CN101428721B - Management operation device for elevator - Google Patents

Management operation device for elevator Download PDF

Info

Publication number
CN101428721B
CN101428721B CN2008101748103A CN200810174810A CN101428721B CN 101428721 B CN101428721 B CN 101428721B CN 2008101748103 A CN2008101748103 A CN 2008101748103A CN 200810174810 A CN200810174810 A CN 200810174810A CN 101428721 B CN101428721 B CN 101428721B
Authority
CN
China
Prior art keywords
earthquake
elevator
long period
detector
seismic motion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101748103A
Other languages
Chinese (zh)
Other versions
CN101428721A (en
Inventor
中山彻也
重田政之
宫田弘市
中村秀广
关谷裕二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN101428721A publication Critical patent/CN101428721A/en
Application granted granted Critical
Publication of CN101428721B publication Critical patent/CN101428721B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The invention provides an elevator control operation device comprising a receiver unit and a long period taphrogeny detector. The receiver unit receives urgent earthquake rapid reports input from outside including earthquake source information and earthquake seismic degree information. The long period taphrogeny detector detects a long period taphrogeny and outputs a signal. A control unit enables an elevator car to stop at a nearest floor, open the elevator door to make the elevator in a stand by state when the control unit judges the earthquake source is in a predefine object area from the received urgent earthquake report and the seismic degree of the earthquake is above a specified value, and switches to the predefine long period taphrogeny control operation when the control unit judges that the long period taphrogeny detector outputs signals within a given time from the earthquake starts, and enables the elevator to return to normal when the control unit judges that the long period taphrogeny detector does not output signals within the given time from the earthquake starts.

