CN101446178B - Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith - Google Patents

Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith Download PDF

Info

Publication number
CN101446178B
CN101446178B CN200810232256XA CN200810232256A CN101446178B CN 101446178 B CN101446178 B CN 101446178B CN 200810232256X A CN200810232256X A CN 200810232256XA CN 200810232256 A CN200810232256 A CN 200810232256A CN 101446178 B CN101446178 B CN 101446178B
Authority
CN
China
Prior art keywords
hole
drilling
coal bed
inner core
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810232256XA
Other languages
Chinese (zh)
Other versions
CN101446178A (en
Inventor
殷新胜
石智军
姚宁平
田宏亮
王毅
田东庄
姚克
莫海涛
凡东
张幼振
李锁智
李泉新
冀前辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE filed Critical SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE
Priority to CN200810232256XA priority Critical patent/CN101446178B/en
Publication of CN101446178A publication Critical patent/CN101446178A/en
Application granted granted Critical
Publication of CN101446178B publication Critical patent/CN101446178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to wind pressure air drilling equipment in a downhole soft outbursting coal bed and a process matched therewith. At present, as the consequent layer drilling characterized by high construction speed, low cost and high gas extraction efficiency becomes the primary option for coal control and gas control in coal mines, for soft outbursting coal beds, the gas extraction efficiency is directly dependant upon the pore-forming rate of the consequent layer drilling. The equipment comprises a boring machine, an air compressor, an orifice dust collection and dust removal device, a high-strength large through-hole drill rod, a drill bit with an inner core which can automatically fall off, and an antistatic explosion-protection PVC sieve tube; the boring machine which has large power and large torque supplies power to drilling construction; the orifice dust collection and dust removal device collects and eliminates slack carried out by wind from the orifice during drilling; and the antistatic explosion-protection PVC sieve tube is transferred from the interior of the high-strength large through-hole drill rod to the bottom of the orifice without lifting a drill on the completion of drilling, and at last remains in the orifice, thereby ensuring the completeness of drilling. The equipment and the process matched therewith provided by the invention has the advantages of increasing the pore-forming rate of the consequent layer drilling in soft outbursting coal beds, improving the effect of gas extraction, improving the working atmosphere of downhole air drilling, and protecting the production safety of outbursting coal mines.

