CN101572440A CNA2009100248631A CN200910024863A CN101572440A CN 101572440 A CN101572440 A CN 101572440A CN A2009100248631 A CNA2009100248631 A CN A2009100248631A CN 200910024863 A CN200910024863 A CN 200910024863A CN 101572440 A CN101572440 A CN 101572440A
Authority
CN
China
Prior art keywords
test
power grid
stipulations
grid protocol
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100248631A
Other languages
Chinese (zh)
Other versions
CN101572440B (en
Inventor
胡浔惠
王首顶
凌强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN2009100248631A priority Critical patent/CN101572440B/en
Publication of CN101572440A publication Critical patent/CN101572440A/en
Application granted granted Critical
Publication of CN101572440B publication Critical patent/CN101572440B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a power grid protocol analysis and test method, which is characterized by comprising the following steps: 1) listing test items for a power grid protocol test; 2) setting test item weighting for the power grid protocol test; 3) setting automatic test items for the power grid protocol test; 4) testing the protocol; 5) recording in the test process and monitoring in the whole course; and 6) automatically obtaining a test conclusion and automatically printing a test report form. Through the steps, the power grid protocol analysis and test method further strengthens the consistency of communication procedure between various automation manufacturers and various dispatching ends, reduces working time for debugging an automation substation end and a main station end, avoids cycle data transmission protocol defects caused by artificial factors or understanding errors, and is favorable for automation communication procedure software management.

