CN101476286A - 铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法 - Google Patents

铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法 Download PDF

Info

Publication number
CN101476286A
CN101476286A CNA2008101476541A CN200810147654A CN101476286A CN 101476286 A CN101476286 A CN 101476286A CN A2008101476541 A CNA2008101476541 A CN A2008101476541A CN 200810147654 A CN200810147654 A CN 200810147654A CN 101476286 A CN101476286 A CN 101476286A
Authority
CN
China
Prior art keywords
crossbeam
longeron
draw
stretch
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101476541A
Other languages
English (en)
Other versions
CN101476286B (zh
Inventor
卿三惠
王佑江
蒋光全
郜小群
周祖海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 5th Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway Erju 5th Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway Erju 5th Engineering Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN2008101476541A priority Critical patent/CN101476286B/zh
Publication of CN101476286A publication Critical patent/CN101476286A/zh
Application granted granted Critical
Publication of CN101476286B publication Critical patent/CN101476286B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法,方法步骤为:1)横梁安装;2)横梁临时锁定;3)纵梁安装;4)通长钢铰线的施工;5)格构体系的转换。本发明通过对纵横梁格构式漂浮体系的施工方法,成功完成了漂浮体系的成功转换,顺利、安全、高质量完成了大桥的施工,取得了较好的社会和经济效益。

