CN101476331B - Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch - Google Patents

Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch Download PDF

Info

Publication number
CN101476331B
CN101476331B CN2007101721341A CN200710172134A CN101476331B CN 101476331 B CN101476331 B CN 101476331B CN 2007101721341 A CN2007101721341 A CN 2007101721341A CN 200710172134 A CN200710172134 A CN 200710172134A CN 101476331 B CN101476331 B CN 101476331B
Authority
CN
China
Prior art keywords
basement
concrete
support
closed
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101721341A
Other languages
Chinese (zh)
Other versions
CN101476331A (en
Inventor
胡开彪
尹亚鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN2007101721341A priority Critical patent/CN101476331B/en
Publication of CN101476331A publication Critical patent/CN101476331A/en
Application granted granted Critical
Publication of CN101476331B publication Critical patent/CN101476331B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to basement construction, in particular to a method for disassembling an inner concrete support of a basement foundation pit. The method for disassembling the inner concrete support of the basement foundation pit through sealed explosion comprises that: the basement foundation pit adopts a row-pile and siding wall type inner concrete support foundation pit supporting system. The disassembly method mainly comprises the following steps: support replacement of a structure, namely utilizing backfill of a basement and a force transferring belt to complete support replacement of the structure; disassembly of partial inner concrete support for supporting the foundation pit; construction of a basement structure on the force transferring belt; and disassembly of the inner concrete support through sealed explosion. The method for disassembling the inner concrete support of the basement foundation pit through sealed explosion shortens the construction period and guarantees safety.

Description

The basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing
Technical field
The present invention relates to basement construction, relate in particular to supporting removal method in a kind of basement foundation ditch concrete.
Background technology
When soft clay area was carried out basement construction, campshed and board wall formula added the interior foundation pit supporting system that supports of concrete and use more.Be supported for temporary structure in the concrete, when basement structure construction arrived certain phase, it needed to remove.Sequence of construction during conventional construction is: support the bottom basement structure in the concrete of construct and change after support finishes, large tracts of land is opened wide and is removed the interior support of concrete, gets into follow-up basement structure construction again.The drawback of conventional job practices is: 1., after first large tracts of land removes and support in the concrete, just can carry out follow-up basement structure construction, the large tracts of land that operation is many, the time is long is opened wide and is removed support in the concrete, can have influence on the basement structure construction progress.2., large tracts of land opens wide explosion and removes in the concrete and support, potential safety hazard is many, need do careful Security alert work, informs near resident, and sets up protection canopy, prevent blasting flyrock destroy around building, the injury pedestrian.Do not have influence on the basement structure construction progress and support sealing explosion rule in the concrete, and conventional relatively job practices safety.
Summary of the invention
The present invention is intended to solve the defective of said traditional supporting removal method, and a kind of basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing is provided.Basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing of the present invention has shortened the construction period, has guaranteed safety.
The present invention is achieved in that
A kind of basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing, said basement foundation ditch adopt in campshed and board wall formula and the concrete and support foundation pit supporting system, and said method for dismounting mainly comprises the following steps:
Structure is changed the support step, utilizes basement backfill and load transfering strip to accomplish structure and changes support;
Remove in the part pattern foundation pit supporting structure concrete and support step;
The above part basement structure of load transfering strip construction sequence;
Support step in the closed demolition blasting concrete.
Described basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing, said method for dismounting change support in structure and also comprise the position step of finding out brace summer in the overlapping part that needs to handle and the adjustment before the step.
Supporting step in the described basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing, said dismounting part pattern foundation pit supporting structure concrete comprises:
The elongated falsework step of setting up;
Cut the brace summer step, according to cutting placing of reinforcement topping concrete earlier, the main muscle of row is blocked in electric welding again, after cut concrete in the reinforcing bar, last electric welding is blocked down the order of arranging main muscle and is operated.
Supporting step in the described basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing, said closed demolition blasting concrete comprises:
Step is set up in the double-layer pipe protection;
On the interior brace summer of need explosion, cover step with overburden integral body;
Double steel pipe protective frame step is set up at interior brace summer side and top in explosion;
Totally-enclosed overcoat construction step lays bamboo fence on the top of the shelf, and overlap joint is not less than 10cm between the bamboo fence, uses the iron wire banding.
Described basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing, said double steel pipe protective frame is from treating more than the quick-fried brace summer 2m.
Support the construction that blasting procedure does not influence basement structure in the basement foundation ditch supporting concrete of the present invention, can shorten the construction period of basement; After basement structure construction is intact, in basement inner sealing explosion pattern foundation pit supporting structure concrete, support, relatively safety.Noise of blasting is little, can not cause the panic and uncomfortable of surrounding resident.
Description of drawings
Below, in conjunction with the specific embodiment the present invention is further described;
Fig. 1 is a sketch map of the present invention.
The specific embodiment
Please refer to Fig. 1, a kind of basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing, said basement 3 foundation ditches adopt in campshed and board wall 1 formula and the concrete and support 2 foundation pit supporting systems, and 5 is support post among the figure, and said method for dismounting is:
At first be familiar with pattern foundation pit supporting structure and structural drawings, the relation of support and structural column wall in the arrangement pattern foundation pit supporting structure is found out the overlapping part that need handle.As support too much overlappingly with inner insulated column, and should link up supporting designing unit in early days, under the prerequisite that does not influence the pattern foundation pit supporting structure safety, the suitable position of brace summer in the adjustment.
(1), utilizes basement backfill and load transfering strip to accomplish structure and change support.
Changing support need excavate under the soil body to the base plate behind the foundation ditch bottom surface; Periphery is provided with the board-like load transfering strip of plain concrete between basement bottom board and fender body; The face of load transfering strip, end absolute altitude are identical with the basement bottom board absolute altitude, and load transfering strip is constructed when the basement bottom board casting and compacting of concrete simultaneously.
Then the construct wall and the top board structure of subcellar; Subcellar side wall outside backfill macadam-aggregate mix; But periphery is built with plain concrete between subcellar top board crossbeam, position and fender body below the plate face about 1 meter, builds 1.1~1.2 meters of thickness.Should strict control mud content during subcellar side wall outside backfill, the backfill mud content should be controlled at 3%~5%.The macadam-aggregate mix rational gradation composition both can have been avoided lacking the sand grains filling between particle after the compacting and the aerial construction that forms, had also guaranteed to have between sand powder particulate enough bulky grains to form skeleton, satisfied requirement of strength.
After treating that concrete that power transmission is watered reaches sufficient intensity (85%), could begin artificial the dismounting in the part pattern foundation pit supporting structure concrete and support.
(2), the artificial dismounting in the part pattern foundation pit supporting structure concrete support, and dodges the basement structure exterior wall.
Manual work cuts support need set up falsework, and falsework needs elongated setting up, and avoids manual work to cut the back boom brace summer and breaks the crushing floor.
Artificial pneumatic pick cuts brace summer 4, and according to cutting placing of reinforcement topping concrete earlier, the main muscle of row is blocked in electric welding again, after cut concrete in the reinforcing bar, electric welding is at last blocked down the order of arranging main muscle and is operated.
(3), the above part basement structure construction of load transfering strip.
(4), blasting parameter designs the closed demolition blasting concrete support of enforcement in basement.
In implementing the totally-enclosed concrete of basement, need set up the double-layer pipe protection before the support and control microexplosion.On the interior brace summer of need explosion, cover with waste and old gunnysack is whole, overlapping overlap joint is no less than 10cm between the gunnysack.Double steel pipe protective frame is set up at interior brace summer side and top in explosion, and lays the bamboo fragrant plant on the top of the shelf, and overlap joint is not less than 10cm between the bamboo fragrant plant, uses the iron wire banding, forms totally-enclosed overcoat.Protective frame should be from treating more than the quick-fried brace summer 2m.

