CN101648688B - Tunnel double-column piler - Google Patents

Tunnel double-column piler Download PDF

Info

Publication number
CN101648688B
CN101648688B CN200910053823XA CN200910053823A CN101648688B CN 101648688 B CN101648688 B CN 101648688B CN 200910053823X A CN200910053823X A CN 200910053823XA CN 200910053823 A CN200910053823 A CN 200910053823A CN 101648688 B CN101648688 B CN 101648688B
Authority
CN
China
Prior art keywords
entablatrance
column
track adjusting
piler
wheel shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910053823XA
Other languages
Chinese (zh)
Other versions
CN101648688A (en
Inventor
娄文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JINGXING LOGISTICS EQUIPMENT ENGINEERING Co Ltd
JINGXING WAREHOUSING APPARATUS ENGINEERING Co Ltd SHANGHAI
Original Assignee
SHANGHAI JINGXING LOGISTICS EQUIPMENT ENGINEERING Co Ltd
JINGXING WAREHOUSING APPARATUS ENGINEERING Co Ltd SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JINGXING LOGISTICS EQUIPMENT ENGINEERING Co Ltd, JINGXING WAREHOUSING APPARATUS ENGINEERING Co Ltd SHANGHAI filed Critical SHANGHAI JINGXING LOGISTICS EQUIPMENT ENGINEERING Co Ltd
Priority to CN200910053823XA priority Critical patent/CN101648688B/en
Publication of CN101648688A publication Critical patent/CN101648688A/en
Application granted granted Critical
Publication of CN101648688B publication Critical patent/CN101648688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The invention provides a tunnel double-column piler which is characterized in that the tunnel double-column piler comprises a lower guide rail. The upper side of the lower guide rail is provided with two travelling wheel boxes; the upper side of the travelling wheel box is connected with a lower beam; the upper side of the lower beam is provided with two stand columns, and the upper side of the stand column is provided with an upper beam; the upper side of the upper beam is provided with an upper guide rail; a freight carrying table is arranged between stand columns, the upper side of the freight carrying table is provided with a pallet fork, and the freight carrying table is connected with a hauling cable; the hauling cable is connected with a hoisting mechanism arranged at one side of the stand column via a fixed pulley arranged on the upper beam, and the hoisting mechanism and the travelling wheel boxes are respectively connected with an electric cabinet. The invention is characterized in that two sides of the upper beam are respectively connected with an upper beam guide pulley, and the travelling wheel boxes are connected with lower beam guide pulleys. The invention has the advantages that the invention can automatically turn a corner, a piler device can be operated among various tunnels, can effectively improve device efficiency and reasonable goods arrangement and lower the consumption of power resources and realizes the goal of energy saving and emission reduction for enterprises.

