CN109695333A - A kind of production of factory's steel floor and mounting process - Google Patents
A kind of production of factory's steel floor and mounting process Download PDFInfo
- Publication number
- CN109695333A CN109695333A CN201811579116.XA CN201811579116A CN109695333A CN 109695333 A CN109695333 A CN 109695333A CN 201811579116 A CN201811579116 A CN 201811579116A CN 109695333 A CN109695333 A CN 109695333A
- Authority
- CN
- China
- Prior art keywords
- steel floor
- hole
- factory
- floor
- square
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/06—Flooring or floor layers composed of a number of similar elements of metal, whether or not in combination with other material
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of production of factory's steel floor and mounting process, including square steel floor, square steel floor surface is provided with tread plate, offer reinforcing through-hole in the middle part of square steel floor, tread plate quantity be provided with it is multiple, reinforce number of openings be provided with it is multiple, it is symmetrical arranged square steel floor and uses stainless steel material, production and mounting process, comprising the following steps: square cutting, laser boring, hydro-forming, injecting glue prepares, and installation steel floor etc., the present invention relates to factory floor technical fields.The production of factory's steel floor and mounting process, product material and mounting material have rust-preventing characteristic, superpower antiskid function, non-slip texture is clean and tidy, regular, has good associative perception after splicing installation, first it can play the role of lacing wire in ground punching filler when installation, through-hole fills up epoxide-resin glue, forms rubber column gel column shape, improves adherence force, high-intensitive and weight vehicle pass-through can be born, and not easy to fall off.
Description
Technical field
The present invention relates to factory's metal floor technical field, the production of specially a kind of factory's steel floor and erector
Skill.
Background technique
Steel floor is also known as industrial floor, stainless steel floor.It is applicable in large-scale industrial district and any particular energy source area, is not suitable at home
Installation, steel floor is that one kind is mainly used for heavy workshop, industrial premises, production of construction materials workshop, press workshop, the works such as harbour
The metal floor of industry workshop indispensability, the steel floor in workshop is substantially what steel plate process was simply process at present,
Load-bearing property is poor, and insufficient installing and fixing upward stability, and the hydraulic press used passes through 2-3 punch forming, though
The deformation of products that right high production efficiency is still suppressed is larger and laborious in high hardness materials such as processing stainless steels, mold
Loss is also big, and the service life is shorter.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, it the present invention provides a kind of production of factory's steel floor and mounting process, solves and adds
The laborious mold loss of the high hardness materials such as work stainless steel is also big, service life shorter problem.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of factory's steel floor, including square steel
Floor, square steel floor surface are provided with tread plate, offer reinforcing through-hole in the middle part of the square steel floor.
Preferably, the tread plate quantity is provided with multiple, and is symmetrical arranged.
Preferably, the reinforcing number of openings is provided with multiple, and is symmetrical arranged.
Preferably, the square steel floor uses stainless steel material, and the square steel floor setting is square.
A kind of production of factory's steel floor and mounting process, comprising the following steps:
Step 1: square is cut, square steel floor is made of stainless steel big material plate, uses laser cutting machine first
It carries out being cut into square steel plate template;
Step 2: laser boring, the square steel plate template finished will be cut in step 1 be placed into laser cutting machine and beaten
Hole gets multiple reinforcing through-holes for reinforcing and obtains cutting sample;
Step 3: hydro-forming, the cutting sample in step 2 is placed under hydraulic press and is suppressed, is suppressed for anti-skidding
Tread plate, obtain finished product;
Step 4: ground punching, the lacing hole to match with finished product steel floor is got on ground, and the ash in hole is cleared up
Dirt;
Step 5: injecting glue prepares, filled up in the lacing hole that step 4 is beaten after epoxide-resin glue in the position to match with steel floor
It sets and uniformly fills epoxide-resin glue;
Step 6: installation steel floor is put at the top of steel floor using being mounted above after being directed at floor on glue and lacing hole
It sets clump weight to be compressed, prevents hollowing;
Step 7: removing clump weight after gelling is solid, observes whether glue fills up by through-hole, if any unfilled situation, can pass through
Through-hole is secondary to carry out adding glue, guarantees that steel floor and ground occur without hollowing phenomenon;
Step 8: cleaning is completed, the spot on steel floor surface is cleared up after clump weight is removed, and completes installation.