Claims (4)

1. a basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing supports foundation pit supporting system in said basement foundation ditch employing campshed and board wall formula and the concrete, it is characterized in that said method for dismounting mainly comprises the following steps:
One, the overlapping part of finding out the need processing of interior support of pattern foundation pit supporting structure and structural column wall is also adjusted the position step of interior brace summer;
Structure is changed the support step, utilizes basement backfill and load transfering strip to accomplish structure and changes support;
Two, the artificial dismounting in the part pattern foundation pit supporting structure concrete supported step;
Three, the above part basement structure of load transfering strip construction sequence;
Four, support step in the closed demolition blasting concrete.
2. basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing according to claim 1 is characterized in that, and is said two, and artificial the dismounting supported step in the part pattern foundation pit supporting structure concrete and comprised:
Elongatedly set up the falsework step and cut the brace summer step, according to cutting placing of reinforcement topping concrete earlier, the main muscle of row is blocked in electric welding again, after cut concrete in the reinforcing bar, electric welding is at last blocked down the order of arranging main muscle and is operated.
3. basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing according to claim 1 is characterized in that, and is said four, supports step in the closed demolition blasting concrete and comprises:
Step is set up in the double-layer pipe protection;
On the interior brace summer of need explosion, cover step with overburden integral body;
Double steel pipe protective frame step is set up at interior brace summer side and top in explosion;
Totally-enclosed overcoat construction step lays the bamboo fragrant plant on the top of the shelf, and overlap joint is not less than 10cm between the bamboo fragrant plant, uses the iron wire banding.
4. basement foundation ditch closed demolition blasting method for internal concrete reinforcement bracing according to claim 3 is characterized in that, said double steel pipe protective frame from treat quick-fried in more than the brace summer 2m.
CN2007101721341A 2007-12-12 2007-12-12 Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch Expired - Fee Related CN101476331B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101721341A CN101476331B (en) 2007-12-12 2007-12-12 Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101721341A CN101476331B (en) 2007-12-12 2007-12-12 Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch

Publications (2)

Publication Number Publication Date
CN101476331A CN101476331A (en) 2009-07-08
CN101476331B true CN101476331B (en) 2012-07-04

Family

ID=40837106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101721341A Expired - Fee Related CN101476331B (en) 2007-12-12 2007-12-12 Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch

Country Status (1)

Country Link
CN (1) CN101476331B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404965A (en) * 2014-11-05 2015-03-11 浙江海洋学院 Method for removing reinforced concrete support beams in foundation pit support

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296644B (en) * 2010-06-28 2016-06-08 上海隧道工程有限公司 Internal support of foundation pit demolition blasting vibration safety monitoring system and monitoring method
CN101886392B (en) * 2010-06-30 2012-03-21 济南鼎汇土木工程技术有限公司 Supporting design and construction method of foundation pit supporting system
CN102116027A (en) * 2010-12-17 2011-07-06 上海市第四建筑有限公司 Frame type combined support-replacing system and construction method thereof
CN102191776A (en) * 2011-05-11 2011-09-21 中天建设集团有限公司 Structure for underpinning reinforced concrete inner support by profile steels and construction method for same
CN102444130B (en) * 2011-10-20 2014-01-01 中建六局第三建筑工程有限公司 Support replacing construction method in deep foundation pit project
CN103184739A (en) * 2011-12-29 2013-07-03 五冶集团上海有限公司 Demolition blasting method for reinforced concrete bracing
CN102587420B (en) * 2012-02-13 2014-03-26 中天建设集团有限公司 Supporter exchanging method for stage construction basement using cast-in-situ bored piles as separation palisade
CN102720201B (en) * 2012-07-02 2014-10-29 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building
CN104250971A (en) * 2013-06-26 2014-12-31 中国二十冶集团有限公司 Closed removing method for basement enclosure supporting body
CN104514228A (en) * 2013-09-29 2015-04-15 浙江宝业建设集团有限公司 Large-chassis multi-tower building construction method and structure
CN104895089B (en) * 2015-04-08 2017-08-29 山东大学 Basement floor and the construction method of the cooperative permanent support system of support pile
CN106055801B (en) * 2016-06-03 2018-12-14 武汉科技大学 A kind of determination method of Brace in Deep Footing Groove beam demolition blasting sequence
CN106088098A (en) * 2016-06-15 2016-11-09 龙元建设集团股份有限公司 Supporting removal construction method
CN106869110A (en) * 2016-12-29 2017-06-20 上海市基础工程集团有限公司 The construction method of underground continuous wall of existing underground structure
CN107761741A (en) * 2017-10-18 2018-03-06 中铁八局集团建筑工程有限公司 One kind manually abolishes inner support beam method
CN109083155B (en) * 2018-08-28 2024-01-05 中建二局第三建筑工程有限公司 Supporting structure in foundation pit and blasting demolition method thereof
CN109235926B (en) * 2018-10-19 2019-10-22 洛阳理工学院 Reinforced concrete frame structure unidirectionally collapses the construction method of the anti-back seat of demolition blasting
CN110130364A (en) * 2019-05-28 2019-08-16 中国二十冶集团有限公司 Foundation pit list supports support replacement construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404965A (en) * 2014-11-05 2015-03-11 浙江海洋学院 Method for removing reinforced concrete support beams in foundation pit support

Also Published As

Publication number Publication date
CN101476331A (en) 2009-07-08

Similar Documents

Publication Publication Date Title
CN101476331B (en) Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch
CN105926669B (en) A kind of Construction Method of Metro Station
CN108505805B (en) Large cast-in-situ water pool with expansion reinforcing belt for crack control and construction method thereof
CN105804089B (en) Locally increase deep support system and its construction method after a kind of former deep foundation pit construction
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN109629576B (en) Suspension protection system for water supply pipe crossing foundation pit and construction method
CN110904867A (en) Construction method for dismantling upper-span existing line arch bridge
CN206144583U (en) High ground stress tunnel supporting structure
CN201943086U (en) Underground building wall body
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN104032767A (en) Tower crane foundation in deep foundation pit and construction method of tower crane foundation
CN109441110A (en) A kind of basement shear wall post-cast strip precast outer die construction method
CN211777473U (en) Protective structure of tunnel upper portion solution cavity
CN112983467A (en) Treatment method for tunnel gate closing type large collapse
CN105040709A (en) Construction method for support replacement of fender-post retaining and protecting of deep foundation pit
CN103452326A (en) Method and equipment for sequentially constructing ultra-long hanging posts
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN207143746U (en) Support beam template system under concrete support trestle plate
CN204919559U (en) Repair system of ground fissure
CN214832726U (en) Supporting structure for pipe-jacking working well in deep soft soil area
CN206873459U (en) A kind of large-span steel-reinforced concrete foundation ditch support system
JP2003278476A (en) Widening device of existing tunnel and its method
CN104963344B (en) The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out
CN204282371U (en) A kind of pre-loaded support struts for foundation ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704