CN101683690B - Method for manufacturing bottom of molten steel tank - Google Patents

Method for manufacturing bottom of molten steel tank Download PDF

Info

Publication number
CN101683690B
CN101683690B CN2008100133737A CN200810013373A CN101683690B CN 101683690 B CN101683690 B CN 101683690B CN 2008100133737 A CN2008100133737 A CN 2008100133737A CN 200810013373 A CN200810013373 A CN 200810013373A CN 101683690 B CN101683690 B CN 101683690B
Authority
CN
China
Prior art keywords
mouth
protection sleeve
square brick
permanent
river
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100133737A
Other languages
Chinese (zh)
Other versions
CN101683690A (en
Inventor
刘伟
王斌
刘文东
武学勇
王术平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN2008100133737A priority Critical patent/CN101683690B/en
Publication of CN101683690A publication Critical patent/CN101683690A/en
Application granted granted Critical
Publication of CN101683690B publication Critical patent/CN101683690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention relates to a method for building a concave ladle bottom of a ladle, wherein a concave mould is adopted as a mould for building the ladle bottom, when building, the concave mould is firstly placed at the ladle bottom, the distance between the edge of the concave mould and the ladle wall is balanced, then stirred castable is poured into the ladle bottom from a gap between the concave mould and the ladle wall, the concave mould is lifted out after the castable is solidified, and finally, bricks are built on the surface of the castable. The method is used for building the bottom of the ladle, so that the brick body built on the surface of the castable can not be jacked up under the condition of heating, the process of making up gaps is saved, the production cost is saved, and the labor intensity of operators is reduced.

