CN101464234A - 用于管片接头试验的管片试件制造方法 - Google Patents

用于管片接头试验的管片试件制造方法 Download PDF

Info

Publication number
CN101464234A
CN101464234A CNA2008102052965A CN200810205296A CN101464234A CN 101464234 A CN101464234 A CN 101464234A CN A2008102052965 A CNA2008102052965 A CN A2008102052965A CN 200810205296 A CN200810205296 A CN 200810205296A CN 101464234 A CN101464234 A CN 101464234A
Authority
CN
China
Prior art keywords
steel plate
duct piece
specimen
test
loading end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102052965A
Other languages
English (en)
Other versions
CN101464234B (zh
Inventor
曹文宏
陈正杰
申伟强
乔宗昭
杨志豪
楼葭菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN 200810205296 priority Critical patent/CN101464234B/zh
Publication of CN101464234A publication Critical patent/CN101464234A/zh
Application granted granted Critical
Publication of CN101464234B publication Critical patent/CN101464234B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及试件的制造方法,具体涉及一种用于隧道管片接头试验的管片试件制造方法,该方法步骤如下:制作管片试件的钢筋笼,并按照管片试件加载端位置在所述钢筋笼结构的相对应加载端位置处预留槽形拼接钢板的安装位;将槽型拼接钢板安装在钢筋笼结构的加载端;之后将钢筋笼结构和槽型拼接钢板放入现有钢模中固定并进行试件的混凝土浇筑;试件养护完成后在所述拼接钢板上焊接肋板钢结构,肋板钢结构的构造根据加载端荷载要求进行设计,采用隧道现有钢模进行试验构件的制作,不仅能保证试验构件与隧道管片制作精度的一致性,而且对于加载边端进行保护,保证了试验数据的准确,而且减少了试件的钢模加工成本,节约了试验时间。

Description

用于管片接头试验的管片试件制造方法
技术领域
本发明涉及试件的制造方法,具体涉及一种用于隧道管片接头试验的管片试件制造方法。
背景技术
对于钢筋混凝土管片,由于接头刚度和承载力低于管片本身的刚度和承载力,接头成为衬砌环的薄弱环节,衬砌环的承载力是由其接头的承载力所控制,接头转角变形和接缝张开导致圆环的变形并影响接缝的防水效果。因为单靠理论计算是难以得到管片的接头刚度的,为了确保结构的安全,了解管片设计得合理与否,必须对衬砌环进行管片接头刚度试验。
在传统的隧道管片试验中通常有三种方式:一种采用等比例缩小的管片模型进行接头试验;或者是采用材质均匀的圆管进行切割来模拟隧道结构;再者是直接使用施工用的现有管片进行接头试验。
三种试验方法的不足在于:第一种方法需要重新制作试验用的钢模,并且由于采用等比例缩小的试验管片,得到的试验数据会出现一定的误差。第二种方法比第一种方法省时省力,但是得到的隧道管片试验数据与原型差别更大。第三种由于管片为混凝土结构,在加载端施加压力时会造成边端混凝土结构的损坏,造成试验数据的不精准。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种用于管片接头试验的加载方法,该方法在管片试件钢筋笼的加载端安装槽形拼接钢板,并通过现有钢模并进行试件的混凝土浇筑,待试件养护完成后在所述槽型拼接钢板上焊接肋板钢结构,以避免试验中对试件加载端的损坏,保证试验数据的精准。
本发明目的实现由以下技术方案完成:
一种用于管片接头试验的管片试件制造方法,其特征在于该方法步骤如下:制作管片试件的钢筋笼,并按照管片试件加载端位置在所述钢筋笼结构的相对应加载端位置处预留槽形拼接钢板的安装位;将槽型拼接钢板安装在钢筋笼结构的加载端;之后将钢筋笼结构和槽型拼接钢板放入现有钢模中固定并进行试件的混凝土浇筑;试件养护完成后在所述拼接钢板上焊接肋板钢结构,肋板钢结构的构造根据加载端荷载要求进行设计。
所述槽型拼接钢板由弧形的下钢板和上钢板以及边端钢板焊接而成,所述下钢板和上钢板的弧度分别和管片内外弧面一致,所述边端钢板宽度和管片试件厚度一致。
所述槽形拼接钢板的上钢板和下钢板之间焊接有不少于一个的锚筋。
本发明的优点是,采用隧道现有钢模进行试验构件的制作,不仅能保证试验构件与隧道管片制作精度的一致性,而且对于加载边端进行保护,保证了试验数据的准确,而且减少了试件的钢模加工成本,节约了试验时间。
附图概述
附图1为本发明实施例管片试件主视图;
附图2为本发明实施例管片试件侧视图;
附图3为本发明实施例管片试件加载端结构示意图。
具体实施方案
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如附图1至3所示,标号1-11分别表示:加载端1、槽形拼接钢板2、肋板钢结构3、管片4、上钢板5、下钢板6、边端钢板7、锚筋8、试件试验接头9、端板10、肋板11。
本实施例通过在管片试件4钢筋笼的加载端安装槽形拼接钢板2,并通过现有钢模固定并进行试件的混凝土浇筑,待试件养护完成后在所述槽型拼接钢板2上焊接肋板钢结构3的方法来保证加载实验的准确。
本实施例制作的管片试件4为通用隧道管片的试件。
本实施例方法步骤如下:
首先制作管片试件4的钢筋笼,并按照管片试件4加载端位置在钢筋笼的相对应加载端位置处预留槽形拼接钢板2的安装位;
将槽型拼接钢板2拼接在钢筋笼的加载端;之后将钢筋笼和槽型拼接钢板2放入现有钢模中固定,并进行试件的混凝土浇筑,槽型拼接钢板2与钢模上固定预埋件相互阻碍时,可局部割除槽型拼接钢板2,待试件4浇筑好后进行补强作业,试件4养护完成后在槽型拼接钢板2上焊接与加载装置进行配套设计的肋板钢结构3。
制作槽型拼接钢板2所选用的上钢板5的弧度和管片试件4外弧面一致,下钢板6的弧度和管片试件4内弧面一致,边端钢板7的宽度和管片试件4的厚度相同,将上钢板5、下钢板6和边端钢板7焊接成槽形拼接钢板2,并在槽形拼接钢板2的上钢板5和下钢板6之间焊接锚筋8,锚筋8的数量可以根据不同试验的需求进行增减。
制作管片试件4的钢筋笼的钢筋材料选用通用管片材料,试件钢筋笼的尺寸规格与通用管片的钢筋笼基本相同,区别在于试件中钢筋笼的加载边端上预留槽形拼接钢板2的安装位,为槽形拼接钢板2安装定位。
肋板钢结构3主要作用是保证施加的荷载能有效、合理地传递到混凝土管片上,本实施例中肋板钢结构3由端板10和多个肋板11构成,端板10和肋板11材质是钢板,所述的肋板11焊接在槽型钢板上,端板10可与加载装置连接。显然,根据不同的试验和加载装置的需要,肋板钢结构可以由端板和肋板构成多种结构。
管片试件4与通用隧道管片制作精度一致,而且试件接头端互相拼接后可以保证和隧道内衬砌环的结构相同,再通过加载装置在加载端施加作用力,可以精确的获得所需的实验数据。

