CN101358261B - Masonry method of mixer - Google Patents

Masonry method of mixer Download PDF

Info

Publication number
CN101358261B
CN101358261B CN2008101968419A CN200810196841A CN101358261B CN 101358261 B CN101358261 B CN 101358261B CN 2008101968419 A CN2008101968419 A CN 2008101968419A CN 200810196841 A CN200810196841 A CN 200810196841A CN 101358261 B CN101358261 B CN 101358261B
Authority
CN
China
Prior art keywords
brick
front wall
building
expansion joint
per
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101968419A
Other languages
Chinese (zh)
Other versions
CN101358261A (en
Inventor
秦祖宏
程时胜
胡小明
黄道昌
韩新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN2008101968419A priority Critical patent/CN101358261B/en
Publication of CN101358261A publication Critical patent/CN101358261A/en
Application granted granted Critical
Publication of CN101358261B publication Critical patent/CN101358261B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for building a mixer furnace in the metallurgical industry. The invention provides a building method to solve the problems that the existing mixer furnace building method can not prevent the taphole from easily being corroded and the separate taphole is out of step with the front wall after being poured. The purpose of the invention is realized through the following proposals: a mixer furnace building method, two end walls and the back wall adopting the brick building process and the front wall, the tap hole and the furnace top adopting the integral casting process. Experiments show that the problem that the corrosion degree of the front wall and the taphole is out of step is solved by the method. The method greatly improves the service life of the mixer furnace, the capacity of passing melted iron is increased to be more than 1500000 tons from the original capacity of less than 1000000 tons without repair in the midway, the cost is saved, the production efficiency is improved, and the method is propitious to popularization and application.

Description

The building method of hot metal mixer
Technical field
The present invention relates to a kind of method that hot metal mixer is built by laying bricks or stones in the metallurgy industry.
Background technology
At present, hot metal mixer built dual mode by laying bricks or stones, the one, all adopt brick form, the 2nd, adopt integrated poured, two kinds of modes respectively have relative merits, for brick hot metal mixer, body of heater can be etched in use for some time, especially the iron notch position weathers the most seriously, so some enterprise can decrease serious iron notch and furnace roof and pour into a mould invading, but in use finds, with iron notch, after the furnace roof cast, furnace service life is to a certain degree improved, but front wall occurs and iron notch, serious nonsynchronous problem of the erosion life-span of furnace roof has restricted the raising of furnace service life, its stove was used as a servant 1,000,000 tons of iron quantity not sufficients, and stove labour must repeatedly be repaired front wall and iron notch midway, has increased maintenance cost, has reduced production efficiency.
Summary of the invention
Can not prevent effectively that at existing hot metal mixer building method iron notch easily is etched and independent iron notch cast back and the serious nonsynchronous problem of front wall, the invention provides a kind of building method, can address the above problem preferably.
Described purpose is achieved by the following scheme:
A kind of building method of hot metal mixer: two headwalls, back wall adopt brick technology, and front wall, iron notch and furnace roof adopt integral cast technology.
When headwall is built by laying bricks or stones, the per four layers of brick clamp one deck expansion joint paper of short transverse, folder one deck expansion joint paper between adjacent two bricks of horizontal direction.The brick of building headwall by laying bricks or stones is filled space with the magnesium powder by the masonry thickness direction between layer and the layer.
Used brick is M-1, M-23, M-128 or M-129 type magnesia brick, must not be with seam between forward and backward, the upper and lower brick.
Before the formwork of being convenient to front wall cast of certain width is built at the wall position by laying bricks or stones before front wall and headwall joint walling supports brick, supports brick and all adopts M-1 or M-128 type magnesia brick, by the per 4 layers of folder one deck expansion joint paper of short transverse; Horizontal direction all adopts M-1 type magnesia brick, per 2 folder one deck expansion joint paper; Horizontal direction all adopts M-128 type magnesia brick, per 2 layers of folder one deck expansion joint paper.
Experimental results show that, adopt and to have solved front wall and the iron notch nonsynchronous problem of degree that weathers after the method for the invention, this method has improved the work-ing life of hot metal mixer greatly, crossing the iron amount is brought up to more than 1,500,000 tons by 1,000,000 tons of original less thaies, and need not to repair again midway, saved cost, improved production efficiency, be beneficial to and apply.
Description of drawings
Fig. 1 is the plumb cut structural representation of hot metal mixer;
Fig. 2 is the horizontal section structural representation of hot metal mixer.
Wherein, headwall 1, back wall 2, front wall 3, iron notch 4 supports brick 5, furnace roof 6.
Embodiment
Elaborate the preferred embodiment of the present invention below in conjunction with accompanying drawing.
With reference to Fig. 1, Fig. 2, the iron notch of brick hot metal mixer is seriously corroded, and carries out large repairs then.
Its two headwall 1, back wall 2 still are brick, and adopt integral cast technology for front wall 3, iron notch 4 and furnace roof 6.Specific as follows:
Two headwalls are built by laying bricks or stones:
With M-1, M-23, M-128 or the flat block of M-129 type magnesia brick allotment, before and after two-layer, require forward and backward, up and down must not with the seam, per 4 layers add one deck expansion joint paper, flat expansion joint paper of 2 brick clamps, purpose be to solve baker and use in headwall splash expand the front wall formwork cracking of building body that causes, cave in.Fill the space with the magnesium powder between layer and the layer, a batch levelling must carefully be cut in front-back wall and furnace bottom junction, and vision slit is above uses the kyanite composite brick, and the brick type is constant.
Front wall is built (formwork position) by laying bricks or stones:
With M-1 or the flat block of M-128 type magnesia brick, expansion joint paper of the per 4 layers of brick clamp of short transverse, expansion joint paper of per 2 folders of horizontal direction M-1, expansion joint paper of the per 2 layers of folder of M-128, before and after 4 layered sutures require forward and backward, upper and lower must not be with seam, between layer and the layer with magnesium powder filling space.
Back wall is built by laying bricks or stones:
Build with M-1 or M-128 type magnesia brick are flat, expansion joint paper of per 4 layers of folder one deck expansion joint per 2 M-1 brick clamp of paper horizontal direction, expansion joint paper of per 2 folders of M-128, the brickwork joint requirement, forward and backward, up and down must not be with seam, between layer and the layer with magnesium powder filling space.
The construction of iron notch position:
With aluminium silicon carbide mould material scene front wall and iron notch are together poured into a mould.Iron notch position mould material is poured into a mould at twice, be poured into for the first time 558mm place, molten iron face top, guarantee that homo(io)thermism begins to build rest part after 40 hours again in the stove under 16-20 ℃ condition, after all cast finishes, guarantee in the stove that homo(io)thermism is 16-20 ℃ of demouldings after 48 hours.
The furnace roof construction:
Adopt high strength micro expansion mould material disposal pouring.Build finish after, guarantee in the stove homo(io)thermism between 16-20 ℃, the demoulding after 72 hours.

