CN101446178A - Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith - Google Patents
Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith Download PDFInfo
- Publication number
- CN101446178A CN101446178A CNA200810232256XA CN200810232256A CN101446178A CN 101446178 A CN101446178 A CN 101446178A CN A200810232256X A CNA200810232256X A CN A200810232256XA CN 200810232256 A CN200810232256 A CN 200810232256A CN 101446178 A CN101446178 A CN 101446178A
- Authority
- CN
- China
- Prior art keywords
- hole
- drilling
- coal bed
- soft
- drilling equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The invention relates to wind pressure air drilling equipment in a downhole soft outbursting coal bed and a process matched therewith. At present, as the consequent layer drilling characterized by high construction speed, low cost and high gas extraction efficiency becomes the primary option for coal control and gas control in coal mines, for soft outbursting coal beds, the gas extraction efficiency is directly dependant upon the pore-forming rate of the consequent layer drilling. The equipment comprises a boring machine, an air compressor, an orifice dust collection and dust removal device, a high-strength large through-hole drill rod, a drill bit with an inner core which can automatically fall off, and an antistatic explosion-protection PVC sieve tube; the boring machine which has large power and large torque supplies power to drilling construction; the orifice dust collection and dust removal device collects and eliminates slack carried out by wind from the orifice during drilling; and the antistatic explosion-protection PVC sieve tube is transferred from the interior of the high-strength large through-hole drill rod to the bottom of the orifice without lifting a drill on the completion of drilling, and at last remains in the orifice, thereby ensuring the completeness of drilling. The equipment and the process matched therewith provided by the invention has the advantages of increasing the pore-forming rate of the consequent layer drilling in soft outbursting coal beds, improving the effect of gas extraction, improving the working atmosphere of downhole air drilling, and protecting the production safety of outbursting coal mines.
Description
Technical field
The present invention relates to creep under the coal mine equipment and process matching, be specifically related to soft projecting coal bed middle blast air drilling equipment in a kind of down-hole and process matched therewith.
Technical background
Control coal and gas are outstanding to be the great task that China's coal-mine faces, and is the essential measure of guaranteeing mine safety and carry out gas pumping.Since country's promulgation control of coalmine gas policy, the gas pumping technology is growing.The particularly intensive application of wearing layer hole of grid type for alleviating soft projecting coal bed gas control pressure, improve gas pumping efficient, reducing coal and gas outburst risk, has been played positive effect.But wear the great in constructing amount of layer hole simultaneously, the cost height, speed is low.And compare with wearing a layer hole, with the obvious advantage along the gas pumping of layer boring: as all to be in inside, coal seam along layer boring, effectively extraction rate height; Fast along layer drilling construction speed, cost is low.For the advantage of maximum performance, must improve hole depth and aperture along layer boring along layer boring.For soft projecting coal bed for, regularity of coal seam is poor, the gas bearing capacity height, pressure is big, along the hole lock of tool drilling that easily collapses in the layer drilling construction process, has limited to the application in suitable layer of hole so again.At present, domestic governing problem for soft projecting coal bed gas adopts the indirect layer hole method of wearing mostly; And adopt a mine along layer hole pumping and mining gas, and it is limited along layer drilling construction degree of depth, and substantially all below 100m, and boring aperture is less.How improving soft projecting coal bed gas control efficient is the important topic of studying at present.
From present technical development situation, the main selection that speed of application is fast, cost is low, the gas pumping rate is high along layer boring will becoming colliery control coal and gas control.For soft projecting coal bed, the one-tenth porosity of holing along layer has just directly determined gas pumping efficient especially.In order to improve the one-tenth porosity of weak seam, need present conventional construction equipment and process matched therewith be improved along layer boring.
