CN101969232B - Automatic test method and device of power grid video and environment monitoring system - Google Patents

Automatic test method and device of power grid video and environment monitoring system Download PDF

Info

Publication number
CN101969232B
CN101969232B CN 201010525844 CN201010525844A CN101969232B CN 101969232 B CN101969232 B CN 101969232B CN 201010525844 CN201010525844 CN 201010525844 CN 201010525844 A CN201010525844 A CN 201010525844A CN 101969232 B CN101969232 B CN 101969232B
Authority
CN
China
Prior art keywords
module
testing
scheme
monitoring system
testing scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010525844
Other languages
Chinese (zh)
Other versions
CN101969232A (en
Inventor
谢善益
刘之尧
赵永发
张飞
高雅
叶千里
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Power Technology Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN 201010525844 priority Critical patent/CN101969232B/en
Publication of CN101969232A publication Critical patent/CN101969232A/en
Application granted granted Critical
Publication of CN101969232B publication Critical patent/CN101969232B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y02B70/3266
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses automatic test method and device of a power grid video and environment monitoring system, which is characterized in that the method comprises the following steps of: switching on the power grid video and environment monitoring system; automatically executing a test scheme stored in advance; and automatically generating a report form containing test results. The invention can have no need of artificial operation in a test process, and once the power grid video and environment monitoring system is switched on, the test scheme is automatically executed, therefore, the stability and the effectiveness of test can be improved.

