CN106623883A - Integral pouring process for large steel ladle - Google Patents

Integral pouring process for large steel ladle Download PDF

Info

Publication number
CN106623883A
CN106623883A CN201611156473.6A CN201611156473A CN106623883A CN 106623883 A CN106623883 A CN 106623883A CN 201611156473 A CN201611156473 A CN 201611156473A CN 106623883 A CN106623883 A CN 106623883A
Authority
CN
China
Prior art keywords
castable
ladle
layer
containment wall
permanent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611156473.6A
Other languages
Chinese (zh)
Inventor
苗振鲁
宁知常
李保琴
赵友虎
丁中
崔美棠
丁爱忠
牛新辉
王桂民
李圣伯
刘立华
李书国
齐红霞
吴克刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201611156473.6A priority Critical patent/CN106623883A/en
Publication of CN106623883A publication Critical patent/CN106623883A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/02Linings
    • B22D41/023Apparatus used for making or repairing linings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ceramic Products (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention relates to an integral pouring process for a large steel ladle, and belongs to the technical field of steel-making. The integral pouring process comprises the steps that (1) a self-adhesive nano-ceramic insulation board is used as a steel ladle wall insulating layer; (2) low-cement and high-aluminum combined castable and semi-lightweight high-aluminum castable is used for a steel ladle permanent safety layer wholly, low-cement and high-aluminum combined castable is used for a ladle bottom, and semi-lightweight high-aluminum castable is used for a ladle wall; and (3) low-cement and high-strength high-slag resistant corundum spinel combined castable is used for a ladle wall working layer, and adopted for integral pouring is conducted in a bottom-wall separation mode. The pouring process is good in safety, high in melting loss resistance, small in molten steel pollution, good in insulating performance, capable of reducing energy consumption, long in service life, low in cost and convenient in construction.

