CN101305135A - 夯头及使用方法 - Google Patents
夯头及使用方法 Download PDFInfo
- Publication number
- CN101305135A CN101305135A CNA2006800414458A CN200680041445A CN101305135A CN 101305135 A CN101305135 A CN 101305135A CN A2006800414458 A CNA2006800414458 A CN A2006800414458A CN 200680041445 A CN200680041445 A CN 200680041445A CN 101305135 A CN101305135 A CN 101305135A
- Authority
- CN
- China
- Prior art keywords
- head
- rammer
- main body
- rammer head
- pyramid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D11/00—Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
- E02D3/123—Consolidating by placing solidifying or pore-filling substances in the soil and compacting the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Bridges Or Land Bridges (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Artificial Fish Reefs (AREA)
- Piles And Underground Anchors (AREA)
Abstract
一种夯头,其具有伸长的角锥或圆锥形状,所述夯头用于建造夯实的集料墩。夯头的角锥或圆锥形状在增大横向土压力方面更有效,并在墩的建造中提供比用依赖于具有平底和斜侧面的夯头的现有方法可得到的更大的节约。
Description
本申请享有2005年9月29日提交的共同未决的美国临时申请第60/721,594号的权利并由此要求其优先权。
发明领域
本发明涉及在基土中安装集料墩(aggregate pier),以用于支撑建筑物、墙壁、工业设施及与运输相关的结构。特别是,本发明是对方法和装置的改进,该方法和装置用于通过使用一般伸长的角锥或圆锥形状的改进的夯头来有效地安装夯实的集料墩。角锥或圆锥夯头设计成更有效地增大周围基质土壤中的横向应力,从而允许更快更有效的墩建造过程。
背景
位于包含软土或松软土壤的区域内的重型设备或对沉降敏感的设备通常支撑在由打入桩或钻孔的混凝土墩组成的深地基上。深地基设计成将结构负载通过软土转移到更强的土层。
近年来,集料墩越来越多地用于支撑位于包含软土的区域中的结构。墩设计成增强并加固软层,使因而产生的沉降最小。使用各种方法来建造墩,包括在美国专利No.5,249,892和No.6,354,766(“短集料墩”)中描述的钻孔和夯实方法、在美国专利No.6,425,713(“横向移位墩”)中描述的打入心轴方法(driven mandrel method)、称为“撞击墩(impact Pier)”的夯头打入心轴方法(待决的美国专利)和打入锥形心轴方法(待决的美国专利)。
