出物冷却过程中的铵盐(NH4Cl和NH4HS)的流动沉积腐蚀一直是石化企业难以解决的问题。为了防止铵盐在换热管束和设备中的结晶和沉积,通常在加氢反应流出物空冷器(简称REAC)系统上游注入冲洗水,洗去沉积的铵盐。然而,高浓度的铵盐水溶液又会导致严重的冲蚀失效。因此,REAC系统注水的优化操作方法一直是国内外石化企业关注的焦点。
对于易发生铵盐沉积的REAC系统,若注水点位于铵盐的沉积部位之上,则无法有效洗去沉积的铵盐,将导致管束的堵塞、相关设备的换热效率下降和REAC系统的压降的上升,增加了设备失效的风险;若REAC系统的注水方式不当,在苛刻工况下,将会造成间歇性的局部腐蚀,形成管束测厚的盲区,给装置的防腐工作增加了很大的难度;若REAC系统的注水量不足,或由于工艺原因造成液态水分布不均匀,则形成的高浓度铵盐水溶液在较高的流速下会对管束造成严重的冲蚀。然而,注水量过多,又会增加装置的能耗,浪费水资源。
因此,只有对REAC系统的注水点、注水方式和注水量进行优化操作,才能有效避免加氢反应流出物冷却过程中铵盐的沉积和冲蚀问题。2004年美国石油协会出版的API 932-B规范中对REAC系统注水的水质,注水系统的设计、REAC出入口管道的分布和管束材质的选用做了相关规定。然而,其研究成果主要来源于腐蚀现象的统计分析和工作人员的操作经验,尤其是对含氯原料油加工导致REAC失效的腐蚀机理的研究不够明确,缺乏对NH4Cl结晶沉积的定量分析。并且,对于劣质含酸原料油加工的苛刻工况,缺乏有效的控制手段。因此,因铵盐沉积导致REAC系统腐蚀泄漏的事故依然时有发生。
为了有效控制REAC系统的泄漏、爆管、着火等事故,减少非计划停工所造成的经济损失,保证石化企业安全、稳定、长周期运行,亟需设计建立一种加氢反应流出物空冷器系统注水的优化操作方法,为现场的操作人员提供可靠的操作依据,有效避免REAC系统的失效。
发明内容
本发明的目的在于提供一种加氢反应流出物空冷器系统注水的优化方法,根据DCS控制系统数据库读取加氢反应流出物空冷器系统的运行参数,结合系统化验分析数据,对REAC系统的注水点、注水方式和注水量进行优化,有效避免因铵盐(NH4C1和NH4HS)的沉积所引发的REAC系统管道和管束的垢下腐蚀和局部冲蚀,可供现场操作人员对REAC系统的注水进行优化操作,有效避免REAC系统失效引发的非计划停工事故,确保REAC系统的安全、稳定、长周期运行。
为实现上述目的,本发明解决其技术问题所采用的技术方案是:
本发明包括注水点的优化、注水方式的优化和注水量的优化共三个部分;其中:
1)注水点的优化包括以下步骤:
a)通过DCS控制系统数据库读取加氢反应流出物空冷器系统原料进料量和循环氢摩尔流量,结合原料油原始化验分析数据获取S含量、循环氢中H2S含量、N含量和Cl含量,分别计算得出H2S、NH3和HCl的摩尔流量;
b)通过DCS控制系统数据库读取低分干气摩尔流量和加氢反应流出物空冷器系统的操作压力,结合本步骤a)获得的循环氢摩尔流量和H2S、NH3及HCl的摩尔流量,确定H2S、NH3和HCl的分压;
c)根据H2S和NH3的分压,计算反应生成的NH4HS沉积温度系数
Figure A20091010129400051
结合NH4HS沉积温度曲线,确定NH4HS沉积温度
Figure A20091010129400052
根据HCl和NH3的分压,计算反应生成的NH4Cl沉积温度系数
Figure A20091010129400053
结合NH4Cl沉积温度曲线,确定NH4Cl的沉积温度
Figure A20091010129400054
d)通过DCS控制系统数据库读取加氢反应流出物空冷器系统入口温度Ti、出口温度Tj、入口温度变化最大值ΔT1和出口温度变化最大值ΔT2,若 T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS > ( T j - &Delta;T 2 ) , 则在位置1处设置一个注水点;若 T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta;T 2 ) , 则加氢反应流出物空冷器系统不设置注水点;若 T NH 4 Cl > ( T i - &Delta;T 1 ) , T NH 4 HS > ( T j - &Delta;T 2 ) , 则在位置1和2处同时设置一个注水点;若 T NH 4 Cl > ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta;T 2 ) , 则在位置2处设置一个注水点;