Preferably, after being checked in the step 7, through-hole is filled up into epoxide-resin glue, forms rubber column gel column shape.
(3) beneficial effect
The present invention provides a kind of production of factory's steel floor and mounting process.Have it is following the utility model has the advantages that
The production of factory's steel floor and mounting process, steel floor use stainless steel material, and mounting material uses epoxy resin
Fixed, product material and mounting material have antirust, wear-resistant property, the raised tread plate that steel floor uses Sheet Metal Forming Technology to be formed
Frictional force can be greatly increased, superpower antiskid function is played, non-slip texture is clean and tidy, regular, has after splicing installation good whole
Body-sensing, when installation, first can play the role of lacing wire in ground punching filler, and there are multiple through-holes on every piece of floor, and through-hole fills up asphalt mixtures modified by epoxy resin
Rouge glue forms rubber column gel column shape, improves adherence force, plays reinforcement adherence force, it can be identified that steel floor bottom without hollowing, guarantees to paste
Effect is secured, can bear high-intensitive and weight vehicle pass-through.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of steel floor of the present invention;
The cross-sectional view of partial structurtes when Fig. 2 is present invention installation steel floor.
In figure: 1- square steel floor, 2- tread plate, 3- reinforce through-hole, the ground 4-, 5- lacing hole, 6- epoxide-resin glue.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of factory's steel floor, including square steel floor 1,
1 surface of square steel floor is provided with tread plate 2, offers in the middle part of square steel floor 1 and reinforces through-hole 3.
2 quantity of tread plate is provided with multiple and arranged symmetrically.
Reinforcing 3 quantity of through-hole is provided with multiple and arranged symmetrically.
Square steel floor 1 uses stainless steel material, and the setting of square steel floor 1 is square.
A kind of production of factory's steel floor and mounting process, comprising the following steps:
Step 1: square is cut, square steel floor 1 is made of stainless steel big material plate, first using laser cutting
Machine carries out being cut into square steel plate template;
Step 2: laser boring, the square steel plate template finished will be cut in step 1 be placed into laser cutting machine and beaten
Hole gets multiple reinforcing through-holes 3 for reinforcing and obtains cutting sample;
Step 3: hydro-forming, the cutting sample in step 2 is placed under hydraulic press and is suppressed, is suppressed for anti-skidding
Tread plate 2, obtain finished product;
Step 4: ground 4 is punched, the lacing hole 5 to match with finished product steel floor is got on ground 4, and cleared up in hole
Dust;
Step 5: injecting glue prepares, fills up in the lacing hole 5 that step 4 is beaten after epoxide-resin glue 6 and matching with steel floor
Position uniformly fills epoxide-resin glue 6;
Step 6: installation steel floor, using being mounted above after being directed at floor on glue and lacing hole 5, at the top of steel floor
It places clump weight to be compressed, prevents hollowing;
Step 7: removing clump weight after gelling is solid, observes whether glue fills up by through-hole, if any unfilled situation, can pass through
Through-hole is secondary to carry out adding glue, guarantees that steel floor and ground 4 occur without hollowing phenomenon;
Step 8: cleaning is completed, the spot on steel floor surface is cleared up after clump weight is removed, and completes installation.
After being checked in step 7, through-hole is filled up into epoxide-resin glue 6, forms rubber column gel column shape.