Description

A kind of integrated poured technique of large ladle furnace
Technical field
The present invention relates to a kind of integrated poured technique of large ladle furnace, and in particular to for production technology be converter- CAS-LF-CCM or converter-CAS-LF-RH-CCM are applied to the integrated poured work of the large ladle furnace of 210 tons and the above Skill, belongs to steelmaking technical field.
Background technology
The existing 210 tons of converters 2 in 210 regions of Ji steel steel mill, average tap about 220t, Steel ladle clearance is 400- 700mm, dominating process route:Converter-CAS-LF-CCM, converter-CAS-LF-RH-CCM, converter-CAS-CCM tri- Kind, more than 50%, liquid steel temperature scope 1530-1630 DEG C (wherein walks the molten steel LF out-station temperatures of LF+RH routes to RH handling rates 1600-1630 DEG C), CAS 15-25min of process time, LF refining process time about 35-60min, RH refining treatment cycles 35-50min, 50-60min of continuous-casting steel pouring cycle.At present ladle integrally uses the longevity to build by laying bricks or stones based on magnesia carbon brick and aluminium-magnesia carbon brick About 80 stoves of life.
The content of the invention
It is an object of the invention to provide a kind of integrated poured technique of large ladle furnace, the present invention improves ladle security Can, ton steel cost is reduced, optimize brick-building art.Technical scheme is as follows:
A kind of integrated poured technique of large ladle furnace, technique is as follows:
(1) ladle wall heat-insulation layer adopts self-adhering-type nano ceramics heat-insulating shield, good heat insulating;
(2) ladle permanent secure layer integrally combines high alumina castable and half light high alumina castable using low cement, and bag bottom is adopted High alumina castable is combined with low cement, containment wall is using half light high alumina castable, and it is convenient to construct;
(3) containment wall working lining adopts low cement combined high-strength, high resistance to slag corundum spinel castable, integrated poured to adopt Separated with diapire and poured into a mould, can effectively prevent from wrapping bottom and containment wall seam crossing bleed-out, increase the security that ladle is used.
Of the invention integrated poured technique is comprised the following steps that:
(1) heat-insulation layer construction:Self-adhering-type warming plate is pasted onto into ladle shell inwall using chamotte, it is ensured that the fiber of stickup with Containment wall is firmly combined with;Warming plate adopts self-adhering-type nano ceramics heat-insulating shield;
(2) construction of permanent secure layer:Bag bottom permanent secure layer casting and constructing, bag bottom combines high alumina casting using low cement Material, adds water by the amount of 3-5% (mass fraction), and the material adds water to stir every time and discharge after 3-5min;In casting process, using shake Dynamic rod carries out horizontal vibrating.After bag bottom permanent layer has been poured intensity (pressing pressure motionless), the loose tool for placing into permanent layer enters The construction of row containment wall permanent layer, containment wall need to carry out centering using half light high alumina castable, permanent layer loose tool, it is ensured that indentured permanent layer Thickness is uniform and up to standard;Preferably, wrap bottom and high alumina castable is combined using low cement, add water by the amount of 4% (mass fraction);More Preferably, the material adds water to stir every time and discharge after 4min;
(3) working lining construction:First according to slag line brick masonry number of rings, working lining cast height is determined;Then by working lining Fetal membrane centering is positioned, it is ensured that fetal membrane is placed steady and fixed, it is to avoid loosen in use;Working lining is combined using low cement High intensity, high resistance to slag corundum spinel castable, castable amount of water is 4-6% (mass fraction), and castable adds water every time Could discharge after stirring, it is ensured that material flowability meets execution conditions;The construction of working lining containment wall needs to stand health after finishing 24 hours, when small powder harden to press pressure it is motionless when, carry out the demoulding, the demoulding will confirm after finishing to containment wall situation.Pouring ladle During the working lining of bottom, vibrations process need to be carried out to castable;During vibrations, shock club is forbidden to laterally pull wherein, it is to avoid to produce empty Hole;Preferably, slag line brick masonry number of rings is set as 8-11 rings;Working lining adopts low cement combined high-strength, high resistance to slag corundum Spinel pouring material, castable amount of water is 5% (mass fraction);
(4) build by laying bricks or stones before residue pile, containment wall castable face is polished flat with sander, then smear one layer of thin chamotte and look for Flat, the gap of brick need to control within 1.5mm, to close tweel block and be placed on left side gudgeon direction;Bag need to adopt thickness 20- along pressing plate The steel plate of 25mm, spacing is 200mm between each steel plate, and is entered using the triangular steel of thickness 20-25mm every piece of steel plate bottom Row is reinforced, and requires every piece of steel plate both sides full weld;Preferably, bag along pressing plate need to adopt thickness 23mm steel plate, each steel plate it Between spacing be 200mm, and reinforced using the triangular steel of thickness 23mm every piece of steel plate bottom;
(5) construction of the tank along castable:Tank is used after mould overlay film, tank presses 3-5%'s (mass fraction) along material Amount adds water (hold not dissipate by hand and be defined);The demoulding after tank is sufficiently hardened along material and to form intensity.Preferably, tank presses 4% (matter along material Amount fraction) amount add water.
