CN102587828B - Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process - Google Patents
Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process Download PDFInfo
- Publication number
- CN102587828B CN102587828B CN2012100565224A CN201210056522A CN102587828B CN 102587828 B CN102587828 B CN 102587828B CN 2012100565224 A CN2012100565224 A CN 2012100565224A CN 201210056522 A CN201210056522 A CN 201210056522A CN 102587828 B CN102587828 B CN 102587828B
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- drilling
- pipe
- hole
- protecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
A gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process belong to soft coal seam cooperative drilling and protecting systems and process. The gas extraction and drilling cooperative drilling and protecting integrated system mainly consists of a control table, a hydraulic pump station, an air compressor, a feeding device, a drill stem, a hole protecting tube, a drill bit and the like. The hole protecting tube is located in the drill stem, and the hole protecting tube and the drill stem are synchronously connected and drill cooperatively. The depth of a drilled hole is equal to the length of the hole protecting tube. Finally, the hole protecting tube penetrates through the drill bit, and the drill stem is withdrawn while the hole protecting tube is remained in the hole to realize functions of supporting a hole wall and extracting gas. The system and the process are convenient in operation, the hole protecting tube and the drill stem realize cooperative drilling and protecting, the hole protecting tube is easy to be remained in the drilled hole, problems that the hole collapses and the hole protecting tube is difficult to be fed to the drilled hole can be resolved, the hole protecting depth is high, the hole wall can be supported more effectively, deformation and collapse are prevented, accordingly high gas extraction concentration and flow of the soft coal seams are guaranteed, and the gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and the process are particularly applicable to quite soft coal seams with the value of the firmness factor f smaller than 0,3.
Description
Technical field
The present invention relates to a kind of weak seam cooperating type and bore protecting system and technique, particularly a kind of weak seam mash gas pumping drilling bores and protects integral system and technique.
Technical background
China has 52% mine to belong to highly gassy mine, and gas control is the prerequisite that ensures the mine safety High-efficient Production.Yet China's weak seam ratio is very high, that mining area master's mining coal seams such as table mountain, Huainan, the Huaibei, Guizhou, Sichuan all belong to is soft, low thoroughly, high gas layer, and a lot of mine has coal and Gas Outburst danger.It is the effective means of administering gas that construction drill is taken out coal-bed gas in advance in advance, is also the measure that current China's coal-mine is generally taked.But at the coal seam solid coefficient
fValue is less than in 0.3 dead-soft coal seam, can deform after 90% above gas pumping hole drill, long distance collapses or even closed, thereby block Gas and mobile passage, has had a strong impact on the gas pumping effect.And mine is in order effectively to administer gas, and the drainage holes quantity of construction is a lot, and the input of manpower, fund and time is very large, and the single hole cost is very high, this has just caused gas pumping effect and gas control to drop into serious not mating.
Chinese patent, the patent No. is that CN101446178A discloses the soft projecting coal bed Wind pressure air drilling technique in a kind of down-hole, when drill bit gets into whole Kong Houxian from aperture, does not pull out of hole, and by drill pipe bore, sends into the guard aperture screen casing, pulls out of hole afterwards.Therefore, but be subject to coal (rock) soft or hard layering and drilling tool gravity effect, certainly lead to hole deviation while drilling, cause drilling track to be similar to parabola, long distance is sent in guard aperture pipe process, and hole wall is large to guard aperture pipe frictional resistance, disposable to send into overlength guard aperture pipe difficulty large; Document " firedamp taking-out discharging drilling guard aperture Discussion on Technology " test shows that make propulsion plant with high-power rig send frequent jam in the pipe process in boring, sends at most 20 m.Usually the mash gas pumping drilling hole depth, more than hundred meters, adopts this technique to send into guard aperture pipe performance difficulty in this case.
Summary of the invention
The objective of the invention is to provide a kind of weak seam mash gas pumping drilling cooperating type to bore and protect integral system and technique, solve weak seam guard aperture pipe and send into difficult problem.