In use, square steel floor 1 is made of stainless steel big material plate, carried out first using laser cutting machine
It is cut into square steel plate template, the square steel plate template that cutting finishes is placed into laser cutting machine and is punched, is got
Multiple reinforcing through-holes 3 for reinforcing obtain cutting sample, and cutting sample is placed under hydraulic press and is suppressed, use is suppressed
In anti-skidding tread plate 2, finished product is obtained, ground 4 is punched, the lacing hole 5 to match with finished product steel floor is got on ground 4, and
And the dust in hole has been cleared up, it is filled up in lacing hole 5 after glue and uniformly applies the position painting spread and matched with steel floor on ground 4
Stable being placed into of square steel floor 1, is filled the top of glue position by full glue, and clump weight is placed at the top of steel floor and is pressed
Tightly, cancel clump weight after gelling is solid, observe whether glue fills up by through-hole, it, can be secondary by through-hole if any unfilled situation
It carries out adding glue, guarantees that epoxide-resin glue 6 is filled up without hollowing, then by through-hole in steel floor and ground 4, form rubber column gel column shape, then will match
Pouring weight is removed, and clears up the dust on steel floor surface, removes mounting material used for positioning, completes installation, steel floor is not using
Rust steel material, product material and mounting material have antirust, wear-resistant property, and steel floor is anti-using the protrusion that Sheet Metal Forming Technology is formed
Draw runner 2 can greatly increase frictional force, play superpower antiskid function, and non-slip texture is clean and tidy, regular, have after splicing installation good
Associative perception, lacing wire can be played the role of by first punching filler on ground 4 when installation, and there are multiple through-holes on every piece of floor, and through-hole fills up
Epoxide-resin glue 6 forms rubber column gel column shape, improves adherence force, plays reinforcement adherence force, it can be identified that steel floor bottom is without hollowing,
Guarantee that sticking effect is secured, high-intensitive and weight vehicle pass-through can be born.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions.By sentence " element limited including one ..., it is not excluded that
There is also other identical elements in the process, method, article or apparatus that includes the element ".
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of factory's steel floor, including square steel floor (1), it is characterised in that: square steel floor (1) the surface setting
Have tread plate (2), is offered in the middle part of the square steel floor (1) and reinforce through-hole (3).
2. a kind of factory's steel floor according to claim 1, it is characterised in that: tread plate (2) quantity is provided with
It is multiple, and be symmetrical arranged.
3. a kind of factory's steel floor according to claim 1, it is characterised in that: reinforcing through-hole (3) the quantity setting
Have multiple and arranged symmetrically.
4. a kind of factory's steel floor according to claim 1, it is characterised in that: the square steel floor (1) is not using
Become rusty Steel material, and square steel floor (1) setting is square.
5. production and the mounting process of a kind of factory's steel floor, it is characterised in that: the following steps are included:
Step 1: square is cut, square steel floor (1) is made of stainless steel big material plate, is cut first using laser
Cutting mill carries out being cut into square steel plate template;
Step 2: laser boring, the square steel plate template finished will be cut in step 1 be placed into laser cutting machine and beaten
Hole gets multiple reinforcing through-holes (3) for reinforcing and obtains cutting sample;
Step 3: hydro-forming, the cutting sample in step 2 is placed under hydraulic press and is suppressed, is suppressed for anti-skidding
Tread plate (2), obtain finished product;
Step 4: ground (4) are punched, the lacing hole (5) to match with finished product steel floor is got in ground (4), and clear up
Dust in hole;
Step 5: injecting glue prepares, filled up in the lacing hole (5) that step 4 is beaten after epoxide-resin glue (6) with steel floor phase
The position matched uniformly fills epoxide-resin glue (6);
Step 6: installation steel floor, using being mounted above after being directed at floor on glue and lacing hole (5), on steel floor top
Portion places clump weight and is compressed, and prevents hollowing;
Step 7: removing clump weight after gelling is solid, observes whether glue fills up by through-hole, if any unfilled situation, can pass through
Through-hole is secondary to carry out adding glue, guarantees that steel floor and ground (4) occur without hollowing phenomenon;
Step 8: cleaning is completed, the spot on steel floor surface is cleared up after clump weight is removed, and completes installation.