2)注水方式的优化包括以下步骤:
a)通过DCS控制系统数据库读取注水点的平均温度,结合饱和水蒸汽的绝对压力表,用插值法确定注水点处饱和水蒸汽的绝对压力;通过DCS控制系统数据库读取循环氢摩尔流量、低分干气摩尔流量和系统的操作压力,结合原料油原始化验分析数据获取加氢装置液态水含量,计算得出注水前水蒸汽的分压;
b)通过注水点处饱和水蒸汽的绝对压力和注水前水蒸汽的分压,确定加氢反应流出物注水前的相对湿度R.H.;若R.H.>10%,且 T NH 4 Cl < ( T i - &Delta;T 1 ) , 则采用连续式注水;若R.H.>10%, T NH 4 Cl < ( T i - &Delta;T 1 ) T NH 4 HS > ( T j - &Delta;T 2 ) , 则采用连续式注水;若R.H.>10%, T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta;T 2 ) , 则采用间歇式注水;若R.H.<10%,且 T NH 4 Cl > ( T i - &Delta;T 1 ) , 则采用间歇式注水;若R.H.<10%, T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS > ( T j - &Delta;T 2 ) , 则采用连续式注水;若R.H.<10%, T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta;T 2 ) , 则采用间歇式注水;
3)注水量的优化包括以下步骤
a)通过DCS控制系统数据库读取加氢反应流出物空冷器系统的实际注水量,结合系统的操作压力、循环氢摩尔流量和低分干气摩尔流量,计算得出注水后水蒸汽的分压;
b)根据注水点处的饱和水蒸汽的绝对压力和本步骤a)中注水后水蒸汽的分压,确定加氢反应流出物注水后的相对湿度R.H.′,若R.H.′>125%,则实际注水量保持不变;若R.H.′<125%,则需提高实际注水量,直至注水后的相对湿度高于125%;
c)通过DCS控制系统数据库,读取原料进料量,结合原料油原始化验分析数据获取N含量,计算得出NH4HS的质量流量;根据步骤a)中实际注水量,结合NH4HS的质量流量,确定含硫污水中NH4HS的质量浓度;若含硫污水中NH4HS的质量浓度小于4%,则实际注水量保持不变;若NH4HS的质量浓度大于4%,则需提高实际注水量,直至注水点处NH4HS的浓度低于4%;
d)比较本步骤b)和c)中获得的实际注水量的值,取两者中的较大值作为注水量。
本发明具有的有益效果是:
本发明包括注水点的优化、注水方式的优化和注水量的优化,可有效避免因铵盐(NH4Cl和NH4HS)的沉积导致REAC管道和管束的垢下腐蚀和局部冲蚀,减少REAC系统非计划停工事故的发生,确保REAC系统的安全、稳定、长周期运行。最大限度提高企业的经济效益。
附图说明
图1是加氢反应流出物空冷器系统的工艺流程图。
图2是注水点优化的流程图。
图3是注水方式优化的流程图。
图4是注水量优化的流程图。
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
如图1所示,加氢反应流出物从反应器中流出,经5台换热器和8台空冷器(编号A~H)进行冷却后,在高压分离器中进行三相分离。其中,循环氢从顶部分离,含硫污水由底部排出,冷高分油直接进入低压分离器,二次分离后产生低分干气和进入分馏装置的烃类。
由于加氢反应流出物中含有HCl、NH3、H2S等杂质,在冷却过程中易生成腐蚀性的铵盐(NH4HS和NH4Cl)。铵盐的沉积不仅会堵塞换热器和空冷器管束,吸湿后还会导致严重的垢下腐蚀和局部冲蚀。由于铵盐易溶于水,因此工艺上通常采用在空冷器及其上游的换热器前注入冲洗水,溶解并洗去沉积的铵盐。
根据空冷器进出口温度、换热器操作温度以及铵盐的沉积温度,可确定合适的注水点,位置1表示在最后一台换热器与空冷器之间注水,位置2表示在最后一台换热器之前注水。在铵盐沉积位置前注入冲洗水,是控制加氢反应流出物空冷器系统腐蚀失效的重要手段。