Description

A kind of method for constructing bottom of ladle
Technical field
The present invention relates to building method at the bottom of a kind of molten steel jar spill jar
Background technology
Former masonry way is the horizontal ramming in the permanent end at the bottom of the molten steel jar jar, after ventilative square brick and mouth of a river square brick installation end, at the bottom of jar, drops into ramming mass, and it is floating to utilize manual work to carry out, and the permanent end is horizontal.The brick-on-end body that tiles in the above after solidifying of the permanent end, ventilative square brick is up and down directly built by laying bricks or stones on the bag bottom susceptor.Behind the ladle baking, bag end brick expanded by heating.Jar end expansion jack-up, thus make square brick jack-up, make up and down and produce the slit between the square brick.The slit is often smeared the grey way of magnesium by the workman slit is remedied less than 5mm; 5-20mm is arrived in the slit greatly, can not remedy, must ladle be handed over light maintenance.Both increase cost, delayed production again.
Summary of the invention
The present invention has overcome deficiency of the prior art, and a kind of method for constructing bottom of ladle is provided, and utilizes this method to make at the bottom of the molten steel jar jar; Can avoid heating square brick jack-up and produce the slit; Save the operation that remedies the slit, reduced production cost, improved the service life at the bottom of the molten steel jar jar.
In order to address the above problem, the present invention adopts following technical scheme to realize:
A kind of method for constructing bottom of ladle, this method comprises the steps:
(1) the permanent end of molten steel jar, is made into the permanent end of spill;
(2) lay bricks in spill, the flat successively block in top, the permanent end, the flat and upright end of laid on end molten steel jar,, the flat and upright end also is a spill at permanent the end.
The female mold moulding by casting is adopted at the permanent end of described spill, and specific practice is following:
(1) female mold is steadily put into jar at the bottom of, make die edge and molten steel jar tank skin spacing balanced, and the square brick protection sleeve of will breathing freely, mouth of a river square brick protection sleeve are aimed at ventilative square brick mouth and mouth of a river square brick mouth;
(2) the permanent bottom pour mold material feeding that stirs touches the mould lower surface until the pours upper surface at the bottom of pouring into jar from the slit between mould and tank skin, after material is paved, with vibrating head along a direction vibration, till anti-slurry;
(3) after material feeding to be poured is solidified mould is hung out;
(4) health is carried out at the permanent end, health is no less than 24 hours;
(5) on the permanent end, build the flat and upright end successively by laying bricks or stones.
The female mold that described a kind of method for constructing bottom of ladle adopted; This female mold comprises die ontology, counterweight, suspension hook, ventilative square brick protection sleeve, mouth of a river protection sleeve and pillar; The shape of die ontology is corresponding with ladle bag Bottom Shape; Low between the both sides senior middle school of die ontology; The die ontology upper surface is provided with counterweight and suspension hook, and the lower surface of die ontology is provided with ventilative square brick protection sleeve, mouth of a river protection sleeve and pillar, and this female mold is fixed at the bottom of the ladle bag through pillar; The height of ventilative square brick protection sleeve, mouth of a river protection sleeve and pillar should be consistent with the pours desired height, and the position of ventilative square brick protection sleeve and mouth of a river protection sleeve is corresponding with the position at the ventilative square brick mouth and the mouth of a river respectively.
Compared with prior art; The invention has the beneficial effects as follows: be spill at the bottom of the molten steel jar jar; Build the flat and upright end on this basis by laying bricks or stones, can effectively prevent to protect square brick under the situation of heating by the phenomenon of jack-up, remedy this procedure of slit thereby saved; Alleviate labor intensity of operating personnel, reduced the enterprise operation cost.
Description of drawings
Fig. 1 is the structural representation of molten steel jar;
Fig. 2 is that the female mold master looks cutaway view;
Fig. 3 is the female mold vertical view.
The specific embodiment
See Fig. 1, a kind of method for constructing bottom of ladle, this method comprises the steps:
(1) the permanent end A of molten steel jar is made into the permanent end of spill, adopts female mold to process; At the bottom of female mold steadily put into jar, make die edge and molten steel jar tank skin spacing balanced, and the square brick protection sleeve of will breathing freely, mouth of a river square brick protection sleeve are aimed at ventilative square brick mouth and mouth of a river square brick mouth;
(2) the permanent bottom pour mold material feeding that stirs touches the mould lower surface until the pours upper surface at the bottom of pouring into jar from the slit between mould and tank skin, after material is paved, with vibrating head along a direction vibration, till anti-slurry;
(3) after material feeding to be poured is solidified mould is hung out;
(4) health is carried out at the permanent end, health is no less than 24 hours;
(5) lay bricks in spill at permanent the end, the flat successively block in top, the permanent end, the flat B of laid on end molten steel jar and upright end C, flat B and upright end C also are spill.
See Fig. 2, Fig. 3, the female mold that is adopted comprises die ontology 1, counterweight 2, suspension hook 3, ventilative square brick protection sleeve 5, mouth of a river protection sleeve 4 and pillar 6, and the shape of die ontology 1 is corresponding with ladle bag Bottom Shape.Die ontology 1 is concave shape low between the senior middle school of both sides, and the difference in height of limit portion and bottom is to satisfy the consistency of thickness at jar permanent end of the end; Die ontology 1 diameter less than the ladle bag at the bottom of diameter, both diameter difference should satisfy pours and flow into a jar end naturally.Die ontology 1 material and thickness should satisfy counterweight 2 weight, are good with steel, require surfacing.Counterweight 2 is fixed on die ontology 1 upper surface, and its material, quantity and weight should reach that mould can be by the requirement of jack-up in casting process.Suspension hook 3 is fixed on die ontology 1 upper surface, and the requirement of die horizontal in the process of slinging should be satisfied in the position, and quantity satisfies the requirement of mold releasability.The lower surface of die ontology 1 is provided with ventilative square brick protection sleeve 5, mouth of a river protection sleeve 4 and pillar 6, and ventilative square brick protection sleeve 5 is the hollow-core construction of up/down perforation with mouth of a river protection sleeve 4, and this is built by laying bricks or stones at the bottom of mould is fixed on the ladle bag through pillar 6.Ventilative square brick protection sleeve 5 is fixed on the lower surface of die ontology 1; And connect with die ontology 1 upper surface; The height of ventilative square brick protection sleeve 5 should be consistent with the pours desired height, and after the installation, the position of ventilative square brick protection sleeve 5 is above ventilative square brick mouth; Shape of cross section should be consistent with ventilative square brick, and size should cover ventilative square brick mouth comprehensively.Mouth of a river protection sleeve 4 is fixed on the lower surface of die ontology 1; And connect with die ontology 1 upper surface, the protection sleeve height should be consistent with the pours desired height, the position is installed afterwards on the mouth of a river; Shape of cross section should be consistent with mouth of a river square brick, and size should cover the mouth of a river comprehensively.Pillar 6 is fixed on the lower surface of die ontology 1, and height should be consistent with the pours desired height, and size, quantity and position should be satisfied die ontology 1 balance and placed.