Description

Power grid protocol analysis and method of testing
Technical field
The present invention relates to a kind of power grid protocol analysis and method of testing, belong to technical field of power systems.
Background technology
IEC60870-5-101 (2.0 editions, 2002) and IEC60870-5-104 (1.0 editions, 2000) agreement have been used widely in China since issue.China's power industry has been issued DL634.5101-2002 and DL634.5104-2002 agreement again, and indicates and to be and IEC60870-5-101 (2.0 editions, 2002) and IEC60870-5-104 (1.0 editions, 2000) are adopting by equation.Since this agreement contained remote measurement, remote signalling, remote control, remote regulating, to the time, telemechanical task substantially such as dress, file transfer under the parameter, and the transmission controlling mechanism of IEC60870-5-101/104 is perfect, makes that its range of application is very extensive.It is more that agreement offers user's option, but use personnel for electric power system, and configurable parameter is too many, is difficult for holding the apolegamy of parameter and the selection of application function on the contrary.
According to result for retrieval, finding does not domesticly still have complete protocol analysis, stipulations testing software, and domestic existing similar software is faced with the problem of three aspects: 1, do not have complete comprehensive stipulations test event, the stipulations test event is not configurable; 2, the weight of stipulations test event can not be self-defined, can not test automatically, needs the tester manually to intervene; 3, can only test correct reaction, can not analog communication in various mistakes.
Summary of the invention
Technical problem to be solved by this invention is:
1. further strengthened the consistency of each automation producer and each dispatching terminal signal procedure;
2. reduce the operating time of automation factory station end and main website end debugging;
3. avoid because the telemechanical stipulations defective that artificial origin or misinterpretation produce is beneficial to the management of automated communication program software.
For solving the problems of the technologies described above, the invention provides a kind of power grid protocol analysis and method of testing, it is characterized in that comprising the following steps:
1) list the power grid protocol test items: list all test points that contain stipulations, and all possible errors of analog communication process, according to predefined basis for estimation, judge the result of test individual event automatically;
2) power grid protocol test items weight is set: the heavy method of testing of the right to use, promptly each test event all is provided with weight, comprise and to survey and non-ly must survey item, must survey and have right of veto by one vote, if there is one must survey and do not pass through, whole stipulations test result is not just passed through, the non-item of must surveying can be provided with 1-5 level weight according to important level, calculate the total points of stipulations test at last, can draw the conclusion of stipulations test accurate science, have great practical value by the weight method of testing.
3) the automatic test event of power grid protocol test is set: the tester sets the parameter of automatic test, comprises period that period, mode of operation, the period of remote regulating, remote regulating value, the quality of remote control are described etc., and all test processs are controlled automatically;
4) stipulations are tested;
5) in test process, carry out record, and carry out complete monitoring: whole process is the test process of monitoring stipulations in real time, to the analysis that makes an explanation of stipulations message, mistake to current simulation is pointed out, correct response and wrong message are analyzed and pointed out, and test case and the result to each test event monitors in real time, and recorded message, but the message of inverting is simultaneously recurred test process.
6) obtain test result automatically, automatically printing test is reported list: behind the EOT, automatically draw test result and test detail, comprise each test event weight, whether test, pass through situation, form complete test report, and with the test case warehousing, so that inquiry test record in the past, comprise result, test detail, test process and test packet, and can look back test process.
The beneficial effect that the present invention reached:
Power grid protocol analysis of the present invention, stipulations method of testing by above step, have further been strengthened the consistency of each automation producer and each dispatching terminal signal procedure; Reduce the operating time of automation factory station end and main website end debugging; Avoided because the telemechanical stipulations defective that artificial origin or misinterpretation produce is beneficial to the management of automated communication program software.
Description of drawings
Fig. 1 is power grid protocol analysis and test system structure figure among the present invention;
Fig. 2 is the first stipulations main website test flow chart among the present invention;
Fig. 3 is the second stipulations main website test flow chart among the present invention;
Fig. 4 is the system's main functional modules schematic diagram among the present invention.
Embodiment
Fig. 1 is power grid protocol analysis and test system structure figure among the present invention, system comprises a portable machine, one socket gauge is installed on it to be analyzed and testing software approximately, also comprise a switch and serial ports expansion equipment, first kind of stipulations is serial stipulations, by serial ports expansion equipment, test macro can carry out serial communication with tested substation, carry out the test implementation of first kind of stipulations, second kind of stipulations is network stipulations, can carry out network communication with tested substation by the switch test system, implement the test of second kind of stipulations.
Fig. 4 is the system's main functional modules schematic diagram among the present invention.Described portable machine comprises following functional module:
1.FACE interface: be human-computer interaction interface, can carry out landing of user by this module, system configuration, test configurations, the configuration of test item weights, can on the interface, carry out the control of start-stop to test process, the energy explicit message, browsing data, the alarm when monitoring communication and the real-time condition of test, detailed, the list that outputs test result of test record, test that can also query history provides printing function.
2.Register accreditation process: realize the registering functional of application program sequence number, realize to user's the management and the management of user right.Native system has all been realized rights management to functions such as test, configuration, communications, promptly has the user of this authority just to operate accordingly, has guaranteed the just and seriousness of test process.If the keeper lands increase, deletion that accreditation process can realize user and group, giving of the authority of user and group can be appointed group leader.If group leader lands accreditation process, can realize management to this group membership.If domestic consumer lands accreditation process, can revise the password of oneself and browse oneself authority.
3.Scanner serial communication process: this process is responsible for serial communication, the interpretive analysis of being responsible for first kind of stipulations, the formulation of first kind of stipulations testing scheme, the enforcement of scheme, be responsible for the supervision and the record of first kind of stipulations test process, the acquisition of test result, the output of test result.
4.Trynet1 network communication process: this process is responsible for network communication, the interpretive analysis of being responsible for second kind of stipulations, the formulation of second kind of stipulations testing scheme, the enforcement of scheme, be responsible for the supervision and the record of second kind of stipulations test process, the acquisition of test result, the output of test result.
Fig. 2 is the first stipulations main website test flow chart among the present invention; Fig. 3 is the second stipulations main website test flow chart among the present invention.
Protocol analysis test specific operation process is:
A. move the Register accreditation process, land, add the user who has configuration, tests authority with the system manager.
B. move the FACE interface, land with the user who adds.
C. in the configuration of the enterprising row communication parameter of FACE, test parameter, form template, also the test template of preserving before can be loaded into.
D. guarantee the connection of hardware, when for example carrying out the test of first kind of stipulations, portable machine and serial port device, tested substation physically are communicated with, when carrying out second kind of stipulations test, make on portable machine and switch, the tested substation network to be connected.
E. on FACE, start test, Scanner or Trynet1 that will be relevant according to the automatic pull-up of protocol type of test, and begin test.
F. can the real time monitoring test case on FACE.
G. behind the EOT, hit testing finishes on FACE, the output test case.
In the process of stipulations communication, the correct interpretation of data, normal release and foundation that communication connects, data reissue with fault tolerant mechanism all be very important, if communication product does not have processes complete or inaccurate in these areas, to have a strong impact on communication, even at all can't communication, yet some aspect for stipulations, handling inaccurately can not influence normal communication, thus want the stipulations situation of correct response communication product, just can not be identical to the various test events of stipulations, the weight method of testing that the present invention discloses, the test event of stipulations divided into to survey and non-ly must survey item, must survey normally key item of item, must survey item and all could pass by whole stipulations test result, the non-item of must surveying is provided with 1-5 level weight, and last overall scores equals to survey an achievement and Fei Bi surveys an achievement summation.The stipulations disposal ability that can reflect communication product so truly, accurately, objectively.
A kind of test products is for the test result that draws of energy justice, must reduce artificial factor as much as possible, the power grid protocol automatic test approach is among the present invention: the test event for preparing in advance according to the tester, test parameter, the for example automatically mistake of simulation and the remote control period that needs of test automatically, parameters such as remote regulating period, form testing scheme and testing procedure, one by one test event is tested automatically, and real time monitoring test case, automatically point out current test event, show the current mistake of simulating, according to the logic determines storehouse, draw the correctness of current test event, and provide error reason and correct response, and the tester is come into plain view to whole test process, the tested person also knows the test case of oneself.EOT provides the conclusion and the test detail of test automatically, comprises the message of test process, and whole process is full-automatic, and testing scheme preserved into template, test call to each product is unified template, accomplishes that test process is fair and just, drops to artificial factor minimum.
Power grid protocol analysis of the present invention and method of testing have been avoided the inconsistent problem of variety of protocol interoperability option that in the past occurred in the stipulations debug process; Avoided because the telemechanical stipulations defective that artificial origin or misinterpretation produce also will help the management of automated communication program software; Improved the operating efficiency of grid automation factory station end and main website end, also greatly improved DL634.5101-2002, DL634.5104-2002 agreement application level simultaneously at electrical network.
The present invention is illustrated according to the preferred embodiment, should be appreciated that the foregoing description does not limit the present invention in any form, and all employings are equal to the technical scheme that form obtained of replacement or equivalent transformation, all drop within protection scope of the present invention.

