WO2015149594A1 - Iec61850-based communication simulation method for partial discharge on-line monitoring device - Google Patents
Iec61850-based communication simulation method for partial discharge on-line monitoring device Download PDFInfo
- Publication number
- WO2015149594A1 WO2015149594A1 PCT/CN2015/072875 CN2015072875W WO2015149594A1 WO 2015149594 A1 WO2015149594 A1 WO 2015149594A1 CN 2015072875 W CN2015072875 W CN 2015072875W WO 2015149594 A1 WO2015149594 A1 WO 2015149594A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- partial discharge
- iec61850
- alarm
- line monitoring
- simulation method
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/25—Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
- G01R19/2513—Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/2832—Specific tests of electronic circuits not provided for elsewhere
- G01R31/2836—Fault-finding or characterising
- G01R31/2846—Fault-finding or characterising using hard- or software simulation or using knowledge-based systems, e.g. expert systems, artificial intelligence or interactive algorithms
- G01R31/2848—Fault-finding or characterising using hard- or software simulation or using knowledge-based systems, e.g. expert systems, artificial intelligence or interactive algorithms using simulation
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/12—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
- G01R31/1227—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Definitions
- the IEC61850 standard is the latest series of substation communication networks and systems specified by the International Electrotechnical Commission's TC57 Working Group to address new interoperability issues facing substation automation systems.
- the standard has been supported by most mainstream manufacturers at home and abroad, and has become the only unified standard in the field of substation automation in the world. Therefore, it has been widely used in the online monitoring of partial discharge intelligent electronic device communication.
- the step (2) specifically refers to: using the SQL database's on-time column sorting search function to find out each analog data section of a partial discharge analysis.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- General Engineering & Computer Science (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
An IEC61850-based communication simulation method for a partial discharge on-line monitoring device. The method comprises the following steps: (1) starting an IEC61850/MMS communications service by simulation; (2) querying values of analog quantities, pre-stored in an SQL database, of an analysis on a partial discharge on-line monitoring intelligent electronic device to be simulated; (3) generating alarm rules by using preconfigured telemetering limits, and automatically computing corresponding alarm telesignalling states; (4) sending the analog quantities and the alarm telesignalling states in the form of an IEC61850 report; and (5) waiting for the next moment of data sending, and repeating step (2) until all pre-stored data is sent. A common PC can be used to simulate a partial discharge on-line monitoring apparatus, so as to conveniently and flexibly debug and verify advanced applications such as state evaluation on various backgrounds and primary devices, of an intelligent substation, needing to communicate with the on-line monitoring intelligent electronic device.
Description
本发明涉及一种基于IEC61850的局部放电在线监测设备通信仿真方法,属于国际标准《变电站通信网络和系统》(IEC61850)的制造报文规范(MMS)在电力系统变电站自动化系统的应用的领域。The invention relates to a communication simulation method for a partial discharge online monitoring device based on IEC61850, which belongs to the field of application of a manufacturing message specification (MMS) of an international standard "Substation Communication Network and System" (IEC61850) in a power system substation automation system.
IEC61850标准是国际电工委员会TC57工作组针对解决变电站自动化系统面临的互操作新问题最新指定的《变电站通信网络和系统》系列标准。该标准得到国内外大部分主流厂家的支持,成为全球在变电站自动化领域唯一统一的标准,因此在在线监测局部放电智能电子设备通信中也得到越来越广泛的应用。The IEC61850 standard is the latest series of substation communication networks and systems specified by the International Electrotechnical Commission's TC57 Working Group to address new interoperability issues facing substation automation systems. The standard has been supported by most mainstream manufacturers at home and abroad, and has become the only unified standard in the field of substation automation in the world. Therefore, it has been widely used in the online monitoring of partial discharge intelligent electronic device communication.