Description

The automated testing method of electrical network video and environmental monitoring system and device
Technical field
The present invention relates to a kind of method of testing and device, the method for testing and the device of particularly a kind of electrical network video and environmental monitoring system.
Background technology
For guaranteeing the safe operation of electricity grid substation, video and environmental monitoring system are housed usually in the electricity grid substation.With the Guangdong Power Grid is example, and the video of Guangdong Power Grid transformer station and the mechanism of environmental monitoring system comprise provincial main website, local level main website and each station end system (comprising the inner various encoders of station end, transducer etc.); Provincial main websites at different levels link to each other with the local level main website through communication network, and the local level main website links to each other with each station end system again.At present, the equipment that exists many different manufacturers to produce on the market, the equipment of each producer all there are differences.So when the equipment of different manufacturers inserts same system, cause compatibility issue easily, thereby make the system can't operate as normal.Therefore, if can before these equipment access systems, carry out a test, go measurement equipment whether can insert electrical network video and environmental monitoring system with unified standard, just can avoid compatibility issue.And hope that also can test which aspect of the equipment of drawing does not meet standard, so that equipment is transformed, thereby more existing equipment can be utilized.But because in the most method of testing, test process all has the manual operation of adding factor, such as the variation of parameter, and order that scheme is carried out or the like.And the adding of human factor will produce greatly influence for the result who tests, and therefore reduce the stability and the validity thereof of test.
Summary of the invention
The objective of the invention is to, the automated testing method and the device of a kind of electrical network video and environmental monitoring system is provided.It can be to not needing manual operation in the test process that is, in case start, testing scheme automatically performs, and can improve the stability and the validity of test.
Technical scheme of the present invention:
The automated testing method of electrical network video and environmental monitoring system is characterized in that, said method comprises:
Insert electrical network video and environmental monitoring system;
Automatically perform the testing scheme of having stored in advance;
Automatically generate the form of test result.
In the automated testing method of aforesaid electrical network video and environmental monitoring system; The said method that has automatically performed the testing scheme of having stored in advance is: the testing scheme for storage is in advance carried out one by one; After each testing scheme finishes; Trigger the next testing scheme of startup, until executing all testing schemes.
In the automated testing method of aforesaid electrical network video and environmental monitoring system, the method for the form of said automatic generation test result is: after executing all testing schemes, directly trigger startup report generation function, test result is converted into report form.
In the automated testing method of aforesaid electrical network video and environmental monitoring system; Said method also comprises: when testing scheme is carried out; Under virtual unit running environment that is virtually reality like reality, carry out; When the local level main website is tested, virtual unit simulate provincial main website with the station end system to the communication of local level main website; When the station end system is tested, the communication of virtual unit simulation local level master Station To Station end system; When provincial main website was tested, virtual unit simulation local level main website was to the communication of provincial main website.
The electrical network video of said method and the automatic test device of environmental monitoring system before the realization is characterized in that it comprises:
Interface module is used for testing apparatus is connected into electrical network video and environmental monitoring system to be tested;
The scheme memory is used for storing in advance testing scheme.
Executive Module is used for obtaining testing scheme one by one from the scheme memory and tests;
Reports module is used for test result is converted into report form.
In the automatic test device of aforesaid electrical network video and environmental monitoring system, said Executive Module comprises trigger module, is used to trigger Executive Module and obtains next bar testing scheme from the scheme memory, or directly trigger Reports module.
In the automatic test device of aforesaid electrical network video and environmental monitoring system, also comprise a virtual device modules, running environment that is virtually reality like reality when carrying out for testing scheme.
Compared with prior art; The present invention is through store testing scheme one by one; From storage, obtain testing scheme one by one when carrying out test, directly trigger the operation of obtaining next bar testing scheme after executing a testing scheme, so Automatic Cycle; Until having obtained all testing schemes, trigger automatically again and carry out the operation that test result is formed form.All test processs do not have any manual operation, in case start, testing scheme automatically performs, and can improve the stability and the validity of test.Without manual operation, followed the fairness doctrine of test.
Description of drawings
Fig. 1 is the structural representation of electrical network video and environmental monitoring system;
Fig. 2 is a workflow diagram of the present invention;
Fig. 3 is an apparatus structure sketch map of the present invention.
Mark in the accompanying drawing: 1-interface module, 2-scheme memory, 3-Executive Module, 4-Reports module, 5-trigger module, 6-virtual device modules.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further described, but not as the foundation to the present invention's restriction.
Embodiment
Electrical network video and environmental monitoring system (its structure is as shown in Figure 1); Comprise provincial master supervisory system (provincial main website); Provincial master supervisory system is connected with local level master supervisory system (local level main website) through the IP communication network, and the local level master supervisory system is connected with station end supervisory control system through the IP communication network; The end supervisory control system (end system of standing) of standing is used to monitor transformer station's live video and environmental information, and with information uploading to local level master supervisory system; The local level master supervisory system is used to keep watch on the real-time monitor message of a plurality of stations end supervisory control system, and with information uploading to provincial master supervisory system; Provincial master supervisory system is used to keep watch on the real-time monitor message of a plurality of local level master supervisory systems.The end supervisory control system of standing comprises station end processing unit, and the end processing unit of standing is connected with video monitoring equipment, environmental information collecting device, the network equipment and memory device; The end processing unit of standing is used for the real-time processing and the historical information retrieval of video information, voice messaging and environmental information; Video monitoring equipment is used to monitor the real-time video information of transformer station; The environmental information collecting device is used to gather the real time environment information of transformer station; The network equipment is used for carrying out exchanges data, information sharing with higher level or outside; Memory device is used for store video information, environmental information and warning message.The end processing unit of standing also is connected with alarm device, and alarm device comprises station end system software and hardware abnormality alarming and monitoring alarm, and the monitoring alarm comprises environmental information abnormality alarming, fire-fighting alarm, breaks in alarm and video unusual fluctuation alarm.The end processing unit of standing adopts embedded Linux system.Video monitoring equipment comprises network high-speed ball, network middling speed ball and network fixed cameras; The environmental information collecting device comprises temperature sensor, air velocity transducer, humidity sensor, water sensor, SF6 transducer, gate inhibition and infrared correlation probe.Local level master supervisory system and provincial master supervisory system monitoring station end supervisory control system; Be the model of on the transformer station's floor plan that carries with electronic chart, clicking station end supervisory control system primary equipment, keep watch on the multi-angle real-time video of a plurality of video cameras of primary equipment.Local level master supervisory system and provincial master supervisory system also comprise the management of video device, and the manual video recording of Long-distance Control station end supervisory control system, regularly video recording, alarm triggered video recording and picture unusual fluctuation detect video recording.Local level master supervisory system and provincial master supervisory system also comprise the Report Server Management device, realize real time record environmental data, measurement period environmental data and call the history environment data through the form that generates form.
The automated testing method of electrical network video and environmental monitoring system, shown in the step of Fig. 1, this method comprises:
Insert electrical network video and environmental monitoring system;
Automatically perform the testing scheme of having stored in advance;
Automatically generate the form of test result.
The said method that has automatically performed the testing scheme of having stored in advance is: the testing scheme for storage is in advance carried out one by one, after each testing scheme finishes, triggers the next testing scheme of startup, until executing all testing schemes.
The method of the form of said automatic generation test result is: after executing all testing schemes, directly trigger startup report generation function, test result is converted into report form.
Said method also comprises: when testing scheme is carried out, under virtual unit running environment that is virtually reality like reality, carry out, when the local level main website was tested, virtual unit was simulated provincial main website and station end system to the communication of local level main website; When the station end system is tested, the communication of virtual unit simulation local level master Station To Station end system; When provincial main website was tested, virtual unit simulation local level main website was to the communication of provincial main website.
Realize the electrical network video of preceding method and the automatic test device of environmental monitoring system, as shown in Figure 1, it comprises:
Interface module 1 is used for testing apparatus is connected into electrical network video and environmental monitoring system to be tested;
Scheme memory 2 is used for storing in advance testing scheme.
Executive Module 3 is used for obtaining testing scheme one by one from scheme memory 2 and tests;
Reports module 4 is used for test result is converted into report form.
Said Executive Module 3 comprises trigger module 5, is used to trigger Executive Module 3 and obtains next bar testing scheme from scheme memory 2, or directly trigger Reports module 4.
It also comprises a virtual device modules 6, running environment that is virtually reality like reality when carrying out for testing scheme.Virtual device modules 6 is used to simulate provincial master station module, local level main website and station end system; Virtual device modules 6 comprises:
Equipment control generic module (CDevManager) is responsible for virtual unit is managed;
Monitor module (DevListener), when equipment receives, or when sending data, the notice listener makes the upper strata can statistics;
EM equipment module (CDevice) is represented an equipment;
Protocol stack module (CProtocol) is responsible for the parsing work of agreement;
Network port module (CSocket) is responsible for the transmitting-receiving of transport layer data;
Attribute structure phantom piece (Attribute), the attribute of description virtual unit reads from configuration file;
Order feedback arrangement phantom piece (CodeCFG), the behavior that the needs after description equipment receives orders are carried out is read from configuration file.

Claims (2)

1. the automated testing method of electrical network video and environmental monitoring system is characterized in that, said method comprises:
Insert electrical network video and environmental monitoring system;
Automatically perform the testing scheme of having stored in advance;
Automatically generate the form of test result;
Saidly automatically performed in advance that the method for the testing scheme of storage does, carried out one by one, after each testing scheme finishes, triggered and start next testing scheme, until executing all testing schemes for the testing scheme of storage in advance;
The method of the form of said automatic generation test result does, execute all testing schemes after, directly trigger and start the report generation function, test result is converted into report form;
Said method also comprises: when testing scheme is carried out, under virtual unit running environment that is virtually reality like reality, carry out, when the local level main website was tested, virtual unit was simulated provincial main website and station end system to the communication of local level main website; When the station end system is tested, the communication of virtual unit simulation local level master Station To Station end system; When provincial main website was tested, virtual unit simulation local level main website was to the communication of provincial main website.
2. realize the electrical network video of the said method of claim 1 and the automatic test device of environmental monitoring system, it is characterized in that it comprises:
Interface module (1) is used for testing apparatus is connected into electrical network video and environmental monitoring system to be tested;
Scheme memory (2) is used for storing in advance testing scheme;
Executive Module (3) is used for obtaining testing scheme one by one from scheme memory (2) and tests;
Reports module (4) is used for test result is converted into report form;
Said Executive Module (3) comprises trigger module (5), is used to trigger Executive Module (3) and obtains next bar testing scheme from scheme memory (2), or directly trigger Reports module (4); It also comprises a virtual device modules (6), running environment that is virtually reality like reality when carrying out for testing scheme; Virtual device modules 6 comprises:
Equipment control generic module (CDevManager) is responsible for virtual unit is managed;
Monitor module (DevListener), when equipment receives, or when sending data, the notice listener makes the upper strata can statistics;
EM equipment module (CDevice) is represented an equipment;
Protocol stack module (CProtocol) is responsible for the parsing work of agreement;
Network port module (CSocket) is responsible for the transmitting-receiving of transport layer data;
Attribute structure phantom piece (Attribute), the attribute of description virtual unit reads from configuration file;
Order feedback arrangement phantom piece (CodeCFG), the behavior that the needs after description equipment receives orders are carried out is read from configuration file.
CN 201010525844 2010-10-29 2010-10-29 Automatic test method and device of power grid video and environment monitoring system Active CN101969232B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010525844 CN101969232B (en) 2010-10-29 2010-10-29 Automatic test method and device of power grid video and environment monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010525844 CN101969232B (en) 2010-10-29 2010-10-29 Automatic test method and device of power grid video and environment monitoring system