Claims (6)

1. power grid protocol analysis and method of testing is characterized in that: comprise the following steps
1) list the power grid protocol test items: list all test points that contain stipulations, and all possible errors of analog communication process, according to predefined basis for estimation, judge the result of test individual event automatically;
2) power grid protocol test items weight is set;
3) the automatic test event that power grid protocol is tested is set;
4) stipulations are tested;
5) in test process, carry out record, and carry out complete monitoring;
6) obtain test result automatically, automatically printing test report list.
2. power grid protocol analysis according to claim 1 and method of testing, it is characterized in that: in described step 2) in, each test event all is provided with weight, comprise and to survey and non-ly must survey item, must survey and have right of veto by one vote, if there is one must survey and do not pass through, whole stipulations test result is not just passed through, the non-item of must surveying can be provided with 1-5 level weight according to important level, calculates the total points of stipulations test at last.
3. power grid protocol analysis according to claim 1 and method of testing is characterized in that: in described step 3), the parameter of described automatic test comprises the period that period, remote regulating value, the quality of the period of remote control, mode of operation, remote regulating are described.
4. power grid protocol analysis according to claim 1 and method of testing, it is characterized in that: in described step 5), the test process of the omnidistance stipulations of monitoring in real time, to the analysis that makes an explanation of stipulations message, the mistake of current simulation is pointed out, correct response and wrong message are analyzed and pointed out, test case and result to each test event monitors in real time, and recorded message, the message of inverting is simultaneously recurred test process.
5. power grid protocol analysis according to claim 1 and method of testing, it is characterized in that: in described step 6), behind the EOT, automatically draw test result and test is detailed, comprise each test event weight, whether test, by situation, form complete test report, and with the test case warehousing, so that inquiry test record in the past comprises result, test detail, test process and test packet, and can look back test process.
6. power grid protocol analysis according to claim 5 and method of testing is characterized in that: testing scheme is preserved into template, the test call of each product is unified template.
CN2009100248631A 2009-02-27 2009-02-27 Power grid code analysis and test method Active CN101572440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100248631A CN101572440B (en) 2009-02-27 2009-02-27 Power grid code analysis and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100248631A CN101572440B (en) 2009-02-27 2009-02-27 Power grid code analysis and test method

Publications (2)

Publication Number Publication Date
CN101572440A true CN101572440A (en) 2009-11-04
CN101572440B CN101572440B (en) 2011-04-20

Family

ID=41231703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100248631A Active CN101572440B (en) 2009-02-27 2009-02-27 Power grid code analysis and test method

Country Status (1)

Country Link
CN (1) CN101572440B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101969232A (en) * 2010-10-29 2011-02-09 广东电网公司电力科学研究院 Automatic test method and device of power grid video and environment monitoring system
CN102098185A (en) * 2010-11-30 2011-06-15 华中电网有限公司 System for testing consistency of communication protocols of electric energy metering system
CN102624587A (en) * 2012-03-26 2012-08-01 中国电力科学研究院 System and method capable of achieving defect detection for IEC60870-5-101/104 communication protocol
CN102970175A (en) * 2012-02-08 2013-03-13 深圳市金宏威技术股份有限公司 Power distribution network protocol test analytical method and system
CN103095524A (en) * 2012-12-25 2013-05-08 南京国电南自电网自动化有限公司 Automatic testing method of reply type electric power communication protocol based on configuration
CN103368791A (en) * 2013-06-28 2013-10-23 吉林省电力有限公司长春供电公司 Method for rapidly and automatically detecting IEC104 protocol message
CN103730959A (en) * 2013-12-19 2014-04-16 广东电网公司电力科学研究院 Method for testing communication protocols of power distribution network equipment
CN103795146A (en) * 2014-01-26 2014-05-14 国家电网公司 Power distribution terminal conformance testing method
CN103973512A (en) * 2014-04-28 2014-08-06 国家电网公司 Method for detecting power distribution network communication parameters
CN105827469A (en) * 2014-12-29 2016-08-03 国家电网公司 MODBUS TCP implementation defect tester and detection method thereof
CN107547540A (en) * 2017-08-30 2018-01-05 上海许继电气有限公司 The protocol massages monitoring methods of IEC 60,870 5 104
CN108306786A (en) * 2017-12-29 2018-07-20 中国电力科学研究院有限公司 A kind of automatic test approach and system based on WAMS communication protocols
CN114401212A (en) * 2022-01-22 2022-04-26 海南电网有限责任公司电力科学研究院 Method for testing communication protocol of double master stations