The object of the present invention is achieved like this: the coal bed gas extraction hole cooperating type brill for weak seam protects integral system, and this system comprises: console, hydraulic power unit, air compressor, apparatus for feeding, drilling rod, guard aperture pipe, polyurethane foam circle and drill bit; Hydraulic power unit is connected with console by high-pressure rubber pipe, and apparatus for feeding is positioned on the guide groove of frame top, with console, by high-pressure rubber pipe, is connected; Described guard aperture pipe is positioned at drilling rod inside, is provided with some polyurethane foam circles between guard aperture pipe and drilling rod; Drilling rod is positioned at the apparatus for feeding middle part, and drill bit is installed on the drilling rod top, and the drilling rod afterbody is connected with air compressor by high-pressure rubber pipe.
Described guard aperture Guan Youshi pipe and floral tube alternately connect to form, and real pipe, floral tube and drilling rod three are isometric, and guard aperture pipe external diameter is less than drilling rod internal diameter 20mm~30mm.It is the circular eyelet of 0.5mm that the floral tube outer wall is provided with diameter, and circular eyelet spacing is not less than 80mm.
Described polyurethane foam circle length is 0.1m~0.2m, and adjacent polyurethane foam circle spacing is 5m~20m.
Weak seam gas pumping hole drill protects integral process, comprises drilling process and trip-out technique, and the drilling process concrete steps are as follows:
A. the real pipe of first segment is sent in the first segment drilling rod, real pipe pierces in coal seam with drilling rod;
B. connect a joint floral tube at real pipe end, the second section drilling rod is enclosed within outside floral tube and is connected with the first segment drilling rod, floral tube pierces in coal seam with the second section drilling rod;
C. connect joint pipe in fact at the floral tube end, the 3rd joint drilling rod is enclosed within outside real pipe and is connected with the second section drilling rod, real Guan Suidi tri-joint drilling rods pierce in coal seam together;
D. repeating step b and c, until creep into to projected depth;
Trip-out technique concrete steps are as follows:
A. rotate the guard aperture pipe, make the fragmentation of polyurethane foam circle;
B. the final section drilling rod is exited to boring together with inner reality pipe, and unload the final section drilling rod, the real pipe in the final section drilling rod is pushed in last joint drilling rod;
C. circulation step b, until exit all drilling rods.
Owing to having adopted such scheme, the present invention has following effect:
(1) the guard aperture pipe synchronously is connected with drilling rod, collaborative creeping into, and boring has many dark guard aperture pipes how long just to have.With respect to the disposable overlength guard aperture pipe of sending into, there do not is the problem that will overcome the pipe friction resistance while sending into.
(2) while pulling out of hole, drilling rod exits section by section, and the guard aperture pipe pushes section by section, and the displacement of guard aperture pipe is little, and the integrally bending distortion is little, can realize Safe withdrawing.
(3) install the polyurethane foam circle between guard aperture pipe and drilling rod, effectively fixing guard aperture pipe can ensure that guard aperture pipe and drilling rod are collaborative to creep into that guard aperture Guan Buhui is subject to the effect of drilling rod moment of torsion and destroys.
(4) the drill bit inner core is subject to guard aperture pipe thrust to impel the linkage release, and inner core moves and separates with drill bit, and during convenient the trip-out, the guard aperture pipe passes drill bit.
(5) guard aperture Guan Shiguan alternately is connected with floral tube, has ensured the intensity of guard aperture pipe on the basis that meets the mash gas extraction requirement, and effectively opposing boring distortion is collapsed.
Solve weak seam guard aperture pipe and sent into difficult problem.Reached purpose of the present invention.
Advantage: this system and technological operation are convenient, collaborative the boring of guard aperture pipe and drilling rod protected, the guard aperture pipe is easily stayed boring, can overcome serious collapse hole guard aperture pipe difficulty and send into the problem of boring, and the guard aperture degree of depth is long, more effectively the supporting hole wall, prevent distortion, cave in, thereby guarantee that the weak seam gas extraction concentration is large, flow is high, is particularly useful for solid coefficient
fThe dead-soft coal seam that value is less than 0.3.
The accompanying drawing explanation
Fig. 1 is structure chart of the present invention.
Fig. 2 is floral tube structure chart of the present invention.
Fig. 3 is real duct ligation composition of the present invention.