Claims (2)

1. the building method of a hot metal mixer is characterized in that two headwalls, back wall adopt brick technology, and front wall, iron notch and furnace roof adopt integral cast technology; When described headwall is built by laying bricks or stones, the per four layers of brick clamp one deck expansion joint paper of short transverse, folder one deck expansion joint paper between adjacent two bricks of horizontal direction, used brick is M-1 or M-23 type magnesia brick; Built the support brick between front wall and the headwall by laying bricks or stones, supported brick and all adopt M-1 type magnesia brick, by the per 4 layers of folder one deck expansion joint paper of short transverse; Horizontal direction all adopts M-1 type magnesia brick, per 2 folder one deck expansion joint paper.
2. the building method of hot metal mixer according to claim 1, the brick that it is characterized in that building headwall by laying bricks or stones be by the masonry thickness direction, between layer and the layer with magnesium powder filling space.
CN2008101968419A 2008-09-02 2008-09-02 Masonry method of mixer Expired - Fee Related CN101358261B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101968419A CN101358261B (en) 2008-09-02 2008-09-02 Masonry method of mixer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101968419A CN101358261B (en) 2008-09-02 2008-09-02 Masonry method of mixer

Publications (2)

Publication Number Publication Date
CN101358261A CN101358261A (en) 2009-02-04
CN101358261B true CN101358261B (en) 2011-05-25

Family

ID=40330859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101968419A Expired - Fee Related CN101358261B (en) 2008-09-02 2008-09-02 Masonry method of mixer

Country Status (1)

Country Link
CN (1) CN101358261B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103255256B (en) * 2013-05-29 2014-09-17 新兴铸管股份有限公司 Method for building reusable iron mixing furnace top
CN112325653B (en) * 2020-09-28 2022-09-20 甘肃酒钢集团宏兴钢铁股份有限公司 Repairing method of metal mixer lining

Also Published As

Publication number Publication date
CN101358261A (en) 2009-02-04

Similar Documents

Publication Publication Date Title
US3492383A (en) Process of manufacturing a crack resistant multi-layer furnace lining
CN101985173B (en) Steel ladle lining covering method
CN101700572B (en) Method for building container bottom of carbon-containing molten steel container
CN101683690B (en) Method for constructing bottom of ladle
CN101358261B (en) Masonry method of mixer
CN110918967A (en) Repairing method for inner liner of torpedo hot metal mixer car
CN105618725A (en) Compositely-bricked small-medium-sized steel ladle work lining
CN104529485B (en) Two-layer compound refractory material and two-layer compound refractory material ditch cover and its manufacture method and application
CN101386898B (en) Repairing method of molten iron chute for mixer furnace
CN106623883A (en) Integral pouring process for large steel ladle
CN101979188B (en) Method for building bottom of molten steel tank
CN102954693B (en) Method for constructing bottom groove circulating pipe of vacuum-circulating degassing furnace
CN214814757U (en) High-stability composite steel ladle edge structure
CN110877100B (en) Method for building bottom of spherical hot metal ladle of blast furnace
CN211866588U (en) Steel ladle with stepped ladle bottom
CN214349569U (en) Composite refining ladle
CN203336965U (en) Novel furnace slope brick used for electric-arc furnace
CN200978292Y (en) Integral pouring iron mixing vehicle splash guard
CN102535471B (en) Secondary grouting method applied to space between bottom plate and foundation in installation work of mechanical equipment
CN203764968U (en) Preformed part used for refined steel ladle slag line
CN101761159B (en) Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting
RU82605U1 (en) FILLING BUCKET
CN210587146U (en) Accident ladle
CN205732944U (en) A kind of continuous casting production magnesia carbon brick impact-resistant panels prefabricated component
JPH08219659A (en) Construction method for induction furnace lining refractory

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20160902