CN101538839A - 一种高塑性粘土心墙的施工方法 - Google Patents
一种高塑性粘土心墙的施工方法 Download PDFInfo
- Publication number
- CN101538839A CN101538839A CN200910058708A CN200910058708A CN101538839A CN 101538839 A CN101538839 A CN 101538839A CN 200910058708 A CN200910058708 A CN 200910058708A CN 200910058708 A CN200910058708 A CN 200910058708A CN 101538839 A CN101538839 A CN 101538839A
- Authority
- CN
- China
- Prior art keywords
- plastic clay
- highly plastic
- wall
- core
- rolling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
一种高塑性粘土心墙的施工方法,属一种水资源丰富,土料材料充沛,适合修建当地材料坝的地区修建的一种新兴的坝型的施工方法。它包括以下步骤:1)清理填筑层面;2)在填筑层面铺设高塑性粘土带,在高塑性粘土带之间铺设砾石土心墙;3)对高塑性粘土带和砾石土心墙碾压。这种方法适于用高塑性粘土作大坝防渗体的砾石土心墙坝,采用该施工方法填筑的大坝能满足设计的功能和变形要求。
Description
(一)技术领域:
一种高塑性粘土心墙的施工方法,属一种主要用于国内交通条件不发达,施工环境、气候条件恶劣,水资源丰富,土料材料充沛,适合修建当地材料坝的地区修建的一种新兴的坝型的施工方法。
(二)背景技术:
砾石土心墙坝为国内最早施工的首座100级堆石坝高坝,其大坝防渗体由砾石土和高塑性粘土组成。高塑性粘土为低液限粘土,采取多项降水措施后,含水率仍然高出设计要求很多,实际填筑含水率24%~29%。国内没有直接的同类填筑经验,先采用“薄层轻碾”碾压试验,即高塑性粘土的铺设厚度为15cm~20cm,碾的重量为14吨左右,这样碾压出来的高塑性粘土塑性高、表面剪切并伴随深部剪切,压实性不强,不能满足设计需要。并且在犁块、旋碎、翻晒过程中,破坏了高塑性粘土的透水毛细孔,根本无法达到设计要求,制备的料全部是外干内湿的干硬块体,经过1月多的制备工作,所制备的全是废料,根本无法满足施工性能和设计利用其塑性的功能。
(三)发明内容:
本发明要解决的问题就是针对以上不足而提供一种适于用高塑性粘土作大坝防渗体的砾石土心墙坝的施工方法。采用该施工方法填筑的大坝能满足设计的功能和变形要求。其技术方案如下:
本发明方法包括以下步骤:
1)将高塑性粘土运至大坝堆料场堆存;
2)清理填筑层面,将填筑层面人工凿毛,填筑层面包括由心墙贴坡混凝土面或岩石面组成的两岸坡(1)的内侧壁;
3)在两岸坡的内侧壁分别铺设厚度为40~60cm、宽度为1.2~3.0m的高塑性粘土带,在高塑性粘土带之间铺设砾石土心墙;
4)对高塑性粘土带采用1~26吨振动平碾,对砾石土心墙采用20~25吨凸块振动碾;
5)碾压完成后现场取样试验,合格后填筑下一层。
与现有技术相比本发明的有益效果是:
本发明对高塑性粘土和砾石土采用“厚层重碾”的施工方法,即对心墙的铺设厚度为40~60cm,碾的重量达到26吨。对高塑性粘土用平碾进行静压和动压,对砾石土用凸碾进行静压和动压,保证碾压质量的同时兼顾经济性。这种施工方法使高塑性粘土和砾石土的压实性大大增强,防渗能力得到提高,充分发挥了当地粘土其较高的塑性和适应变形能力。用本发明方法建成的大坝防渗良好。结合室内外的渗透等实验、结合大三轴力学实验,论证结果满足设计的功能和变形要求。此举开创了填筑含水率大于最优含水率10%(最优含水率19~20%,实际填筑含水率24~29%)以上直接上坝之国内先例,突破了国内的设计和施工规范和常规工艺。经过蓄水后原型观测结果表明,大坝运行状况良好。
采用本发明方法填筑的大坝论证结果如下(摘自《华能四川硗碛水电站枢纽工程蓄水安全鉴定报告》):
大坝施工质量保证体系和质量管理体系比较完善,名种坝料的施工工艺严谨。结合带比较平顺整齐,避免了料物混杂。砾石土层面均匀洒水有利于紧密结合,高塑性黏土采用大、小平碾碾压,效果良好。检测项目和频次满足要求,取样检测的干密度(压实度、相对密度、孔隙率)、渗透系统及力学指标均满足设计要求,坝体填筑质量合格。