Description

A kind of tunnel double-column piler
Technical field
The present invention relates to a kind of tunnel double-column piler; The tiered warehouse facility that is used for all kinds of enterprises; Lane stacker is moved between a plurality of tunnels, the piler equipment of tiered warehouse facility can be utilized fully, belong to tiered warehouse facility turnover equipment technical field.
Background technology
On the tunnel of tiered warehouse facility shelf, carrying cargo with piler at present, generally is on each tunnel, to be equipped with a cover piler equipment; Volume is big but frequency of utilization is not high but some three-dimensional storehouse is used for carrying cargo, and therefore in order to adapt to the actual demand of each business unit, reduces cost input and electric power resource consumption, has developed this turning double-column piler.
Summary of the invention
The purpose of this invention is to provide a kind of double-column piler of turning, on the lower and upper cross-member of piler, increase turning mechanism, lane stacker is turned round between a plurality of tunnels of shelf.
In order to realize above purpose, technical scheme of the present invention provides a kind of tunnel double-column piler, it is characterized in that; Comprise lower guideway, the lower guideway upside is provided with two and walks roller box, walks the roller box upside and connects cross sill; The cross sill upside is provided with two columns, and the column upside is provided with entablatrance, and the entablatrance upside is provided with upper rail; Be provided with loading platform between the column, the loading platform upside is provided with pallet fork, and loading platform connects hauling rope; Hauling rope connects the lifting mechanism be located at column one side via the fixed pulley that is located on the entablatrance, lifting mechanism with walk roller box and be connected electric cabinet respectively, it is characterized in that; The both sides of said entablatrance connect the entablatrance track adjusting wheel respectively, and the said roller box of walking connects the cross sill track adjusting wheel.
Further; Described entablatrance track adjusting wheel comprises first stake body that is fixed on the entablatrance; First stake body is provided with first and dominates to wheel shaft; First leading connects first flap to wheel shaft, and the both sides of first flap are respectively equipped with one first secondary guide wheel shaft, and the first secondary guide wheel shaft connects first track adjusting wheel through clutch shaft bearing.
Described cross sill track adjusting wheel comprises second stake body that is fixed on away on the roller box; Second stake body is provided with second and dominates to wheel shaft; Second leading connects second flap to wheel shaft; The both sides of second flap are respectively equipped with two second secondary guide wheel shafts, and the second secondary guide wheel shaft connects second track adjusting wheel through second bearing.
Piler is bearing in when walking on the guide rail by walking roller box among the present invention, the running of leading in the two sides of guide rail of the track adjusting wheel of entablatrance and cross sill guide wheel device.The present invention is easy to use; Basically need not to change the topology layout of original piler; Thereby make lane stacker from mono-in tunnel operation becoming a set of equipment access goods of can advancing in a plurality of tunnels; Reduce input cost, and reduced power source consumption, improved capacity utilization rate.
The invention has the advantages that piler can be moved between a plurality of tunnels, need not to change the lane stacker original structure, can be widely used on tiered warehouse facility, improved usage ratio of equipment and the consumption that reduces power resource.
Description of drawings
Fig. 1 is a kind of tunnel double-column piler structural representation;
Fig. 2 is an entablatrance guide wheel device structural representation;
Fig. 3 is an entablatrance guide wheel device lateral plan;
Fig. 4 is a cross sill guide wheel device structural representation;
Fig. 5 is a cross sill guide wheel device lateral plan.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
Embodiment
As shown in Figure 1; Be a kind of tunnel double-column piler structural representation, described tunnel double-column piler by entablatrance 1, column 2, loading platform 3, pallet fork 4, lifting mechanism 5, electric cabinet 6, cross sill 7, walk roller box 8, entablatrance track adjusting wheel 9, cross sill track adjusting wheel 10, lower guideway 11, upper rail 12, fixed pulley 13 and hauling rope 14 and form.Lower guideway 11 upsides are provided with two and walk roller box 8, walk roller box 8 upsides and connect cross sill 7, and cross sill 7 upsides are provided with two columns 2; Column 2 upsides are provided with entablatrance 1, and entablatrance 1 upside is provided with upper rail 12, is provided with loading platform 3 between the column 2; Loading platform 3 upsides are provided with pallet fork 4; Loading platform 3 connects hauling ropes 14, and hauling rope 14 connects the lifting mechanism 5 that is located at column 2 one sides via the fixed pulley 13 that is located on the entablatrance 1, lifting mechanism 5 with walk roller box 8 and be connected electric cabinet 6 respectively; The both sides of said entablatrance 1 connect entablatrance track adjusting wheel 9 respectively, and the said roller box 8 of walking connects cross sill track adjusting wheels 10.
As shown in Figure 2; Be entablatrance guide wheel device structural representation, Fig. 3 is its lateral plan, and described entablatrance track adjusting wheel 9 comprises first stake body 15 that is fixed on the entablatrance 1; First stake body 15 is provided with first and dominates to wheel shaft 16; The first leading both sides that connect first flap, 17, the first flaps 17 to wheel shaft 16 are respectively equipped with one first secondary guide wheel shaft 18, the first secondary guide wheel shafts 18 and connect first track adjusting wheel 20 through clutch shaft bearing 19.
As shown in Figure 4; Be cross sill guide wheel device structural representation, Fig. 5 is its lateral plan, and described cross sill track adjusting wheel 10 comprises second stake body 21 that is fixed on away on the roller box 8; Second stake body 21 is provided with second and dominates to wheel shaft 22; The second leading both sides that connect second flap, 23, the second flaps 23 to wheel shaft 22 are respectively equipped with two second secondary guide wheel shaft 24, the second secondary guide wheel shafts 24 and connect second track adjusting wheel 26 through second bearing 25.
During use, the motor drives piler that electric cabinet 6 controls are walked in the roller box 8 moves on lower guideway, and the motor drives loading platform 3 in the electric cabinet 6 control lifting mechanisms 5 goes up and down.First track adjusting wheel 20 is stuck in the both sides of upper rail 12, and second track adjusting wheel 26 is stuck in the both sides of lower guideway 11.When piler when straight way runs to the bend in tunnel gradually; First flap 17 and second flap 23 rotate around first leading the dominating to wheel shaft 22 to wheel shaft 16 and second respectively; Be contained in first track adjusting wheel 20 and second track adjusting wheel 26 on first flap 17 and second flap 23 also around the guide rail movement of bend part; Because first flap 17 and second flap 23 are dominated to wheel shaft 16 and second around first and are dominated to wheel shaft 22 and can rotate by 360 degree; Thereby piler has forwarded another tunnel by under the guiding of first track adjusting wheel 20 and second track adjusting wheel 26 to from a tunnel, and piler has just been accomplished the exercises of getting the stock thing.
Said electric cabinet model is JXDDJ-II, and this electric cabinet has manually, automatic, the online automatic three kinds of modes of unit, selects mode through the touch-screen on the electrical control cubicles, and all modes are all controlled through PLC.Manually be controlled to be the non-normal working mode, generally be used for maintenance of equipment and debugging.The unit automatic guidance is the back work mode that piler carries out unit process.The on-line working mode is main mode of operation, and when piler is assigned job command by the storehouse management computing machine through monitoring equipment, piler carries out operation by instruction to be accomplished the back and return telegram to the higher level, the wait next instruction.Piler has been accomplished the exercises that turn to another tunnel from a tunnel after receiving instruction.
In tiered warehouse facility, use two column turning pilers, can improve the reasonable Arrangement in its equipment effectiveness and goods yard and the consumption of minimizing power resource effectively.