如图2所示,注水点的优化包括以下步骤:
a)通过DCS控制系统数据库1读取加氢反应流出物空冷器系统原料进料量2和循环氢摩尔流量3,结合原料油原始化验分析数据4获取S含量、循环氢中H2S含量、N含量和Cl含量,分别计算得出H2S、NH3和HCl的摩尔流量;
b)通过DCS控制系统数据库1读取低分干气摩尔流量5和加氢反应流出物空冷器系统的操作压力6,结合本步骤a)获得的循环氢摩尔流量3和H2S、NH3及HCl的摩尔流量,确定H2S、NH3和HCl的分压;
c)根据H2S和NH3的分压,计算反应生成的NH4HS沉积温度系数
Figure A20091010129400071
结合NH4HS沉积温度曲线,确定NH4HS沉积温度
Figure A20091010129400072
根据HCl和NH3的分压,计算反应生成的NH4Cl沉积温度系数
Figure A20091010129400073
结合NH4Cl沉积温度曲线,确定NH4Cl的沉积温度
d)通过DCS控制系统数据库1读取加氢反应流出物空冷器系统入口温度Ti11、出口温度Tj12、入口温度变化最大值ΔT113和出口温度变化最大值ΔT214,若 T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS > ( T j - &Delta;T 2 ) , 则选择结果1,在位置1处设置一个注水点;若 T NH 4 Cl < ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta;T 2 ) , 则选择结果2,加氢反应流出物空冷器系统不设置注水点;若 T NH 4 Cl > ( T i - &Delta;T 1 ) , T NH 4 HS > ( T j - &Delta;T 2 ) , 则选择结果3,在位置1和2处同时设置一个注水点;若 T NH 4 Cl > ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta;T 2 ) , 则选择结果4,在位置2处设置一个注水点;
如图3所示,注水方式的优化包括以下步骤:
a)通过DCS控制系统数据库1读取注水点平均温度15,结合饱和水蒸汽的绝对压力表,用插值法确定注水点处饱和水蒸汽的绝对压力16;通过DCS控制系统数据库1读取循环氢摩尔流量3、低分干气摩尔流量5和系统的操作压力6,结合原料油原始化验分析数据4获取加氢装置液态水含量17,计算得出注水前水蒸汽的分压18;
b)通过注水点处饱和水蒸汽的绝对压力16和注水前水蒸汽的分压18,确定加氢反应流出物注水前的相对湿度R.H.19;若R.H.>10%,且 T NH 4 Cl > ( T i - &Delta;T 1 ) , 则采用连续式注水;若R.H.>10%, T NH 4 Cl < ( T i - &Delta;T 1 ) T NH 4 HS > ( T j - &Delta;T 2 ) , 则采用连续式注水;若R.H.>10%, T NH 4 Cl < ( T i - &Delta;T 1 ) T NH 4 HS < ( T j - &Delta;T 2 ) , 则采用间歇式注水;若R.H.<10%,且 T NH 4 Cl > ( T i - &Delta;T 1 ) , 则采用间歇式注水;若R.H.<10%, T NH 4 Cl < ( T i - &Delta;T 1 ) T NH 4 HS > ( T j - &Delta;T 2 ) , 则采用连续式注水;若R.H.<10%, T NH 4 Cl < ( T i - &Delta;T 1 ) T NH 4 HS < ( T j - &Delta;T 2 ) , 则采用间歇式注水;
如图4所示,注水量的优化包括以下步骤
a)通过DCS控制系统数据库1读取加氢反应流出物空冷器系统的实际注水量20,结合系统的操作压力6、循环氢摩尔流量3和低分干气摩尔流量5,计算得出注水后水蒸汽的分压21;
b)根据注水点处的饱和水蒸汽的绝对压力16和本步骤a)中注水后水蒸汽的分压21,确定加氢反应流出物注水后的相对湿度R.H.′22,若R.H.′>125%,则实际注水量保持不变;若R.H.′<125%,则需提高实际注水量,直至注水后的相对湿度高于125%;