Description

Soft projecting coal bed middle blast air drilling equipment in down-hole and process matched therewith
Technical field
The present invention relates to creep under the coal mine equipment and process matching, be specifically related to soft projecting coal bed middle blast air drilling equipment in a kind of down-hole and process matched therewith.
Technical background
Control coal and gas are outstanding to be the great task that China's coal-mine faces, and is the essential measure of guaranteeing mine safety and carry out gas pumping.Since country's promulgation control of coalmine gas policy, the gas pumping technology is growing.The particularly intensive application of wearing layer hole of grid type for alleviating soft projecting coal bed gas control pressure, improve gas pumping efficient, reducing coal and gas outburst risk, has been played positive effect.But wear the great in constructing amount of layer hole simultaneously, the cost height, speed is low.And compare with wearing a layer hole, with the obvious advantage along the gas pumping of layer boring: as all to be in inside, coal seam along layer boring, effectively extraction rate height; Fast along layer drilling construction speed, cost is low.For the advantage of maximum performance, must improve hole depth and aperture along layer boring along layer boring.For soft projecting coal bed for, regularity of coal seam is poor, the gas bearing capacity height, pressure is big, along the hole lock of tool drilling that easily collapses in the layer drilling construction process, has limited to the application in suitable layer of hole so again.At present, domestic governing problem for soft projecting coal bed gas adopts the indirect layer hole method of wearing mostly; And adopt a mine along layer hole pumping and mining gas, and it is limited along layer drilling construction degree of depth, and substantially all below 100m, and boring aperture is less.How improving soft projecting coal bed gas control efficient is the important topic of studying at present.
From present technical development situation, the main selection that speed of application is fast, cost is low, the gas pumping rate is high along layer boring will becoming colliery control coal and gas control.For soft projecting coal bed, the one-tenth porosity of holing along layer has just directly determined gas pumping efficient especially.In order to improve the one-tenth porosity of weak seam, need present conventional construction equipment and process matched therewith be improved along layer boring.
Summary of the invention
The invention provides soft projecting coal bed middle blast air drilling equipment in a kind of down-hole and process matched therewith, can improve a present suitable layer hole construction method at soft projecting coal bed gas control, increase effective hole depth in suitable layer hole, raising is along a layer hole one-tenth porosity; Help the coal-bed gas extraction, reduce the outstanding disaster occurrence probability of coal and gas; Reduce the protrusion-dispelling cost, improve safety production efficiency.
Soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention, comprise rig, air compressor machine, aperture control of dust dust arrester, high strength large through-hole drilling rod, inner core come off automatically drill bit and antistatic explosion-proof PVC screen casing, it is characterized in that: the air compressor machine air outlet directly is connected with drilling rod with high-voltage tube, provides the pressure wind regime by drill pipe bore in boring.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its aperture control of dust dust arrester directly is connected with orifice tube, and borehole sealing is become a confined space, helps the unified collection and treatment of cinder in the hole.
Under the described coal mine soft projecting coal bed in blast air drilling equipment, its aperture control of dust dust arrester when work, by shower nozzle to dust arrester internal spray water smoke to help the dirt that disappears.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its high strength large through-hole drilling rod internal diameter is greater than antistatic explosion-proof PVC screen casing external diameter, can satisfy the intensity needs that normally creep into, also can satisfy the space requirement of carrying antistatic explosion-proof PVC screen casing in the drilling rod.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its antistatic explosion-proof PVC screen casing is to punch to form on antistatic explosion-proof pvc pipe tube wall, makes it have gas permeability; Drilling and forming hole finishes the back and does not carry earlier brill, to carrying antistatic explosion-proof PVC screen casing at the bottom of the hole and it being stayed in the hole, guarantees the integrality of soft projecting coal bed boring by high strength large through-hole drilling rod inside, improves gas pumping efficient.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its inner core drill bit that comes off automatically is made up of inner core and bit body two parts, at the bottom of being transported to the hole, antistatic explosion-proof PVC screen casing carries when boring, inner core be subjected to antistatic explosion-proof PVC screen casing responsive to axial force automatically and bit body come off, open passage thus antistatic explosion-proof PVC screen casing can be stayed in the hole in putting forward the brill process smoothly.
The process matched therewith of soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention may further comprise the steps:
The first step, the location and installation rig: fixing rig, according to the position of drill site situation reasonable Arrangement air compressor machine;
Second step connected footpath at a gulp drill bit by crossover sub on high strength large through-hole drilling rod, perforate makes it satisfy orifice tube requirement down;
In the 3rd step, following orifice tube is installed aperture control of dust dust arrester;