随着基于IEC61850标准一次设备在线监测在智能变电站的推广和应用,作为智能变电站重要特点的智能高级应用如一次设备健康状态评估等功能也在逐步试点应用中。但即使利用实际的在线监测智能电子设备,也很难对一次设备的故障进行模拟,而且一般在实验室很难具备这种条件,这对于跟踪并发现高级应用的问题造成了很大的困难。另一种方法是使用通用IEC61850/MMS服务端仿真,手动产生遥测、遥信量来模拟在线监测智能电子设备的通信行为,但在线监测智能电子设备发出的各模拟量数据间,模拟量与遥信量数据是尤其内在的逻辑关系的,这种逻辑关系正是模拟一次设备故障的关键所在,通用IEC61850/MMS服务端仿真很难满足相应的要求。因此如何简单高
效地进行在线监测智能电子设备通信仿真模拟,对相关高级应用进行开发调试,以及在工程测试平台上进行验证是一个亟待解决的问题。With the promotion and application of online monitoring of primary equipment based on IEC61850 standard in intelligent substation, intelligent advanced applications such as primary equipment health assessment, which are important features of intelligent substation, are also gradually being applied in pilot applications. But even with the actual online monitoring of intelligent electronic devices, it is difficult to simulate the failure of a primary device, and it is generally difficult to have such conditions in the laboratory, which makes it difficult to track and discover problems of advanced applications. Another method is to use the universal IEC61850/MMS server-side simulation to manually generate telemetry and remote signaling to simulate the online communication of intelligent electronic devices. However, online monitoring of analog data sent by intelligent electronic devices, analog and remote The signal data is especially intrinsic logical relationship. This kind of logical relationship is the key to simulating a device failure. The general IEC61850/MMS server-side simulation is difficult to meet the corresponding requirements. So how simple is it?
Efficient online monitoring of intelligent electronic device communication simulation, development and debugging of related advanced applications, and verification on the engineering test platform is an urgent problem to be solved.
发明内容Summary of the invention
为了克服现有技术中存在的不足,本发明提供一种基于IEC61850的局部放电在线监测设备通信仿真方法,本发明可使用普通PC机建立局部放电在线监测智能电子设备仿真系统,用于代替实际在线监测智能电子设备等,产生一次设备的故障状态的在线监测数据,以对智能变电站自动化系统的一次设备健康状态评估等高级应用进行方便灵活的调试和验证。In order to overcome the deficiencies in the prior art, the present invention provides a communication simulation method for a partial discharge online monitoring device based on IEC61850. The present invention can establish a partial discharge online monitoring intelligent electronic device simulation system using an ordinary PC to replace the actual online Monitor intelligent electronic devices, etc., to generate online monitoring data of the fault status of the equipment, to facilitate and flexibly debug and verify advanced applications such as equipment health assessment of the intelligent substation automation system.
为解决上述技术问题,本发明采用的技术方案为:In order to solve the above technical problems, the technical solution adopted by the present invention is:
一种基于IEC61850的局部放电在线监测设备通信仿真方法,包括如下步骤:A communication simulation method for a partial discharge online monitoring device based on IEC61850, comprising the following steps:
步骤(1):仿真启动IEC61850/MMS通信服务;Step (1): simulate and start the IEC61850/MMS communication service;
步骤(2):查询预存贮于SQL数据库中的待仿真局部放电在线监测智能电子设备某一次分析的各模拟量的值;Step (2): querying the partial discharge to be simulated in the SQL database to monitor the value of each analog quantity of the intelligent electronic device for one analysis;
步骤(3):使用预配置的遥测越限产生告警规则,自动计算对应的告警遥信状态;Step (3): generating a warning rule by using a pre-configured telemetry violation limit, and automatically calculating a corresponding alarm remote signaling state;
步骤(4):以IEC61850报告形式发送各模拟量和告警遥信状态;Step (4): transmitting each analog quantity and alarm remote signal status in the form of IEC61850 report;
步骤(5):等待下次数据发送时刻,重复步骤2,直至所有预存数据发送完毕。Step (5): Wait for the next data transmission time, repeat step 2 until all pre-stored data is transmitted.
所述步骤(2)具体是指:使用SQL数据库的按时标列排序查找功能,查找出某一次局部放电分析的各模拟量数据断面。
The step (2) specifically refers to: using the SQL database's on-time column sorting search function to find out each analog data section of a partial discharge analysis.
所述步骤(3)具体是指:使用预配置的遥测越限产生告警的规则,自动扫描个遥测量的当前模拟值,与各遥测的约越上限或越上上限值进行比较,并根据比较结果对对应的越上限遥信或越上上限遥信进行告警设置。The step (3) specifically refers to: automatically scanning the current analog value of the telemetry by using a pre-configured rule for generating an alarm, and comparing with the upper limit or the upper limit of each telemetry, and according to The comparison result sets an alarm for the corresponding upper limit remote communication or upper limit remote communication.
本发明的有益效果在于,可使用普通PC机建立局部放电在线监测智能电子设备仿真系统,用于代替实际在线监测智能电子设备等,产生一次设备的故障状态的在线监测数据,摆脱了智能变电站一次设备健康状态评等高级应用调试时对实际在线监测智能电子设备的依赖,同时简化了这些高级应用投运前调试工作的复杂度。The invention has the beneficial effects that an ordinary PC can be used to establish a partial discharge online monitoring intelligent electronic device simulation system, which is used to replace the actual online monitoring of intelligent electronic devices, etc., to generate online monitoring data of the fault state of the primary device, and get rid of the intelligent substation once. Equipment health status rating The reliance on actual online monitoring of intelligent electronic devices during advanced application debugging, while simplifying the complexity of debugging these advanced applications before commissioning.
图1为本发明的仿真方法流程示意图。FIG. 1 is a schematic flow chart of a simulation method according to the present invention.
下面结合附图对本发明作更进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.
如图1所示,为一种基于IEC61850的局部放电在线监测设备通信仿真方法,包括如下步骤:步骤(1):仿真启动IEC61850/MMS通信服务;步骤(2):查询预存贮于SQL数据库中的待仿真局部放电在线监测智能电子设备某一次分析的各模拟量的值;步骤(3):使用预配置的遥测越限产生告警规则,自动计算对应的告警遥信状态;步骤(4):以IEC61850报告形式发送各模拟量和告警遥信状态;步骤(5):等待下次数据发送时刻,重复步骤2,直至所有预存数据发送完毕。As shown in FIG. 1 , it is a communication simulation method for a partial discharge online monitoring device based on IEC 61850, comprising the following steps: Step (1): Simulating and starting IEC 61850/MMS communication service; Step (2): Query pre-storing in SQL database The partial discharge to be simulated online monitors the value of each analog quantity of the intelligent electronic device for one analysis; step (3): generates the alarm rule by using the pre-configured telemetry violation limit, and automatically calculates the corresponding alarm remote signal status; step (4) : Send each analog quantity and alarm remote signal status in the form of IEC61850 report; Step (5): Wait for the next data transmission time, repeat step 2 until all pre-stored data is sent.
所述步骤(2)具体是指:使用SQL数据库的按时标列排序查找功能,查找出某一次局部放电分析的各模拟量数据断面。
The step (2) specifically refers to: using the SQL database's on-time column sorting search function to find out each analog data section of a partial discharge analysis.
所述步骤(3)具体是指:使用预配置的遥测越限产生告警的规则,自动扫描个遥测量的当前模拟值,与各遥测的约越上限或越上上限值进行比较,并根据比较结果对对应的越上限遥信或越上上限遥信进行告警设置。The step (3) specifically refers to: automatically scanning the current analog value of the telemetry by using a pre-configured rule for generating an alarm, and comparing with the upper limit or the upper limit of each telemetry, and according to The comparison result sets an alarm for the corresponding upper limit remote communication or upper limit remote communication.
在线监测智能电子设备发出的各模拟量数据间,模拟量与遥信量数据是尤其内在的逻辑关系的,这种逻辑关系正是模拟一次设备故障的关键所在。一次设备故障时个模拟量信息可存贮于支持SQL的数据库中,针对仿真可使用轻量级的进程内数据库如SQLite,每一个遥测量的信息需包括断面序号、逻辑设备名、数据对象引用、遥测值等信息。Online monitoring of analog data sent by intelligent electronic devices, analog and remote signal data is particularly intrinsic logical relationship, this logical relationship is the key to simulate a device failure. An analog data can be stored in a database that supports SQL in the event of a device failure. A lightweight in-process database such as SQLite can be used for simulation. Each telemetry information should include the serial number, logical device name, and data object reference. , telemetry values and other information.