c)通过DCS控制系统数据库1,读取原料进料量2,结合原料油原始化验分析数据4获取N含量,计算得出NH4HS的质量流量23;根据步骤a)中实际注水量20,结合NH4HS的质量流量23,确定含硫污水中NH4HS的质量浓度24;若含硫污水中NH4HS的质量浓度小于4%,则实际注水量保持不变;若NH4HS的质量浓度大于4%,则需提高实际注水量,直至注水点处NH4HS的浓度低于4%;
d)比较本步骤b)和c)中获得的实际注水量的值,取两者中的较大值作为注水量。
所述的DCS控制系统数据库包括:原料进料量、循环氢摩尔流量、低分干气摩尔流量、空冷器入口温度、出口温度、入口温度变化最大值、出口温度变化最大值、注水点的平均温度、系统的操作压力和实际注水量。
所述的原料油原始化验分析数据包括:原料油中的S含量、N含量和Cl含量,循环氢中H2S的含量、加氢装置液态水的含量。
已知某石化企业加氢裂化装置DCS控制系统数据库包括:加氢反应流出物系统原料进料量Wx180t/h,空冷器入口温度Ti140℃,空冷器出口温度Tj50℃,反应流出物空冷器前注水点的温度Tw150℃,空冷器入口温度变化的最大值ΔT110℃,空冷器出口温度变化的最大值ΔT210℃,加氢反应流出物系统的操作压力Psystem11.2Mpa,加氢反应流出物系统的实际注水量WWr′8t/h,循环氢的摩尔流量mX17182.5kmol/h,低分干气的摩尔流量mX266.96kmol/h。
加氢反应流出物系统原料化验分析数据包括:原料油中S的含量Fs2.0%,原料油中N的含量Fn1000ppm,原料中Cl的含量Fc3ppm,脱硫前循环氢中的H2S含量Fs′3000ppm,加氢装置中的液态水含量Wa650Kg。
查饱和水蒸汽的绝对压力表通过插值法可确定注水点处饱和水蒸汽的绝对压力Psatstm475.72KPa。
饱和水蒸汽的绝对压力表
  温度/℃   绝对压力/KPa
  141   371.53
  142   382.11
  143   392.92
  144   403.98
  145   415.29
  146   426.85
  147   438.67
  148   450.75
  149   463.10
  150   475.72
  151   488.61
  152   501.78
  153   515.23
  154   528.96
一种加氢反应流出物空冷器系统注水的优化操作方法,包括注水点的优化、注水方式的优化和实际注水量的优化三个步骤:
注水点个数和位置的确定包括以下步骤:
a)通过DCS控制系统数据库,读取加氢反应流出物系统原料进料量Wf和循环氢摩尔流量mX1,结合加氢反应流出物系统原料化验分析数据分别确定H2S、NH3和HCl的摩尔流量。
m H 2 S = W f &times; F s ( mwS ) + m X 1 &times; F s &prime; = 134.05 kmol / h
m NH 3 = w f &times; F n ( mwN ) = 12.86 kmol / h
mHCl = w f &times; f c ( mwCl ) = &times; 10 - 2 kmol / h
b)通过DCS控制系统数据库,读取加氢反应流出物系统的操作压力Psystem和低分干气的摩尔流量mX2,结合步骤a)中循环氢的摩尔流量mX1、H2S的摩尔流量mH2S、NH3的摩尔流量mNH3和HCl的摩尔流量mHCl,分别计算加氢反应流出物系统H2S、NH3和HCl的分压。
P H 2 s = m H 2 S m X 1 + m X 2 &times; P system = 207.1 KPa
P NH 3 = m NH 3 m X 1 + m X 2 &times; P system = 19.87 KPa
P HCl = mHCl m X 1 + m X 2 &times; P system = 2.35 &times; 10 - 2 KPa
c)通过步骤中b)得到的H2S的分压NH3的分压
Figure A20091010129400108
和HCl的分压PHCl,确定NH4HS和NH4Cl的沉积温度系数
Figure A200910101294001010
Figure A200910101294001011
K NH 4 HS = P H 2 S &times; P NH 3 = 4.12 &times; 10 3 KP a 2