当被安装在粘性土中时,包括钻或挖掘腔的短集料墩方法(美国专利No.5,249,892和No.6,354,766)是一种有效的地基解决方案,孔的侧壁稳定性在粘性土中容易维持。该方法通常由下列步骤组成:a)在基土中钻通常为圆柱形的腔或孔;b)在腔的底部将土压实;c)将相对薄层(thin lift)的集料安置到腔内;d)用特殊设计的斜面夯头夯实集料层;以及e)重复该工序,以形成一般延伸到地表面的集料墩。该工序的基本原理是将足够的能量应用于斜面夯头,使得该工序在连续的夯实期间沿腔的侧面增加基质土壤内的横向应力。横向应力增大很重要,这是因为它降低了基质土壤的可压缩性,从而在墩装载期间允许所施加的负载有效地转移到基质土壤。
公开在美国专利No.5,249,892中的夯头的底部是平的,并具有斜侧面。在商业实践中,斜面夯的平底部分占夯横截面面积的约70%,而斜面部分只包括夯横截面面积的约30%。这样,约70%的夯横截面面积专门用于向下压实每个集料层(由平底部分完成),而只有30%的夯横截面面积专门用于增加基质土中的横向应力(由斜面部分完成)。如这样构造的,短集料墩方法的斜面夯头最经常用于在30英寸直径的孔中压实12英寸的集料层。
夯头打入心轴方法(“撞击墩”方法)是短集料墩方法的替换形式。“撞击墩”方法包括将中空管子(心轴)打入地中而无需钻孔。管子在底部安装有夯头,夯头具有比管子大的直径且具有平底和斜侧面。将充满集料的心轴打入到墩高度的设计底部,并接着升高,从而允许集料从管子中流出,并进入由于抽回心轴而产生的腔中。然后,将夯头向下打回到集料中,以压实集料。夯头的平底形状压实集料;斜侧面迫使集料进入孔的侧壁中,因而增加了周围地面中的横向应力。
打入锥形心轴方法是用移位心轴来形成集料墩的另一方法。在这种情况下,心轴的形状为截锥形,其顶部大于底部,具有与垂直面成约1度至约5度的锥角。将心轴打入到地面中,从而在打入期间使基质土壤向下和横向移动。在到达墩高度的设计底部后,抽回心轴,从而在地中留下圆锥形的腔。心轴的圆锥形状允许孔的侧壁的暂时稳定性,以便可以将集料从地表面注入腔内。在放置一层集料之后,将心轴重新向下打入到集料中,以压实集料,并迫使它横向进入到孔的侧壁中。有时,用较大的心轴来压实在墩的顶部附近的集料。
发明内容
本发明可称为“伸长的角锥形或圆锥形夯头夯实的集料墩”方法和装置,并描述对已有技术的集料墩方法的改进,特别是对美国专利No.5,249,892的短集料墩方法的改进。本发明利用具有为伸长的角锥或圆锥的一般形状的主体的全腔直径夯头(full-cavity-diameter tamper head)。更具体地,角锥主体具有在其基部或顶部的规则多边形和其侧面的等腰三角形,该等腰三角形朝主体的底部尖端部位逐渐变细。这样的角锥形夯头主体在图1、2A和2B中示出。圆锥形主体通常具有圆形基部或顶部,该主体朝尖端部位逐渐变细。这样的圆锥形夯头主体在图3、4A和4B中示出。
本发明的角锥形和圆锥形夯头之中的每一个在其顶部或基部(与尖的夯实端部或底部尖端相对)的尺寸都制定成接近于钻孔或腔的直径,并设计成在压实期间最大限度地增大基质土壤中的横向应力。每种类型的夯头都以大约60度的优选角度增加从夯的底部尖端到夯的基部或顶部的横截面。夯头的顶部优选地包括焊接到角锥形主体的基部或顶部的扁平圆盘,该扁平圆盘设计成具有与待填充的钻腔的直径相同的直径。尽管可使用其它规则多边形形状,如正方形和六边形,但是图1所示夯头的角锥形主体的横截面是规则的八边形(所有八条边在长度上都相等)。圆锥形主体的横截面为圆形,以产生圆锥形状。