(四)附图说明:
图1,是本发明心墙结构示意图;
图2,是本发明心墙施工工艺流程图。
(五)具体实施方式:
参见图1和图2,本发明施工方法包括以下步骤:
1)在料场对高塑性粘土的含水率进行调整。
采用高含水率直接上坝填筑技术,直接从料场开采运输至大坝下游堆存场地,堆成“土牛”并用彩条布将其遮盖,使用时直接挖装上坝进行填筑;根据实验检测结果,坝面土层表面干燥需补充水分时,在坝面上用洒水车直接进行洒水,要求以压力水和压缩空气混合以雾状喷出,使洒水均匀,洒水后用圆盘耙掺和均匀。
2)对料场高塑性粘土检测合格:压实度≥99%,渗透系数<1×10-5cm/s);对另一料场的砾石土检测合格:压实度≥98%,渗透系数<1×10-6cm/s)。
3)在料场清理完杂物后,对高塑性粘土采用推土机20cm薄层平采集料,人工清除石块,反铲直接装车,运至大坝堆料场直接堆存,防雨篷布覆盖,在现场需要料时二次运输上坝。将砾石土运至大坝堆料场堆存。
4)将坝体按照设计蓝图结构下线进行分区施工放线。
5)现场施工首先清理填筑层面上的杂物,将填筑层面人工凿毛以利结合,若填筑层面表面风干则喷洒水湿润,按填筑高度在两岸岩石或混凝土面上喷洒水湿润,涂刷浓泥浆。
6)按坝体分区施工线在两岸坡的内侧壁分别铺设厚度为40cm--60cm、宽度为1.2~3.0m的高塑性粘土带2,在高塑性粘土带2之间铺设同样高度的砾石土心墙3。为保证边缘压实度,在高塑性粘土和砾石土接头处,高塑性粘土的高度高于砾石土15cm~20cm。高塑性粘土带2的铺设厚度根据情况而定,在40cm--60cm之间,最好是60cm厚。如果高塑性粘土含水不合格,则采用上述第1)步骤调整含水量至合格;如果高塑性粘土含水合格,则进行下一步骤。
7)对高塑性粘土带2采用1--26吨振动平碾,碾压遍数采用静压2遍+动压2遍的压实参数,即让碾子停止振动碾压2遍,再开启振动碾压2遍;对砾石土心墙3采用20~25吨凸块振动碾,碾压遍数为静压2遍+动压8遍。碾压两岸坡靠岩石边或混凝土边的高塑性粘土带2时采用1--26吨振动平碾。填筑时高塑性粘土料与砾石土料同时进行填筑。碾压遍数即碾滚前进及倒退为同一碾迹时计1遍。根据情况,对高塑性粘土带进行碾压时,碾的吨位在1--26之间,最好选用26吨的碾;对砾石土心墙进行碾压时,碾的吨位在20~25吨之间,最好选用20.5吨的碾;对两岸坡靠岩石边或混凝土边的高塑性粘土带进行碾压时,碾的吨位在1--26吨之间,最好选用1吨的碾,碾压遍数最佳是静压1遍+动压2遍。碾压遍数既要考虑质量,又要兼顾经济。高塑性粘土带2的最佳宽度为1.5m。
8)每层碾压完成后现场取样试验,直至合格后,人工清除超填料,准备填筑下一层。合格的标准为:渗透系数<1x10-6cm/s、压实指标压实度≥98%。如果不合格,则补压至合格。
Claims (5)
1、一种高塑性粘土心墙的施工方法,其特征在于包括以下步骤:
1)将高塑性粘土运至大坝堆料场堆存;
2)清理填筑层面,将填筑层面人工凿毛,填筑层面包括由心墙贴坡混凝土面或岩石面组成的两岸坡(1)的内侧壁;
3)在两岸坡(1)的内侧壁分别铺设厚度为40~60cm、宽度为1.2~3.0m的高塑性粘土带(2),在高塑性粘土带(2)之间铺设砾石土心墙(3);
4)对高塑性粘土带(2)采用1~26吨振动平碾,对砾石土心墙(3)采用20~25吨凸块振动碾;
5)碾压完成后现场取样试验,合格后填筑下一层。
2、根据权利要求1所述的高塑性粘土心墙的施工方法,其特征在于将填筑层面人工凿毛后,若表面风干,则按填筑高度在两岸岩石面或混凝土面上喷洒水湿润,涂刷浓泥浆。
3、根据权利要求1所述的高塑性粘土心墙的施工方法,其特征在于铺设高塑性粘土带(2)和砾石土心墙(3)时,在高塑性粘土和砾石土接头处,高塑性粘土的高度高于砾石土15cm~20cm。
4、根据权利要求1所述的高塑性粘土心墙的施工方法,其特征在于碾压高塑性粘土带(2)时碾压遍数为静压2遍+动压2遍;碾压砾石土心墙(3)时碾压遍数为静压2遍+动压8遍。
