CN101319489A - 预顶导向移梁方法 - Google Patents

预顶导向移梁方法 Download PDF

Info

Publication number
CN101319489A
CN101319489A CNA2008100481650A CN200810048165A CN101319489A CN 101319489 A CN101319489 A CN 101319489A CN A2008100481650 A CNA2008100481650 A CN A2008100481650A CN 200810048165 A CN200810048165 A CN 200810048165A CN 101319489 A CN101319489 A CN 101319489A
Authority
CN
China
Prior art keywords
hydraulic jack
slide block
joist
guiding
beam body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100481650A
Other languages
English (en)
Other versions
CN101319489B (zh
Inventor
潘晓民
高宗余
黄燕庆
赵兴亚
段雪炜
苏磊
王伟臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2008100481650A priority Critical patent/CN101319489B/zh
Publication of CN101319489A publication Critical patent/CN101319489A/zh
Application granted granted Critical
Publication of CN101319489B publication Critical patent/CN101319489B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

预顶导向移梁方法,涉及一种实现梁体或部分梁段沿特定方向移动,调整梁体平面线形和结构内力的方法。移梁程序为:计算导向液压千斤顶和顶推液压千斤顶所需的顶力值,用导向液压千斤顶、顶推液压千斤顶对托梁滑块施加所计算出的顶力,实现梁体位移;实测实际位移值,调整导向液压千斤顶和顶推液压千斤顶的计算调整顶力值,再对托梁滑块施加所计算出的调整顶力,直至梁体或部分梁段到达预定位置。本发明利用顶推、导向液压千斤顶顶推托梁滑块,使梁体或部分梁段沿所要求的特定方向移动,调整梁体平面线形和结构内力。本发明在深圳华强立交A匝道桥维修工程中首先采用,使切向、径向均有较大变形的六跨预应力曲线梁成功复位。