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101969232B (en) * 2010-10-29 2012-05-23 广东电网公司电力科学研究院 Automatic test method and device of power grid video and environment monitoring system
CN101969232A (en) * 2010-10-29 2011-02-09 广东电网公司电力科学研究院 Automatic test method and device of power grid video and environment monitoring system
CN102098185A (en) * 2010-11-30 2011-06-15 华中电网有限公司 System for testing consistency of communication protocols of electric energy metering system
CN102970175A (en) * 2012-02-08 2013-03-13 深圳市金宏威技术股份有限公司 Power distribution network protocol test analytical method and system
CN102624587B (en) * 2012-03-26 2015-04-29 中国电力科学研究院 System and method capable of achieving defect detection for IEC60870-5-101/104 communication protocol
CN102624587A (en) * 2012-03-26 2012-08-01 中国电力科学研究院 System and method capable of achieving defect detection for IEC60870-5-101/104 communication protocol
CN103095524A (en) * 2012-12-25 2013-05-08 南京国电南自电网自动化有限公司 Automatic testing method of reply type electric power communication protocol based on configuration
CN103095524B (en) * 2012-12-25 2015-12-23 南京国电南自电网自动化有限公司 A kind of response formula electric power communication protocol automatic test approach based on configuration
CN103368791B (en) * 2013-06-28 2016-08-10 吉林省电力有限公司长春供电公司 A kind of IEC104 protocol massages fast automatic detecting method
CN103368791A (en) * 2013-06-28 2013-10-23 吉林省电力有限公司长春供电公司 Method for rapidly and automatically detecting IEC104 protocol message
CN103730959A (en) * 2013-12-19 2014-04-16 广东电网公司电力科学研究院 Method for testing communication protocols of power distribution network equipment
CN103730959B (en) * 2013-12-19 2015-11-11 广东电网公司电力科学研究院 The communication protocol method of testing of Distribution Network Equipment
CN103795146B (en) * 2014-01-26 2016-02-10 国家电网公司 Distribution terminal conformance test method
CN103795146A (en) * 2014-01-26 2014-05-14 国家电网公司 Power distribution terminal conformance testing method
CN103973512A (en) * 2014-04-28 2014-08-06 国家电网公司 Method for detecting power distribution network communication parameters
CN103973512B (en) * 2014-04-28 2017-02-22 国家电网公司 Method for detecting power distribution network communication parameters
CN105827469A (en) * 2014-12-29 2016-08-03 国家电网公司 MODBUS TCP implementation defect tester and detection method thereof
CN107547540A (en) * 2017-08-30 2018-01-05 上海许继电气有限公司 The protocol massages monitoring methods of IEC 60,870 5 104
CN107547540B (en) * 2017-08-30 2020-06-26 上海许继电气有限公司 IEC-60870-5-104 protocol message monitoring method
CN108306786A (en) * 2017-12-29 2018-07-20 中国电力科学研究院有限公司 A kind of automatic test approach and system based on WAMS communication protocols
CN114401212A (en) * 2022-01-22 2022-04-26 海南电网有限责任公司电力科学研究院 Method for testing communication protocol of double master stations
CN114401212B (en) * 2022-01-22 2023-08-04 海南电网有限责任公司电力科学研究院 Method for testing double-master-station communication protocol

Also Published As

Publication number Publication date
CN101572440B (en) 2011-04-20

Similar Documents

Publication Publication Date Title
CN101572440B (en) Power grid code analysis and test method
CN105785199B (en) Multifunctional ligand electric terminals integrated test system and its working method
CN107402332B (en) Intelligent power distribution terminal multi-meter-position automatic detection system and detection method thereof
CN110427314B (en) Method and system for testing information safety reliability of metering automation terminal
CN113422820B (en) Automatic joint debugging device and method for remote information of main station
CN112701790B (en) Intelligent joint debugging platform and joint debugging method for transformer substation and master station
CN108922641B (en) Periodic test device and method for high-temperature reactor nuclear power station protection system
CN101175285A (en) Automatic testing method and system for mobile phone software
CN104898638B (en) A kind of routine test device of PWR nuclear power plant protection system
CN107257304B (en) Telecontrol point-aligning-free configuration test system
CN208953619U (en) A kind of distribution terminal intelligent checking system
CN109541353A (en) Power distribution automation detection system
CN103869260A (en) Power supply test system and method
WO2015149596A1 (en) Iec61850-based communication simulation method for leakage current on-line monitoring device
CN112737886B (en) Tool testing method and system, electronic equipment and storage medium
CN108512730B (en) Intelligent substation telecontrol system equipment testing method, device and system
WO2015149594A1 (en) Iec61850-based communication simulation method for partial discharge on-line monitoring device
CN104793075A (en) Periodic test system for protection systems for pressurized water reactor nuclear power plants
WO2015149595A1 (en) Iec61850-based communication simulation method for insulation on-line monitoring device
CN105182773A (en) Data detection system and method for run-up test of aeroengine
CN105785170A (en) Intelligent transformer substation oriented data flow panoramic displaying device and intelligent transformer substation oriented data flow panoramic displaying method
CN115967169A (en) Test system and method for intelligent distribution transformer terminal
CN108931694A (en) A kind of distribution terminal intelligent checking system and its detection method
CN116055374A (en) Power distribution automation terminal test system and test control method
CN116599572A (en) Commercial batch satellite single machine intelligent testing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NARI NANJING CONTROL SYSTEM LTD.

Effective date: 20141202

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141202

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee after: NARI Technology Development Co., Ltd.

Patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20