根据本发明的夯头的伸长的角锥形或圆锥形结构允许夯应用于松散放置的集料层,该松散放置的集料的深度大约与夯基部或顶部的直径一样大,而夯基部或顶部的直径又接近于待填充的孔或腔的直径。因此,对于24英寸直径的孔来说,集料层的厚度可从12英寸(对于已有技术的夯)增加到24英寸,因而增加了建造效率。根据本发明,将夯头的顶部制造成大约与待填充的孔或腔相同的直径提供了在夯实操作期间对集料的限制。相对于已有技术的夯头,由角锥形或圆锥形夯头提供的横向应力的增加允许墩性能的增加。因此,本发明能同时提供更有效的建造过程和墩性能的增加。
附图说明
图1是示出根据本发明的优选角锥形夯头的透视图的图示。
图2A是示出图1夯头的侧视图的图示,以及图2B是示出图1夯头的底视图的图示。
图3是示出根据本发明的优选圆锥形夯头的透视图的图示。
图4A是示出图3夯头的侧视图的图示,以及图4B是示出沿图4A的线B-B截取的横截面的图示。
图5是示出根据本发明的墩建造工序的示意图,包括例如通过钻孔形成腔、在腔中放置第一集料层、用图1中的角锥形夯来夯实集料以增大横向应力、以及放置并夯实其他的集料层以将墩建到地表面。
图6是绘出根据第一次测试的负载测试结果的曲线图,该测试对用已有技术建造的两个墩(表示“平底夯头”)和根据本发明建造的墩(表示“角锥形夯头”)进行。
图7是绘出根据第二次测试的负载测试结果的曲线图,该测试对使用已有技术建造的两个墩(表示“平底夯头”)和根据本发明建造的墩(表示“角锥形夯头”)进行。
详细描述
在详细说明本发明的任何实施方式之前,应理解,本发明并不将其应用限于在下面的描述或附图的图示中阐述的部件的结构和布置细节。本发明可以有可替代的实施方式或以各种方式实践或实现。具体地,如所述的尺寸以及它们在附图中出现的位置仅为示例性的实施方式,并且在条件允许时可以由本领域的技术人员修改。
本发明的方法和装置用于在基土中有效地安装集料墩。如图5所示的方法包括在基土中形成具有一般一致的横截面面积的细长形垂直腔或孔1。优选地,垂直腔一般为圆柱形,并以任何合适的方式如钻孔来形成。腔还可以通过穿入和抽出细长形管子或心轴来形成。
接着,将集料层2放置到孔1的底部中。由于本发明的夯头的结构,放置到孔中的每个集料层在孔内可具有约等于腔的直径的厚度。之后,用本发明的角锥形夯头3或圆锥形夯头13来夯实集料层,这些夯头尤其设计成应用足够的能量以极大地增加孔周围的基质土壤中的横向压力。随着连续地添加和夯实集料层来完成墩。
不论是角锥形还是圆锥形,夯头都具有横向尺寸约等于腔的横向尺寸的顶部或基部。在腔一般为圆柱形的情况下,夯头顶部的横向尺寸接近于腔的直径。
用于制造夯实的集料墩的方法对于本领域的技术人员来说是众所周知的,因此不需要在这里陈述。然而,它们以引用方式被明确地并入,如在这里充分阐述的。
如图1、2A和2B所示,角锥形夯头3优选地包括两个组成部分:伸长的角锥主体4和圆形限制盘(confinement plate)5,该圆形限制盘5被焊接在角锥主体的面向上的基部9的顶上。也可将夯头构造成没有限制盘。
常规的夯杆或心轴6焊接到限制盘5的顶部,以便支撑夯头3,并在夯实每个集料层的过程中将必要的能量应用于夯头。优选地使用1/2英寸或3/8英寸厚的轧制钢构造角锥主体4,将轧制钢弯曲成形为优选地具有规则的八边形基部或顶部的角锥形主体。主体4的边焊接在一起,以形成如图1、2A和2B所示的一般的角锥形形状。
在优选实施方式中,夯头3在夯顶部的直径为24英寸,即,限制盘5的直径为24英寸,且角锥主体顶部的对角之间的距离也为24英寸。形成角锥形主体的边的等腰三角形7优选地定向成与水平面成约60度。对于夯头主体4,该结构导致约21英寸的夯头长度。
圆锥形夯头13包括锥形主体14和圆锥形尖端15,其中主体14的锥度相应于尖端15的锥度,以形成统一的锥形,如图3、4A和4B所示。尖端是优选为钢的实体,与焊接到主体14顶部的底盘16一样。主体14实质上为中空的,并包括用于加固的在内壁18上的钢加力板(steel gusset)17,如图4B所示。加力板17约5/8英寸厚,且根据优选的实施方式在中心被间隔开3英寸。