In the 4th step, replacing connects the drill bit that comes off automatically, connects air supply device, beginning is normally crept into: the unit head speed of gyration is controlled between the 120-200r/min, creeps into feeding rate and is controlled between the 1-2m/min, and air feed pressure maximum can reach 1.2MPa, at the uniform velocity creep into, until creeping into to the target hole depth;
The 5th step, reach drilling depth, stop boring, remove air supply device, begin to carry antistatic explosion-proof PVC screen casing from high strength large through-hole drilling rod is inner at the bottom of the hole in the hole, carry brill, come off the automatically inner core of drill bit of inner core is come off by the automatic and bit body of antistatic explosion-proof PVC screen casing responsive to axial force, guarantee that antistatic explosion-proof PVC screen casing stays in the hole simultaneously, normally carry brill;
The 6th step, carry brill and finish, remove facility, intact hole.
The present invention compared with prior art, and is practical, and easy to maintenance, can satisfy the soft projecting coal bed requirement of creeping into along the coal-bed gas extraction borehole under the coal mine fully; Adopted the air compressor machine of independent air feed, its air feed pressure and air quantity are more than the twice of at present most of used mine system wind regimes, under being used of aperture control of dust dust arrester, greatly reduce the work plane dust, big latus rectum drilling rod of Cai Yonging and the automatic separation-type drill bit of inner core have strengthened conveying screen casing operability simultaneously, effectively raise the one-tenth porosity along layer hole, improve soft projecting coal bed gas control efficient greatly, ensured the mine production safety.
Description of drawings
Fig. 1 is a drill site construction schematic top plan view of the present invention.
Fig. 2 is an aperture control of dust dust arrester schematic diagram.
Fig. 3 is the tear-away drill bit structure schematic diagram of inner core.
Fig. 4 is the cross section view for Fig. 3.
Fig. 5 is antistatic explosion-proof PVC screen construction schematic diagram.
Specific embodiment
Referring to Fig. 1, soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention, comprise rig, air compressor machine, aperture control of dust dust arrester, high strength large through-hole drilling rod, inner core come off automatically drill bit and antistatic explosion-proof PVC screen casing, it is characterized in that: the air compressor machine air outlet directly is connected with drilling rod with high-voltage tube, provides the pressure wind regime by drill pipe bore in boring.
Referring to Fig. 2, soft projecting coal bed middle blast air drilling equipment under the described coal mine, its aperture control of dust dust arrester directly is connected with orifice tube, and borehole sealing is become a confined space, helps the unified collection and treatment of cinder in the hole.Under the coal mine soft projecting coal bed in blast air drilling equipment, its aperture control of dust dust arrester when work, by shower nozzle to dust arrester internal spray water smoke to help the dirt that disappears.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its high strength large through-hole drilling rod internal diameter is greater than antistatic explosion-proof PVC screen casing external diameter, can satisfy the intensity needs that normally creep into, also can satisfy the space requirement of carrying antistatic explosion-proof PVC screen casing in the drilling rod.
Referring to Fig. 5, soft projecting coal bed middle blast air drilling equipment under the described coal mine, its antistatic explosion-proof PVC screen casing is to punch to form on antistatic explosion-proof pvc pipe tube wall, makes it have gas permeability; Drilling and forming hole finishes the back and does not carry earlier brill, to carrying antistatic explosion-proof PVC screen casing at the bottom of the hole and it being stayed in the hole, guarantees the integrality of soft projecting coal bed boring by high strength large through-hole drilling rod inside, improves gas pumping efficient.
Referring to Fig. 3, Fig. 4, soft projecting coal bed middle blast air drilling equipment under the described coal mine, its inner core drill bit that comes off automatically is made up of inner core and bit body two parts, at the bottom of being transported to the hole, antistatic explosion-proof PVC screen casing carries when boring, inner core be subjected to antistatic explosion-proof PVC screen casing responsive to axial force automatically and bit body come off, open passage thus antistatic explosion-proof PVC screen casing can be stayed in the hole in putting forward the brill process smoothly.
The process matched therewith of soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention may further comprise the steps:
The first step, the location and installation rig: fixing rig, according to the position of drill site situation reasonable Arrangement air compressor machine;
Second step connected footpath at a gulp drill bit by crossover sub on high strength large through-hole drilling rod, perforate makes it satisfy orifice tube requirement down;
In the 3rd step, following orifice tube is installed aperture control of dust dust arrester;
In the 4th step, replacing connects the drill bit that comes off automatically, connects air supply device, beginning is normally crept into: the unit head speed of gyration is controlled between the 120-200r/min, creeps into feeding rate and is controlled between the 1-2m/min, and air feed pressure maximum can reach 1.2MPa, at the uniform velocity creep into, until creeping into to the target hole depth;
The 5th step, reach drilling depth, stop boring, remove air supply device, begin to carry antistatic explosion-proof PVC screen casing from high strength large through-hole drilling rod is inner at the bottom of the hole in the hole, carry brill, come off the automatically inner core of drill bit of inner core is come off by the automatic and bit body of antistatic explosion-proof PVC screen casing responsive to axial force, guarantee that antistatic explosion-proof PVC screen casing stays in the hole simultaneously, normally carry brill;
The 6th step, carry brill and finish, remove facility, intact hole.