Publications (2)

Publication Number Publication Date
CN101969232A CN101969232A (en) 2011-02-09
CN101969232B true CN101969232B (en) 2012-05-23

Family

ID=43548347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010525844 Active CN101969232B (en) 2010-10-29 2010-10-29 Automatic test method and device of power grid video and environment monitoring system

Country Status (1)

Country Link
CN (1) CN101969232B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102904769A (en) * 2011-07-27 2013-01-30 广西鑫百纳电气有限公司 Test method and test equipment for monitoring systems
CN103678119B (en) * 2013-10-31 2016-12-07 国家电网公司 Substation simulation software testing system and method for testing thereof towards power system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101432633A (en) * 2006-04-24 2009-05-13 Abb研究有限公司 System level testing for substation automation systems
CN101572440A (en) * 2009-02-27 2009-11-04 国电南瑞科技股份有限公司 Power grid protocol analysis and test method
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
CN101867225A (en) * 2010-05-31 2010-10-20 江苏省电力公司南通供电公司 Debugging method for integrated automation of transformer substation and integration of relaying protection system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006021543A1 (en) * 2006-05-08 2007-11-15 Abb Technology Ag System and method for the automated acceptance and evaluation of the quality of mass data of a technical process or a technical project

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101432633A (en) * 2006-04-24 2009-05-13 Abb研究有限公司 System level testing for substation automation systems
CN101572440A (en) * 2009-02-27 2009-11-04 国电南瑞科技股份有限公司 Power grid protocol analysis and test method
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
CN101867225A (en) * 2010-05-31 2010-10-20 江苏省电力公司南通供电公司 Debugging method for integrated automation of transformer substation and integration of relaying protection system

Also Published As

Publication number Publication date
CN101969232A (en) 2011-02-09

Similar Documents

Publication Publication Date Title
WO2015106605A1 (en) Method for testing station level of intelligent substation
CN103200051B (en) Intelligent substation message emulating is tested and is associated message analysis system and method
CN103176084B (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN108306753B (en) Simulation device, test method and system for shutdown of I-zone data communication network
CN104977856B (en) Substation monitoring analogue means, system and method
CN106647703A (en) Power fault intelligent analysis and inversion system and method
CN204465143U (en) Distribution line detects and management system
CN103036316B (en) Based on the IED device intelligence detection method of IEC61850
CN104753173A (en) Method for automatically diagnosing telemeasuring data transmission failure of power grid energy manage system
CN108830391A (en) Wind power generating set operation management system, method and computer equipment
CN108226775A (en) The automatic fault selftesting method and device of wind-driven generator
CN108595390B (en) Method for verifying parameter consistency of SCD and IED of intelligent substation
CN1972287A (en) Communication protocol record analysis apparatus and its analysis method
CN101969232B (en) Automatic test method and device of power grid video and environment monitoring system
CN102156795A (en) Simulation information system of digital transformer station based on transformer station configuration description file
CN102073930A (en) Virtual machine-based security risk evaluation method for power dispatching automation system
CN107064743A (en) Power distribution network transient state ripple failure tracking method and device based on cloud analysis with identification
CN118133542A (en) Electric power safety control system based on digital twin
CN201919124U (en) Automatic testing device for power grid video and environmental monitoring system
CN101969233A (en) Testing method and device of power grid video and environment monitoring system
CN204706958U (en) A kind of intelligent substation message emulating test and correlation analysis system
CN115567422B (en) Basic platform testing method, testing terminal, host and testing system
CN102035253A (en) Memorable and learnable test method and device for power grid video and environment monitoring system
CN202167821U (en) Monitoring and control device of cable branch box
CN201887547U (en) Video scene simulation testing device of power network video and environment monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

Address before: 510600 No. 71-73 Meihua Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20210301

Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Patentee after: China Southern Power Grid Power Technology Co.,Ltd.

Address before: 510080 water Donggang 8, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong.

Patentee before: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

TR01 Transfer of patent right