Summary of the invention
The invention provides soft projecting coal bed middle blast air drilling equipment in a kind of down-hole and process matched therewith, can improve a present suitable layer hole construction method at soft projecting coal bed gas control, increase effective hole depth in suitable layer hole, raising is along a layer hole one-tenth porosity; Help the coal-bed gas extraction, reduce the outstanding disaster occurrence probability of coal and gas; Reduce the protrusion-dispelling cost, improve safety production efficiency.
Soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention, comprise rig, air compressor machine, aperture control of dust dust arrester, high strength large through-hole drilling rod, inner core come off automatically drill bit and antistatic explosion-proof PVC screen casing, it is characterized in that: the air compressor machine air outlet directly is connected with drilling rod with high-voltage tube, provides the pressure wind regime by drill pipe bore in boring.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its aperture control of dust dust arrester directly is connected with orifice tube, and borehole sealing is become a confined space, helps the unified collection and treatment of cinder in the hole.
Under the described coal mine soft projecting coal bed in blast air drilling equipment, its aperture control of dust dust arrester when work, by shower nozzle to dust arrester internal spray water smoke to help the dirt that disappears.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its high strength large through-hole drilling rod internal diameter is greater than antistatic explosion-proof PVC screen casing external diameter, can satisfy the intensity needs that normally creep into, also can satisfy the space requirement of carrying antistatic explosion-proof PVC screen casing in the drilling rod.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its antistatic explosion-proof PVC screen casing is to punch to form on antistatic explosion-proof pvc pipe tube wall, makes it have gas permeability; Drilling and forming hole finishes the back and does not carry earlier brill, to carrying antistatic explosion-proof PVC screen casing at the bottom of the hole and it being stayed in the hole, guarantees the integrality of soft projecting coal bed boring by high strength large through-hole drilling rod inside, improves gas pumping efficient.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its inner core drill bit that comes off automatically is made up of inner core and bit body two parts, at the bottom of being transported to the hole, antistatic explosion-proof PVC screen casing carries when boring, inner core be subjected to antistatic explosion-proof PVC screen casing responsive to axial force automatically and bit body come off, open passage thus antistatic explosion-proof PVC screen casing can be stayed in the hole in putting forward the brill process smoothly.
The process matched therewith of soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention may further comprise the steps:
The first step, the location and installation rig: fixing rig, according to the position of drill site situation reasonable Arrangement air compressor machine;
Second step connected footpath at a gulp drill bit by crossover sub on high strength large through-hole drilling rod, perforate makes it satisfy orifice tube requirement down;
In the 3rd step, following orifice tube is installed aperture control of dust dust arrester;
In the 4th step, replacing connects the drill bit that comes off automatically, connects air supply device, beginning is normally crept into: the unit head speed of gyration is controlled between the 120-200r/min, creeps into feeding rate and is controlled between the 1-2m/min, and air feed pressure maximum can reach 1.2MPa, at the uniform velocity creep into, until creeping into to the target hole depth;
The 5th step, reach drilling depth, stop boring, remove air supply device, begin to carry antistatic explosion-proof PVC screen casing from high strength large through-hole drilling rod is inner at the bottom of the hole in the hole, carry brill, come off the automatically inner core of drill bit of inner core is come off by the automatic and bit body of antistatic explosion-proof PVC screen casing responsive to axial force, guarantee that antistatic explosion-proof PVC screen casing stays in the hole simultaneously, normally carry brill;
The 6th step, carry brill and finish, remove facility, intact hole.
The present invention compared with prior art, and is practical, and easy to maintenance, can satisfy the soft projecting coal bed requirement of creeping into along the coal-bed gas extraction borehole under the coal mine fully; Adopted the air compressor machine of independent air feed, its air feed pressure and air quantity are more than the twice of at present most of used mine system wind regimes, under being used of aperture control of dust dust arrester, greatly reduce the work plane dust, big latus rectum drilling rod of Cai Yonging and the automatic separation-type drill bit of inner core have strengthened conveying screen casing operability simultaneously, effectively raise the one-tenth porosity along layer hole, improve soft projecting coal bed gas control efficient greatly, ensured the mine production safety.