5、根据权利要求1所述的高塑性粘土心墙的施工方法,其特征在于碾压两岸坡靠岩石面或混凝土面的高塑性粘土带(2)时采用1~26吨振动平碾。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910058708A CN101538839A (zh) | 2009-03-26 | 2009-03-26 | 一种高塑性粘土心墙的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910058708A CN101538839A (zh) | 2009-03-26 | 2009-03-26 | 一种高塑性粘土心墙的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101538839A true CN101538839A (zh) | 2009-09-23 |
Family
ID=41122215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910058708A Pending CN101538839A (zh) | 2009-03-26 | 2009-03-26 | 一种高塑性粘土心墙的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101538839A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831890A (zh) * | 2010-05-25 | 2010-09-15 | 葛洲坝集团第五工程有限公司 | 一种大坝防渗心墙掺砾土掺合施工方法 |
CN102864782A (zh) * | 2012-10-22 | 2013-01-09 | 安蓉建设总公司 | 一种粘土心墙堆石坝坝体快速填筑施工方法 |
CN103046516A (zh) * | 2012-12-29 | 2013-04-17 | 中国葛洲坝集团股份有限公司 | 一种堆石坝砾石土心墙底部的填筑方法 |
CN103981868A (zh) * | 2013-02-07 | 2014-08-13 | 中国水电顾问集团贵阳勘测设计研究院 | 用于提高碾压混凝土层间结合度的施工方法及结构 |
CN104213543A (zh) * | 2014-09-24 | 2014-12-17 | 中国水利水电第五工程局有限公司 | 一种用于土石坝底部两墙间的粘土填筑施工方法 |
CN106638484A (zh) * | 2016-12-23 | 2017-05-10 | 中国水利水电第五工程局有限公司 | 一种平、凸结合用于心墙土料冬、雨季快速施工方法 |
CN106681223A (zh) * | 2017-01-20 | 2017-05-17 | 天津大学 | 一种堆石坝坝面洒水量智能监控系统及其监控方法 |
CN107862138A (zh) * | 2017-11-09 | 2018-03-30 | 成都希盟泰克科技发展有限公司 | 大坝工程施工方案可行性与施工强度匹配优化方法 |
CN110016916A (zh) * | 2019-04-15 | 2019-07-16 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种砾石土料皮带机端头加水装置及工艺 |
CN112359784A (zh) * | 2020-11-17 | 2021-02-12 | 中国电建集团成都勘测设计研究院有限公司 | 一种高土心墙坝岸边接触粘土空间差异设置型式 |
-
2009
- 2009-03-26 CN CN200910058708A patent/CN101538839A/zh active Pending
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831890A (zh) * | 2010-05-25 | 2010-09-15 | 葛洲坝集团第五工程有限公司 | 一种大坝防渗心墙掺砾土掺合施工方法 |
CN102864782A (zh) * | 2012-10-22 | 2013-01-09 | 安蓉建设总公司 | 一种粘土心墙堆石坝坝体快速填筑施工方法 |
CN102864782B (zh) * | 2012-10-22 | 2014-10-29 | 安蓉建设总公司 | 一种粘土心墙堆石坝坝体快速填筑施工方法 |
CN103046516B (zh) * | 2012-12-29 | 2015-04-01 | 中国葛洲坝集团股份有限公司 | 一种堆石坝砾石土心墙底部的填筑方法 |
CN103046516A (zh) * | 2012-12-29 | 2013-04-17 | 中国葛洲坝集团股份有限公司 | 一种堆石坝砾石土心墙底部的填筑方法 |