Claims (5)

1. the soft projecting coal bed middle blast air drilling in down-hole is equipped, comprise rig (1), air compressor machine (2), aperture control of dust dust arrester (3), high strength large through-hole drilling rod (4), inner core come off automatically drill bit (5) and antistatic explosion-proof PVC screen casing (6), it is characterized in that: described air compressor machine (2) air outlet by high-voltage tube with in boring, provide the high strength large through-hole drilling rod (4) of pressure wind regime to be connected; Described high strength large through-hole drilling rod (4) internal diameter is greater than antistatic explosion-proof PVC screen casing (6) external diameter; The described inner core drill bit (5) that comes off automatically is made up of inner core and bit body two parts, can separate with bit body when inner core is subjected to axial force.
2. the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 1, it is characterized in that: described aperture control of dust dust arrester (3) is connected with orifice tube, constitutes a confined space.
3. the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 1 and 2 is characterized in that: the shower nozzle (7) to dust arrester internal spray water smoke is set in the described aperture control of dust dust arrester (3).
4. the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 3, it is characterized in that: described antistatic explosion-proof PVC screen casing (6) is for being provided with the antistatic explosion-proof pvc pipe of air-vent on the tube wall.
5. the process matched therewith of soft projecting coal bed middle blast air drilling equipment, it is characterized in that: its operation may further comprise the steps:
The first step, the location and installation rig: fixing rig (1), according to the position of drill site situation reasonable Arrangement air compressor machine (2);
Second step, go up connection footpath at a gulp drill bit at high strength large through-hole drilling rod (4), perforate makes it satisfy orifice tube requirement down;
In the 3rd step, following orifice tube is installed aperture control of dust dust arrester (3);
The 4th step, change to connect the inner core drill bit (5) that comes off automatically, connect air supply device, beginning is normally crept into: the unit head speed of gyration is controlled between the 120-200r/min, creeping into feeding rate is controlled between the 1-2m/min, air feed pressure maximum can reach 1.2MPa, at the uniform velocity creeps into, until creeping into to the target hole depth;
The 5th step, reach drilling depth, stop boring, remove air supply device, begin to carry antistatic explosion-proof PVC screen casing (6) from high strength large through-hole drilling rod (4) is inner at the bottom of the hole in the hole, carry brill, come off the automatically inner core (8) of drill bit (5) of inner core is come off by the automatic and bit body (9) of antistatic explosion-proof PVC screen casing (6) responsive to axial force, guarantee that antistatic explosion-proof PVC screen casing (6) stays in the hole simultaneously, normally carry brill;
The 6th step, carry brill and finish, remove facility, intact hole.
CN200810232256XA 2008-11-13 2008-11-13 Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith Active CN101446178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810232256XA CN101446178B (en) 2008-11-13 2008-11-13 Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810232256XA CN101446178B (en) 2008-11-13 2008-11-13 Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith

Publications (2)

Publication Number Publication Date
CN101446178A CN101446178A (en) 2009-06-03
CN101446178B true CN101446178B (en) 2011-11-16

Family

ID=40742034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810232256XA Active CN101446178B (en) 2008-11-13 2008-11-13 Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith

Country Status (1)

Country Link
CN (1) CN101446178B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322697A (en) * 2018-12-12 2019-02-12 中煤科工集团重庆研究院有限公司 Method for treating gas on high-gas coal face by using well instead of roadway