Description of drawings
Fig. 1 is a drill site construction schematic top plan view of the present invention.
Fig. 2 is an aperture control of dust dust arrester schematic diagram.
Fig. 3 is the tear-away drill bit structure schematic diagram of inner core.
Fig. 4 is the cross section view for Fig. 3.
Fig. 5 is antistatic explosion-proof PVC screen construction schematic diagram.
Specific embodiment
Referring to Fig. 1, soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention, comprise rig, air compressor machine, aperture control of dust dust arrester, high strength large through-hole drilling rod, inner core come off automatically drill bit and antistatic explosion-proof PVC screen casing, it is characterized in that: the air compressor machine air outlet directly is connected with drilling rod with high-voltage tube, provides the pressure wind regime by drill pipe bore in boring.
Referring to Fig. 2, soft projecting coal bed middle blast air drilling equipment under the described coal mine, its aperture control of dust dust arrester directly is connected with orifice tube, and borehole sealing is become a confined space, helps the unified collection and treatment of cinder in the hole.Under the coal mine soft projecting coal bed in blast air drilling equipment, its aperture control of dust dust arrester when work, by shower nozzle to dust arrester internal spray water smoke to help the dirt that disappears.
Soft projecting coal bed middle blast air drilling equipment under the described coal mine, its high strength large through-hole drilling rod internal diameter is greater than antistatic explosion-proof PVC screen casing external diameter, can satisfy the intensity needs that normally creep into, also can satisfy the space requirement of carrying antistatic explosion-proof PVC screen casing in the drilling rod.
Referring to Fig. 5, soft projecting coal bed middle blast air drilling equipment under the described coal mine, its antistatic explosion-proof PVC screen casing is to punch to form on antistatic explosion-proof pvc pipe tube wall, makes it have gas permeability; Drilling and forming hole finishes the back and does not carry earlier brill, to carrying antistatic explosion-proof PVC screen casing at the bottom of the hole and it being stayed in the hole, guarantees the integrality of soft projecting coal bed boring by high strength large through-hole drilling rod inside, improves gas pumping efficient.
Referring to Fig. 3, Fig. 4, soft projecting coal bed middle blast air drilling equipment under the described coal mine, its inner core drill bit that comes off automatically is made up of inner core and bit body two parts, at the bottom of being transported to the hole, antistatic explosion-proof PVC screen casing carries when boring, inner core be subjected to antistatic explosion-proof PVC screen casing responsive to axial force automatically and bit body come off, open passage thus antistatic explosion-proof PVC screen casing can be stayed in the hole in putting forward the brill process smoothly.
The process matched therewith of soft projecting coal bed middle blast air drilling equipment under the coal mine of the present invention may further comprise the steps:
The first step, the location and installation rig: fixing rig, according to the position of drill site situation reasonable Arrangement air compressor machine;
Second step connected footpath at a gulp drill bit by crossover sub on high strength large through-hole drilling rod, perforate makes it satisfy orifice tube requirement down;
In the 3rd step, following orifice tube is installed aperture control of dust dust arrester;
In the 4th step, replacing connects the drill bit that comes off automatically, connects air supply device, beginning is normally crept into: the unit head speed of gyration is controlled between the 120-200r/min, creeps into feeding rate and is controlled between the 1-2m/min, and air feed pressure maximum can reach 1.2MPa, at the uniform velocity creep into, until creeping into to the target hole depth;
The 5th step, reach drilling depth, stop boring, remove air supply device, begin to carry antistatic explosion-proof PVC screen casing from high strength large through-hole drilling rod is inner at the bottom of the hole in the hole, carry brill, come off the automatically inner core of drill bit of inner core is come off by the automatic and bit body of antistatic explosion-proof PVC screen casing responsive to axial force, guarantee that antistatic explosion-proof PVC screen casing stays in the hole simultaneously, normally carry brill;
The 6th step, carry brill and finish, remove facility, intact hole.
Claims (7)
1, the soft projecting coal bed middle blast air drilling equipment in down-hole, comprise rig (1), air compressor machine (2), aperture control of dust dust arrester (3), high strength large through-hole drilling rod (4), inner core come off automatically drill bit (5) and antistatic explosion-proof PVC screen casing (6), it is characterized in that: described air compressor machine (2) air outlet by high-voltage tube with in boring, provide the high strength large through-hole drilling rod (4) of pressure wind regime to be connected.
2, the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 1, it is characterized in that: described aperture control of dust dust arrester (3) is connected with orifice tube, constitutes a confined space.
3, the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 1 and 2 is characterized in that: the shower nozzle (7) to dust arrester internal spray water smoke is set in the described aperture control of dust dust arrester (3).
4, the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 3, it is characterized in that: described high strength large through-hole drilling rod (4) internal diameter is greater than antistatic explosion-proof PVC screen casing (6) external diameter.
5, the soft projecting coal bed middle blast air drilling equipment in down-hole according to claim 3, it is characterized in that: described antistatic explosion-proof PVC screen casing (6) is for being provided with the antistatic explosion-proof pvc pipe of air-vent on the tube wall.
6, down-hole according to claim 3 soft projecting coal bed in blast air drilling equipment, it is characterized in that: the described inner core drill bit (5) that comes off automatically is made up of inner core and bit body two parts, can separate with bit body when inner core is subjected to axial force.
7, the process matched therewith of soft projecting coal bed middle blast air drilling equipment, it is characterized in that: its operation may further comprise the steps:
The first step, the location and installation rig: fixing rig (1), according to the position of drill site situation reasonable Arrangement air compressor machine (2);
Second step, go up connection footpath at a gulp drill bit at high strength large through-hole drilling rod (4), perforate makes it satisfy orifice tube requirement down;
In the 3rd step, following orifice tube is installed aperture control of dust dust arrester (3);
The 4th step, change to connect the inner core drill bit (5) that comes off automatically, connect air supply device, beginning is normally crept into: the unit head speed of gyration is controlled between the 120-200r/min, creeping into feeding rate is controlled between the 1-2m/min, air feed pressure maximum can reach 1.2MPa, at the uniform velocity creeps into, until creeping into to the target hole depth;
The 5th step, reach drilling depth, stop boring, remove air supply device, begin to carry antistatic explosion-proof PVC screen casing (6) from high strength large through-hole drilling rod (4) is inner at the bottom of the hole in the hole, carry brill, come off the automatically inner core (8) of drill bit (5) of inner core is come off by the automatic and bit body (9) of antistatic explosion-proof PVC screen casing (6) responsive to axial force, guarantee that antistatic explosion-proof PVC screen casing (6) stays in the hole simultaneously, normally carry brill;
The 6th step, carry brill and finish, remove facility, intact hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810232256XA CN101446178B (en) | 2008-11-13 | 2008-11-13 | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810232256XA CN101446178B (en) | 2008-11-13 | 2008-11-13 | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101446178A true CN101446178A (en) | 2009-06-03 |