The present invention has compared with prior art advantages below:
(1) security is good:Molten bath position is overall knotting, and material overall performance is good, gap being likely to result in without laying bricks etc. Hidden danger, security reliability is high.
(2) anti-melting loss is strong, and molten steel pollution is few:Using high-performance aluminum magnesia spinel system castable, anti-erosion is good, and ladle holds Product change is little, and charge weight is stable, and molten steel pollution is few, it is to avoid carburetting, is conducive to improving the cleanliness factor of molten steel.
(3) good heat insulating, can saving energy consumption:Overall ladle employs rational thermal insulation layer and permanent layer is designed, containment wall, Carbon-free material is selected at bag bottom, and thermal conductivity factor is low, and ladle temperature drop is slow, and clad temperature can be saved within 280 DEG C in the whole bag labour phase More than power consumption 0.5kwh/t.
(4) life-span length, low cost:Integrated poured knotting material repeatedly circulating sleeve can be poured and used, the life-span more than 120 stoves, Cost ratio builds ladle reduction by laying bricks or stones.
(5) it is convenient to construct:Overall knotting steel ladle full adopts casting and constructing, and the work for greatly alleviating Field Force is strong Degree.
Specific embodiment
Further describe the present invention with reference to specific embodiment, advantages of the present invention and feature will be with description and It is apparent.But embodiment is only exemplary, does not constitute any restriction to the scope of the present invention.Those skilled in the art should It should be appreciated that, the details of technical solution of the present invention and form can be repaiied without departing from the spirit and scope of the invention Change or replace, but these modifications and replacement are each fallen within protection scope of the present invention.
A kind of integrated poured technique of the large ladle furnace of embodiment 1
Comprise the following steps that:
(1) heat-insulation layer construction:Self-adhering-type warming plate is pasted onto into ladle shell inwall using chamotte, it is ensured that the fiber of stickup with Containment wall is firmly combined with;Warming plate adopts self-adhering-type nano ceramics heat-insulating shield;
(2) construction of permanent secure layer:Bag bottom permanent secure layer casting and constructing, bag bottom combines high alumina casting using low cement Material, adds water by the amount of 4% (mass fraction), and the material adds water to stir every time and discharge after 4min;In casting process, using shock club Carry out horizontal vibrating.After bag bottom permanent layer has been poured intensity (pressing pressure motionless), the loose tool for placing into permanent layer is wrapped The construction of wall permanent layer, containment wall need to carry out centering using half light high alumina castable, permanent layer loose tool, it is ensured that indentured permanent layer thickness It is uniform and up to standard;
(3) working lining construction:First according to slag line brick masonry number of rings, slag line brick masonry number of rings is set as 10 rings, working lining It is poured into the lowermost layer of 10 ring residue piles;Then the centering of working lining fetal membrane is positioned, it is ensured that fetal membrane is placed steady and fixed, it is to avoid Loosen in use;Working lining adopts low cement combined high-strength, high resistance to slag corundum spinel castable, castable to add The water yield is 5% (mass fraction), and castable adds water every time after stirring and could discharge, it is ensured that material flowability meets construction bar Part;The construction of working lining containment wall needs to stand health 24 hours after finishing, when small powder harden to press pressure it is motionless when, carry out the demoulding, the demoulding Containment wall situation is confirmed after finishing.During the working lining of pouring ladle bottom, vibrations process need to be carried out to castable;During vibrations, sternly Prohibit shock club to laterally pull wherein, it is to avoid produce cavity;
(4) build by laying bricks or stones before residue pile, containment wall castable face is polished flat with sander, then smear one layer of thin chamotte and look for Flat, the gap of brick need to control within 1.5mm, to close tweel block and be placed on left side gudgeon direction;Bag need to adopt thickness 23mm along pressing plate Steel plate, spacing is 200mm between each steel plate, and is reinforced using the triangular steel of thickness 23mm every piece of steel plate bottom, And require every piece of steel plate both sides full weld;
(5) construction of the tank along castable:Tank is used after mould overlay film, tank is along material by the amount of 4% (mass fraction) Add water (hold not dissipate by hand and be defined);The demoulding after tank is sufficiently hardened along material and to form intensity.
A kind of integrated poured technique of the large ladle furnace of embodiment 2
Comprise the following steps that:
(1) heat-insulation layer construction:Self-adhering-type warming plate is pasted onto into ladle shell inwall using chamotte, it is ensured that the fiber of stickup with Containment wall is firmly combined with;Warming plate adopts self-adhering-type nano ceramics heat-insulating shield;