由于IEC61850标准规定其中CID(Configured智能电子设备Description)文件包含了智能电子设备投运时的完整模型信息,仿真可使用实际被仿真设备的已有CID文件,解析获得该设备对外通信的所有信息和配置,启动IEC61850/MMS通信服务。Since the IEC61850 standard stipulates that the CID (Configured Intelligent Electronic Device Description) file contains the complete model information when the intelligent electronic device is put into operation, the simulation can use the existing CID file of the actual simulated device to parse and obtain all the information of the external communication of the device. Configure and start the IEC61850/MMS communication service.
再使用SQL数据库的查找功存贮于数据库中的某一断面的所有遥测量数据,然后使用预配置的遥测越限产生告警的规则,自动扫描个遥测量的当前模拟值,与各遥测的约越上限或越上上限值进行比较,并根据比较结果对对应的越上限遥信或越上上限遥信进行告警设置,以IEC61850报告形式发送各模拟量和告警遥信状态。Then use the SQL database search function to store all the telemetry data of a section in the database, and then use the pre-configured telemetry violation to generate the alarm rule, automatically scan the current analog value of the telemetry, and the telemetry The upper limit or the upper limit is compared, and the corresponding upper limit or upper limit remote message is set according to the comparison result, and each analog quantity and alarm remote signal status is sent in the form of IEC61850 report.
然后判断是否所有预存数据都已发送完毕,如果发送完毕则停止发送;如果还有模拟数据待发送,则进入等待流程,准备进行下一次的故障模拟数据发送。
Then it is judged whether all the pre-stored data has been sent, and if the transmission is completed, the transmission is stopped; if there is still analog data to be sent, the waiting flow is entered, and the next failure simulation data is prepared.
本发明提供的一种基于IEC61850的局部放电在线监测设备通信仿真方法,可使用普通PC机建立局部放电在线监测智能电子设备仿真系统,用于代替实际在线监测智能电子设备等,产生一次设备的故障状态的在线监测数据,摆脱了智能变电站一次设备健康状态评等高级应用调试时对实际在线监测智能电子设备的依赖,同时简化了这些高级应用投运前调试工作的复杂度。The invention provides a communication simulation method for a partial discharge online monitoring device based on IEC61850, which can establish a partial discharge online monitoring intelligent electronic device simulation system using an ordinary PC to replace the actual online monitoring of intelligent electronic devices, etc., to generate a primary device failure. The online monitoring data of the state has got rid of the dependence of the actual on-line monitoring of intelligent electronic equipment during the debugging of the advanced application of the intelligent substation primary equipment health status evaluation, and simplified the complexity of the commissioning work before the commissioning of these advanced applications.
以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润色,这些改进和润色也应视为本发明的保护范围。
The above description is only a preferred embodiment of the present invention, and it should be noted that those skilled in the art can also make several improvements and touches without departing from the principles of the present invention. It should be considered as the scope of protection of the present invention.
Claims (3)
- 一种基于IEC61850的局部放电在线监测设备通信仿真方法,包括如下步骤:A communication simulation method for a partial discharge online monitoring device based on IEC61850, comprising the following steps:步骤(1):仿真启动IEC61850/MMS通信服务;Step (1): simulate and start the IEC61850/MMS communication service;步骤(2):查询预存贮于SQL数据库中的待仿真局部放电在线监测智能电子设备某一次分析的各模拟量的值;Step (2): querying the partial discharge to be simulated in the SQL database to monitor the value of each analog quantity of the intelligent electronic device for one analysis;步骤(3):使用预配置的遥测越限产生告警规则,自动计算对应的告警遥信状态;Step (3): generating a warning rule by using a pre-configured telemetry violation limit, and automatically calculating a corresponding alarm remote signaling state;步骤(4):以IEC61850报告形式发送各模拟量和告警遥信状态;Step (4): transmitting each analog quantity and alarm remote signal status in the form of IEC61850 report;步骤(5):等待下次数据发送时刻,重复步骤(2),直至所有预存数据发送完毕。Step (5): Wait for the next data transmission time, repeat step (2) until all pre-stored data is transmitted.