Description

预顶导向移梁方法
技术领域
本发明涉及一种实现梁体或部分梁段沿特定方向移动,调整梁体平面线形和结构内力的方法。
背景技术
在常规桥梁架设、改建及维修工程中,当梁体需沿顺桥向或横桥向移动时,可沿顺桥向或横桥向布置液压千斤顶或卷扬机,采用顶推或拖拉的方式移动梁体。但在桥梁构造、受力要求、设备布置等诸多条件受限的情况下,若要求梁体或部分梁段沿某特定方向移动,上述方法不能满足要求。需要采用特殊的方法,协调顺桥向与横桥向的位移量,实现梁体或部分梁段沿某特定方向的移动。
发明内容
本发明的目的是针对上述现状,旨在提供一种可协调顺桥向与横桥向的梁体位移量,实现梁体沿所要求的特定方向移动的预顶导向移梁施工方法。
本发明目的的实现方式为,预顶导向移梁施工方法,移梁程序为:
1)实测托梁滑块与移梁滑道间的滑动摩阻系数,计算导向液压千斤顶和顶推液压千斤顶所需的顶力值,
2)利用托梁滑块下的滑动面的自锁功能,将需移动梁体或部分梁段用托梁滑块托住,
3)用导向液压千斤顶对托梁滑块施加所计算出的顶力,用顶推液压千斤顶对托梁滑块施加所计算出的顶力,使托梁滑块带着所托的梁体或部分梁段沿所要求的特定方向移动,
4)实测托梁滑块3实际位移值,调整导向液压千斤顶和顶推液压千斤顶的计算顶力调整值,
5)用导向液压千斤顶对托梁滑块施加所计算出的调整顶力,用顶推液压千斤顶对托梁滑块施加所计算出的调整顶力,使托梁滑块带着所托的梁体或部分梁段沿所要求的特定方向移动,
重复步骤4)、5),直至梁体到达预定位置。
本发明在确定托梁滑块下的滑动面的摩阻系数时,须考虑滑动面的自锁功能。
本发明利用顶推液压千斤顶对托梁滑块施加的顶推力,顶推托梁滑块带着所托的梁体沿顶推力方向移动。利用导向液压千斤顶对托梁滑块施加外力,改变对托梁滑块总顶推力的方向,使托梁滑块与梁体或部分梁段沿所要求的特定方向移动,调整梁体平面线形和结构内力。
本发明在深圳华强立交A匝道桥维修工程中首先采用,使切向、径向均有较大变形的六跨预应力曲线梁成功复位,解决了梁体或部分梁段沿某特定方向移动,调整梁体平面线形和结构内力的相关技术问题,取得了良好效果。
附图说明
图1是用导向液压千斤顶、顶推液压千斤顶顶导、顶推托梁滑块状态图
图2是图1的A-A向视图
图3是图1的B-B向视图
具体实施方式
参照图2,梁体5由托梁滑块3托住,托梁滑块3位于移梁滑道4上,导向液压千斤顶1对托梁滑块3施加改变顶推力方向的外力。
参照图3,梁体5由托梁滑块3托住,托梁滑块3位于移梁滑道4上,顶推液压千斤顶2顶推托梁滑块3。
参照图1,梁体5由托梁滑块3托住,用导向液压千斤顶1、顶推液压千斤顶2顶导、顶推托梁滑块3。
本发明的工作原理为:当顶推液压千斤顶2对托梁滑块3施加的顶推力,大于托梁滑块3与移梁滑道4间的滑动摩阻力,小于托梁滑块3与梁体5间的滑动摩阻力时,托梁滑块3带着所托的梁体5在移梁滑道4上,沿顶推力方向移动。若在与顶推液压千斤顶2成一定角度的方向上布置导向液压千斤顶1,当导向液压千斤顶1对托梁滑块3施加外力后,可改变对托梁滑块3总顶推力的方向,使托梁滑块3与梁体5沿所要求的特定方向移动。
导向液压千斤顶1和顶推液压千斤顶2,根据梁体5的移动方向的需要及梁体5下有效空间的情况,可转换使用。
移梁程序为:
1)实测托梁滑块与移梁滑道间的滑动摩阻系数,计算导向液压千斤顶和顶推液压千斤顶所需的顶力值,
2)利用托梁滑块下的滑动面的自锁功能,将需移动梁体或部分梁段用托梁滑块托住,
3)用导向液压千斤顶对托梁滑块施加所计算出的顶力,用顶推液压千斤顶对托梁滑块施加所计算出的顶力,使托梁滑块带着所托的梁体或部分梁段沿所要求的特定方向移动,
4)实测托梁滑块3实际位移值,调整导向液压千斤顶和顶推液压千斤顶的计算顶力调整值,
5)用导向液压千斤顶对托梁滑块施加所计算出的调整顶力,用顶推液压千斤顶对托梁滑块施加所计算出的调整顶力,使托梁滑块带着所托的梁体或部分梁段沿所要求的特定方向移动,
重复步骤4)、5),直至梁体到达预定位置。

Claims (1)

1、预顶导向移梁方法,其特征在于移梁程序为:
1)实测托梁滑块与移梁滑道间的滑动摩阻系数,计算导向液压千斤顶和顶推液压千斤顶所需的顶力值,
2)利用托梁滑块下的滑动面的自锁功能,将需移动梁体或部分梁段用托梁滑块托住,
3)用导向液压千斤顶对托梁滑块施加所计算出的顶力,用顶推液压千斤顶对托梁滑块施加所计算出的顶力,使托梁滑块带着所托的梁体或部分梁段沿所要求的特定方向移动,
4)实测托梁滑块3实际位移值,调整导向液压千斤顶和顶推液压千斤顶的计算顶力调整值,
5)用导向液压千斤顶对托梁滑块施加所计算出的调整顶力,用顶推液压千斤顶对托梁滑块施加所计算出的调整顶力,使托梁滑块带着所托的梁体或部分梁段沿所要求的特定方向移动,
重复步骤4)、5),直至梁体到达预定位置。
CN2008100481650A 2008-06-25 2008-06-25 预顶导向移梁施工方法 Active CN101319489B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100481650A CN101319489B (zh) 2008-06-25 2008-06-25 预顶导向移梁施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100481650A CN101319489B (zh) 2008-06-25 2008-06-25 预顶导向移梁施工方法

Publications (2)

Publication Number Publication Date
CN101319489A true CN101319489A (zh) 2008-12-10
CN101319489B CN101319489B (zh) 2010-06-30

Family

ID=40179729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100481650A Active CN101319489B (zh) 2008-06-25 2008-06-25 预顶导向移梁施工方法

Country Status (1)

Country Link
CN (1) CN101319489B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864734A (zh) * 2010-06-28 2010-10-20 中铁二局股份有限公司 一种高速铁路分体式箱梁的横移架设方法
CN102409622A (zh) * 2011-09-20 2012-04-11 卢士军 牵引式桥梁顶升设备
CN110455450A (zh) * 2019-08-13 2019-11-15 中铁四院集团岩土工程有限责任公司 移梁监测方法、监测装置、监测系统及存储介质

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864734A (zh) * 2010-06-28 2010-10-20 中铁二局股份有限公司 一种高速铁路分体式箱梁的横移架设方法
CN102409622A (zh) * 2011-09-20 2012-04-11 卢士军 牵引式桥梁顶升设备
CN110455450A (zh) * 2019-08-13 2019-11-15 中铁四院集团岩土工程有限责任公司 移梁监测方法、监测装置、监测系统及存储介质

Also Published As

Publication number Publication date
CN101319489B (zh) 2010-06-30

Similar Documents

Publication Publication Date Title
CN101429820B (zh) 建筑物整体移位方法
CN206784190U (zh) 大跨度钢箱梁可升降自行式连续顶推系统
CN101319489B (zh) 预顶导向移梁施工方法
CN103196396B (zh) 基于数学手段的深孔直线度激光检测方法
CN205436692U (zh) 一种大型龙门自走式自动压力矫直机
CN204139628U (zh) 大悬挑非对称空间立体桁架辅助滑移装置
CN105013899B (zh) 一种基于bim技术的弯扭构件成型方法
CN103196397B (zh) 一种立式深孔直线度激光检测装置
CN111335168B (zh) 千米级混合梁斜拉桥合龙方法
CN202000644U (zh) 移动式承重支架平台
CN110029591A (zh) 梁底楔形块的施工辅助装置及其使用方法
CN105155418A (zh) 一种桥梁平移的施工方法
CN102877412A (zh) 钢塔整体竖立式预拼装方法
CN210049635U (zh) 一种建筑物的旋转平移系统
CN113065183B (zh) 一种施工方案的优化方法及优化装置、优化系统
CN108978496B (zh) 一种桥梁智能顶推施工系统及其顶推施工方法
CN116394055A (zh) 平衡控制方法、装置、机床及可读存储介质
CN202672044U (zh) 一种桥梁施工顶推动力的装置
CN214348821U (zh) 一种建筑施工用自动化弯管装置
CN206204799U (zh) 一种用于梁体的顶推纠偏装置
CN105239513B (zh) 一种钢梁预应力张拉装置及其张拉控制方法
CN108018771A (zh) 一种薄壁式钢箱梁桥梁结构及其顶推方法
CN211850929U (zh) 一种利用导梁进行大跨度钢结构屋盖的安装装置
CN113863162A (zh) 一种大型钢桁梁顶推施工结构及方法
CN207032059U (zh) 可用于大跨度钢箱梁施工的顶推动力装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150421

Owner name: MAJOR BRIDGE RECONNAISSANCE + DESIGN INSTITUTE OF

Free format text: FORMER OWNER: ZHONGTIE MAJOR BRIDGE RECONNAISSANCE + DESIGN INSTITUTE CO., LTD.

Effective date: 20150421

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150421

Address after: 430050 No. 34, Hanyang Avenue, Hanyang District, Hubei, Wuhan

Patentee after: China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hubei, Wuhan, No. 34

Patentee before: Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.