虽然夯头顶部直径可从24英寸变化,但是直径优选为与孔1的直径相同。可容许孔的直径与夯头顶部的直径之间的少许偏差,但夯头顶部的直径不应比钻孔的直径大于约10%,或小于钻孔直径的约90%。约0.9到约1.1的夯头与钻孔的直径比很重要,以便夯头的顶部或限制盘5,如果包括,在夯实期间对集料2提供限制。如果夯头的顶部太小,那么在夯实期间,集料就可能向上推到顶部周围;如果夯头的顶部太大,那么它就会在夯实期间将孔的侧壁的一部分向下推。
夯的圆锥角优选为约60度,但范围可从与水平面成45度到约75度。60度的夯头角允许24英寸直径的夯头在压实期间充分压实约两英尺厚的集料层,并且设计成使夯实期间增大的横向应力达到最优。本发明的角锥形和圆锥形夯头是对已有技术的短集料墩方法的改进,这是因为已有技术一般用于一英尺厚的集料层,从而要求已有技术使用更多的集料层和更多的时间来建造墩,而本发明的角锥形和圆锥形夯头可压实高达两倍厚的集料层。与水平面成小于60度的夯头角用于厚度小于2英尺的集料层;大于60度的夯头角能够压实较厚的集料层,但比与水平面成60度定向的夯头提供较小的垂直限制。
也可使用可替换的角锥形夯头尺寸和形状,例如由钢制成的夯头主体,以形成正方形、六边形或其他连贯的横截面形状。角锥形或圆锥形夯头的壁厚可以从1/4英寸变化到1英寸,取决于夯头的直径、长度、夯头构造材料和打入条件(driving condition)。角锥主体4和圆锥主体14可为中空的,对其应使用较厚和较结实的构造材料,或者可包括内部支柱或盘,其中可使用较薄或较不结实的构造材料。如前所述,只要角锥主体4或圆锥主体14的逐渐变细的侧面便于压实集料和将集料横向推到孔的侧壁中以增加周围土中的压力,夯头圆锥角就可以在45度到75度之间变化。
优选地,夯头3的角锥主体4或圆锥主体14分别会聚成一般的尖端8和20。但是,尖端8和20可被截平或钝化。如果被截平或钝化,钝端的面积应不大于夯主体的顶部或基部或者圆形限制盘的面积的20%。当端8或20变得更钝化时,可用本发明的夯头来适当地夯实的集料层变得更薄。所以,一般尖锐的尖部是优选的。
为了用于这里描述和附图中示出的优选夯头3或13,合适的集料由“优良等级”的公路底层集料组成,其具有2英寸的最大颗粒尺寸且少于12%通过第200号筛眼孔径(0.074英寸)。还可以使用可替换的集料,如最大颗粒尺寸范围在1/4英寸和3英寸之间的干净石料、少于5%通过第200号筛眼孔径的集料、再生混凝土、矿渣、再生沥青、用水泥处理的基料和其它构造材料。集料的最大尺寸应不超过腔直径的25%。
本发明的主要优点是,在构造期间增大横向土压力方面,角锥形或圆锥形夯头比在已有技术中描述的夯头更有效。此改进的横向应力增大是夯头3和13的独特性状的结果。与在已有技术中专用于横向应力增大的横截面面积的约30%相比,角锥形或圆锥形夯头使其横截面面积的高达100%专用于横向应力增大。另一优点是,与可在已有技术中使用的集料层相比,由于增加的夯倾角的原因,本发明的夯头可应用于更厚的集料层。对于优选的实施方式,这意味着夯头可应用于24英寸到30英寸厚的松散放置的集料层。在实践中,这意味着现在可以将具有同样支撑能力的墩建造成具有更小的直径和更厚的层高度。