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975048B (en) * 2010-10-19 2013-12-25 陕西龙门天地油气技术有限公司 Construction process of multi-branch underground screen pipe
CN102031950B (en) * 2010-12-06 2012-02-15 煤炭科学研究总院西安研究院 Hole-forming process method for comb gas extraction borehole in coal seam roof
CN102383781B (en) * 2011-07-15 2014-01-08 河南理工大学 Method for measuring gas pressure of coal bed
CN102561952A (en) * 2011-11-28 2012-07-11 中煤科工集团重庆研究院 Large-through-hole opening type all-dimensional drilling bit and sieve tube lowering method thereof
CN102747953B (en) * 2012-03-06 2014-07-30 中国矿业大学 Multiple step type drilling and protecting integrated system and process for soft coal seam
CN102587828B (en) * 2012-03-06 2013-12-04 中国矿业大学 Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process
CN102587961B (en) * 2012-04-10 2013-12-25 中国矿业大学 Feeding method for hole protecting pipe for soft coal seam gas extraction hole
CN102635391B (en) * 2012-04-28 2014-02-12 陈凤平 Method for preventing and controlling gas outburst
CN102828707B (en) * 2012-09-25 2015-10-14 无锡金帆钻凿设备股份有限公司 The dust-proof slag-draining device of anchoring drilling machine
CN103195471B (en) * 2013-04-22 2015-05-20 中国矿业大学 Method for preventing drilling collapse of downhole coal bed
CN103216259B (en) * 2013-04-22 2015-01-14 中国矿业大学 System protecting underground coal bed hole drilling from collapse
CN103556944B (en) * 2013-11-13 2015-11-18 河南理工大学 For soft projecting coal bed creep into double-deck in the anti-blocking drilling tool of deslagging and using method thereof
CN103758450B (en) * 2014-01-17 2015-10-07 北京市市政工程研究院 A kind of certainly creeping into can with expansion anchor pole hole-forming device
CN103790618B (en) * 2014-03-05 2016-04-20 王宽 A kind of mining water-bath type orifice blowout prevention and dust arrester
CN106194058A (en) * 2014-12-02 2016-12-07 成都宸鸿科技有限公司 A kind of dust suction drilling rod
CN106194057A (en) * 2014-12-02 2016-12-07 成都宸鸿科技有限公司 A kind of Multifunctional drill rod
CN105239971B (en) * 2015-11-17 2017-12-22 中煤科工集团西安研究院有限公司 Soft coal bed in coal mine drilling screen casing conveying device and its carrying method
CN105545218B (en) * 2016-01-29 2018-05-22 河南理工大学 The open bionical drop resistance guard aperture drilling rod of soft seam drilling multiple wing indent and drilling method
CN108179975B (en) * 2018-01-25 2022-04-08 中国矿业大学 Mining drilling machine and dust removal device thereof
CN108374640B (en) * 2018-03-26 2019-05-21 中煤科工集团西安研究院有限公司 The soft projecting coal bed foam pressure-increasing directional drilling equipment of underground coal mine and method
CN109653689A (en) * 2019-01-25 2019-04-19 安徽理工大学 A kind of water conservancy diversion drilling rod
CN109611072A (en) * 2019-01-25 2019-04-12 安徽理工大学 A kind of pressure-relief outburst-prevention drilling machine
CN110344758B (en) * 2019-08-05 2020-08-25 湖南科技大学 Construction method for gas extraction drill hole of high-gas extremely-soft coal seam
CN113431623B (en) * 2021-07-28 2023-06-09 西安科技大学 High-gas weak coal seam extraction system and method
CN113565431A (en) * 2021-08-27 2021-10-29 中国铁建重工集团股份有限公司 Pressure control method of air compressor for pneumatic down-the-hole hammer
CN114658396B (en) * 2022-03-23 2023-07-14 中煤科工集团西安研究院有限公司 Gas conveying hole protection device and method for underground coal mine near-horizontal directional hole continuous screen pipe
CN115045640B (en) * 2022-06-27 2024-03-22 中煤科工集团西安研究院有限公司 Device and method for penetrating through borehole and opposite-pulling lower screen pipe

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4083415A (en) * 1975-12-18 1978-04-11 Kennametal Inc. Mining bit with replaceable work engaging member
CN2386182Y (en) * 1999-07-23 2000-07-05 大庆石油管理局钻井研究所 Antiseize drilling bit for putting explosive in blasthole on gravel layer and shifting sand
US6601454B1 (en) * 2001-10-02 2003-08-05 Ted R. Botnan Apparatus for testing jack legs and air drills
BE1014476A6 (en) * 2001-11-15 2003-11-04 Diamant Drilling Service Drilling tool for shafts, gas- and oil wells, has joint accommodated in chamber formed axially into body of cutting bit
CN101131091A (en) * 2007-07-26 2008-02-27 煤炭科学研究总院重庆分院 Down-hole coal bed air-pressing helix drilling tools and drilling method using the same
CN201037427Y (en) * 2007-04-02 2008-03-19 中国矿业大学 Extrusive danger coal bed safety guide spraying drilling device
CN201065735Y (en) * 2007-07-12 2008-05-28 煤炭科学研究总院西安分院 Central cable type high intensity large through-hole drill rod
CN201334869Y (en) * 2008-11-13 2009-10-28 煤炭科学研究总院西安研究院 Pressured air drilling equipment used in downhole loose and soft coal seam with potential gas outburst