6. production and the mounting process of a kind of factory's steel floor according to claim 5, it is characterised in that: the step
After being checked in seven, through-hole is filled up epoxide-resin glue (6), forms rubber column gel column shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811579116.XA CN109695333A (en) | 2018-12-24 | 2018-12-24 | A kind of production of factory's steel floor and mounting process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811579116.XA CN109695333A (en) | 2018-12-24 | 2018-12-24 | A kind of production of factory's steel floor and mounting process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109695333A true CN109695333A (en) | 2019-04-30 |
Family
ID=66231856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811579116.XA Pending CN109695333A (en) | 2018-12-24 | 2018-12-24 | A kind of production of factory's steel floor and mounting process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109695333A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502155A (en) * | 2020-04-23 | 2020-08-07 | 陈小乐 | Environment-friendly ceramic tile and preparation method and installation method thereof |
CN112122883A (en) * | 2020-08-18 | 2020-12-25 | 武义雄昶五金制造有限公司 | Manufacturing method of antiskid blind road plate |
CN114108995A (en) * | 2020-08-26 | 2022-03-01 | 江苏鑫达建设工程有限公司 | High-flatness stainless steel ground construction process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397842A (en) * | 2007-09-25 | 2009-04-01 | 中色科技股份有限公司 | Construction method of cast iron terrace with hole |
US20110020589A1 (en) * | 2009-07-22 | 2011-01-27 | Kuo-Ying Kan | Combination plate |
CN201933751U (en) * | 2010-12-30 | 2011-08-17 | 上海华仕科技工程有限公司 | Novel metal floor tile |
CN103806630A (en) * | 2013-12-26 | 2014-05-21 | 上海华仕科技工程有限公司 | Metal floor tile installing technology |
CN204059858U (en) * | 2014-08-21 | 2014-12-31 | 浙江南柯泰金属制品有限公司 | A kind of floor |
CN105971237A (en) * | 2016-05-13 | 2016-09-28 | 湖北永益金属地板有限公司 | Convex-concave-convex strip-shaped metal floor |
-
2018
- 2018-12-24 CN CN201811579116.XA patent/CN109695333A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397842A (en) * | 2007-09-25 | 2009-04-01 | 中色科技股份有限公司 | Construction method of cast iron terrace with hole |
US20110020589A1 (en) * | 2009-07-22 | 2011-01-27 | Kuo-Ying Kan | Combination plate |
CN201933751U (en) * | 2010-12-30 | 2011-08-17 | 上海华仕科技工程有限公司 | Novel metal floor tile |
CN103806630A (en) * | 2013-12-26 | 2014-05-21 | 上海华仕科技工程有限公司 | Metal floor tile installing technology |
CN204059858U (en) * | 2014-08-21 | 2014-12-31 | 浙江南柯泰金属制品有限公司 | A kind of floor |
CN105971237A (en) * | 2016-05-13 | 2016-09-28 | 湖北永益金属地板有限公司 | Convex-concave-convex strip-shaped metal floor |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502155A (en) * | 2020-04-23 | 2020-08-07 | 陈小乐 | Environment-friendly ceramic tile and preparation method and installation method thereof |
CN112122883A (en) * | 2020-08-18 | 2020-12-25 | 武义雄昶五金制造有限公司 | Manufacturing method of antiskid blind road plate |
CN114108995A (en) * | 2020-08-26 | 2022-03-01 | 江苏鑫达建设工程有限公司 | High-flatness stainless steel ground construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109695333A (en) | A kind of production of factory's steel floor and mounting process | |
CN202336906U (en) | Plate plying machine | |
CN205270643U (en) | A stamping waste material automatic clear upset frock for punch press | |
CN206884248U (en) | A kind of moveable Copper fabrication waste material extrusion forming device | |
CN107931419A (en) | One kind of multiple gauge material continuous stamping process | |
CN210730248U (en) | A stock scraper for clearing up residual glue of multilayer hot press hot pressboard | |
CN206982870U (en) | A kind of printing machine is die cut receipts waste-removing device online | |
CN202239238U (en) | Blanking progressive die for edge of toast box | |
CN202787951U (en) | Environment-friendly type building formwork | |
CN210508226U (en) | Steel construction work piece processing district road surface structure | |
CN111687299B (en) | Household ladder pedal punching all-in-one machine | |
CN210588389U (en) | Scrap cleaning device for metal processing | |
CN204136143U (en) | A kind of cross cutting automatic waste clearing device | |
CN206199932U (en) | A kind of large-scale tubular target shaping tool | |
CN201232348Y (en) | Environmental protection resin foaming formwork | |
CN208246284U (en) | A kind of self-holding puncher easy to use | |
CN202611104U (en) | Three-dimensional rib mesh structure | |
CN206622501U (en) | A kind of diel of automatically removing burr | |
CN202073309U (en) | Seamless plastic building template | |
CN106276273A (en) | A kind of reinforcing bar collating unit | |
CN219862279U (en) | Construction tool for pressing anti-skid grooves on ramp pavement | |
CN219451464U (en) | Novel build work platform bed board | |
CN203320429U (en) | Steel template for drain opening | |
CN217617231U (en) | Stamping device is used in metal product production | |
CN215319050U (en) | Device is cut in wood-plastic board production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190430 |
|
WD01 | Invention patent application deemed withdrawn after publication |