Description

The control running gear of elevator
Technical field
The elevator that the present invention relates to a kind of generation of exploration seismic and carry out earthquake controlled operation is used the control running gear.
Background technology
In the ordinary course of things, be provided with the obligated earthquake detector that is provided with of building of elevator, when detecting earthquake, elevator switched to earthquake controlled operation through earthquake detector.
Different and different according to the function of elevator by class with the earthquake detector that obligation is set; In not having the conventional lift of quick traffic coverage, need to be provided with these the 2 kinds of detectors of low S wave detector that are used for surveying the low S wave detector of spy of the low especially main motion of acceleration/accel (S ripple) and survey the low S ripple of acceleration/accel.At this, so-called spy is low, and the S wave detector is not meant the detector that low earthquake is all surveyed to all acceleration/accels, and is meant the detector that the earthquake with the acceleration/accel that needs the earthquake controlled operation of startup is surveyed.On the other hand, low S wave detector is meant that to the earthquake of acceleration/accel more than setting value in the earthquake with the acceleration/accel that needs the earthquake controlled operation of startup be the detector that so-called violent earthquake is surveyed.And, also can use the P wave detector of the initial stage fine motion (P ripple) of exploration seismic to replace special low S wave detector.
Through above-mentioned 2 kinds earthquake detector is arranged in the building that is provided with elevator, the earthquake controlled operation that elevator is predesignated according to the result of detection of each earthquake detector.For example, detect earthquake, but low S wave detector carries out the 1st grade of other earthquake controlled operation when not detecting earthquake at the low S wave detector of spy.Concrete method is after making the lift car that carries out lifting action rest in nearest floor, opens the car door of the lift car of having stopped and the elevator lobby door of the floor that lift car is stopped.After this, elevator is automatically restoring to normal operation through behind the certain hour.
On the other hand, when having detected the earthquake, when low S wave detector has also detected earthquake, carry out the 2nd grade of other earthquake controlled operation except the low S wave detector of spy.Concrete method is after making the lift car that carries out lifting action be accommodated to nearest floor, opens the car door of the lift car of having stopped and the elevator lobby door of the floor that lift car is stopped.After this, after having passed through certain hour, still make elevator keep the operation halted state, and after having carried out safety verification through the maintainer and having recovered the adjustment operation, recover normally operation.
But, through research, find when adopting the earthquake detector of above-mentioned acceleration detection mode earthquake, might survey the seismic motion that but seismic motion that cycle long little less than acceleration/accel promptly rocked with the cycle of several seconds to tens second lentamente.Therefore; When hoist trunk that the long period seismic motion causes being provided with building or the elevator of elevator taking place rock slowly; Even big deflection has taken place in building and hoist trunk etc.; But, do not switch to earthquake controlled operation and proceed normal situation about moving so elevator can occur because the earthquake detector of above-mentioned acceleration detection mode is surveyed less than this earthquake.
When elevator moves under the state of big deflection takes place owing to rock slowly repeatedly for the hoist trunk of building and elevator etc.; The hoist cable of elevator (comprising main hoist cable, assisted suspension cable and speed controller rope) can produce resonance along with the deflection of building and hoist trunk etc.; And the hoist cable that has produced resonance can bump with the wall of lift car, counterbalanced weight or elevator lifting channel, thereby possibly damage lift facility.If lift facility is in operation as stated and is damaged, lift car then might take place carry out emergency braking because of the signal from the detector that detects this damage, thereby cause elevator passenger to be closed in the situation in the lift car.Especially when the long period earthquake has taken place, because this kind earthquake is easy and the eigentone of high building forms resonance, so may cause big loss.
For this reason; As prior art; Seismic motion detects to long period, and according to the testing result of this long period seismic motion the technology that elevator switches to the earthquake controlled operation of predesignating of long period has been realized practicability (for example with reference to patent documentation 1 and 2).
The clear 60-197576 communique of patent documentation 1 Japan's open patent
Patent documentation 2 Japan's patents are special is willing to 2006-166812 number
In above-mentioned prior art, when the detector in being arranged on building has detected the long period seismic motion, the elevator that is arranged in this building is switched to the earthquake controlled operation of long period.Therefore, when elevator being switched to the earthquake controlled operation of long period, building has taken place to rock, so from reducing the angle of loss, above-mentioned known technology is necessary further to improve.
Summary of the invention
The present invention makes according to the actual conditions of above-mentioned known technology, the object of the present invention is to provide a kind of control running gear of elevator, and it can reduce the loss that causes because of the long period seismic motion.
To achieve these goals, the invention provides a kind of control running gear of elevator, the control running gear of said elevator has the earthquake detector of detection by the amplitude of seimic building; And according to the earthquake controlled operation that the signal of this earthquake detector is predesignated by control unit, the control running gear of said elevator is characterised in that to have receiving element and long period seismic motion detector; This receiving element receives from the urgent rapid earthquake information report that comprises focus ground information and focus seismic intensity information of outside input; This long period seismic motion detector is surveyed long period seismic motion and output signal, and said urgent rapid earthquake information report is following such information: utilize the propagation speed differential of earthquake, when large-scale earthquake has taken place; The earthquake wave information that seismograph captured on the near fixed point of the focus of adjusting the distance is compiled; And according to the P ripple that observes in the area near apart from focus, with the time S wave propagation situation that arrives after the sequential mode prediction, forecast the time of advent and the earthquake degree of main seismic motion with this; The focus ground of the earthquake that the urgent rapid earthquake information report that said control unit is received in judgement is related is positioned at the object area of predesignating; And the earthquake degree of this earthquake rests on the nearest floor lift car, and opens elevator door when specified value is above; Make elevator get into readiness for action; And in the specified time of when this earthquake takes place, starting at,, switch to the long period seismic motion control operation of predesignating being judged as said long period seismic motion detector when having exported signal; On the other hand; In the specified time of predesignating of when earthquake takes place, starting at, be judged as said long period seismic motion detector when not having output signal, make elevator recover normal operation.
In the present invention who has adopted said structure; When receiving urgent earthquake speed, receiving element gives the correct time; If the focus ground of the earthquake that the urgent rapid earthquake information report that the control unit judgement is received is related is in the object area of predesignating, and the earthquake degree of this earthquake then makes lift car rest on the nearest floor more than specified value; And open elevator door, make elevator get into readiness for action.After this; In the specified time of when this earthquake takes place, starting at, control unit switches to the long period seismic motion control operation of predesignating being judged as long period seismic motion detector when having exported signal; On the other hand; In the specified time of predesignating of when earthquake takes place, starting at, be judged as said long period seismic motion detector when not having output signal, make elevator recover normal operation.So; Replenish the detection of the long period seismic motion of being undertaken by long period seismic motion detector through the information that is the basis with the urgent rapid earthquake information report that comprises focus ground information and focus seismic intensity information; Can be rapidly and suitably carry out earthquake controlled operation, thus the loss that causes because of the long period seismic motion can be reduced.
The invention effect
According to the present invention, can be according to the urgent rapid earthquake information report that comprises focus ground information and focus seismic intensity information, promptly make lift car rest in nearest floor and get into readiness for action; So that defence is carried out in vibrations, simultaneously, judge whether to have taken place the long period seismic motion through long period seismic motion detector; And judged result is reflected in the control of elevator; Thus, can reduce the loss that is produced because of the long period seismic motion, improve safety; Can also the standing time of elevator be controlled in the Min. simultaneously, thereby the operating efficiency that prevents elevator reduces.
Description of drawings
Fig. 1 is the structural representation of an embodiment of the control running gear of expression elevator of the present invention.
Fig. 2 is the diagram of circuit of the sequence of operation of expression control running gear.
Nomenclature
1 hoist trunk
2 Machine Rooms
3 urgent rapid earthquake information report receiving elements (receiver)
4 control panels
4a?CPU
5 winchs
6 drive rope sheave
7 turn to rope sheave
8 main hoist cables
9 lift cars
10 counterbalanceds weight
11 special low S wave detectors
12 low S wave detectors
13 long period seismic motion detectors
The specific embodiment
Followingly describe with reference to the embodiment of accompanying drawing to elevator control running gear of the present invention.
Fig. 1 is the structural representation of an embodiment of expression elevator control running gear of the present invention, and Fig. 2 is the diagram of circuit of the sequence of operation of expression control running gear.
In Fig. 1, the urgent rapid earthquake information report receiving element 3 that is provided with elevator lifting channel 1 in the building A, is formed on the Machine Room 2 of hoist trunk 1 upper end and receives the urgent rapid earthquake information report of input from the outside.In addition, be provided with control panel 4 and winch 5 in the Machine Room 2, this control panel 4 has CPU4a, controls the required calculation process of elevator by this CPU4a, lift car and counterbalanced weight that this winch 5 is stated after driving according to the driving command from CPU4a output.In addition, be connected with on the S. A. of winch 5 and drive rope sheave 6, simultaneously, drive rope sheave 6 and drive near the turning to rope sheave 6 and be wound with two ends main hoist cable 8 down on the rope sheave 7 as one of bearer cable with being arranged on.In addition, under suspention, lift car 9 is by the end suspention support of main hoist cable 8 in hoist trunk 1 at the two ends of main hoist cable 8, and counterbalanced weight 10 is supported by the other end suspention of main hoist cable 8.In addition, in the rope that elevator is used, except graphic main hoist cable 8, also comprise not shown assisted suspension cable and speed controller rope etc.
In addition, also be provided with: special low S wave detector 11, it is arranged in the elevator hole 1a of portion of hoist trunk 1 bottom, is used for the low especially S ripple and the special low S wave detection signal of output of acceleration/accel of exploration seismic; Low S wave detector 12, it is arranged in the Machine Room 2, is used for the lower S ripple and the low S wave detection signal of output of acceleration/accel of exploration seismic; And long period seismic motion detector 13; It is arranged in the Machine Room 2; Be used to survey long period seismic motion and output long period seismic motion signal, these special low S wave detectors 11, low S wave detector 12, long period seismic motion detector 13 and above-mentioned receiving element 3 are connected on the control panel 4.
In addition, in above-mentioned urgent rapid earthquake information report, include focus ground information and focus seismic intensity information.That is, in existing earthquake alarm system, utilize the propagation speed differential of earthquake; When large-scale earthquake has taken place, will be apart from the earthquake wave information aggregating that seismograph captured on the nearer fixed point of focus to the meteorological Room, and according to the P ripple that observes in the area nearer apart from focus; With the time S wave propagation situation that arrives after the sequential mode prediction, forecast the time of advent and the earthquake degree of main seismic motion with this, and in the present invention; Because with the long period seismic motion is object; So, different with the elevator control of carrying out according to the prediction due in and the prediction earthquake degree of so-called main seismic motion, in the present invention; From the urgent rapid earthquake information report of outside input, include focus ground information and focus seismic intensity information, and carry out the control of elevator according to these information.
In this embodiment; Step S1 at Fig. 2 receives urgent rapid earthquake information report by the urgent rapid earthquake information report receiving element 3 that is arranged in the building A that elevator is installed, afterwards, and in step S2; CPU4a by control panel 4 judges whether the focus ground of the earthquake that received urgent rapid earthquake information report is related is included in the object area of predesignating; Simultaneously, in step S3, the earthquake degree and the standard value of this earthquake compared.At this moment; If be judged as this earthquake focus be included in the object area of predesignating; And the earthquake degree of this earthquake is when the standard value of predesignating is above, in step S4, if lift car 9 is carrying out lifting action; Then make lift car rest in nearest floor, make lift car get into readiness for action after elevator door is opened.In addition,, then make lift car 9 keep this state, the calling of being logined was lost efficacy, and make elevator get into readiness for action if lift car 9 is just resting on the floor.After this, in step S5, the specified time that the CPU4a of control panel 4 begins to predesignate when this earthquake takes place, for example 5 minutes timing.Shake owing to the long period seismic motion causes building A when being judged as in this time of 5 minutes; And in step S6, be judged as long period seismic motion detector 13 when having exported long period seismic motion signal; In step S10, the operation of elevator is switched to the long period seismic motion control operation of predesignating by the CPU4a of control panel 4.On the other hand; Shown in step S7, the timing of when this earthquake takes place, starting at 5 minutes finishes, if long period seismic motion detector 13 is not exported long period seismic motion signal during this; Then in step S8, remove readiness for action, and make elevator return to normal operation.
In addition; In above-mentioned steps S2; Judge when the related earthquake of urgent rapid earthquake information report received is not included in the object area of predesignating, and the earthquake degree that in above-mentioned step S3, is judged as this earthquake is when the standard value of predesignating is following, shown in step S9; Make elevator proceed normal operation, and take appropriate measures according to situation afterwards.That is to say; When even the urgent related earthquake of rapid earthquake information report is not included in the object area of predesignating, and the earthquake degree of this earthquake is also below the standard value of predesignating, but shown in step S6; Detected the long period seismic motion at long period seismic motion detector 13; And when having exported long period seismic motion signal, in step S10, the operation of elevator is switched to the long period seismic motion control operation of predesignating by the CPU4a of control panel 4.
In addition; As other earthquake controlled operation; Exported special low S wave detection signal when the CPU4a of control panel 4 is judged as from the low S wave detector 11 of spy, but low S wave detector 12 is during the low S wave detection signal of output, makes the lift car 9 that carries out lifting action rest in nearest floor and elevator door is opened; Afterwards, after having passed through the specified time of predesignating, make elevator return to normal operation.And; Exported special low S wave detection signal being judged as from the low S wave detector 11 of spy; And when low S wave detector 12 has also exported the S wave detection signal low; Make the lift car 9 that carries out lifting action rest in nearest floor and open elevator door, before maintainer's termination of security is confirmed and recovered the adjustment operation, make elevator keep halted state.
According to this embodiment, can be according to the urgent rapid earthquake information report that comprises focus ground information and focus seismic intensity information, promptly make lift car 9 rest in nearest floor and get into readiness for action; So that defence is carried out in vibrations, simultaneously, judge whether to have taken place the long period seismic motion through long period seismic motion detector 13; And judged result is reflected in the control of elevator; Thus, can reduce the loss that is produced because of the long period seismic motion, improve safety; Can also the standing time of elevator be controlled in the Min. simultaneously, thereby prevent that operating efficiency from reducing.

Claims (1)

1. the control running gear of an elevator; The control running gear of said elevator has the earthquake detector of detection by the amplitude of seimic building; And the earthquake controlled operation of predesignating by control unit according to the signal of this earthquake detector; The control running gear of said elevator is characterised in that
Have receiving element and long period seismic motion detector; This receiving element receives from the urgent rapid earthquake information report that comprises focus ground information and focus seismic intensity information of outside input; This long period seismic motion detector is surveyed long period seismic motion and output signal
Said urgent rapid earthquake information report is following such information: the propagation speed differential that utilizes earthquake; When large-scale earthquake has taken place; The earthquake wave information that seismograph captured on the near fixed point of the focus of adjusting the distance is compiled, and according to the P ripple that observes in the area near apart from focus, with the time S wave propagation situation that arrives after the sequential mode prediction; Forecast the time of advent and the earthquake degree of main seismic motion with this
The focus ground of the earthquake that the urgent rapid earthquake information report that said control unit is received in judgement is related is positioned at the object area of predesignating; And the earthquake degree of this earthquake rests on the nearest floor lift car, and opens elevator door when specified value is above; Make elevator get into readiness for action; And in the specified time of when this earthquake takes place, starting at,, switch to the long period seismic motion control operation of predesignating being judged as said long period seismic motion detector when having exported signal; On the other hand; In the specified time of predesignating of when this earthquake takes place, starting at,, make elevator recover normal operation being judged as said long period seismic motion detector when not having output signal.
CN2008101748103A 2007-11-07 2008-11-05 Management operation device for elevator Expired - Fee Related CN101428721B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2007289723A JP2009113937A (en) 2007-11-07 2007-11-07 Emergency operation device of elevator
JP2007-289723 2007-11-07
JP2007289723 2007-11-07

Publications (2)

Publication Number Publication Date
CN101428721A CN101428721A (en) 2009-05-13
CN101428721B true CN101428721B (en) 2012-02-01

Family

ID=40644406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101748103A Expired - Fee Related CN101428721B (en) 2007-11-07 2008-11-05 Management operation device for elevator

Country Status (3)

Country Link
JP (1) JP2009113937A (en)
CN (1) CN101428721B (en)
HK (1) HK1129360A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5518388B2 (en) * 2009-07-27 2014-06-11 株式会社日立製作所 Elevator control device for building having seismic isolation structure
JP5412474B2 (en) * 2011-07-08 2014-02-12 リンナイ株式会社 Gas appliances
JP5924707B2 (en) * 2012-07-04 2016-05-25 三菱電機株式会社 Elevator control device and elevator control method
JP5951666B2 (en) * 2014-03-10 2016-07-13 東芝エレベータ株式会社 elevator
CN104016203A (en) * 2014-06-16 2014-09-03 宁波奥力迅电梯部件有限公司 Lift car safe operation system and method
JP6923102B1 (en) * 2020-08-21 2021-08-18 三菱電機ビルテクノサービス株式会社 Elevator system
CN115469353A (en) * 2022-08-18 2022-12-13 四川省特种设备检验研究院 Method and device for detecting and receiving seismic waves of elevator

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01127583A (en) * 1987-11-11 1989-05-19 Hitachi Ltd Controller for elevator
JPH072450A (en) 1993-06-14 1995-01-06 Hitachi Building Syst Eng & Service Co Ltd Emergency operating device for elevator
JP4994616B2 (en) 2005-08-09 2012-08-08 三菱電機株式会社 Elevator control device and elevator control method
JP4618101B2 (en) * 2005-11-08 2011-01-26 鹿島建設株式会社 Elevator control operation device

Also Published As

Publication number Publication date
HK1129360A1 (en) 2009-11-27
CN101428721A (en) 2009-05-13
JP2009113937A (en) 2009-05-28

Similar Documents

Publication Publication Date Title
CN101428721B (en) Management operation device for elevator
JP5255180B2 (en) Elevator earthquake control operation system and elevator earthquake control operation method
CN101391718B (en) Elevator apparatus
US7926620B2 (en) Elevator control apparatus and control method
CN101088898B (en) Elevator device
JP5183185B2 (en) Elevator device and control operation method of elevator
KR101383966B1 (en) Control device of elevator and method of improving the same
CN101172550B (en) Elevator equipment
CN101537956B (en) Earthquake recovery apparatus for elevator
JP4973014B2 (en) Seismic control system for elevators
CN101081672B (en) Elevator equipment
JP2007099500A (en) Elevator control operation device and elevator system
CN101289152A (en) Earthquake monitoring and controlling device of elevator
CN104125922A (en) Elevator control device
JPH01127583A (en) Controller for elevator
KR100919548B1 (en) Elevator control apparatus and control method
WO2017085839A1 (en) Monitoring system
JP4867813B2 (en) Elevator seismic control operation system
CN102530672A (en) Elevator
JP2008114958A (en) Elevator device
JP2008105845A (en) Earthquake emergency operation system of elevator
JP2008105762A (en) Long period vibration control operation system of elevator
JP5271071B2 (en) Earthquake response control device and program
JPS6136532Y2 (en)
JP5496298B2 (en) Seismic control system for elevators

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1129360

Country of ref document: HK

C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1129360

Country of ref document: HK

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20171105

CF01 Termination of patent right due to non-payment of annual fee