K NH 4 Cl = P HCL &times; P NH 3 = 0.47 KP a 2
通过NH4HS和NH4Cl的沉积温度曲线,分别确定NH4HS的沉积温度
Figure A200910101294001014
为65℃,NH4Cl沉积温度
Figure A200910101294001015
为210℃。
d)通过DCS控制系统数据库,读取空冷器入口温度Ti,空冷器出口温度Tj。根据步骤c)中得到的NH4HS的沉积温度
Figure A200910101294001016
和NH4Cl的沉积温度
Figure A200910101294001017
确定注水点的个数和位置。
已知
Figure A200910101294001018
应在空冷器前设置一个注水点。
Figure A20091010129400111
应在空冷器上游的换热器增设一个注水点。
注水方式的选择包括以下步骤:
a)通过DCS控制系统数据库,读取空冷器前注水点的温度Tw,查饱和水蒸汽的绝对压力表通过插值可得温度Tw时饱和水蒸汽的绝对压力Psatstm。
当温度为150℃时,饱和水蒸汽的绝对压力Psatstm为475.72KPa。
b)通过DCS控制系统数据库,读取加氢反应流出物系统的操作压力Psystem,循环氢的摩尔流量mX1,低分干气的摩尔流量mX2,结合加氢装置中液态水的含量Wa计算出注水前水相的分压
Figure A20091010129400112
根据注水前水相的分压结合步骤a)中饱和水蒸汽的绝对压力Psatstm,确定加氢反应流出物注水前的相对湿度R.H.。
P H 2 O = W a 18 &times; ( m X 1 + m X 2 ) &times; P system = 55.79 KPa
P H 2 O P satstm = 11.73 %
c)根据步骤b)得到注水前加氢反应流出物气相的相对湿度R.H.=11.73%>10%,且
Figure A20091010129400117
应采用连续式注水。
3)实际注水量的优化包括以下步骤:
a)根据DCS控制系统数据库,读取加氢反应流出物系统的实际注水量WWr′,结合加氢反应流出物空冷器系统的操作压力Psystem,循环氢的摩尔流量mX1,低分干气的摩尔流量mX2,计算出注水后水相的分压
Figure A20091010129400118
P H 2 O &prime; = W W r &prime; 18 &times; ( m X 1 + m X 2 ) &times; P system = 383.6 KPa
b)根据步骤a)中注水后水的分压
Figure A200910101294001110
结合饱和水蒸汽的绝对压力Psatstm,确定加氢反应流出物注水后的相对湿度R.H.′。若相对湿度大于等于125%,则系统的实际注水量符合要求。若相对湿度小于125%,则需提高系统实际注水量至W1,直至相对湿度大于125%。
R . H . &prime; = P H 2 O &prime; P satstm = 144.3 %
因此,系统的实际注水量保持不变。
c)首先,通过DCS控制系统读取原料油的进料量Wf,结合原料中N的含量Fn,计算NH4HS的质量流量
Figure A200910101294001112
其次,根据步骤a)中加氢反应流出物的实际注水量WWr′,结合NH4HS的质量流量
Figure A200910101294001113
确定含硫污水中NH4HS的质量浓度
Figure A20091010129400121
W NH 4 HS = W f &times; F N &times; 51 14 = 655.7 kg / h
C NH 4 HS = W NH 4 HS W W r &prime; &times; 100 % = 8.20 %
含量污水中的NH4HS浓度 C NH 4 HS = 4.0 % < 8.20 % 则提高实际注水量WWr至16.5t/h,直至NH4HS的浓度低于4.0%。
d)比较步骤b)和c)中获得的实际注水量的值,取两者中的较大值作为实际注水量。
上述具体实施方式用来解释说明本发明,而不是对本发明进行限制,在本发明的精神和权利要求的保护范围内,对本发明作出的任何修改和改变,都落入本发明的保护范围。