Claims (1)

1. a method for constructing bottom of ladle is characterized in that, this method comprises the steps: 1) the permanent end of molten steel jar, be made into the permanent end of spill; 2) lay bricks in spill, the flat successively block in top, the permanent end, the flat and upright end of laid on end molten steel jar,, the flat and upright end also is a spill at permanent the end;
The female mold moulding by casting is adopted at the permanent end of described spill; This female mold comprises die ontology, counterweight, suspension hook, ventilative square brick protection sleeve, mouth of a river protection sleeve and pillar; The shape of die ontology is corresponding with ladle bag Bottom Shape; Low between the both sides senior middle school of die ontology; The die ontology upper surface is provided with counterweight and suspension hook, and the lower surface of die ontology is provided with ventilative square brick protection sleeve, mouth of a river protection sleeve and pillar, and this female mold is fixed at the bottom of the ladle bag through pillar; The height of ventilative square brick protection sleeve, mouth of a river protection sleeve and pillar should be consistent with the pours desired height, and the position of ventilative square brick protection sleeve and mouth of a river protection sleeve is corresponding with the position at the ventilative square brick mouth and the mouth of a river respectively; Concrete operation method is:
1) female mold is steadily put into jar at the bottom of, make die edge and molten steel jar tank skin spacing balanced, and the square brick protection sleeve of will breathing freely, mouth of a river protection sleeve are aimed at ventilative square brick mouth and mouth of a river square brick mouth;
2) the permanent bottom pour mold material feeding that stirs touches the mould lower surface until the pours upper surface at the bottom of pouring into jar from the slit between mould and tank skin, after material is paved, with vibrating head along a direction vibration, till anti-slurry;
3) after material feeding to be poured is solidified mould is hung out;
4) health is carried out at the permanent end, health is no less than 24 hours;
5) on the permanent end, build the flat and upright end successively by laying bricks or stones.
CN2008100133737A 2008-09-26 2008-09-26 Method for manufacturing bottom of molten steel tank Active CN101683690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100133737A CN101683690B (en) 2008-09-26 2008-09-26 Method for manufacturing bottom of molten steel tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100133737A CN101683690B (en) 2008-09-26 2008-09-26 Method for manufacturing bottom of molten steel tank

Publications (2)

Publication Number Publication Date
CN101683690A CN101683690A (en) 2010-03-31
CN101683690B true CN101683690B (en) 2012-07-18

Family

ID=42047183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100133737A Active CN101683690B (en) 2008-09-26 2008-09-26 Method for manufacturing bottom of molten steel tank

Country Status (1)

Country Link
CN (1) CN101683690B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500753A (en) * 2011-12-02 2012-06-20 中冶宝钢技术服务有限公司 Brick building process of bottom of steel ladle
CN103157783B (en) * 2011-12-19 2015-09-02 攀钢集团攀枝花钢钒有限公司 A kind of building method of bottom of steel ladle
CN104259286B (en) * 2014-07-31 2016-08-24 中冶陕压重工设备有限公司 Forcing press is utilized to carry out method curved at the bottom of steel ladle bag
CN104148624B (en) * 2014-08-25 2016-06-15 新兴铸管股份有限公司 Iron ladle building method
CN108097941B (en) * 2017-11-23 2019-10-25 南京钢铁股份有限公司 A kind of ladle and its building method
CN109990747A (en) * 2019-04-01 2019-07-09 山东钢铁集团日照有限公司 A kind of hot-metal bottle tank bottom height detection method and its implement system
CN110449568B (en) * 2019-08-27 2022-01-25 北京利尔高温材料股份有限公司 Steel ladle composite bottom construction process
CN115572789B (en) * 2022-10-25 2024-03-26 武钢集团昆明钢铁股份有限公司 Installation method of converter bottom blowing air supply element

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1919500A (en) * 2005-08-22 2007-02-28 崔东瑞 Casing patch method for ladle brickwork neck bush
CN101020610A (en) * 2006-12-08 2007-08-22 攀钢集团钢城企业总公司 Poured material for foundry ladle bottom and its pouring process and mold

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1919500A (en) * 2005-08-22 2007-02-28 崔东瑞 Casing patch method for ladle brickwork neck bush
CN101020610A (en) * 2006-12-08 2007-08-22 攀钢集团钢城企业总公司 Poured material for foundry ladle bottom and its pouring process and mold

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
劳动部培训司.弧面炉底.《筑炉工》.中国劳动出版社,1994,第210-213页. *
陶绍平等.提高盛钢桶使用寿命的试验研究.《首钢科技》.1993,(第3期),27-30. *

Also Published As

Publication number Publication date
CN101683690A (en) 2010-03-31

Similar Documents

Publication Publication Date Title
CN101683690B (en) Method for manufacturing bottom of molten steel tank
CN100575504C (en) Iron runner exempts to toast mould material and lining technology is made in the cast of single iron mouth blast furnace iron outlet groove
CN110409244A (en) A kind of prefabricated road deck of composite bearing and prefabricated pavement construction method
CN104529485B (en) Two-layer compound refractory material and two-layer compound refractory material ditch cover and its manufacture method and application
CN105618725A (en) Compositely-bricked small-medium-sized steel ladle work lining
CN104647570B (en) Before a kind of State of Blast Furnace, resistance to material pours mould and pouring procedure
CN209021227U (en) A kind of smelting nickel-base alloy helps conductance chute with molten steel
CN207775938U (en) A kind of monoblock type walling crib construction formwork removing device of inspection shaft
CN202804169U (en) Novel steel ladle permanent layer structure
CN204035547U (en) A kind of purging upper nozzle for continuous casting tundish brick cup
CN209272454U (en) A kind of new-type ladle
CN217600761U (en) Prefabricated part structure of blast furnace tapping main channel cover impact area
CN204075177U (en) A kind of continuous casting pouring basket slag bridging wall
CN108405842B (en) Novel manufacturing and masonry method of steel ladle air brick
CN102827980A (en) Construction method for casting material in area of blast-furnace tuyere without supporting die
CN104128596B (en) The ramming process method of middle-size and small-size refining ladle permanent layer
CN203401073U (en) Steel ladle bottom-covering work layer masonry construction
CN201264084Y (en) Novel ladle bottom masonry mold
CN203944831U (en) Novel anti-leakage ladle lining
CN101637941B (en) Integral casting technology of hot metal ladle and moulding bed device
CN213388738U (en) Fashioned blast furnace mould is pour to integral type
CN201280513Y (en) Refractory mounting structure outside the upper sleeve of sleeve lime kiln
CN205519616U (en) 4 location structure on permanent layer mould of ladle
CN202591604U (en) Integral forming device of ladle mouth
CN105965681A (en) Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant