CN101397842A - Construction method of cast iron terrace with hole - Google Patents

Construction method of cast iron terrace with hole Download PDF

Info

Publication number
CN101397842A
CN101397842A CNA2007101896242A CN200710189624A CN101397842A CN 101397842 A CN101397842 A CN 101397842A CN A2007101896242 A CNA2007101896242 A CN A2007101896242A CN 200710189624 A CN200710189624 A CN 200710189624A CN 101397842 A CN101397842 A CN 101397842A
Authority
CN
China
Prior art keywords
terrace
cast iron
layer
hole
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101896242A
Other languages
Chinese (zh)
Inventor
崔凡
张华�
汤雪飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nonferrous Metals Processing Technology Co Ltd
Original Assignee
China Nonferrous Metals Processing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nonferrous Metals Processing Technology Co Ltd filed Critical China Nonferrous Metals Processing Technology Co Ltd
Priority to CNA2007101896242A priority Critical patent/CN101397842A/en
Publication of CN101397842A publication Critical patent/CN101397842A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a construction method of an apertured cast iron terrace in the terrace construction field, wherein, a foundation soil layer is arranged in the lowest layer; a concrete cushioning layer, a cement mortar bonding layer and an apertured cast iron panel layer are arranged above the foundation soil layer in sequence; the concrete cushioning layer is C15; and the cement mortar bonding layer is a 35mm-thick bonding layer in which the ratio of cement to mortar is 1 to 2. The construction method not only effectively solves the problem that the terrace is apt to crack and collapse, but also has quite high flatness, high temperature resistance and long service life and is mainly used for the design of the terrace of nonferrous metal processing shops.

Description

A kind of job practices of cast iron terrace with hole
Technical field
The present invention relates to the construction field of terrace, specifically a kind of job practices of cast iron terrace with hole.
Background technology
In the manufacturing process of non-ferrous metal processing plant, often exist the art production process that terrace strong wear, terrace are contacted with scorching hot object, thereby cause the ordinary concrete terrace to ftracture easily, subside, yet production technology require ground to have strong cracking resistance and slump resistance energy.
Summary of the invention
The purpose of this invention is to provide a kind of job practices with a kind of cast iron terrace with hole of strong cracking resistance and slump resistance energy, this invention can not only effectively solve the problem that terrace ftractures easily, subsides, and can satisfy the requirement and the long service life of production technology.
The technical solution adopted for the present invention to solve the technical problems is: foundation soil is arranged at stratum, and the foundation soil upper strata sets gradually the concrete bed course, cement mortar setting course, porose cast iron plate surface layer.
Described concrete bed course is C15.
Described cement mortar setting course is that cement and mortar ratio are the thick setting course of 35mm of 1:2.
The invention has the beneficial effects as follows, not only effectively solved the problem that non-ferrous metal processing plant terrace for a long time ftractures easily, subsides, and also can bear the high temperature below 100 ℃ simultaneously and have higher planeness and long service life.
Description of drawings
Fig. 1 is a kind of cast iron terrace with hole organigram of cast iron terrace with hole job practices;
1. foundation soils among the figure, 2. concrete bed course, the thick 1:2 cement mortar of 3.35mm setting course, 4. porose cast iron, 5. hole.
Fig. 2 is the vertical view of porose cast iron;
The specific embodiment
In Fig. 1, earlier with the compacting of ground epibasal tier, compacting coefficient 〉=0.9.Pour into a mould the C15 concrete bed course of 100mm~200mm on the upper strata, thick 1: 2 cement mortar setting course of 35mm is that thickness is that 6mm highly is the porose cast iron plate surface layer of 25mm at last.During installation, bed course should first hacking and is cleaned clean back with water and lay setting course and surface layer, and the smooth of cast iron plate extruded and guaranteed by cement paste by the hole.Cast iron plate must keep profile neat smooth promptly do not have sand holes crackle, crack situation, and the straight-line dimension deviation of plate must not surpass ± 1mm, and diagonal is no more than ± 2mm, and the front of plate and edgewise bend degree (interplanar deviation) are no more than ± 1mm.The tensile strength of the intensity of cast iron should satisfy 1.176x10N/m 2, flexural strength satisfies 2.7x10N/m 2, Brinell hardness satisfies 143~229.

Claims (3)

1. the job practices of a cast iron terrace with hole, it is characterized in that: foundation soil is arranged at stratum, and the foundation soil upper strata sets gradually the concrete bed course, cement mortar setting course, porose cast iron plate surface layer.
2. according to the job practices of the described a kind of cast iron terrace with hole of claim 1, it is characterized in that: the job practices according to the porose a kind of cast iron terrace described in claims 1 is characterized in that: described concrete bed course is C15.
3. according to the job practices of the described porose a kind of cast iron terrace of claim 1, it is characterized in that: described cement mortar setting course be cement with mortar thickness than being the thick setting course of 35mm of 1:2.
CNA2007101896242A 2007-09-25 2007-09-25 Construction method of cast iron terrace with hole Pending CN101397842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101896242A CN101397842A (en) 2007-09-25 2007-09-25 Construction method of cast iron terrace with hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101896242A CN101397842A (en) 2007-09-25 2007-09-25 Construction method of cast iron terrace with hole

Publications (1)

Publication Number Publication Date
CN101397842A true CN101397842A (en) 2009-04-01

Family

ID=40516663

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101896242A Pending CN101397842A (en) 2007-09-25 2007-09-25 Construction method of cast iron terrace with hole

Country Status (1)

Country Link
CN (1) CN101397842A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628650A (en) * 2013-11-28 2014-03-12 中国五冶集团有限公司 Metal floor and formation method
CN109695333A (en) * 2018-12-24 2019-04-30 威海英纳吉精密机械有限公司 A kind of production of factory's steel floor and mounting process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628650A (en) * 2013-11-28 2014-03-12 中国五冶集团有限公司 Metal floor and formation method
CN109695333A (en) * 2018-12-24 2019-04-30 威海英纳吉精密机械有限公司 A kind of production of factory's steel floor and mounting process

Similar Documents

Publication Publication Date Title
CN101575913A (en) Construction method for preventing reserved holes of pipes from water leakage
CN102644356A (en) Combined prefabricated slab
WO2007143885A1 (en) An insulated and soundproof block and a masonry method thereof
CN105016669A (en) Prefabricated cable channel and preparation method thereof
US11679528B2 (en) Solid waste large-mixing-amount concrete prefabricated laminated slab and preparation method thereof
CN101397842A (en) Construction method of cast iron terrace with hole
CN204343622U (en) A kind of syndeton of combined floor
CN202898944U (en) Ultra-large type side-pavement assembling plate block
CN105887624B (en) A kind of permeable trade face layer paving structure and method for paving
CN111531702A (en) Preparation method of prestressed prefabricated part
CN204551765U (en) Buffer isolator between building structure
CN104988995A (en) Method for preventing cracking of wire box and distribution box hole in wall
CN211621043U (en) Ceramic thick plate permeable paving system
CN208502238U (en) Superimposed sheet makes mold
CN103883068B (en) A kind of high-performance cement Mortar Plates built-in light ecological material L shape insulating bearing building block
CN108409264B (en) Preparation method of L-shaped prefabricated terrazzo decorative hanging plate
CN105569214A (en) Dense thin-wall filled building block construction technology
CN104908150A (en) Piping shaft manufacturing formwork and industrialized piping shaft production method
CN105297875A (en) Construction method of integrated catchwater
CN205777234U (en) A kind of decorating outer wall of building insulation hanging slab
CN206607854U (en) A kind of concrete blinding
CN106812064A (en) Parallel-moving type bridge bow member
CN203007767U (en) Bicycle ramp
CN213204810U (en) Novel assembled ceramic tile
CN204326520U (en) Novel building basalt foaming formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090401