Claims (3)

1.一种用于管片接头试验的管片试件制造方法,其特征在于该方法步骤如下:制作管片试件的钢筋笼,并按照管片试件加载端位置在所述钢筋笼的相对应加载端位置处预留槽形拼接钢板的安装位;将槽型拼接钢板安装在钢筋笼结构的加载端;之后将钢筋笼结构和槽型拼接钢板放入现有钢模中固定并进行试件的混凝土浇筑;试件养护完成后在所述拼接钢板上焊接肋板钢结构,肋板钢结构的构造与加载端荷载要求对应。
2.根据权利要求1所述的一种用于管片接头试验的管片试件制造方法,其特征在于所述槽型拼接钢板由弧形的下钢板和上钢板以及边端钢板焊接而成,所述下钢板和上钢板的弧度分别和管片内外弧面一致,所述边端钢板宽度和管片试件厚度一致。
3.根据权利要求2所述的一种用于管片接头试验的管片试件制造方法,其特征在于所述槽形拼接钢板的上钢板和下钢板之间焊接不少于一个的锚筋。
CN 200810205296 2008-12-31 2008-12-31 用于管片接头试验的管片试件制造方法 Expired - Fee Related CN101464234B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810205296 CN101464234B (zh) 2008-12-31 2008-12-31 用于管片接头试验的管片试件制造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810205296 CN101464234B (zh) 2008-12-31 2008-12-31 用于管片接头试验的管片试件制造方法

Publications (2)

Publication Number Publication Date
CN101464234A true CN101464234A (zh) 2009-06-24
CN101464234B CN101464234B (zh) 2011-02-09

Family

ID=40804912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810205296 Expired - Fee Related CN101464234B (zh) 2008-12-31 2008-12-31 用于管片接头试验的管片试件制造方法

Country Status (1)

Country Link
CN (1) CN101464234B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105181252A (zh) * 2015-09-23 2015-12-23 同济大学 一种盾构隧道管片环缝抗渗性能试验用试件及其制造方法
CN105181270A (zh) * 2015-09-18 2015-12-23 中国矿业大学(北京) 一种应用三元乙丙橡胶止水条的纵向接缝的防水测试方法
CN105300601A (zh) * 2015-09-23 2016-02-03 同济大学 盾构隧道管片纵缝抗渗性能试验系统
CN105403366A (zh) * 2015-09-23 2016-03-16 同济大学 盾构隧道管片环缝抗渗性能试验系统
CN105510381A (zh) * 2016-01-21 2016-04-20 北京交通大学 一种盾构隧道管片衬砌接头过火试验方法
CN108169002A (zh) * 2017-12-22 2018-06-15 云南民族大学 一种测试钢-混凝土组合梁徐变特性的缩尺试验模型及方法
CN109655346A (zh) * 2018-11-06 2019-04-19 无锡地铁集团有限公司 一种隧道管片纵向力模拟施加装置及其方法
CN109853855A (zh) * 2018-12-19 2019-06-07 苏州交通工程集团有限公司 管片弧面型钢筋高精度保护层施工工艺
CN111707511A (zh) * 2020-06-09 2020-09-25 同济大学 一种用于接头力学试验的预设裂损隧道管片制作方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105181270A (zh) * 2015-09-18 2015-12-23 中国矿业大学(北京) 一种应用三元乙丙橡胶止水条的纵向接缝的防水测试方法
CN105181252A (zh) * 2015-09-23 2015-12-23 同济大学 一种盾构隧道管片环缝抗渗性能试验用试件及其制造方法
CN105300601A (zh) * 2015-09-23 2016-02-03 同济大学 盾构隧道管片纵缝抗渗性能试验系统
CN105403366A (zh) * 2015-09-23 2016-03-16 同济大学 盾构隧道管片环缝抗渗性能试验系统
CN105181252B (zh) * 2015-09-23 2019-01-25 同济大学 一种盾构隧道管片环缝抗渗性能试验用试件
CN105510381A (zh) * 2016-01-21 2016-04-20 北京交通大学 一种盾构隧道管片衬砌接头过火试验方法
CN108169002A (zh) * 2017-12-22 2018-06-15 云南民族大学 一种测试钢-混凝土组合梁徐变特性的缩尺试验模型及方法
CN109655346A (zh) * 2018-11-06 2019-04-19 无锡地铁集团有限公司 一种隧道管片纵向力模拟施加装置及其方法
CN109655346B (zh) * 2018-11-06 2021-05-04 无锡地铁集团有限公司 一种隧道管片纵向力模拟施加装置及其方法
CN109853855A (zh) * 2018-12-19 2019-06-07 苏州交通工程集团有限公司 管片弧面型钢筋高精度保护层施工工艺
CN111707511A (zh) * 2020-06-09 2020-09-25 同济大学 一种用于接头力学试验的预设裂损隧道管片制作方法

Also Published As

Publication number Publication date
CN101464234B (zh) 2011-02-09

Similar Documents

Publication Publication Date Title
CN101464234B (zh) 用于管片接头试验的管片试件制造方法
CN101736839B (zh) 预留水暖井洞口的预应力混凝土楼板施工方法
CN110722327B (zh) 一种整体插入式锚箱制作方法
CN113250468A (zh) 一种高层建筑的对称悬挑钢桁架施工方法及施工结构
CN112570998A (zh) 一种火力发电机组空冷管道制作工艺方法
CN202673588U (zh) 用于连接混凝土塔筒和钢塔筒的装置
CN111506952A (zh) 一种利用bim建模桩基础指导的蜂窝钢结构施工方法
CN201738305U (zh) 钢筋笼钢筋接头对接精度控制装置
CN108190044B (zh) 一种飞行器装配全轴向热防护构件的装配方法
CN101477002B (zh) 用于管片接头试验的管片试件
CN201355328Y (zh) 一种试验用管片试件
CN102561694B (zh) 大曲率球形混凝土结构支模施工方法
CN205000633U (zh) 一种定制弧形钢模板
CN110616839A (zh) 基于轻钢龙骨和水泥板的混凝土叠合板底板制备方法
CN102319776B (zh) 电解槽壳体端板结构的加工装置及加工方法
CN113514024B (zh) 一种机翼试验件及其加工方法
CN210636825U (zh) 一种提高剪力钉定位精度的工具
CN201574523U (zh) 钢筋定位卡
CN210002241U (zh) 装配化墩桩连接构造
CN110205943B (zh) 预制简支小箱梁端横梁的施工方法
CN219638475U (zh) 一种钢模免支撑梁加固装置
CN220364874U (zh) 一种基于ecc材料的桥梁湿接缝结构
CN202756372U (zh) 用于安装行车的辅助引销
CN211737137U (zh) 盾构圆环支架模板快速安装装置
CN208451603U (zh) 一种卷取机检修安全平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20181231