In figure: 1, hydraulic power unit; 2, console; 3, high-pressure rubber pipe; 4, air compressor; 5, pallet; 6, apparatus for feeding; 7, drilling rod; 8, guard aperture pipe; 8-1, floral tube; 8-2, real pipe; 9, clamper; 10, frame; 11, drill bit; 12, boring; 13, coal seam; 14, polyurethane foam circle; 15, presbyopia; 16, internal thread; 17, external screw thread.
The specific embodiment
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
Embodiment 1: the coal bed gas extraction hole cooperating type brill for weak seam protects integral system,
This system comprises: console 2, hydraulic power unit 1, air compressor 4, apparatus for feeding 6, drilling rod 7, guard aperture pipe 8, polyurethane foam circle 14 and drill bit 11; Hydraulic power unit 1 is connected with console 2 by high-pressure rubber pipe 3, and apparatus for feeding 6 is positioned on the guide groove of frame 10 tops, with console 2, by high-pressure rubber pipe 3, is connected; Described guard aperture pipe 8 is positioned at drilling rod 7 inside, be provided with some polyurethane foam circles 14 between guard aperture pipe 8 and drilling rod 7, drilling rod 7 is positioned at apparatus for feeding 6 middle parts, and drill bit 11 is installed on drilling rod 7 tops, drilling rod 7 afterbodys are provided with pallet 5, and pallet 5 is connected with air compressor 4 by high-pressure rubber pipe 3.
Described guard aperture pipe 8 is comprised of floral tube 8-1 and real pipe 8-2, and real pipe 8-2, floral tube 8-1 and drilling rod 7 threes are isometric, and guard aperture pipe 8 external diameters are less than drilling rod 7 internal diameter 20mm~30mm.It is the circular eyelet of 0.5mm that floral tube 8-1 outer wall is provided with diameter, and circular eyelet spacing is not less than 80mm.
Described polyurethane foam circle length is 0.1m~0.2m, and adjacent polyurethane foam circle spacing is 5m~20m.
Weak seam gas pumping hole drill protects integral process, comprises drilling process and trip-out technique, and the drilling process concrete steps are as follows:
A. the real pipe of first segment is sent in the first segment drilling rod, real pipe pierces in coal seam with drilling rod;
B. connect a joint floral tube at real pipe end, the second section drilling rod is enclosed within outside floral tube and is connected with the first segment drilling rod, floral tube pierces in coal seam with the second section drilling rod;
C. connect joint pipe in fact at the floral tube end, the 3rd joint drilling rod is enclosed within outside real pipe and is connected with the second section drilling rod, real Guan Suidi tri-joint drilling rods pierce in coal seam together;
D. repeating step b and c, until creep into to projected depth;
Trip-out technique concrete steps are as follows:
A. rotate the guard aperture pipe, make the fragmentation of polyurethane foam circle;
B. the final section drilling rod is exited to boring together with inner reality pipe, and unload the final section drilling rod, the real pipe in the final section drilling rod is pushed in last joint drilling rod;
C. circulation step b, until exit all drilling rods.
In Fig. 1, this system is by installation compositions such as hydraulic power unit 1, console 2, air compressor 4, apparatus for feeding 6, drilling rod 7, guard aperture pipe 8, clamper 9 and drill bits 1.Wherein console 2 one ends are connected with hydraulic power unit 1, and the other end is connected with apparatus for feeding 6; Apparatus for feeding 6 is positioned at frame 10 tops; Guard aperture pipe 8 is positioned at drilling rod 7 inside.Be provided with some polyurethane foam circles 14 between guard aperture pipe 8 and drilling rod 7.Drilling rod 7, through apparatus for feeding 6 and clamper 9, enters in boring 12, and drill bit 11 is installed on its top, and it is fixing that afterbody is provided with pallet 5; Air compressor 4 is connected with pallet 5 by high-pressure rubber pipe 3.
In Fig. 2, guard aperture pipe 8 comprises floral tube 8-1 and real pipe 8-2, and the two two ends is provided with internal thread 16 and external screw thread 17.Wherein floral tube 8-2 is provided with presbyopia 15.
Implementation step: each parts of first connected system, drilling rod 7 and drill bit 13 are installed, debug system.Then start to creep into, the real pipe of first segment 8-2 is sent in first segment drilling rod 7, the real pipe of first segment 8-2 periphery installs a polyurethane foam circle 14 additional, guarantees the rotation together with first segment drilling rod 7 that the real pipe of first segment 8-2 can be stable.Start afterwards apparatus for feeding 6, real pipe 8-2 pierces in coal seam 13 with first segment drilling rod 7; At first continued access floral tube 8-1, clamper 9 pins first segment drilling rods 7, at real pipe 8-2 end, connects a joint floral tube 8-1, second section drilling rod 7 is enclosed within to floral tube 8-1 outer and be connected with first segment drilling rod 7.Clamper 9 releases, start apparatus for feeding 6, and floral tube 8-1 pierces in coal seam 13 with first segment drilling rod 7.And then the real pipe of continued access 8-2, clamper 9 pins second section drilling rods 7, at floral tube 8-1 end, connects the real pipe of joint 8-2, the 3rd joint drilling rod 7 is enclosed within to real pipe 8-2 outer and be connected with second section drilling rod 7.Clamper 9 releases, start apparatus for feeding 6, and real pipe 8-2 pierces in coal seam 13 with second section drilling rod 7.Floral tube 8-1 and real pipe 8-2 are crept in circulation so successively, while guaranteeing often to creep into 10m ~ 20m, install a polyurethane foam circle 14, until creep into to projected depth.Then rotate guard aperture pipe 8, make 14 fragmentations of polyurethane foam circle, be convenient to guard aperture pipe 8 and separate with drilling rod 7.Promote guard aperture pipe 8 and drill bit 11 inner cores are moved and separate with drill bit 11, guard aperture pipe 9 passes 0.5m from drill bit 11 inside.Then carry brill, first final section drilling rod 7 is exited to boring together with inner real pipe 8-2, and unload final section drilling rod 7, the real pipe 8-2 in final section drilling rod 7 is pushed in last joint drilling rod, circulation successively, until exit all drilling rods.Last guard aperture pipe not only can guard aperture but also can be used as gas pumping pipe mash gas extraction.
Claims (2)
1. a weak seam gas pumping hole cooperating type bores and protects integral system, and it is characterized in that: this system comprises: console, hydraulic power unit, air compressor, apparatus for feeding, drilling rod, guard aperture pipe, polyurethane foam circle and drill bit; Hydraulic power unit is connected with console, and apparatus for feeding is positioned at the frame top and is connected with console; Be provided with some polyurethane foam circles between guard aperture pipe and drilling rod; Drilling rod is positioned at the apparatus for feeding middle part, and drill bit is installed on the drilling rod top, and the drilling rod afterbody is connected with air compressor;
Described guard aperture Guan Youshi pipe and floral tube alternately connect to form, and real pipe, floral tube and drilling rod three are isometric, and guard aperture pipe external diameter is less than drilling rod internal diameter 20mm~30mm;
Described polyurethane foam circle length is 0.1m~0.2m, and adjacent polyurethane foam circle spacing is 5m~20m.
2. a weak seam gas pumping hole cooperating type bores and protects integral process, and it is characterized in that: weak seam gas pumping hole drill protects integral process, comprises drilling process and trip-out technique, and the drilling process concrete steps are as follows:
A. the real pipe of first segment is sent in the first segment drilling rod, real pipe pierces in coal seam with drilling rod;
B. connect a joint floral tube at real pipe end, the second section drilling rod is enclosed within outside floral tube and is connected with the first segment drilling rod, floral tube pierces in coal seam with the second section drilling rod;
C. connect joint pipe in fact at the floral tube end, the 3rd joint drilling rod is enclosed within outside real pipe and is connected with the second section drilling rod, real Guan Suidi tri-joint drilling rods pierce in coal seam together;