- 根据权利要求1所述的基于IEC61850的局部放电在线监测设备通信仿真方法,其特征在于:所述步骤(2)具体是指:使用SQL数据库的查找功能,查找出某一次局部放电分析的各模拟量数据断面。The IEC 61850-based partial discharge online monitoring device communication simulation method according to claim 1, wherein the step (2) specifically refers to: using a search function of the SQL database to find a simulation of a partial discharge analysis. Volume data section.
- 根据权利要求1所述的基于IEC61850的局部放电在线监测设备通信仿真方法,其特征在于:所述步骤(3)具体是指:使用预配置的遥测越限产生告警的规则,自动扫描个遥测量的当前模拟值,与各遥测的约越上限或越上上限值进行比较,并根据比较结果对对应的越上限遥信或越上上限遥信进行告警设置。 The IEC 61850-based partial discharge online monitoring device communication simulation method according to claim 1, wherein the step (3) specifically refers to: automatically generating a remote measurement by using a pre-configured remote detection limit to generate an alarm rule. The current analog value is compared with the upper limit or the upper limit of each telemetry, and the corresponding upper limit or upper limit remote alarm is set according to the comparison result.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410136150.5A CN103984795A (en) | 2014-04-04 | 2014-04-04 | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method |
| CN201410136150.5 | 2014-04-04 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2015149594A1 true WO2015149594A1 (en) | 2015-10-08 |
Family
ID=51276764
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2015/072875 WO2015149594A1 (en) | 2014-04-04 | 2015-02-12 | Iec61850-based communication simulation method for partial discharge on-line monitoring device |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN103984795A (en) |
| WO (1) | WO2015149594A1 (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103955564A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based leakage current on-line monitoring equipment communication simulation method |
| CN103984795A (en) * | 2014-04-04 | 2014-08-13 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method |
| CN103955562A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation method for insulation on-line monitoring equipment |
| CN103955563A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation method for transformer grounding on-line monitoring equipment |
| CN103995916A (en) * | 2014-04-04 | 2014-08-20 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based SF6Communication simulation method for gas online monitoring equipment |
| CN103955561A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based lightning arrester on-line monitoring equipment communication simulation method |
| CN105260830B (en) * | 2015-09-30 | 2018-11-09 | 国家电网公司 | A kind of partial discharge intelligent assembly performance estimating method |
| CN105158719B (en) * | 2015-09-30 | 2018-04-03 | 国家电网公司 | A kind of partial discharge intelligent assembly check system and method |
| CN113805019A (en) * | 2021-09-15 | 2021-12-17 | 南方电网数字电网研究院有限公司 | Gateway-based partial discharge detection method, device, gateway device and medium |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102033798A (en) * | 2010-10-20 | 2011-04-27 | 国电南瑞科技股份有限公司 | Method for simulating intelligent electronic device IEC61850/MMS (Microsoft media server) server |
| CN102496072A (en) * | 2011-12-19 | 2012-06-13 | 国电南瑞科技股份有限公司 | System for estimating distributive state of intelligent transformer station |
| CN102929757A (en) * | 2012-11-09 | 2013-02-13 | 南京国电南自电网自动化有限公司 | IEC61850/MMS communication simulation method of protection action event when fault occurs in power system |
| CN103902768A (en) * | 2014-03-25 | 2014-07-02 | 中国南方电网有限责任公司电网技术研究中心 | Communication simulation method for oil chromatography on-line monitoring equipment |
| CN103955561A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based lightning arrester on-line monitoring equipment communication simulation method |
| CN103955562A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation method for insulation on-line monitoring equipment |
| CN103955564A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based leakage current on-line monitoring equipment communication simulation method |
| CN103955563A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation method for transformer grounding on-line monitoring equipment |
| CN103984795A (en) * | 2014-04-04 | 2014-08-13 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method |
| CN103995916A (en) * | 2014-04-04 | 2014-08-20 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based SF6Communication simulation method for gas online monitoring equipment |
| CN103995924A (en) * | 2014-05-05 | 2014-08-20 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103345543A (en) * | 2013-06-08 | 2013-10-09 | 广东电网公司电力科学研究院 | Intelligent substation merging unit simulation modeling method |
-
2014
- 2014-04-04 CN CN201410136150.5A patent/CN103984795A/en active Pending
-
2015
- 2015-02-12 WO PCT/CN2015/072875 patent/WO2015149594A1/en active Application Filing