Claims (3)

1、一种加氢反应流出物空冷器系统注水工艺的优化方法,其特征在于:包括注水点的优化、注水方式的优化和注水量的优化共三个部分;其中:
1)注水点的优化包括以下步骤:
a)通过DCS控制系统数据库(1)读取加氢反应流出物空冷器系统原料进料量(2)和循环氢摩尔流量(3),结合原料油原始化验分析数据(4)获取S含量、循环氢中H2S含量、N含量和Cl含量,分别计算得出H2S、NH3和HCl的摩尔流量;
b)通过DCS控制系统数据库(1)读取低分干气摩尔流量(5)和加氢反应流出物空冷器系统的操作压力(6),结合步骤a)获得的循环氢摩尔流量(3)和H2S、NH3及HCl的摩尔流量,确定H2S、NH3和HCl的分压;
c)根据H2S和NH3的分压,计算反应生成的NH4HS沉积温度系数KNH4HS(7),结合NH4HS沉积温度曲线,确定NH4HS沉积温度TNH4HS(8);根据HCl和NH3的分压,计算反应生成的NH4Cl沉积温度系数KNH4Cl(9),结合NH4Cl沉积温度曲线,确定NH4Cl的沉积温度TNH4Cl(10);
d)通过DCS控制系统数据库(1)读取加氢反应流出物空冷器系统入口温度Ti(11)、出口温度Tj(12)、入口温度变化最大值ΔT1(13)和出口温度变化最大值ΔT2(14),若 T NH 4 Cl < ( T i - &Delta; T 1 ) , T NH 4 HS > ( T j - &Delta; T 2 ) , 则在位置1处设置一个注水点;若 T NH 4 Cl < ( T 1 - &Delta; T 1 ) , T NH 4 HS < ( T j - &Delta; T 2 ) , 则加氢反应流出物空冷器系统不设置注水点;若 T NH 4 Cl > ( T i - &Delta; T 1 ) , T NH 4 HS > ( T j - &Delta; T 2 ) , 则在位置1和2处同时设置一个注水点;若 T NH 4 Cl > ( T i - &Delta;T 1 ) , T NH 4 HS < ( T j - &Delta; T 2 ) , 则在位置2处设置一个注水点;
2)注水方式的优化包括以下步骤:
a)通过DCS控制系统数据库(1)读取注水点平均温度(15),结合饱和水蒸汽的绝对压力表,用插值法确定注水点处饱和水蒸汽的绝对压力(16);通过DCS控制系统数据库(1)读取循环氢摩尔流量(3)、低分干气摩尔流量(5)和系统的操作压力(6),结合原料油原始化验分析数据(4)获取加氢装置液态水含量(17),计算得出注水前水蒸汽的分压(18);
b)通过注水点处饱和水蒸汽的绝对压力(16)和注水前水蒸汽的分压(18),确定加氢反应流出物注水前的相对湿度R.H.(19);若R.H.>10%,且 T NH 4 Cl > ( T i - &Delta; T 1 ) , 则采用连续式注水;若R.H.>10%, T NH 4 Cl < ( T i - &Delta; T 1 ) T NH 4 HS > ( T j - &Delta; T 2 ) , 则采用连续式注水;若R.H.>10%, T NH 4 Cl < ( T i - &Delta; T 1 ) T NH 4 HS < ( T j - &Delta; T 2 ) , 则采用间歇式注水;若R.H.<10%,且 T NH 4 Cl > ( T i - &Delta; T 1 ) , 则采用间歇式注水;若R.H.<10%, T NH 4 Cl < ( T i - &Delta;T 1 ) T NH 4 HS > ( T j - &Delta; T 2 ) , 则采用连续式注水;若R.H.<10%, T NH 4 Cl < ( T i - &Delta; T 1 ) T NH 4 HS < ( T j - &Delta; T 2 ) , 则采用间歇式注水;
3)注水量的优化包括以下步骤
a)通过DCS控制系统数据库(1)读取加氢反应流出物空冷器系统的实际注水量(20),结合系统的操作压力(6)、循环氢摩尔流量(3)和低分干气摩尔流量(5),计算得出注水后水蒸汽的分压(21);
b)根据注水点处的饱和水蒸汽的绝对压力(16)和本步骤a)中注水后水蒸汽的分压(21),确定加氢反应流出物注水后的相对湿度R.H.′(22),若R.H.′>125%,则实际注水量保持不变;若R.H.′<125%,则需提高实际注水量,直至注水后的相对湿度高于125%;
c)通过DCS控制系统数据库(1),读取原料进料量(2),结合原料油原始化验分析数据(4)获取N含量,计算得出NH4HS的质量流量(23);根据步骤a)中实际注水量(20),结合NH4HS的质量流量(23),确定含硫污水中NH4HS的质量浓度(24);若含硫污水中NH4HS的质量浓度小于4%,则实际注水量保持不变;若NH4HS的质量浓度大于4%,则需提高实际注水量,直至注水点处NH4HS的浓度低于4%;
d)比较本步骤b)和c)中获得的实际注水量的值,取两者中的较大值作为注水量。
2、根据权利要求1所述的一种加氢反应流出物空冷器系统注水工艺的优化方法,其特征在于:所述的DCS控制系统数据库包括:原料进料量、循环氢摩尔流量、低分干气摩尔流量、空冷器入口温度、出口温度、入口温度变化最大值、出口温度变化最大值、注水点的平均温度、系统的操作压力和实际注水量。
3、根据权利要求1所述的一种加氢反应流出物空冷器系统注水工艺的优化方法,其特征在于:所述的原料油原始化验分析数据包括:原料油中的S含量、N含量和Cl含量,循环氢中H2S的含量、加氢装置液态水的含量。
CN2009101012946A 2009-07-27 2009-07-27 一种加氢反应流出物空冷器系统注水的优化方法 Expired - Fee Related CN101655336B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101012946A CN101655336B (zh) 2009-07-27 2009-07-27 一种加氢反应流出物空冷器系统注水的优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101012946A CN101655336B (zh) 2009-07-27 2009-07-27 一种加氢反应流出物空冷器系统注水的优化方法

