CN101635456B - 输配电网联合状态估计的方法 - Google Patents
输配电网联合状态估计的方法 Download PDFInfo
- Publication number
- CN101635456B CN101635456B CN 200910053612 CN200910053612A CN101635456B CN 101635456 B CN101635456 B CN 101635456B CN 200910053612 CN200910053612 CN 200910053612 CN 200910053612 A CN200910053612 A CN 200910053612A CN 101635456 B CN101635456 B CN 101635456B
- Authority
- CN
- China
- Prior art keywords
- distribution network
- network
- transmission
- outgoing line
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 64
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000004364 calculation method Methods 0.000 claims abstract description 7
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 claims description 3
- 230000007704 transition Effects 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910053612 CN101635456B (zh) | 2009-06-23 | 2009-06-23 | 输配电网联合状态估计的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910053612 CN101635456B (zh) | 2009-06-23 | 2009-06-23 | 输配电网联合状态估计的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101635456A CN101635456A (zh) | 2010-01-27 |
CN101635456B true CN101635456B (zh) | 2013-07-10 |
Family
ID=41594554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910053612 Expired - Fee Related CN101635456B (zh) | 2009-06-23 | 2009-06-23 | 输配电网联合状态估计的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101635456B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101964525B (zh) * | 2010-06-25 | 2013-04-03 | 清华大学 | 一种支持大规模电流量测的配电网状态估计方法 |
CN101924364B (zh) * | 2010-07-23 | 2013-05-01 | 清华大学 | 变电站-调度中心两级分布式电网的非线性状态估计方法 |
CN102255308B (zh) * | 2011-07-15 | 2014-03-12 | 中国电力科学研究院 | 一种配电网正常状态辨识方法 |
CN103199528A (zh) * | 2013-04-18 | 2013-07-10 | 西南交通大学 | 广域电力系统状态估计协调方法 |
CN103887790B (zh) * | 2014-03-05 | 2015-09-16 | 广州供电局有限公司 | 输配电网协同潮流控制方法与系统 |
CN104330678B (zh) * | 2014-11-20 | 2017-08-11 | 国家电网公司 | 一种基于低压配电网三相状态估计的台区用电监测方法 |
CN104456845B (zh) * | 2014-11-21 | 2017-10-17 | 上海卓源节能科技有限公司 | 公用建筑中央空调预开启时间的计算方法 |
CN104931802A (zh) * | 2015-03-26 | 2015-09-23 | 广东电网有限责任公司江门供电局 | 一种出线负荷三相集成保护调控方法 |
CN105071388B (zh) * | 2015-08-14 | 2017-06-13 | 贵州电网公司信息通信分公司 | 一种基于极大似然估计的配电网状态估计方法 |
CN105356456B (zh) * | 2015-11-18 | 2019-02-05 | 中国电力科学研究院 | 一种基于边界节点等值的输配电网联合潮流计算方法 |
CN107171341B (zh) * | 2017-06-15 | 2020-03-17 | 河海大学 | 一种基于分布式计算的输配电网一体化无功优化方法 |
CN109031041B (zh) * | 2018-07-06 | 2023-10-20 | 广东电网有限责任公司广州供电局 | 配电网电压监测装置布点方法与系统 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101271544A (zh) * | 2008-05-04 | 2008-09-24 | 天津市电力公司 | 一种电网中母线负荷的预测方法 |
CN101383511A (zh) * | 2008-10-10 | 2009-03-11 | 清华大学 | 基于数据采集系统量测数据的电力系统状态估计方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3970130B2 (ja) * | 2002-08-28 | 2007-09-05 | 三菱電機株式会社 | 配電系統における分散型電源の連系状態推定方法 |
US7499816B2 (en) * | 2006-12-12 | 2009-03-03 | Abb Research Ltd. | Estimation of real-time power system quantities using time-synchronized measurements |
-
2009
- 2009-06-23 CN CN 200910053612 patent/CN101635456B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101271544A (zh) * | 2008-05-04 | 2008-09-24 | 天津市电力公司 | 一种电网中母线负荷的预测方法 |
CN101383511A (zh) * | 2008-10-10 | 2009-03-11 | 清华大学 | 基于数据采集系统量测数据的电力系统状态估计方法 |
Non-Patent Citations (3)
Title |
---|
JP特开2004-88963A 2004.03.18 |
基于状态估计的电网支路参数估计方法;宁辽逸 等;《中国电机工程学报》;20090105;第29卷(第1期);7-13 * |
宁辽逸 等.基于状态估计的电网支路参数估计方法.《中国电机工程学报》.2009,第29卷(第1期),7-13. |
Also Published As
Publication number | Publication date |
---|---|
CN101635456A (zh) | 2010-01-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101635456B (zh) | 输配电网联合状态估计的方法 | |
CN103001214B (zh) | 一种基于中性点偏移的配电网三相潮流计算方法 | |
CN104820163A (zh) | 一种基于ftu的配电网故障定位方法 | |
CN104078956B (zh) | 适用于含分布式电源的配电网的自适应电流速断保护方法 | |
CN104617576B (zh) | 考虑直流控制特性的多直流馈出交流电网故障计算方法 | |
CN106291258B (zh) | 一种微电网中线路故障的定位方法 | |
CN110880743A (zh) | 一种基于肯德尔秩相关性的风电场站送出线路纵联保护方法 | |
CN110927519A (zh) | 基于μPMU量测值的主动配电网故障定位方法 | |
CN106501667A (zh) | 一种含分布式电源配电网单相断线故障选线方法 | |
CN103487698A (zh) | 一种分布式电源接入配电网的故障分析方法 | |
CN103762594B (zh) | 基于时钟同步数据矩阵的馈线合环冲击电流计算方法 | |
CN109066616A (zh) | 考虑光伏接入的配电网自适应正序电流速断保护整定方法 | |
CN110333394A (zh) | 一种低压配电网线路阻抗估计方法 | |
CN106291046B (zh) | 混压同塔双回线单相跨单相的跨电压故障电流计算方法 | |
CN106549377B (zh) | 一种交直流混联系统机电-电磁暂态混合仿真的交接方法 | |
CN105186586A (zh) | 一种提高交直流混联电网静态电压稳定性的方法 | |
CN105095590A (zh) | 一种基于三序等值阻抗的机电暂态仿真系统的建模方法 | |
CN110165644A (zh) | 一种基于暂态电流时频特性的新能源场站纵联保护方法 | |
CN105305392A (zh) | 适用于含电压控型iidg配电网的短路计算对称分量法 | |
CN109560561B (zh) | 主动配电网三相不对称运行动态仿真方法、系统及存储介质 | |
CN105048445B (zh) | 计及多类型分布式电源的主动配电网三相状态估计方法 | |
CN108134377B (zh) | 一种基于拓扑信息的配电网自适应电流速断保护整定方法 | |
CN115453265B (zh) | 基于故障初期电流波形特征的岛屿微电网故障暂态保护方法 | |
CN105610156B (zh) | 一种多线路并发合环方法 | |
CN110350596A (zh) | 一种用于提高受端电网暂态稳定裕度的机组出力优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD. Effective date: 20130216 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130216 Address after: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building Applicant after: Shanghai Sunrise Power Technology Co., Ltd. Address before: 200233 Shanghai City, Xuhui District Road No. 159 15 Tianzhou room unit 1301 Applicant before: Shanghai Sunrise Power Automation Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130710 Termination date: 20170623 |
|
CF01 | Termination of patent right due to non-payment of annual fee |