D. repeating step b and c, until creep into to projected depth;
Trip-out technique concrete steps are as follows:
A. rotate the guard aperture pipe, make the fragmentation of polyurethane foam circle;
B. the final section drilling rod is exited to boring together with inner reality pipe, and unload the final section drilling rod, the real pipe in the final section drilling rod is pushed in last joint drilling rod;
C. circulation step b, until exit all drilling rods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100565224A CN102587828B (en) | 2012-03-06 | 2012-03-06 | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100565224A CN102587828B (en) | 2012-03-06 | 2012-03-06 | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102587828A CN102587828A (en) | 2012-07-18 |
CN102587828B true CN102587828B (en) | 2013-12-04 |
Family
ID=46477000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100565224A Active CN102587828B (en) | 2012-03-06 | 2012-03-06 | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102587828B (en) |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103216259B (en) * | 2013-04-22 | 2015-01-14 | 中国矿业大学 | System protecting underground coal bed hole drilling from collapse |
CN103195471B (en) * | 2013-04-22 | 2015-05-20 | 中国矿业大学 | Method for preventing drilling collapse of downhole coal bed |
CN103266913B (en) * | 2013-05-13 | 2016-08-03 | 西南石油大学 | A kind of gas pumping method |
CN103726869B (en) * | 2014-01-24 | 2015-09-16 | 河南理工大学 | Soft and broken seam gas pumping hole pipe-following drilling method |
CN104747075B (en) * | 2015-02-14 | 2017-01-25 | 河南理工大学 | Anti-collapsing drilling method for grout spraying of soft coal seam |
CN104790873B (en) * | 2015-02-14 | 2017-08-29 | 河南理工大学 | Soft rock layer jet is oriented to the integrated drilling method of the anti-collapse hole of pore-forming reaming |
CN105333904B (en) * | 2015-11-11 | 2017-07-21 | 山东科技大学 | The assay method of the up drilling gas parameter of coal petrography |
CN105333905B (en) * | 2015-11-11 | 2017-07-28 | 山东科技大学 | The measurement system of the up drilling gas parameter of coal petrography |
CN106499353A (en) * | 2017-01-06 | 2017-03-15 | 淮南矿业(集团)有限责任公司 | The device of armlet sleeve pipe in a kind of fixed drilling |
CN106988776B (en) * | 2017-03-30 | 2018-09-28 | 河南理工大学 | Soft and broken seam drilling guard aperture construction method |
CN106869798B (en) * | 2017-03-30 | 2018-08-17 | 河南理工大学 | The drilling guard aperture method of weak seam mash gas pumping drilling guard aperture drilling tool |
CN107120143A (en) * | 2017-05-08 | 2017-09-01 | 中国平煤神马能源化工集团有限责任公司 | A kind of real time gas concentration monitoring system for the different depth that drills |
CN107762550B (en) * | 2017-11-06 | 2020-09-04 | 四川大学 | Gas extraction drilling hole sealing method |
CN108005581B (en) * | 2017-12-15 | 2023-10-27 | 河南理工大学 | Device for forming anchoring hole in top plate of soft broken thick-roof coal roadway and using method of device |
CN108374640B (en) * | 2018-03-26 | 2019-05-21 | 中煤科工集团西安研究院有限公司 | The soft projecting coal bed foam pressure-increasing directional drilling equipment of underground coal mine and method |
CN108798645B (en) * | 2018-06-07 | 2021-09-17 | 永城煤电控股集团有限公司 | Interior following formula deviational survey device of drilling rod and interior following formula deviational survey system of drilling rod |
CN109403865B (en) * | 2018-12-20 | 2020-07-28 | 华北科技学院 | Coal bed gas parameter while-drilling test method and device |
CN109653788B (en) * | 2019-03-05 | 2023-08-29 | 安徽理工大学 | Gas extraction pipe suitable for easy-collapse up-hole drilling |
CN111141563A (en) * | 2020-02-26 | 2020-05-12 | 安徽理工大学 | Air quality acquisition device and method for mining safety engineering |
CN113107382B (en) * | 2021-04-16 | 2023-02-28 | 淮南矿业(集团)有限责任公司 | Large-diameter long drill hole casing device and method |
CN113445931B (en) * | 2021-06-29 | 2024-02-06 | 山西天地王坡煤业有限公司 | Along-coal-seam drilling and casing drilling device and casing drilling method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4321967A (en) * | 1979-07-21 | 1982-03-30 | Maschinenfabrik Korfmann Gmbh | Suction of gases from boreholes in coal mining |