Publications (2)

Publication Number Publication Date
CN101655336A true CN101655336A (zh) 2010-02-24
CN101655336B CN101655336B (zh) 2011-01-12

Family

ID=41709721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101012946A Expired - Fee Related CN101655336B (zh) 2009-07-27 2009-07-27 一种加氢反应流出物空冷器系统注水的优化方法

Country Status (1)

Country Link
CN (1) CN101655336B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881566A (zh) * 2010-06-11 2010-11-10 何巨堂 一种空气冷却器
CN104808614A (zh) * 2015-03-02 2015-07-29 浙江理工大学 防止NH4Cl垢下腐蚀的加氢反应流出物空冷器系统优化方法
CN104826565A (zh) * 2015-03-31 2015-08-12 山东胜星化工有限公司 加氢反应中的防铵盐结晶装置
CN105628729A (zh) * 2015-12-24 2016-06-01 浙江理工大学 加氢反应流出物多相流NH4Cl盐结晶速率的预测方法
WO2017067025A1 (zh) * 2015-10-23 2017-04-27 北京中科诚毅科技发展有限公司 一种脱除结晶盐的方法及其设计方法和用途
CN109882736A (zh) * 2019-03-19 2019-06-14 浙江理工大学 基于pid控制的自适应智能化注水系统
CN110068242A (zh) * 2019-03-19 2019-07-30 浙江理工大学 基于pid控制的自适应智能化注水系统及注水方法
CN110564442A (zh) * 2018-06-06 2019-12-13 中国石油化工股份有限公司 一种蒸馏塔顶工艺防腐自动调控系统
CN110767269A (zh) * 2019-10-31 2020-02-07 中国石油化工股份有限公司 一种注水方式确定方法与装置
CN112786118A (zh) * 2019-11-06 2021-05-11 中国石油化工股份有限公司 存储器、加氢反应流出物的腐蚀风险评估方法、装置及设备

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101231230A (zh) * 2007-08-21 2008-07-30 浙江理工大学 一种加氢反应流出物冷却过程的实时监管系统
CN101225326B (zh) * 2007-12-18 2011-03-23 浙江理工大学 一种加氢反应流出物系统失效控制参数的建模方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881566A (zh) * 2010-06-11 2010-11-10 何巨堂 一种空气冷却器
CN101881566B (zh) * 2010-06-11 2012-07-04 何巨堂 一种空气冷却器
CN104808614A (zh) * 2015-03-02 2015-07-29 浙江理工大学 防止NH4Cl垢下腐蚀的加氢反应流出物空冷器系统优化方法
CN104826565A (zh) * 2015-03-31 2015-08-12 山东胜星化工有限公司 加氢反应中的防铵盐结晶装置
WO2017067025A1 (zh) * 2015-10-23 2017-04-27 北京中科诚毅科技发展有限公司 一种脱除结晶盐的方法及其设计方法和用途
CN105628729A (zh) * 2015-12-24 2016-06-01 浙江理工大学 加氢反应流出物多相流NH4Cl盐结晶速率的预测方法
CN110564442A (zh) * 2018-06-06 2019-12-13 中国石油化工股份有限公司 一种蒸馏塔顶工艺防腐自动调控系统
CN110564442B (zh) * 2018-06-06 2021-07-16 中国石油化工股份有限公司 一种蒸馏塔顶工艺防腐自动调控系统
CN110068242A (zh) * 2019-03-19 2019-07-30 浙江理工大学 基于pid控制的自适应智能化注水系统及注水方法
CN109882736A (zh) * 2019-03-19 2019-06-14 浙江理工大学 基于pid控制的自适应智能化注水系统
WO2020187338A1 (zh) * 2019-03-19 2020-09-24 浙江理工大学 基于pid控制的自适应智能化注水系统的注水方法
CN109882736B (zh) * 2019-03-19 2020-11-20 浙江理工大学 基于pid控制的自适应智能化注水系统
CN110767269A (zh) * 2019-10-31 2020-02-07 中国石油化工股份有限公司 一种注水方式确定方法与装置
CN110767269B (zh) * 2019-10-31 2022-07-12 中国石油化工股份有限公司 一种注水方式确定方法与装置
CN112786118A (zh) * 2019-11-06 2021-05-11 中国石油化工股份有限公司 存储器、加氢反应流出物的腐蚀风险评估方法、装置及设备
CN112786118B (zh) * 2019-11-06 2024-05-03 中国石油化工股份有限公司 存储器、加氢反应流出物的腐蚀风险评估方法、装置及设备

Also Published As

Publication number Publication date
CN101655336B (zh) 2011-01-12

Similar Documents

Publication Publication Date Title
CN101655336B (zh) 一种加氢反应流出物空冷器系统注水的优化方法
CN101639688B (zh) 防止nh4hs冲蚀的加氢反应流出物空冷器系统优化方法
CN104266170A (zh) 热电厂锅炉排污水综合利用方法
CN207112362U (zh) 避免管道堵塞的氮肥装置高压二氧化碳放空系统
CN204939232U (zh) 超临界反应器及超临界反应系统
CA2461215C (en) Method for preventing fouling and corrosion caused by ammonium chloride and ammonium sulphates
Addison et al. Brine silica management at mighty river power, New Zealand
CN101225326B (zh) 一种加氢反应流出物系统失效控制参数的建模方法
US11274049B2 (en) Methods and systems for optimizing corrosion and scale inhibitor injection rates in process plants
CN110065984A (zh) 一种蒸汽锅炉给水除氧剂及其制备方法和除氧方法
CN104262173B (zh) 一种由二甘醇低压法合成二甘醇胺的方法
CN110218579A (zh) 一种加氢反应系统脱氯的方法
CN112499648A (zh) 一种尿素水解疏水余热梯级用能系统及梯级用能方法
CN104808614A (zh) 防止NH4Cl垢下腐蚀的加氢反应流出物空冷器系统优化方法
CN105293523A (zh) 一种酮连氮法水合肼生产原料氨水的连续制备方法
CN209853816U (zh) 催化装置除氧器除氧水ph自动控制装置
CN110218580A (zh) 一种加氢反应流出物脱氯的方法
CN210995655U (zh) 一种管线脱油系统
DE102015003680A1 (de) Treibstoff-Produktionsanlage für Kraftwerke
KR101643045B1 (ko) 열 회수 장치
CN106362428A (zh) 一种低温变换工艺凝液汽提方法
CN203990562U (zh) 多台反应釜串联组成的新型连续反应生产线
CN201903794U (zh) 乙烯装置工艺水酸碱度控制系统
CN106140044A (zh) 一种用于环己酮氨肟化反应的液氨蒸发装置
CN109496340A (zh) 控制核电站的技术电路的设备的腐蚀速率的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110112

Termination date: 20210727

CF01 Termination of patent right due to non-payment of annual fee