(2) construction of permanent secure layer:Bag bottom permanent secure layer casting and constructing, bag bottom combines high alumina casting using low cement Material, adds water by the amount of 3% (mass fraction), and the material adds water to stir every time and discharge after 3.5min;In casting process, using vibrations Rod carries out horizontal vibrating;After bag bottom permanent layer has been poured intensity (pressing pressure motionless), placing into the loose tool of permanent layer is carried out The construction of containment wall permanent layer, containment wall need to carry out centering using half light high alumina castable, permanent layer loose tool, it is ensured that indentured permanent thickness Degree is uniform and up to standard;
(3) working lining construction:First according to slag line brick masonry number of rings, slag line brick masonry number of rings is set as 8 rings, and working lining is poured Note to the lowermost layer of 8 ring residue piles;Then the centering of working lining fetal membrane is positioned, it is ensured that fetal membrane is placed steady and fixed, it is to avoid Loosen during use;Working lining adopts low cement combined high-strength, high resistance to slag corundum spinel castable, castable to add water Measure as 4.5% (mass fraction), castable adds water every time after stirring and could discharge, it is ensured that material flowability meets construction bar Part;The construction of working lining containment wall needs to stand health 24 hours after finishing, when small powder harden to press pressure it is motionless when, carry out the demoulding, the demoulding Containment wall situation is confirmed after finishing;During the working lining of pouring ladle bottom, vibrations process need to be carried out to castable;During vibrations, sternly Prohibit shock club to laterally pull wherein, it is to avoid produce cavity;
(4) build by laying bricks or stones before residue pile, containment wall castable face is polished flat with sander, then smear one layer of thin chamotte and look for Flat, the gap of brick need to control within 1.5mm, to close tweel block and be placed on left side gudgeon direction;Bag need to adopt thickness 20mm along pressing plate Steel plate, spacing is 200mm between each steel plate, and is reinforced using the triangular steel of thickness 20mm every piece of steel plate bottom, And require every piece of steel plate both sides full weld;
(5) construction of the tank along castable:Tank is used after mould overlay film, tank is along material by 3.5% (mass fraction) Amount adds water (hold not dissipate by hand and be defined);The demoulding after tank is sufficiently hardened along material and to form intensity.
A kind of integrated poured technique of the large ladle furnace of embodiment 3
Comprise the following steps that:
(1) heat-insulation layer construction:Self-adhering-type warming plate is pasted onto into ladle shell inwall using chamotte, it is ensured that the fiber of stickup with Containment wall is firmly combined with;Warming plate adopts self-adhering-type nano ceramics heat-insulating shield;
(2) construction of permanent secure layer:Bag bottom permanent secure layer casting and constructing, bag bottom combines high alumina casting using low cement Material, adds water by the amount of 4.5% (mass fraction), and the material adds water to stir every time and discharge after 5min;In casting process, using vibrations Rod carries out horizontal vibrating.After bag bottom permanent layer has been poured intensity (pressing pressure motionless), placing into the loose tool of permanent layer is carried out The construction of containment wall permanent layer, containment wall need to carry out centering using half light high alumina castable, permanent layer loose tool, it is ensured that indentured permanent thickness Degree is uniform and up to standard;
(3) working lining construction:First according to slag line brick masonry number of rings, slag line brick masonry number of rings is set as 11 rings, working lining It is poured into the lowermost layer of 11 ring residue piles;Then the centering of working lining fetal membrane is positioned, it is ensured that fetal membrane is placed steady and fixed, it is to avoid Loosen in use;Working lining adopts low cement combined high-strength, high resistance to slag corundum spinel castable, castable to add The water yield is 6% (mass fraction), and castable adds water every time after stirring and could discharge, it is ensured that material flowability meets construction bar Part;The construction of working lining containment wall needs to stand health 24 hours after finishing, when small powder harden to press pressure it is motionless when, carry out the demoulding, the demoulding Containment wall situation is confirmed after finishing.During the working lining of pouring ladle bottom, vibrations process need to be carried out to castable;During vibrations, sternly Prohibit shock club to laterally pull wherein, it is to avoid produce cavity;
(4) build by laying bricks or stones before residue pile, containment wall castable face is polished flat with sander, then smear one layer of thin chamotte and look for Flat, the gap of brick need to control within 1.5mm, to close tweel block and be placed on left side gudgeon direction;Bag need to adopt thickness 24mm along pressing plate Steel plate, spacing is 200mm between each steel plate, and is reinforced using the triangular steel of thickness 24mm every piece of steel plate bottom, And require every piece of steel plate both sides full weld;
(5) construction of the tank along castable:Tank is used after mould overlay film, tank is along material by the amount of 5% (mass fraction) Add water (hold not dissipate by hand and be defined);The demoulding after tank is sufficiently hardened along material and to form intensity.
In the present invention, ladle heat insulation thermal insulation layer is more than 1200 heats;Permanent secure layer is more than 1200 heats;Working lining is more than 150 heats.

Claims (8)

1. the integrated poured technique of a kind of large ladle furnace, it is characterised in that the integrated poured technique of large ladle furnace is as follows:
(1) ladle wall heat-insulation layer adopts self-adhering-type nano ceramics heat-insulating shield;
(2) ladle permanent secure layer integrally combines high alumina castable and half light high alumina castable using low cement, and bag bottom is using low Cement combines high alumina castable, and containment wall is using half light high alumina castable;
(3) containment wall working lining adopts low cement combined high-strength, high resistance to slag corundum spinel castable, integrated poured employing bottom Wall separates cast.
2. integrated poured technique according to claim 1, it is characterised in that pouring technology is comprised the following steps that:
(1) heat-insulation layer construction:Self-adhering-type warming plate is pasted onto into ladle shell inwall using chamotte, it is ensured that the fiber and containment wall of stickup It is firmly combined with;Warming plate adopts self-adhering-type nano ceramics heat-insulating shield;
(2) construction of permanent secure layer:Bag bottom permanent secure layer casting and constructing, bag bottom combines high alumina castable using low cement, Add water by the amount of 3-5% (mass fraction), the material adds water to stir every time and discharge after 3-5min;In casting process, using vibrations Rod carries out horizontal vibrating;After bag bottom permanent layer has been poured intensity (pressing pressure motionless), placing into the loose tool of permanent layer is carried out The construction of containment wall permanent layer, containment wall need to carry out centering using half light high alumina castable, permanent layer loose tool, it is ensured that indentured permanent thickness Degree is uniform and up to standard;
(3) working lining construction:First according to slag line brick masonry number of rings, working lining cast height is determined;Then by working lining fetal membrane Centering is positioned, it is ensured that fetal membrane is placed steady and fixed, it is to avoid loosen in use;Working lining is combined high-strength using low cement Degree, high resistance to slag corundum spinel castable, castable amount of water is 4-6% (mass fraction), and castable adds water every time stirring Could discharge after uniform, it is ensured that material flowability meets execution conditions;The construction of working lining containment wall needs standing health 24 little after finishing When, when small powder harden to press pressure it is motionless when, carry out the demoulding, the demoulding will confirm after finishing to containment wall situation;Pouring ladle basic skill or training When making layer, vibrations process need to be carried out to castable;During vibrations, shock club is forbidden to laterally pull wherein, it is to avoid to produce cavity;
(4) build by laying bricks or stones before residue pile, containment wall castable face is polished flat with sander, it is levelling then to smear one layer of thin chamotte, brick Gap need to control within 1.5mm, close tweel block and be placed on left side gudgeon direction;Wrapping need to adopt thickness 20-25mm's along pressing plate Steel plate, spacing is 200mm between each steel plate, and is reinforced using the triangular steel of thickness 20-25mm every piece of steel plate bottom, And require every piece of steel plate both sides full weld;
(5) construction of the tank along castable:Tank is used after mould overlay film, tank is added along material by the amount of 3-5% (mass fraction) Water (is held not dissipate by hand and is defined);The demoulding after tank is sufficiently hardened along material and to form intensity.
3. integrated poured technique according to claim 2, it is characterised in that bag bottom adopts low cement in the step (2) With reference to high alumina castable, add water by the amount of 4% (mass fraction).
4. integrated poured technique according to claim 2, it is characterised in that low cement combines high alumina in the step (2) Castable adds water to stir every time and discharge after 4min.
5. integrated poured technique according to claim 2, it is characterised in that slag line brick masonry number of rings in the step (3) It is set as 8-11 rings.
6. integrated poured technique according to claim 2, it is characterised in that working lining adopts low water in the step (3) Mud combined high-strength, high resistance to slag corundum spinel castable, castable amount of water is 5% (mass fraction).
7. integrated poured technique according to claim 2, it is characterised in that bag needs to adopt along pressing plate in the step (4) The steel plate of thickness 23mm, spacing is 200mm between each steel plate, and is entered using the triangular steel of thickness 23mm every piece of steel plate bottom Row is reinforced.
8. integrated poured technique according to claim 2, it is characterised in that tank presses 4% along material in the step (5) The amount of (mass fraction) adds water.
CN201611156473.6A 2016-12-14 2016-12-14 Integral pouring process for large steel ladle Pending CN106623883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611156473.6A CN106623883A (en) 2016-12-14 2016-12-14 Integral pouring process for large steel ladle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611156473.6A CN106623883A (en) 2016-12-14 2016-12-14 Integral pouring process for large steel ladle

Publications (1)

Publication Number Publication Date
CN106623883A true CN106623883A (en) 2017-05-10

Family

ID=58823491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611156473.6A Pending CN106623883A (en) 2016-12-14 2016-12-14 Integral pouring process for large steel ladle

Country Status (1)

Country Link
CN (1) CN106623883A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109628704A (en) * 2019-02-15 2019-04-16 安徽鑫海环保新材料股份有限公司 A kind of RH vacuum refining furnace and its building method
CN110935871A (en) * 2020-01-02 2020-03-31 新余钢铁股份有限公司 Steel ladle structure and manufacturing method thereof
CN111390151A (en) * 2020-04-26 2020-07-10 郑州银河耐火材料有限公司 Steel ladle double-ring masonry structure and construction method thereof
CN116372150A (en) * 2023-05-31 2023-07-04 亿川科技(成都)有限责任公司 Automatic construction and beating system and method for ladle maintenance

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01122659A (en) * 1987-11-06 1989-05-15 Kawasaki Steel Corp Protection of permanent lining internal insulation of molten metal container
CN1919499A (en) * 2005-08-22 2007-02-28 崔东瑞 Ladle neck bush pouring technique
CN202845769U (en) * 2012-11-22 2013-04-03 攀钢集团西昌钢钒有限公司 Heat-preserving steel ladle lining and steel ladle
CN203356583U (en) * 2013-06-25 2013-12-25 宝山钢铁股份有限公司 Accessory type integrally-poured permanent lining structure for wall of steel ladle
CN103613397A (en) * 2013-12-09 2014-03-05 攀枝花钢城集团有限公司 Ladle bottom working layer castable and preparation method thereof.
CN106111966A (en) * 2016-06-24 2016-11-16 巩义市红旗炉料有限公司 A kind of compound permanent ladle layer construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01122659A (en) * 1987-11-06 1989-05-15 Kawasaki Steel Corp Protection of permanent lining internal insulation of molten metal container
CN1919499A (en) * 2005-08-22 2007-02-28 崔东瑞 Ladle neck bush pouring technique
CN202845769U (en) * 2012-11-22 2013-04-03 攀钢集团西昌钢钒有限公司 Heat-preserving steel ladle lining and steel ladle
CN203356583U (en) * 2013-06-25 2013-12-25 宝山钢铁股份有限公司 Accessory type integrally-poured permanent lining structure for wall of steel ladle
CN103613397A (en) * 2013-12-09 2014-03-05 攀枝花钢城集团有限公司 Ladle bottom working layer castable and preparation method thereof.
CN106111966A (en) * 2016-06-24 2016-11-16 巩义市红旗炉料有限公司 A kind of compound permanent ladle layer construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109628704A (en) * 2019-02-15 2019-04-16 安徽鑫海环保新材料股份有限公司 A kind of RH vacuum refining furnace and its building method
CN110935871A (en) * 2020-01-02 2020-03-31 新余钢铁股份有限公司 Steel ladle structure and manufacturing method thereof
CN111390151A (en) * 2020-04-26 2020-07-10 郑州银河耐火材料有限公司 Steel ladle double-ring masonry structure and construction method thereof
CN116372150A (en) * 2023-05-31 2023-07-04 亿川科技(成都)有限责任公司 Automatic construction and beating system and method for ladle maintenance
CN116372150B (en) * 2023-05-31 2023-09-08 亿川科技(成都)有限责任公司 Automatic construction and beating system and method for ladle maintenance

Similar Documents

Publication Publication Date Title
CN106623883A (en) Integral pouring process for large steel ladle
CN101634520B (en) Casting method of cast steel cooling plate
CN202621908U (en) Steel ladle
CN101830719A (en) Explosion-proof iron runner castable
CN101700572B (en) Method for building container bottom of carbon-containing molten steel container
CN106699201A (en) Castable for steel making tundish slag dam
CN2905275Y (en) Liner of molten steel container and molten iron container
CN104858409A (en) Steel ladle for steelmaking
CN202461495U (en) Tundish cover with a composite structure
CN100453502C (en) Production method of electric melting magnesium-aluminium-zirconium synthetic material
CN103157785A (en) Construction method of ladle lining
CN103302259B (en) Continuous-casting tundish slag stopping dam and manufacturing method thereof
CN113843411B (en) Low-cost composite dry material working lining for two-flow plate blank continuous casting tundish and construction method
CN104402461A (en) Composite castable
CN203695934U (en) Molten iron jar slag stopper with molten iron flowing opening
CN203356583U (en) Accessory type integrally-poured permanent lining structure for wall of steel ladle
CN206779440U (en) Resistant to corrosion ladle
CN101634523B (en) Casting method of cast steel cooling wall
CN101634524B (en) Casting method of electric furnace water cooling cast steel furnace cover
CN101298092A (en) Method for producing movable core low segregation large-sized hollow steel ingot
CN203253913U (en) Olivine-firebrick-equipped steel ladle permanent layer structure
CN217677614U (en) Corrosion-resistant blast furnace iron runner
CN217600761U (en) Prefabricated part structure of blast furnace tapping main channel cover impact area
CN214977712U (en) Iron ladle repairing structure for casting and building combined blast furnace
CN215845666U (en) Steel ladle for melting alloy in LF furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510