SU1448078A1 (en) * | 1987-03-25 | 1988-12-30 | Московский Горный Институт | Method of degassing a coal-rock mass portion |
CN101446178A (en) * | 2008-11-13 | 2009-06-03 | 煤炭科学研究总院西安研究院 | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith |
CN101701505A (en) * | 2009-09-30 | 2010-05-05 | 中国矿业大学 | Sleeve pore-fixing device and method |
CN201581806U (en) * | 2009-09-30 | 2010-09-15 | 平顶山天安煤业股份有限公司一矿 | Coal face projection prevention hydraulic drill system |
CN201865573U (en) * | 2010-11-27 | 2011-06-15 | 煤炭科学研究总院西安研究院 | Crawler drill for belt-span drilling |
CN201982132U (en) * | 2010-04-29 | 2011-09-21 | 凌标灿 | Hole-protecting pipe for gas extraction hole |
-
2012
- 2012-03-06 CN CN2012100565224A patent/CN102587828B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4321967A (en) * | 1979-07-21 | 1982-03-30 | Maschinenfabrik Korfmann Gmbh | Suction of gases from boreholes in coal mining |
SU1448078A1 (en) * | 1987-03-25 | 1988-12-30 | Московский Горный Институт | Method of degassing a coal-rock mass portion |
CN101446178A (en) * | 2008-11-13 | 2009-06-03 | 煤炭科学研究总院西安研究院 | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith |
CN101701505A (en) * | 2009-09-30 | 2010-05-05 | 中国矿业大学 | Sleeve pore-fixing device and method |
CN201581806U (en) * | 2009-09-30 | 2010-09-15 | 平顶山天安煤业股份有限公司一矿 | Coal face projection prevention hydraulic drill system |
CN201982132U (en) * | 2010-04-29 | 2011-09-21 | 凌标灿 | Hole-protecting pipe for gas extraction hole |
CN201865573U (en) * | 2010-11-27 | 2011-06-15 | 煤炭科学研究总院西安研究院 | Crawler drill for belt-span drilling |
Also Published As
Publication number | Publication date |
---|---|
CN102587828A (en) | 2012-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587828B (en) | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process | |
CN101798931B (en) | Construction technology method of large-scale lead pipe roofs of tunnels and underground engineering without workshops | |
CN103075179B (en) | Entitative coal seam gas drainage drilling hole double-pipe drainage method | |
CN103195471B (en) | Method for preventing drilling collapse of downhole coal bed | |
CN103161493B (en) | Gas-liquid-solid three-phase coupling blasting weakening rock burst and permeability increasing method | |
CN204252941U (en) | Mining hole-sealing gas hole packer with pressure | |
CN103364218A (en) | Miniature TBM (Tunnel Boring Machine) excavation system for tunnel excavation in physical simulation test | |
CN102747953A (en) | Multiple step type drilling and protecting integrated system and process for soft coal seam | |
CN101956546A (en) | Method for improving crossing-hole gas extraction concentration | |
CN203270527U (en) | Device for preventing gas explosion after gate closing and plugging of diversion tunnel | |
CN104481580A (en) | Method and device for repairing downhole coal-bed gas extraction drilled hole | |
CN104481582A (en) | Rapid rescuing method for tunnel gateway collapse | |
CN103114810A (en) | Coal seam drilling hole-collapse preventing lower sleeve device capable of drilling along with drill and drilling method | |
CN205047184U (en) | Colliery drill in pit with punching process in prevent spouting dust device | |
CN103291317A (en) | Construction method for old tunnel segment detaching and tunnel expanding and tunnel expanding machine | |
CN204572026U (en) | A kind of Multifunctional anchor rod device | |
CN101701505B (en) | Sleeve pore-fixing device and method | |
CN105201546A (en) | Device and method for improving gas extraction concentration | |
CN103758484B (en) | The multistage anti-collapse hole construction equipment in gas pumping hole, cherry coal development area | |
CN204252828U (en) | A kind of hydraulic self-locking wedge deflection tool | |
Qianhui | Research and application of auger-air drilling and sieve tube borehole protection in soft outburst-prone coal seams | |
CN104612748A (en) | Coal-mass gas extraction method and device | |
CN205477511U (en) | Prevent releasing hydraulic fracturing hole sealing device | |
CN201003379Y (en) | Glue injection fire extinguishing-proof drilling tool for coal mine | |
CN103541679A (en) | Method for sealing underground hydraulic fracture drilled hole of coal mine in combined manner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |