CN102191776A - Structure for underpinning reinforced concrete inner support by profile steels and construction method for same - Google Patents

Structure for underpinning reinforced concrete inner support by profile steels and construction method for same Download PDF

Info

Publication number
CN102191776A
CN102191776A CN 201110120733 CN201110120733A CN102191776A CN 102191776 A CN102191776 A CN 102191776A CN 201110120733 CN201110120733 CN 201110120733 CN 201110120733 A CN201110120733 A CN 201110120733A CN 102191776 A CN102191776 A CN 102191776A
Authority
CN
China
Prior art keywords
shaped steel
inner support
parallel
steel
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110120733
Other languages
Chinese (zh)
Inventor
宋健松
陈忠
张孝华
周黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN 201110120733 priority Critical patent/CN102191776A/en
Publication of CN102191776A publication Critical patent/CN102191776A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention belongs to the technical field of building construction, and relates to a structure for underpinning a reinforced concrete inner support by profile steels and a construction method for the same, in particular to a design technology of a building construction method. The structure is characterized in that: four parallel profile steels to bear a force instead of the inner support, so that the purposes of ensuring the normal construction of a primary structure and ensuring the safety and reliability of an inner supporting system are realized. The construction method has the following active effects that: a series of problems (for example, the primary structure cannot be in normal construction until the whole inner support must be removed) caused by the collision of the reinforced concrete inner support and the main structure components are avoided; as the four profile steels bear the force instead of the inner support, the construction can be developed smoothly; and the construction method has the advantages of simplicity, safety, reliably, low cost and practicability.

Description

A kind of with the structure of underpinning reinforced concrete inner support by profile steels and its construction method
Technical field
Belong to technical field of building construction, exactly relate to the designing technique of building operations job practices.
Background technology
Along with the increase of skyscraper quantity and height, embedded depth of foundation is also along with increase.Deep basal pit adopts large-span steel-reinforced concrete inner support beam or the supporting of annulus arch reinforced concrete inner support, because they have the correctness aspect calculating, the economy of earthwork construction and the security reliability of Construction practices, so increasing application is arranged in construction.Yet in underground main structure construction, tend to run into the collide problem of resistance of agent structure (post, wall) and interior support.Should guarantee the agent structure normal construction, guarantee that again inner supporting body is safe and reliable, be the difficult problem of construction.
Summary of the invention
The invention provides when resistance is collided in the main structure construction meeting of post, wall and interior support, should guarantee the agent structure normal construction, guarantee that again inner supporting body is safe and reliable a kind ofly to underpin the structure that supports in the steel concrete and its job practices with shaped steel.
The technical scheme that the present invention takes:
A kind of structure with underpinning reinforced concrete inner support by profile steels comprises inner support, and its organization plan is: two piece the be arranged shaped steel parallel with inner support, its parallel aperture for greater than and wrap up the cross-sectional area that the structural column of resistance appears and bump in the inner support place; Above the vertical range of two shaped steel that be arranged in parallel, second group of two shaped steel that be arranged in parallel is set again; Each parallel weldering is put and is connected connection shaped steel with vertical welding between four shaped steel at both ends; The both ends weldering is put four shaped steel that connect shaped steel and all is embedded in the armored concrete buttress; The shaped steel that is embedded in armored concrete buttress place arranges crab-bolt with the surface that is connected shaped steel; Be embedded in the surperficial bar planting of the inner support at armored concrete buttress place; And local explosion prescinds this place's inner support that occurs and bump the resistance structural column.
A kind of construction method with underpinning reinforced concrete inner support by profile steels, according to the following steps operation is implemented:
1) determine can occur and bump in this place that hinders structural column and support,
2) above this inner support, two piece the be arranged shaped steel parallel with this inner support are set, its parallel aperture for greater than and wrap up on the inner support cross-sectional area of the structural column that can occur;
3) above the vertical distance of two shaped steel that be arranged in parallel, second group of two shaped steel that be arranged in parallel is set again;
4) each parallel weldering is put to put with vertical welding and is connected shaped steel between four of both ends shaped steel;
5) both ends welderings is put four shaped steel that connect shaped steel and all is embedded in the steel concrete buttress;
6) shaped steel that is embedded in armored concrete buttress place arranges crab-bolt with the surface that is connected shaped steel;
7) be embedded in the interior stayed surface bar planting at steel concrete buttress place;
8) local explosion cuts this place's inner support that the resistance structural column can occur and bump.
Implementing good effect of the present invention is:
By enforcement of the present invention, guaranteed that under the prerequisite of main component normal construction, four shaped steel have substituted the transmission of reinforced concrete inner support power, have guaranteed its safety.Avoided the series of problems that produces because reinforced concrete inner support collides resistance with the agent structure member, must wait until that such as agent structure inner support integral body abolishes the ability normal construction; Now stressed with four shaped steel replacement inner supports, that just can guarantee to construct carries out smoothly, and method is simple, and is safe and reliable, and cost is low, is the construction method of a practicality.
Description of drawings
Fig. 1 is the present invention's top view of constructing
Fig. 2 is the 1-1 sectional drawing among Fig. 1
Fig. 3 is the 2-2 sectional drawing among Fig. 1
The specific embodiment
Now the invention will be further described by reference to the accompanying drawings
A kind of structure with underpinning reinforced concrete inner support by profile steels comprises inner support 1, and its formation is: two piece the be arranged shaped steel 2 parallel with inner support 1, its parallel aperture for greater than and wrap up the cross-sectional area that the structural column 3 of resistance appears and bump in the inner support place; Above the vertical range of two shaped steel that be arranged in parallel, second group two shaped steel 4 that be arranged in parallel are set again; Each parallel weldering is put to be connected with vertical welding and is connected shaped steel 5 between four shaped steel at both ends; The both ends weldering is put four shaped steel that connect shaped steel and all is embedded in the armored concrete buttress 6; The shaped steel 2 that is embedded in armored concrete buttress 6 places arranges crab-bolt 7 with the surface that is connected shaped steel 5; Be embedded in the surperficial bar planting 8 of the inner support 1 at armored concrete buttress 6 places; And local explosion prescinds this place's inner support 9 that occurs and bump resistance structural column 3.
Described shaped steel is the shaped steel that the surface is provided with the shearing resistance crab-bolt.
A kind of construction method with underpinning reinforced concrete inner support by profile steels, according to the following steps operation is implemented:
1) determine can occur and bump in this place that hinders structural column and support,
2) above this inner support, two piece the be arranged shaped steel parallel with this inner support are set, its parallel aperture for greater than and wrap up on the inner support cross-sectional area of the structural column that can occur;
3) above the vertical distance of two shaped steel that be arranged in parallel, second group of two shaped steel that be arranged in parallel is set again;
4) each parallel weldering is put to put with vertical welding and is connected shaped steel between four of both ends shaped steel;
5) both ends welderings is put four shaped steel that connect shaped steel and all is embedded in the steel concrete buttress;
6) shaped steel that is embedded in armored concrete buttress place arranges crab-bolt with the surface that is connected shaped steel;
7) be embedded in the interior stayed surface bar planting at steel concrete buttress place;
8) local explosion cuts this place's inner support that the resistance structural column can occur and bump.
Embodiment
Square, greenery patches, Zhengzhou (exhibitions hotel, Zhengzhou)
Square, greenery patches (exhibitions hotel, Zhengzhou) engineering is positioned at the CBD of Zhengzhou City central plaza, and inner ring road north, arts center east are that collection commerce, office, deluxe hotel, sightseeing tour etc. are multi-functional is the comprehensive building of one.Underground 4 layers of engineering, 61 layers on the ground, 3 layers on the ground of podiums, 280 meters of total heights, overall floorage 240000m 2Main building except that the partial bottom absolute altitude be-22.6m and dell at the bottom of absolute altitude-26.5m ,-27.5m, all the other are-21.4m.
Foundation pit supporting system selects support pile to add the inner support scheme of reinforced concrete circle beam and brace summer, foundation ditch inherence-6.8 meter, and-11.7 meters ,-16.6 meters absolute altitude places establish three road reinforced concrete inner supports.
Inner support had been constructed and has been finished when this engineering went out the main building drawing owing to designing institute, finished at big construction of bottom plates, had produced the problem that main building exterior frame column and inner support are collided and hindered during the construction basement structure.In order to ensure the engineering construction progress, the main building main body must partly be constructed prior to podium, can not abolish and podium is not finished inner support.For guaranteeing project progress and inner support system safety, determine to adopt shaped steel that local inner support is reinforced, abolish then reinforcing place concrete inner support, make main building structure housing trestle can pass inner support and follow the Core Walls Structure construction closely.

Claims (3)

1. one kind underpins the structure that supports in the steel concrete with shaped steel, comprise interior support (1), it is characterized in that: two piece the be arranged shaped steel (2) parallel with interior support (1), its parallel aperture is for the cross-sectional area of the structural column (3) of resistance occurring and bump greater than support place in also wrapping up; Above the vertical distance of two shaped steel that be arranged in parallel, second group two shaped steel that be arranged in parallel (4) are set again; Each parallel weldering is put to put with vertical welding and is connected shaped steel (5) between four shaped steel at both ends; The both ends weldering is put four shaped steel that connect shaped steel and all is embedded in the steel concrete buttress (6); Be embedded in the shaped steel (2) that steel concrete buttress (6) locates and crab-bolt (7) be set with the surface that is connected shaped steel (5); Be embedded in the surperficial bar planting (8) of the interior support (1) that steel concrete buttress (6) locates; And local explosion prescinds appearance and bumps support (9) in this place that hinders structural column (3).
2. according to claim 1ly a kind ofly underpin the structure that supports in the steel concrete with shaped steel, it is characterized in that: described shaped steel is the shaped steel that the surface is provided with the shearing resistance crab-bolt.
3. construction method with underpinning reinforced concrete inner support by profile steels, according to the following steps operation is implemented:
1) determine can occur and bump in this place that hinders structural column and support,
2) above this inner support, two piece the be arranged shaped steel parallel with this inner support are set, its parallel aperture for greater than and wrap up on the inner support cross-sectional area of the structural column that can occur;
3) above the vertical distance of two shaped steel that be arranged in parallel, second group of two shaped steel that be arranged in parallel is set again;
4) each parallel weldering is put to put with vertical welding and is connected shaped steel between four of both ends shaped steel;
5) both ends welderings is put four shaped steel that connect shaped steel and all is embedded in the steel concrete buttress;
6) shaped steel that is embedded in armored concrete buttress place arranges crab-bolt with the surface that is connected shaped steel;
7) be embedded in the interior stayed surface bar planting at steel concrete buttress place;
8) local explosion cuts this place's inner support that the resistance structural column can occur and bump.
CN 201110120733 2011-05-11 2011-05-11 Structure for underpinning reinforced concrete inner support by profile steels and construction method for same Pending CN102191776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110120733 CN102191776A (en) 2011-05-11 2011-05-11 Structure for underpinning reinforced concrete inner support by profile steels and construction method for same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110120733 CN102191776A (en) 2011-05-11 2011-05-11 Structure for underpinning reinforced concrete inner support by profile steels and construction method for same

Publications (1)

Publication Number Publication Date
CN102191776A true CN102191776A (en) 2011-09-21

Family

ID=44600574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110120733 Pending CN102191776A (en) 2011-05-11 2011-05-11 Structure for underpinning reinforced concrete inner support by profile steels and construction method for same

Country Status (1)

Country Link
CN (1) CN102191776A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421466A (en) * 2015-11-26 2016-03-23 中国建筑第八工程局有限公司 Underpinning construction method and underpinning device for temporary latticed column

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05118036A (en) * 1991-10-30 1993-05-14 Toda Constr Co Ltd Waling material
KR100841979B1 (en) * 2007-11-13 2008-06-27 이태영 Cydlinder type jack
CN101476331A (en) * 2007-12-12 2009-07-08 中国二十冶建设有限公司 Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch
CN202055250U (en) * 2011-05-11 2011-11-30 中天建设集团有限公司 Structure replacing reinforced concrete inner support by section steel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05118036A (en) * 1991-10-30 1993-05-14 Toda Constr Co Ltd Waling material
KR100841979B1 (en) * 2007-11-13 2008-06-27 이태영 Cydlinder type jack
CN101476331A (en) * 2007-12-12 2009-07-08 中国二十冶建设有限公司 Closed demolition blasting method for internal concrete reinforcement bracing of basement foundation ditch
CN202055250U (en) * 2011-05-11 2011-11-30 中天建设集团有限公司 Structure replacing reinforced concrete inner support by section steel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《建筑施工》 20100731 徐立胜等人 钢筋混凝土内支撑用型钢托换进行局部爆破的施工技术 第32卷, 第7期 *
《施工技术》 20100531 楼永良等人 郑州绿地广场基坑支撑替换技术 第39卷, 第5期 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421466A (en) * 2015-11-26 2016-03-23 中国建筑第八工程局有限公司 Underpinning construction method and underpinning device for temporary latticed column

Similar Documents

Publication Publication Date Title
CN103437567B (en) Method for supporting existing building underground added storey through original pile foundations
CN102635120B (en) Circular deep foundation ditch is without Construction of Supporting structure and construction method
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN110206038B (en) Supporting structure at external corner of concave foundation pit and construction method
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN101240550A (en) Construction method for lattice type steel column tower crane pedestal
CN202012088U (en) Foundation structure of tower crane
CN204326082U (en) A kind of foundation pit enclosure structure be applicable on soft foundation
CN101736757A (en) Two-way synchronous construction method of tube structure of high-rise building
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN104652475A (en) Truss type retaining wall
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN205557537U (en) Supporting structure of foundation pit
CN202519697U (en) Steel hoop truss high pile-cap tower crane basic structure
CN201891128U (en) Single-pile elevated bearing-platform tower-crane foundation structure
Clemente et al. Seismic isolation in existing complex structures
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN205024600U (en) A work platform that is used for bridge aquatic pile foundation to be under construction
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN212175797U (en) Large-span underground space deep foundation pit supporting system
CN102191776A (en) Structure for underpinning reinforced concrete inner support by profile steels and construction method for same
CN202055250U (en) Structure replacing reinforced concrete inner support by section steel
CN203625911U (en) Soil discharging construction structure with pit-in-pit door opening arranged in deep foundation pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110921