CN103981868A (zh) * | 2013-02-07 | 2014-08-13 | 中国水电顾问集团贵阳勘测设计研究院 | 用于提高碾压混凝土层间结合度的施工方法及结构 |
CN104213543A (zh) * | 2014-09-24 | 2014-12-17 | 中国水利水电第五工程局有限公司 | 一种用于土石坝底部两墙间的粘土填筑施工方法 |
CN104213543B (zh) * | 2014-09-24 | 2016-05-18 | 中国水利水电第五工程局有限公司 | 一种用于土石坝底部两墙间的粘土填筑施工方法 |
CN106638484A (zh) * | 2016-12-23 | 2017-05-10 | 中国水利水电第五工程局有限公司 | 一种平、凸结合用于心墙土料冬、雨季快速施工方法 |
CN106681223A (zh) * | 2017-01-20 | 2017-05-17 | 天津大学 | 一种堆石坝坝面洒水量智能监控系统及其监控方法 |
CN107862138A (zh) * | 2017-11-09 | 2018-03-30 | 成都希盟泰克科技发展有限公司 | 大坝工程施工方案可行性与施工强度匹配优化方法 |
CN110016916A (zh) * | 2019-04-15 | 2019-07-16 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种砾石土料皮带机端头加水装置及工艺 |
CN112359784A (zh) * | 2020-11-17 | 2021-02-12 | 中国电建集团成都勘测设计研究院有限公司 | 一种高土心墙坝岸边接触粘土空间差异设置型式 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101538839A (zh) | 一种高塑性粘土心墙的施工方法 | |
CN107100049A (zh) | 一种粘土改良尾矿砂路基填料的施工方法 | |
CN109594445A (zh) | 一种生态环保彩色透水沥青路面及其施工方法 | |
CN104480963A (zh) | 一种预制模块式面板土工格栅加筋尾矿砂挡墙的施工方法 | |
CN104018485B (zh) | 一种软土地基的换填垫层碳化加固方法 | |
CN203821187U (zh) | 一种格宾笼复合路基结构 | |
CN108677638A (zh) | 基于建筑垃圾的高速公路路基填筑方法 | |
CN106560559B (zh) | 一种用于城市河道的防渗结构和施工方法 | |
CN206828898U (zh) | 一种填筑高液限土的路基 | |
CN109972468A (zh) | 一种加固吹填砂路堤的施工方法 | |
CN107675577A (zh) | 一种软弱土地区道路路基封闭垫层结构及其施工方法 | |
CN109778625A (zh) | 一种渣土类建筑废弃物填筑的高速公路路基结构 | |
CN206800094U (zh) | 一种大粒径建筑垃圾路基 | |
CN105369721A (zh) | 水泥稳定珊瑚礁砂施工工艺 | |
CN106592565A (zh) | 一种土地整治工程土壤固化剂固堤保坎施工方法 | |
CN101929161B (zh) | 排岩修筑高碾压透水尾矿坝的方法 | |
CN210684359U (zh) | 一种道路桥梁建设用路基 | |
CN106544987A (zh) | 一种蓄涝湿地的渠道防渗施工方法 | |
CN103147378B (zh) | 道路灰土基层铺料斗定垅码方路拌施工方法 | |
CN206666953U (zh) | 一种建筑垃圾再生集料的路基结构 | |
CN210368867U (zh) | 一种均质土坝和堆石坝的叠合结构 | |
Meshram et al. | Application of coir geotextile for road construction: some issues | |
CN209493779U (zh) | 一种防堵塞透水混凝土结构 | |
CN102995646A (zh) | 网箱护垫式护坡结构及其施工方法 | |
CN203007959U (zh) | 网箱护垫式护坡结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090923 |