Description

铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法
技术领域
本发明涉及铁路桥梁的桥面结构施工,尤其是涉及一种铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法。
背景技术
目前铁路桥梁的桥面结构多采用连续钢构或简支梁,简支梁跨度小,适合地势平坦的地形条件;连续钢构跨度较大,但在陡峭的地方桥墩高,安全威胁大,施工方法多采用挂篮悬灌的施工方法,施工工艺较成熟,没有创新点,都为普通的桥梁施工方法。
本发明铁路桥梁的桥面结构采用预应力混凝土纵-横梁格构式漂浮体系,在国内外尚属首次;目前的公路桥梁中纵—横梁格构体系一般采用支架现浇法施工。
发明内容
本发明的目的是提供一种漂浮体系的成功转换,顺利、安全、高质量完成了大桥的施工的铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法。
为了达到上述目的,本发明采用如下技术方案:一种铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法,按如下步骤进行:
1)、横梁安装:横梁采取集中预制,安装采用缆索起重机双钩起吊,安装时,受拱肋净宽限制,起吊状态下将横梁空中水平旋转35~45度,使横梁边缘距拱肋均大于0.2米,然后穿过两侧拱肋下放横梁,下降位置超过肋间横撑后,将横梁转回原位垂直于桥轴线,到达安装位置时,用捎绳稳定横梁,安装吊杆,测定横梁标高,达到要求时,松钩解除横梁上的吊具;
2)、横梁临时锁定:横梁安装就位高程调整完成后,进行桥面临时锁定结构的安装,桥面临时锁定结构采用万能杆件组拼成2×2米截面的桁架,根据横梁间不同跨距进行桁梁长度调整,此时桥梁两端桁梁与桥台或肋间横梁固结,其余部位与预埋在横梁上的钢板焊接,上下游各一列贯通,确保横梁不偏转、不摆动;
3)、纵梁安装:首先安装压重梁,再安装次中纵梁,进行定位观测,精度满足要求后用限位钢筋穿过横梁和纵梁,限制纵梁位移;然后在湿接缝位置安装精轧螺纹钢,梁跨间用专用连接器进行连接;预埋通长钢铰线波纹管、注浆三通管、通长钢铰线的牵引导向索,钢筋安装施工,安装湿接缝模板,浇注湿接缝混凝土,待混凝土强度达到90%后,松开施工跨横梁临时锁定结构,用60吨的千斤顶进行单端张拉预应力精轧螺纹钢筋,注浆完成达到强度后再安装下一跨次中纵梁;依以上工序循环将次中纵梁安装至肋间横梁完成次中纵梁的安装施工;用同样的施工方法再安装中、边纵梁、固定端跨的纵梁。
4)、通长钢铰线的施工:待全桥纵梁安装完成,湿接缝混凝土灌注完成强度达到95%后,进行通长钢铰线安装和张拉:通过孔道摩阻试验,确定孔道摩阻系数μ=0.25,孔道偏差系数k-0.0015进行取值;张拉伸长值满足±6%的要求,张拉顺利完成;通长钢铰线张拉采用四台250吨千斤顶同时张拉,两台为一组,两岸对称张拉,上下游同时进行张拉,两岸保持同步;通长钢铰线管道注浆采用真空注浆法施工。
5)、格构体系的转换:待横向预应力、横梁第三阶段预应力钢铰线张拉及孔道注浆完成后,拆除临时支座,使桥面体系完全作用在永久滑动支座上,完成桥面漂浮体系的成功转换。
本发明通过临时锁定技术解决纵、横梁预制件安装过程中定位、调整以及防止横梁偏转导致湿接缝混凝土开裂等技术问题,本发明通过预应力孔道的精确对位、通长钢铰线的张拉,桥面线形的控制,顺利完成漂浮体系受力的成功转换等技术问题。
本发明的有益效果是:
本发明通过对纵横梁格构式漂浮体系的施工方法,成功完成了漂浮体系的成功转换,顺利、安全、高质量完成了大桥的施工,取得了较好的社会和经济效益。
附图说明
图1是本发明的详细流程工艺图;
图2是本发明中纵梁通长钢较线张拉顺序图。
具体实施方式
本发明铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法中的纵横梁采用预制吊装,先横梁后纵梁,先简支后连续的施工方法,通过临时固结横梁、平衡梁压重、分步吊装纵梁、现浇湿接头、分步施加预应力等方法实现格构体系转换。
格构体系施工工艺流程为:(见图1和图2所示)
1)、横梁安装:横梁采取集中预制,安装利用缆索起重机双钩起吊。受拱肋净宽限制,起吊状态下,将横梁空中水平旋转约40度,使横梁边缘距拱肋均大于0.2米,然后穿过两侧拱肋下放横梁,下降位置超过肋间横撑后,将横梁转回原位,即垂直于桥轴线,到达安装位置时,用捎绳稳定横梁,安装吊杆,测定横梁标高,达到要求时,松钩解除横梁上的吊具。
2)、横梁临时锁定:横梁安装就位高程调整完成后,进行桥面临时锁定结构的安装,桥面临时锁定结构采用万能杆件组拼成2×2米截面的桁架,根据横梁间不同跨距进行桁梁长度调整。桥梁两端桁梁与桥台或肋间横梁固结,其余部位与预埋在横梁上的钢板焊接,上下游各一列贯通,以确保横梁不偏转、不摆动。
3)、纵梁安装:首先安装压重梁,再安装次中纵梁,进行定位观测,精度满足要求后用限位钢筋穿过横梁和纵梁,限制纵梁位移;然后在湿接缝位置安装精轧螺纹钢,梁跨间用专用连接器进行连接;预埋通长钢铰线波纹管、注浆三通管、通长钢铰线的牵引导向索,钢筋安装施工,安装湿接缝模板,浇注湿接缝混凝土,待混凝土强度达到90%后,松开施工跨横梁临时锁定结构,用60吨的千斤顶进行单端张拉预应力精轧螺纹钢筋,注浆完成达到强度后再安装下一跨次中纵梁;依以上工序循环将次中纵梁安装至肋间横梁完成次中纵梁的安装施工;用同样的施工方法再安装中、边纵梁、固定端跨的纵梁。
4)、通长钢铰线的施工:待全桥纵梁安装完成,湿接缝混凝土灌注完成强度达到95%后,进行通长钢铰线安装和张拉:通过孔道摩阻试验,确定孔道摩阻系数μ=0.25,孔道偏差系数k=0.0015进行取值。张拉伸长值满足±6%的要求,张拉顺利完成。通长钢铰线张拉采用四台250吨千斤顶同时张拉,两台为一组,两岸对称张拉,上下游同时进行张拉,两岸保持同步。通长钢铰线管道注浆采用真空注浆法施工。
5)、格构体系的转换:待横向预应力、横梁第三阶段预应力钢铰线张拉及孔道注浆完成后,拆除临时支座,使桥面体系完全作用在永久滑动支座上,完成桥面漂浮体系的成功转换。桥面成桥后桥面高程、轴线、线形均满足设计和规范要求。
本发明施工方法中所使用的工具以及设备都可以采用现有的工具和设备。

Claims (1)

1、一种铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法,其特征在于:按如下步骤进行:
1)、横梁安装:横梁采取集中预制,安装采用缆索起重机双钩起吊,安装时,受拱肋净宽限制,起吊状态下将横梁空中水平旋转35-45度,使横梁边缘距拱肋均大于0.2米,然后穿过两侧拱肋下放横梁,下降位置超过肋间横撑后,将横梁转回原位垂直于桥轴线,到达安装位置时,用捎绳稳定横梁,安装吊杆,测定横梁标高,达到要求时,松钩解除横梁上的吊具;
2)、横梁临时锁定:横梁安装就位高程调整完成后,进行桥面临时锁定结构的安装,桥面临时锁定结构采用万能杆件组拼成2×2米截面的桁架,根据横梁间不同跨距进行桁梁长度调整,此时桥梁两端桁梁与桥台或肋间横梁固结,其余部位与预埋在横梁上的钢板焊接,上下游各一列贯通,确保横梁不偏转、不摆动;
3)、纵梁安装:首先安装压重梁,再安装次中纵梁,进行定位观测,精度满足要求后用限位钢筋穿过横梁和纵梁,限制纵梁位移;然后在湿接缝位置安装精轧螺纹钢,梁跨间用专用连接器进行连接;预埋通长钢铰线波纹管、注浆三通管、通长钢铰线的牵引导向索,钢筋安装施工,安装湿接缝模板,浇注湿接缝混凝土,待混凝土强度达到90%后,松开施工跨横梁临时锁定结构,用60吨的千斤顶进行单端张拉预应力精轧螺纹钢筋,注浆完成达到强度后再安装下一跨次中纵梁;按以上工序循环将次中纵梁安装至肋间横梁完成次中纵梁的安装施工;用同样的施工方法再安装中、边纵梁、固定端跨的纵梁。
4)、通长钢铰线的施工:待全桥纵梁安装完成,湿接缝混凝土灌注完成强度达到95%后,进行通长钢铰线安装和张拉:通过孔道摩阻试验,确定孔道摩阻系数μ=0.25,孔道偏差系数k=0.0015进行取值;张拉伸长值满足±6%的要求,张拉顺利完成;通长钢铰线张拉采用四台250吨千斤顶同时张拉,两台为一组,两岸对称张拉,上下游同时进行张拉,两岸保持同步;通长钢铰线管道注浆采用真空注浆法施工。
5)、格构体系的转换:待横向预应力、横梁第三阶段预应力钢铰线张拉及孔道注浆完成后,拆除临时支座,使桥面体系完全作用在永久滑动支座上,完成桥面漂浮体系的成功转换。
CN2008101476541A 2008-11-24 2008-11-24 铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法 Active CN101476286B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101476541A CN101476286B (zh) 2008-11-24 2008-11-24 铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101476541A CN101476286B (zh) 2008-11-24 2008-11-24 铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法

Publications (2)

Publication Number Publication Date
CN101476286A true CN101476286A (zh) 2009-07-08
CN101476286B CN101476286B (zh) 2010-11-17

Family

ID=40837060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101476541A Active CN101476286B (zh) 2008-11-24 2008-11-24 铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法

Country Status (1)

Country Link
CN (1) CN101476286B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493354A (zh) * 2011-12-23 2012-06-13 中铁大桥局股份有限公司 高速铁路预应力混凝土连续梁整联顶推施工方法
CN102817325A (zh) * 2012-09-13 2012-12-12 永升建设集团有限公司 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法
CN103469805A (zh) * 2013-09-10 2013-12-25 叶长青 预应力筏板基础的施工方法
CN105781121A (zh) * 2016-03-16 2016-07-20 浙江大学城市学院 双向不对称张拉预应力束道理论伸长量的确定方法
CN106049289A (zh) * 2016-06-30 2016-10-26 中铁第四勘察设计院集团有限公司 贝雷梁临时便桥改造为钢混组合永久桥的施工方法
CN107794843A (zh) * 2017-10-24 2018-03-13 山西省交通科学研究院 一种桥梁减震限位器实施方法
CN108532442A (zh) * 2018-04-08 2018-09-14 北京城建道桥建设集团有限公司 斜拉桥宽幅梁格型主梁结构、组合模板体系及其施工方法
CN108568468A (zh) * 2017-03-09 2018-09-25 中铁宝桥集团有限公司 一种空间扭曲板单元成型工装及使用方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493354A (zh) * 2011-12-23 2012-06-13 中铁大桥局股份有限公司 高速铁路预应力混凝土连续梁整联顶推施工方法
CN102493354B (zh) * 2011-12-23 2014-01-15 中铁大桥局股份有限公司 高速铁路预应力混凝土连续梁整联顶推施工方法
CN102817325A (zh) * 2012-09-13 2012-12-12 永升建设集团有限公司 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法
CN102817325B (zh) * 2012-09-13 2015-05-13 永升建设集团有限公司 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法
CN103469805A (zh) * 2013-09-10 2013-12-25 叶长青 预应力筏板基础的施工方法
CN103469805B (zh) * 2013-09-10 2015-07-29 叶长青 预应力筏板基础的施工方法
CN105781121A (zh) * 2016-03-16 2016-07-20 浙江大学城市学院 双向不对称张拉预应力束道理论伸长量的确定方法
CN106049289A (zh) * 2016-06-30 2016-10-26 中铁第四勘察设计院集团有限公司 贝雷梁临时便桥改造为钢混组合永久桥的施工方法
CN106049289B (zh) * 2016-06-30 2018-01-16 中铁第四勘察设计院集团有限公司 贝雷梁临时便桥改造为钢混组合永久桥的施工方法
CN108568468A (zh) * 2017-03-09 2018-09-25 中铁宝桥集团有限公司 一种空间扭曲板单元成型工装及使用方法
CN107794843A (zh) * 2017-10-24 2018-03-13 山西省交通科学研究院 一种桥梁减震限位器实施方法
CN108532442A (zh) * 2018-04-08 2018-09-14 北京城建道桥建设集团有限公司 斜拉桥宽幅梁格型主梁结构、组合模板体系及其施工方法

Also Published As

Publication number Publication date
CN101476286B (zh) 2010-11-17

Similar Documents

Publication Publication Date Title
CN101476286B (zh) 铁路桥面预应力混凝土纵横梁格构式漂浮体系施工方法
CN105839510B (zh) 一种钢‑超高性能混凝土组合连续梁桥结构及其施工方法
CN110042769B (zh) 一种组合梁斜拉桥辅助跨全悬臂拼装施工方法
CN201512345U (zh) 多功能整体吊装架
CN103882812B (zh) 斜拉索桥中跨主梁的施工方法
CN108004924B (zh) 双塔双索面混合式钢-混叠合梁斜拉桥的中跨段的合拢方法
CN103255726A (zh) 一种连续梁拱组合桥的施工方法
CN112227206A (zh) 一种地锚转自锚架梁工艺设计及施工方法
CN209652741U (zh) 一种跨铁路站场大跨度高架桥
CN113120771A (zh) 适用于复合截面节段梁桥后装挑臂的双侧同步吊装设备及施工方法
CN104831632A (zh) 一种桥梁索塔上横梁与下横梁施工方法
CN114808722A (zh) 一种斜拉桥钢混主梁的施工方法
CN111485500A (zh) 一种菱形挂篮后退拆除横向加长加固施工方法及结构
CN102277836B (zh) 倾斜式混凝土塔座的施工方法
CN105484166B (zh) 一种梯型桅杆式悬拼吊机
CN212714544U (zh) 一种菱形挂篮后退拆除横向加长加固施工结构
CN109371852A (zh) 一种跨铁路站场的高架桥施工方法
CN207987749U (zh) 骑索式桥面吊机
CN103835238B (zh) 一种高墩斜拉桥0号块无支架施工方法及施工中的结构
CN111042003A (zh) 一种斜拉桥混凝土梁组合式挂篮施工方法
CN208668245U (zh) 一种用于斜拉桥的钢-uhpc组合梁构造
CN110344334A (zh) 采用背索式架桥机的两跨连做钢混组合桥梁施工方法
CN106522566B (zh) 一种屋盖钢桁架滑移轨道及拆装方法
CN114991006A (zh) 一种多桁架式超宽桥面施工用菱形挂篮装置
CN205474785U (zh) 一种钢-超高性能混凝土组合连续梁桥结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Qing San Hui

Inventor after: Wang Youjiang

Inventor after: Jiang Guangquan

Inventor after: Gao Xiaoqun

Inventor after: Zhou Zuqing

Inventor before: Qing San Hui

Inventor before: Wang Youjiang

Inventor before: Jiang Guangquan

Inventor before: Gao Xiaoqun

Inventor before: Zhou Zuhai

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: QING SANHUI WANG YOUJIANG JIANG GUANGQUAN GAO XIAOQUN ZHOU ZUHAI TO: QING SANHUI WANG YOUJIANG JIANG GUANGQUAN GAO XIAOQUN ZHOU ZUQING

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160120

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU 5TH ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190109

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 5TH ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right