CN101446178B CN101446178B (en) | 2011-11-16 |
Family
ID=40742034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810232256XA Active CN101446178B (en) | 2008-11-13 | 2008-11-13 | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101446178B (en) |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101975048A (en) * | 2010-10-19 | 2011-02-16 | 陕西龙门天地煤层气技术工程有限公司 | Construction process of multi-branch underground screen pipe |
CN102031950A (en) * | 2010-12-06 | 2011-04-27 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102383781A (en) * | 2011-07-15 | 2012-03-21 | 河南理工大学 | Method for measuring gas pressure of coal bed |
CN102561952A (en) * | 2011-11-28 | 2012-07-11 | 中煤科工集团重庆研究院 | Large-through-hole opening type all-dimensional drilling bit and sieve tube lowering method thereof |
CN102587828A (en) * | 2012-03-06 | 2012-07-18 | 中国矿业大学 | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process |
CN102587961A (en) * | 2012-04-10 | 2012-07-18 | 中国矿业大学 | Feeding method and device for hole protecting pipe for soft coal seam gas extraction hole |
CN102635391A (en) * | 2012-04-28 | 2012-08-15 | 陈凤平 | Method for preventing and controlling gas outburst |
CN102747953A (en) * | 2012-03-06 | 2012-10-24 | 中国矿业大学 | Multiple step type drilling and protecting integrated system and process for soft coal seam |
CN102828707A (en) * | 2012-09-25 | 2012-12-19 | 无锡金帆钻凿设备股份有限公司 | Dustproof deslagging device of anchor drill |
CN103195471A (en) * | 2013-04-22 | 2013-07-10 | 中国矿业大学 | Method for preventing drilling collapse of downhole coal bed |
CN103216259A (en) * | 2013-04-22 | 2013-07-24 | 中国矿业大学 | System protecting underground coal bed hole drilling from collapse |
CN103556944A (en) * | 2013-11-13 | 2014-02-05 | 河南理工大学 | Double-layer internal deslagging and anti-blocking drilling tool for soft and outburst coal seam drilling, and use method of drilling tool |
CN103758450A (en) * | 2014-01-17 | 2014-04-30 | 北京市市政工程研究院 | Self-drilling anchor rod boring device capable of reaming at the same time |
CN103790618A (en) * | 2014-03-05 | 2014-05-14 | 王宽 | Mine water bath type orifice blowout prevention and dust removal device |
CN105239971A (en) * | 2015-11-17 | 2016-01-13 | 中煤科工集团西安研究院有限公司 | Conveying device and conveying method for underground coal mine soft coal seam drilling sieve tube |
CN105545218A (en) * | 2016-01-29 | 2016-05-04 | 河南理工大学 | Multi-blade inwards-concave open-type bionic drag-reduction hole-protection drill rod for soft coal seam drilling and drilling method |
CN106194057A (en) * | 2014-12-02 | 2016-12-07 | 成都宸鸿科技有限公司 | A kind of Multifunctional drill rod |
CN106194058A (en) * | 2014-12-02 | 2016-12-07 | 成都宸鸿科技有限公司 | A kind of dust suction drilling rod |
CN108179975A (en) * | 2018-01-25 | 2018-06-19 | 中国矿业大学 | Mining-drilling machine and its dust-extraction unit |
CN108374640A (en) * | 2018-03-26 | 2018-08-07 | 中煤科工集团西安研究院有限公司 | The soft projecting coal bed foam pressure-increasing directional drilling equipment of underground coal mine and method |
CN109611072A (en) * | 2019-01-25 | 2019-04-12 | 安徽理工大学 | A kind of pressure-relief outburst-prevention drilling machine |
CN109653689A (en) * | 2019-01-25 | 2019-04-19 | 安徽理工大学 | A kind of water conservancy diversion drilling rod |
CN110344758A (en) * | 2019-08-05 | 2019-10-18 | 湖南科技大学 | A kind of construction method of high methane pole weak seam mash gas pumping drilling |
CN113431623A (en) * | 2021-07-28 | 2021-09-24 | 西安科技大学 | High-gas weak coal seam extraction system and method |
CN113565431A (en) * | 2021-08-27 | 2021-10-29 | 中国铁建重工集团股份有限公司 | Pressure control method of air compressor for pneumatic down-the-hole hammer |
CN114658396A (en) * | 2022-03-23 | 2022-06-24 | 中煤科工集团西安研究院有限公司 | Gas conveying hole protecting device and method for underground coal mine near-horizontal directional hole continuous sieve tube |
CN115045640A (en) * | 2022-06-27 | 2022-09-13 | 中煤科工集团西安研究院有限公司 | Device and method for pulling screen pipe in opposite directions through penetrating drilled holes |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109322697B (en) * | 2018-12-12 | 2021-04-27 | 中煤科工集团重庆研究院有限公司 | Method for treating gas on high-gas coal face by using well instead of roadway |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4083415A (en) * | 1975-12-18 | 1978-04-11 | Kennametal Inc. | Mining bit with replaceable work engaging member |
CN2386182Y (en) * | 1999-07-23 | 2000-07-05 | 大庆石油管理局钻井研究所 | Antiseize drilling bit for putting explosive in blasthole on gravel layer and shifting sand |
US6601454B1 (en) * | 2001-10-02 | 2003-08-05 | Ted R. Botnan | Apparatus for testing jack legs and air drills |
BE1014476A6 (en) * | 2001-11-15 | 2003-11-04 | Diamant Drilling Service | Drilling tool for shafts, gas- and oil wells, has joint accommodated in chamber formed axially into body of cutting bit |
CN201037427Y (en) * | 2007-04-02 | 2008-03-19 | 中国矿业大学 | Extrusive danger coal bed safety guide spraying drilling device |
CN201065735Y (en) * | 2007-07-12 | 2008-05-28 | 煤炭科学研究总院西安分院 | Central cable type high intensity large through-hole drill rod |
CN101131091B (en) * | 2007-07-26 | 2011-12-21 | 煤炭科学研究总院重庆分院 | Down-hole coal bed air-pressing helix drilling tools and drilling method using the same |
CN201334869Y (en) * | 2008-11-13 | 2009-10-28 | 煤炭科学研究总院西安研究院 | Pressured air drilling equipment used in downhole loose and soft coal seam with potential gas outburst |
-
2008
- 2008-11-13 CN CN200810232256XA patent/CN101446178B/en active Active
Cited By (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101975048B (en) * | 2010-10-19 | 2013-12-25 | 陕西龙门天地油气技术有限公司 | Construction process of multi-branch underground screen pipe |
CN101975048A (en) * | 2010-10-19 | 2011-02-16 | 陕西龙门天地煤层气技术工程有限公司 | Construction process of multi-branch underground screen pipe |
CN102031950A (en) * | 2010-12-06 | 2011-04-27 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102031950B (en) * | 2010-12-06 | 2012-02-15 | 煤炭科学研究总院西安研究院 | Hole-forming process method for comb gas extraction borehole in coal seam roof |
CN102383781A (en) * | 2011-07-15 | 2012-03-21 | 河南理工大学 | Method for measuring gas pressure of coal bed |
CN102383781B (en) * | 2011-07-15 | 2014-01-08 | 河南理工大学 | Method for measuring gas pressure of coal bed |
CN102561952A (en) * | 2011-11-28 | 2012-07-11 | 中煤科工集团重庆研究院 | Large-through-hole opening type all-dimensional drilling bit and sieve tube lowering method thereof |
CN102747953B (en) * | 2012-03-06 | 2014-07-30 | 中国矿业大学 | Multiple step type drilling and protecting integrated system and process for soft coal seam |
CN102587828A (en) * | 2012-03-06 | 2012-07-18 | 中国矿业大学 | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process |
CN102747953A (en) * | 2012-03-06 | 2012-10-24 | 中国矿业大学 | Multiple step type drilling and protecting integrated system and process for soft coal seam |
CN102587828B (en) * | 2012-03-06 | 2013-12-04 | 中国矿业大学 | Gas extraction and drilling cooperative drilling and protecting integrated system for soft coal seams and process |
CN102587961A (en) * | 2012-04-10 | 2012-07-18 | 中国矿业大学 | Feeding method and device for hole protecting pipe for soft coal seam gas extraction hole |
CN102635391A (en) * | 2012-04-28 | 2012-08-15 | 陈凤平 | Method for preventing and controlling gas outburst |
CN102635391B (en) * | 2012-04-28 | 2014-02-12 | 陈凤平 | Method for preventing and controlling gas outburst |
CN102828707A (en) * | 2012-09-25 | 2012-12-19 | 无锡金帆钻凿设备股份有限公司 | Dustproof deslagging device of anchor drill |
CN103216259B (en) * | 2013-04-22 | 2015-01-14 | 中国矿业大学 | System protecting underground coal bed hole drilling from collapse |
CN103216259A (en) * | 2013-04-22 | 2013-07-24 | 中国矿业大学 | System protecting underground coal bed hole drilling from collapse |
CN103195471A (en) * | 2013-04-22 | 2013-07-10 | 中国矿业大学 | Method for preventing drilling collapse of downhole coal bed |
CN103195471B (en) * | 2013-04-22 | 2015-05-20 | 中国矿业大学 | Method for preventing drilling collapse of downhole coal bed |
CN103556944B (en) * | 2013-11-13 | 2015-11-18 | 河南理工大学 | For soft projecting coal bed creep into double-deck in the anti-blocking drilling tool of deslagging and using method thereof |
CN103556944A (en) * | 2013-11-13 | 2014-02-05 | 河南理工大学 | Double-layer internal deslagging and anti-blocking drilling tool for soft and outburst coal seam drilling, and use method of drilling tool |
CN103758450A (en) * | 2014-01-17 | 2014-04-30 | 北京市市政工程研究院 | Self-drilling anchor rod boring device capable of reaming at the same time |
CN103790618A (en) * | 2014-03-05 | 2014-05-14 | 王宽 | Mine water bath type orifice blowout prevention and dust removal device |
CN103790618B (en) * | 2014-03-05 | 2016-04-20 | 王宽 | A kind of mining water-bath type orifice blowout prevention and dust arrester |
CN106194057A (en) * | 2014-12-02 | 2016-12-07 | 成都宸鸿科技有限公司 | A kind of Multifunctional drill rod |
CN106194058A (en) * | 2014-12-02 | 2016-12-07 | 成都宸鸿科技有限公司 | A kind of dust suction drilling rod |
CN105239971B (en) * | 2015-11-17 | 2017-12-22 | 中煤科工集团西安研究院有限公司 | Soft coal bed in coal mine drilling screen casing conveying device and its carrying method |
CN105239971A (en) * | 2015-11-17 | 2016-01-13 | 中煤科工集团西安研究院有限公司 | Conveying device and conveying method for underground coal mine soft coal seam drilling sieve tube |
CN105545218A (en) * | 2016-01-29 | 2016-05-04 | 河南理工大学 | Multi-blade inwards-concave open-type bionic drag-reduction hole-protection drill rod for soft coal seam drilling and drilling method |
CN105545218B (en) * | 2016-01-29 | 2018-05-22 | 河南理工大学 | The open bionical drop resistance guard aperture drilling rod of soft seam drilling multiple wing indent and drilling method |
CN108179975A (en) * | 2018-01-25 | 2018-06-19 | 中国矿业大学 | Mining-drilling machine and its dust-extraction unit |
CN108374640A (en) * | 2018-03-26 | 2018-08-07 | 中煤科工集团西安研究院有限公司 | The soft projecting coal bed foam pressure-increasing directional drilling equipment of underground coal mine and method |
CN109653689A (en) * | 2019-01-25 | 2019-04-19 | 安徽理工大学 | A kind of water conservancy diversion drilling rod |
CN109611072A (en) * | 2019-01-25 | 2019-04-12 | 安徽理工大学 | A kind of pressure-relief outburst-prevention drilling machine |
WO2020151208A1 (en) * | 2019-01-25 | 2020-07-30 | 安徽理工大学 | Pressure-relief anti-outburst drilling machine |
CN110344758A (en) * | 2019-08-05 | 2019-10-18 | 湖南科技大学 | A kind of construction method of high methane pole weak seam mash gas pumping drilling |
CN113431623A (en) * | 2021-07-28 | 2021-09-24 | 西安科技大学 | High-gas weak coal seam extraction system and method |
CN113431623B (en) * | 2021-07-28 | 2023-06-09 | 西安科技大学 | High-gas weak coal seam extraction system and method |
CN113565431A (en) * | 2021-08-27 | 2021-10-29 | 中国铁建重工集团股份有限公司 | Pressure control method of air compressor for pneumatic down-the-hole hammer |