Claims (1)

1. a tunnel double-column piler is characterized in that, comprises lower guideway (11); Lower guideway (11) upside is provided with two and walks roller box (8), walks roller box (8) upside and connects cross sill (7), and cross sill (7) upside is provided with two columns (2); Column (2) upside is provided with entablatrance (1), and entablatrance (1) upside is provided with upper rail (12), is provided with loading platform (3) between the column (2); Loading platform (3) upside is provided with pallet fork (4), and loading platform (3) connects hauling rope (14), and hauling rope (14) connects the lifting mechanism (5) that is located at column (2) one sides via the fixed pulley (13) that is located on the entablatrance (1); Lifting mechanism (5) with walk roller box (8) and be connected electric cabinet (6) respectively; It is characterized in that the both sides of said entablatrance (1) connect entablatrance track adjusting wheel (9) respectively, the said roller box (8) of walking connects cross sill track adjusting wheel (10); Described entablatrance track adjusting wheel (9) comprises first stake body (15) that is fixed on the entablatrance (1); First stake body (15) is provided with first and dominates to wheel shaft (16); First is leading to wheel shaft (16) connection first flap (17); The both sides of first flap (17) are respectively equipped with one first secondary guide wheel shaft (18), and the first secondary guide wheel shaft (18) connects first track adjusting wheel (20) through clutch shaft bearing (19); Described cross sill track adjusting wheel (10) comprises second stake body (21) that is fixed on away on the roller box (8); Second stake body (21) is provided with second and dominates to wheel shaft (22); Second is leading to wheel shaft (22) connection second flap (23); The both sides of second flap (23) are respectively equipped with two second secondary guide wheel shafts (24), and the second secondary guide wheel shaft (24) connects second track adjusting wheel (26) through second bearing (25).
CN200910053823XA 2009-06-25 2009-06-25 Tunnel double-column piler Active CN101648688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910053823XA CN101648688B (en) 2009-06-25 2009-06-25 Tunnel double-column piler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910053823XA CN101648688B (en) 2009-06-25 2009-06-25 Tunnel double-column piler

Publications (2)

Publication Number Publication Date
CN101648688A CN101648688A (en) 2010-02-17
CN101648688B true CN101648688B (en) 2012-05-23

Family

ID=41671044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910053823XA Active CN101648688B (en) 2009-06-25 2009-06-25 Tunnel double-column piler

Country Status (1)

Country Link
CN (1) CN101648688B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102167208B (en) * 2011-03-30 2013-04-10 浙江工商大学 Double-platform stacker applicable to high turnover rate overhead three-dimensional storage system
CN102180326B (en) * 2011-04-06 2014-07-02 深圳市当代通信技术有限公司 Internet of things (IOT) intelligent concentrated storage system based on double-track-shuttling stacking machine
CN102502145A (en) * 2011-09-21 2012-06-20 上海精星物流设备工程有限公司 Climbing type laneway stacker for automatic stereoscopic warehouse
CN202518985U (en) * 2011-12-21 2012-11-07 三一集团有限公司 Stacking machine and guide wheel mechanism thereof
CN102826487A (en) * 2012-05-15 2012-12-19 云南昆船设计研究院 Energy-saving roadway stacker
CN103539039A (en) * 2013-09-13 2014-01-29 合肥井松自动化科技有限公司 Steel wire rope stacking machine
CN104724634A (en) * 2013-12-20 2015-06-24 广西大学 Double-upright type automatic stereoscopic warehouse light-duty stacking machine
CN104477820B (en) * 2014-12-03 2017-07-21 无锡中鼎集成技术有限公司 A kind of horizontal guide sheave pack support for piler
CN105883679A (en) * 2015-01-09 2016-08-24 广西大学 Instructional stacking machine for automatic stereoscopic warehouse
CN105984495B (en) * 2015-03-04 2018-11-27 昆山华恒工程技术中心有限公司 Carrier and for the control system of carrier and the control method of carrier
CN105329598A (en) * 2015-11-26 2016-02-17 北京起重运输机械设计研究院 Combined stand column stacking machine
CN106517036B (en) * 2016-12-16 2018-09-28 温州职业技术学院 A kind of piler
CN107720622B (en) * 2017-10-13 2019-03-19 大连华锐重工集团股份有限公司 A kind of comb-tooth-type lumber jack
CN107827033B (en) * 2017-11-29 2024-03-29 无锡中鼎集成技术有限公司 Cargo carrying platform capable of floating and adjusting running clearance for stacker
CN108945934A (en) * 2018-08-23 2018-12-07 江苏森蓝智能系统有限公司 A kind of copper bar is semi-automatic into library production line
CN109132562A (en) * 2018-10-18 2019-01-04 长春北方化工灌装设备股份有限公司 A kind of explosion-proof piler arrestment mechanism and its braking method
CN110817217B (en) * 2019-10-28 2021-07-30 哈尔滨工大智慧工厂有限公司 Roadway stacker with adjustable body width and control method thereof
CN111017809A (en) * 2020-03-03 2020-04-17 昆明昆船物流信息产业有限公司 Cross beam type stacker and using method thereof
CN113735024A (en) * 2020-05-27 2021-12-03 广东瑞仕格科技有限公司 Stacking machine
CN113233368A (en) * 2021-04-23 2021-08-10 武汉工程大学 Push bench beam type support platform suitable for construction of vertical rectangular pipe curtain of tunnel
CN115353031A (en) * 2022-09-07 2022-11-18 安歌科技(集团)股份有限公司 Guide wheel structure of transfer rail stacker
CN115196468B (en) * 2022-09-15 2022-12-06 山东安大重工机械集团有限公司 Long-track walking type lifting device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002255316A (en) * 2001-02-27 2002-09-11 Murata Mach Ltd Elevating/lowering device
CN2597427Y (en) * 2002-12-29 2004-01-07 太原双塔刚玉股份有限公司 High-speed stacker
CN2644381Y (en) * 2003-10-14 2004-09-29 上海精星物流设备工程有限公司 Tunnel piler
WO2005087648A1 (en) * 2004-03-15 2005-09-22 TGW Transportgeräte GmbH Computer-controlled transport device
JP2006036522A (en) * 2004-07-30 2006-02-09 Hitachi Kiden Kogyo Ltd Stacker crane
CN101037180A (en) * 2006-03-17 2007-09-19 亚仕帝科技股份有限公司 Stack crane and driving control method thereof
CN201553585U (en) * 2009-06-25 2010-08-18 上海精星仓储设备工程有限公司 Laneway piling machine with dual upright posts

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002255316A (en) * 2001-02-27 2002-09-11 Murata Mach Ltd Elevating/lowering device
CN2597427Y (en) * 2002-12-29 2004-01-07 太原双塔刚玉股份有限公司 High-speed stacker
CN2644381Y (en) * 2003-10-14 2004-09-29 上海精星物流设备工程有限公司 Tunnel piler
WO2005087648A1 (en) * 2004-03-15 2005-09-22 TGW Transportgeräte GmbH Computer-controlled transport device
JP2006036522A (en) * 2004-07-30 2006-02-09 Hitachi Kiden Kogyo Ltd Stacker crane
CN101037180A (en) * 2006-03-17 2007-09-19 亚仕帝科技股份有限公司 Stack crane and driving control method thereof
CN201553585U (en) * 2009-06-25 2010-08-18 上海精星仓储设备工程有限公司 Laneway piling machine with dual upright posts

Also Published As

Publication number Publication date
CN101648688A (en) 2010-02-17

Similar Documents

Publication Publication Date Title
CN101648688B (en) Tunnel double-column piler
CN201553585U (en) Laneway piling machine with dual upright posts
CN102602643B (en) Automatic high-density three-dimensional storage system
CN100497155C (en) Tunnel type single-column cargo piling machine
CN109132952A (en) A kind of intelligence trident piler
CN209177372U (en) A kind of man-machine coordination whole process flexibility sorting system
CN205294745U (en) Sheave drive thrust unit
CN201665416U (en) Product conveying equipment
CN109208979A (en) A kind of warehouse style planar movement class mechanical type three-dimensional garage
CN202244998U (en) Climbing type tunnel stacker for automatic three-dimensional bin
CN110161943A (en) A kind of intelligence trident stacking machine control system
CN102701115A (en) Variable-section aisle piler
CN201415676Y (en) Automatic overturn positioning transport trolley
CN104555318A (en) Circulatory transportation system using super capacitor powered car
CN102408069A (en) Rail-type gantry crane
CN208647781U (en) A kind of stereo storage rack rail roadway formula double-column piler
CN208964467U (en) A kind of lifting floor truck
CN108946579A (en) A kind of stereo storage rack rail roadway formula list column piler
CN211811595U (en) Three-dimensional warehousing system of special oil pipe
CN211109261U (en) Robot for classified storage
CN208377611U (en) Four-way walking promotes the container hoisting mechanism that warehouse trucks are carried in logistics
CN209143534U (en) A kind of direct-drive intelligent bridge-type double beam crane
CN210593654U (en) Steel coil transportation system and elevator thereof
CN103523681B (en) Two Beam mobile container handling bridge
CN208964065U (en) A kind of AGV charging elevator frame mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A double column stacker for tunnels

Effective date of registration: 20230612

Granted publication date: 20120523

Pledgee: Bank of Shanghai Limited by Share Ltd. Minhang branch

Pledgor: Shanghai Jingxing Logistics Equipment Engineering Co.,Ltd.

Registration number: Y2023310000241

PE01 Entry into force of the registration of the contract for pledge of patent right