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102033798A (en) * | 2010-10-20 | 2011-04-27 | 国电南瑞科技股份有限公司 | Method for simulating intelligent electronic device IEC61850/MMS (Microsoft media server) server |
| CN102496072A (en) * | 2011-12-19 | 2012-06-13 | 国电南瑞科技股份有限公司 | System for estimating distributive state of intelligent transformer station |
| CN102929757A (en) * | 2012-11-09 | 2013-02-13 | 南京国电南自电网自动化有限公司 | IEC61850/MMS communication simulation method of protection action event when fault occurs in power system |
| CN103902768A (en) * | 2014-03-25 | 2014-07-02 | 中国南方电网有限责任公司电网技术研究中心 | Communication simulation method for oil chromatography on-line monitoring equipment |
| CN103955561A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based lightning arrester on-line monitoring equipment communication simulation method |
| CN103955562A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation method for insulation on-line monitoring equipment |
| CN103955564A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based leakage current on-line monitoring equipment communication simulation method |
| CN103955563A (en) * | 2014-04-04 | 2014-07-30 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation method for transformer grounding on-line monitoring equipment |
| CN103984795A (en) * | 2014-04-04 | 2014-08-13 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based partial discharge on-line monitoring equipment communication simulation method |
| CN103995916A (en) * | 2014-04-04 | 2014-08-20 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based SF6Communication simulation method for gas online monitoring equipment |
| CN103995924A (en) * | 2014-05-05 | 2014-08-20 | 中国南方电网有限责任公司电网技术研究中心 | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103984795A (en) | 2014-08-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2015149594A1 (en) | Iec61850-based communication simulation method for partial discharge on-line monitoring device | |
| WO2015149593A1 (en) | Iec61850-based communication simulation method for transformer grounding on-line monitoring device | |
| WO2015149596A1 (en) | Iec61850-based communication simulation method for leakage current on-line monitoring device | |
| WO2015149595A1 (en) | Iec61850-based communication simulation method for insulation on-line monitoring device | |
| CN107346917B (en) | Secondary device based on virtual machine integrates joint debugging method | |
| WO2015149592A1 (en) | Iec61850-based communication simulation method for lightning arrester on-line monitoring device | |
| CN103200051B (en) | Intelligent substation message simulation test and associated message analysis system and method | |
| WO2015149597A1 (en) | Iec61850-based communication simulation method for sf6 gas on-line monitoring device | |
| CN202533519U (en) | Fully automatic closed loop test system of protective relaying device | |
| CN107180314B (en) | Operation and maintenance business model modeling method based on primary and secondary system incidence relation | |
| CN103902768A (en) | Communication simulation method for oil chromatography on-line monitoring equipment | |
| WO2015154527A1 (en) | Automatic interlocking logic detection method based on goose communication mechanism | |
| CN103412533B (en) | The mechanical check system of intelligent grid dispatching and monitoring information | |
| CN105160864A (en) | Operating data monitoring system and method for intelligent ammeters | |
| CN107069961A (en) | A kind of transformer station's telemechanical apparatus and the method for regulating and controlling main website remote signalling automated closed-loop joint debugging | |
| CN104483842A (en) | Regulation and control integrated automatic master station comparison method | |
| CN112165167B (en) | A kind of intelligent substation relay protection maintenance auxiliary system and method | |
| CN107608291A (en) | A kind of intelligent substation application function linkage rule verification method and system | |
| CN105093017A (en) | Integrated GOOSE tester of intelligent transformer station and test method of tester | |
| CN104319891A (en) | Overhaul and operation maintenance device and method for intelligent substation process layer | |
| CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
| CN110112830A (en) | A kind of supervisory control of substation information transmission platform | |
| CN106909615A (en) | Data message consistency verification method and device between a kind of main website and substation | |
| CN103676669B (en) | The check method of a kind of telecontrol information and nucleus correcting system | |
| CN103995924A (en) | IEC 61850-based communication simulation device and method for on-line switch monitoring equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15772730 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 22.03.2017) |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 15772730 Country of ref document: EP Kind code of ref document: A1 |