CN114658396A (en) * | 2022-03-23 | 2022-06-24 | 中煤科工集团西安研究院有限公司 | Gas conveying hole protecting device and method for underground coal mine near-horizontal directional hole continuous sieve tube |
CN115045640A (en) * | 2022-06-27 | 2022-09-13 | 中煤科工集团西安研究院有限公司 | Device and method for pulling screen pipe in opposite directions through penetrating drilled holes |
CN115045640B (en) * | 2022-06-27 | 2024-03-22 | 中煤科工集团西安研究院有限公司 | Device and method for penetrating through borehole and opposite-pulling lower screen pipe |
Also Published As
Publication number | Publication date |
---|---|
CN101446178B (en) | 2011-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101446178B (en) | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith | |
CN201334869Y (en) | Pressured air drilling equipment used in downhole loose and soft coal seam with potential gas outburst | |
CN103195471A (en) | Method for preventing drilling collapse of downhole coal bed | |
CN103147708A (en) | Through type down hole hammer reverse circulation drilling dust collection device | |
CN206957683U (en) | A kind of coal seam pressure relief and permeability improvement system | |
CN103277129B (en) | One prevents Top Corner Gas on Coal Face to transfinite technology | |
CN104763368A (en) | Orifice seal device for large-diameter downhole hammer and reverse circulation construction technology for orifice seal device | |
WO2024087965A1 (en) | Well-ground combined mining coiled tubing directional fracturing gas extraction system and method | |
CN203296725U (en) | Through type DTH hammer reverse circulation drilling dust collecting device | |
CN205823169U (en) | Bore/punching integration anti-blockage holes highly effective slag draining drill bit | |
CN105888540B (en) | A kind of drilling method of drilling | |
CN104481580A (en) | Method and device for repairing downhole coal-bed gas extraction drilled hole | |
CN102747953A (en) | Multiple step type drilling and protecting integrated system and process for soft coal seam | |
CN103883304A (en) | Method for underground coal gasification for gasifier channel establishment | |
CN102913274B (en) | System for increasing yield of gas excavation borehole and method thereof | |
CN206571429U (en) | A kind of mining machinery mining drill bit | |
CN102748065A (en) | Method for extracting gas of blank zone of working face with large mining length | |
CN107558962A (en) | Concentric tube type batch-type gaslift drainage technology | |
CN201560795U (en) | Apparatus for controlling dust with wind as medium during boring construction for gas drainage | |
CN105089608A (en) | Injection tool matched with underground eddy current tool for water drainage and gas production and application method | |
CN107503680B (en) | Ground large-diameter rapid drilling equipment and method thereof | |
CN211474169U (en) | Directional rig cooling water recycle device | |
CN107143374A (en) | The gas production method and system of belt pressing type drilling malleation mining | |
CN103362541A (en) | Method for locally improving coal seam air permeability in coal seam with high gas and low air permeability | |
CN206554888U (en) | Pump assembly extracting device of oil is sprayed in the direct circulation of single tube post in oil pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: XI AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY Free format text: FORMER NAME: SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE |
|
CP03 | Change of name, title or address |
Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82 Patentee after: Xi'an Research Institute, CCTEG Address before: 710054 No. 52, Yanta Road, Xi'an, Shaanxi Patentee before: Sian Branch Of China Coal Research Institute |