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4083415A (en) * 1975-12-18 1978-04-11 Kennametal Inc. Mining bit with replaceable work engaging member
CN2386182Y (en) * 1999-07-23 2000-07-05 大庆石油管理局钻井研究所 Antiseize drilling bit for putting explosive in blasthole on gravel layer and shifting sand
US6601454B1 (en) * 2001-10-02 2003-08-05 Ted R. Botnan Apparatus for testing jack legs and air drills
BE1014476A6 (en) * 2001-11-15 2003-11-04 Diamant Drilling Service Drilling tool for shafts, gas- and oil wells, has joint accommodated in chamber formed axially into body of cutting bit
CN201037427Y (en) * 2007-04-02 2008-03-19 中国矿业大学 Extrusive danger coal bed safety guide spraying drilling device
CN201065735Y (en) * 2007-07-12 2008-05-28 煤炭科学研究总院西安分院 Central cable type high intensity large through-hole drill rod
CN101131091A (en) * 2007-07-26 2008-02-27 煤炭科学研究总院重庆分院 Down-hole coal bed air-pressing helix drilling tools and drilling method using the same
CN201334869Y (en) * 2008-11-13 2009-10-28 煤炭科学研究总院西安研究院 Pressured air drilling equipment used in downhole loose and soft coal seam with potential gas outburst

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322697A (en) * 2018-12-12 2019-02-12 中煤科工集团重庆研究院有限公司 Method for treating gas on high-gas coal face by using well instead of roadway

Also Published As

Publication number Publication date
CN101446178A (en) 2009-06-03

Similar Documents

Publication Publication Date Title
CN101446178B (en) Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith
CN201334869Y (en) Pressured air drilling equipment used in downhole loose and soft coal seam with potential gas outburst
CN103195471A (en) Method for preventing drilling collapse of downhole coal bed
CN103147708A (en) Through type down hole hammer reverse circulation drilling dust collection device
CN206957683U (en) A kind of coal seam pressure relief and permeability improvement system
CN104763368A (en) Orifice seal device for large-diameter downhole hammer and reverse circulation construction technology for orifice seal device
WO2024087965A1 (en) Well-ground combined mining coiled tubing directional fracturing gas extraction system and method
CN205823169U (en) Bore/punching integration anti-blockage holes highly effective slag draining drill bit
CN105888540B (en) A kind of drilling method of drilling
CN203499569U (en) Water-pressure-controlled drilling and blanking integrated efficient drill bit
CN104481580A (en) Method and device for repairing downhole coal-bed gas extraction drilled hole
CN103883304A (en) Method for underground coal gasification for gasifier channel establishment
CN102913274B (en) System for increasing yield of gas excavation borehole and method thereof
CN102748065A (en) Method for extracting gas of blank zone of working face with large mining length
CN203296725U (en) Through type DTH hammer reverse circulation drilling dust collecting device
CN201560795U (en) Apparatus for controlling dust with wind as medium during boring construction for gas drainage
CN107558962A (en) Concentric tube type batch-type gaslift drainage technology
CN105089608A (en) Injection tool matched with underground eddy current tool for water drainage and gas production and application method
CN206571429U (en) A kind of mining machinery mining drill bit
CN102128047B (en) Gas-slag separation and recovering system for drilling construction
CN107503680B (en) Ground large-diameter rapid drilling equipment and method thereof
CN103835647A (en) Method for drilling floating pebble bed
CN211474169U (en) Directional rig cooling water recycle device
CN107143374A (en) The gas production method and system of belt pressing type drilling malleation mining
CN103362541A (en) Method for locally improving coal seam air permeability in coal seam with high gas and low air permeability

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: XI AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY

Free format text: FORMER NAME: SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE

CP03 Change of name, title or address

Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Patentee after: Xi'an Research Institute, CCTEG

Address before: 710054 No. 52, Yanta Road, Xi'an, Shaanxi

Patentee before: Sian Branch Of China Coal Research Institute