上述优点通过对使用已有技术方法和使用本发明建造的墩进行的负载测试来示出,并在图6和7中进行总结。图6示出在第一个工程地点处的三个负载测试的结果。对使用美国专利No.5,249,892的已有技术方法压实12英寸厚的集料层建造的30英寸直径的墩进行两次测试(表示“平底RAP”)。对使用如图1所示的24英寸直径的60度角锥头压实24英寸厚的集料层建造的24英寸直径的墩进行一次测试(表示“角锥形夯头RAP”)。测试结果绘制在图6中,其示出了在负载测试期间施加到墩的顶部的应力(X轴)与当施加应力时出现的结果偏差(Y轴)之间的关系。应力与偏差的比率为墩的劲度模量,其中较平的斜线表示较硬的特性。也绘出了墩底部的偏差测量结果。
如图6所示的负载测试的结果表明,在所有三个墩的顶部的硬度大致相同,直到施加约15千磅每平方英尺(ksf)的墩顶部应力。当施加到墩的应力大于15ksf时,平底RAP#1呈现较平坦的特性曲线。当施加大于约25ksf的应力时,平底RAP#1和平底RAP#2的硬度明显小于角锥形夯头RAP的硬度。这是因为根据本发明建造的角锥形夯头墩更有效地增加了在建造期间墩周围的限制应力,从而在加载期间给墩提供了更大的强度。重要的是,如果所有三个墩的硬度相等,则本发明仍然提供优点,即与根据已有技术建造的墩相比,墩可被更有效地建造。
图7示出在第二工程地点处的三个负载测试的结果。对使用美国专利No.5,249,892的已有技术方法压实12英寸厚的集料层建造的30英寸直径的墩进行两次测试。对使用如图1所示的24英寸直径的60度角锥头压实24英寸厚的集料层建造的24英寸直径的墩进行一次测试(表示“圆锥形夯头”)。负载测试的结果表明,在所有三个墩的顶部的硬度大致相同,直到施加约10千磅每平方英尺(KSF)的墩顶部应力。当施加到墩的应力大于10千磅时,平底墩结果呈现较平坦的特性曲线。使用角锥形夯建造的墩的硬度大于通过已有技术获得的硬度。
由于通过使用较厚的层可便于建造的事实,因此本发明允许更快地建造集料墩。在采用本发明的一个工程地点处,在使用已有技术方法建造墩所需要的一半时间内建造了墩。因此,使用本发明的可能更快的安装在时间和成本节约方面能提供优于已有技术的显著利益。
前述描述和附图应被考虑为仅说明本发明的原理。本发明可以各种形状和尺寸配置,且不被优选实施方式限制。本领域的技术人员容易想到本发明的很多应用。因此,不希望将本发明限制到所公开的具体实施例或所展示和描述的确切结构和操作。确切地说,可采取落入本发明的范围内的所有适当的修改和等效形式。
Claims (20)
1.一种建造集料墩的方法,其包括步骤:
在地表面中形成细长形腔,所述腔具有一般一致的横截面面积;
将一集料层放置到所述腔内,其中层厚度约等于跨过所述腔的距离;
用角锥形夯头或圆锥形夯头来夯实所述层,以增加孔的侧壁中的横向应力,所述角锥形夯头或圆锥形夯头具有约等于所述腔的所述横截面面积的顶部或基部;以及
用连续的层来重复所述放置和夯实步骤。
2.如权利要求1所述的方法,其中所述夯实步骤包括使用具有倾角的夯头,所述倾角与水平面呈45度到75度的变化范围。
3.如权利要求1所述的方法,其中所述夯实步骤包括使用具有圆锥形状的夯头。
4.如权利要求1所述的方法,其中所述夯实步骤包括使用具有角锥形状的夯头。
5.如权利要求1所述的方法,其中所述细长形腔一般为圆柱形,且所述夯实步骤包括使用具有约等于所述腔的直径的顶部横向尺寸的夯头。
6.如权利要求5所述的方法,其中所述夯头的顶部尺寸不小于所述腔的直径的约90%和不大于约110%。
7.如权利要求1所述的方法,其中放置一集料层的所述步骤包括使用具有材料优良的石料、再生混凝土、再生沥青、矿渣及用水泥处理的基料中的至少一种材料的集料。
8.如权利要求5所述的方法,其中形成所述腔的所述步骤是通过钻孔。
9.如权利要求1所述的方法,其中形成腔的所述步骤是通过穿入和抽出细长形管子或心轴。
10.一种夯头,其用于在地表面内一般垂直的孔中形成夯实的集料墩,所述孔具有一般为圆形的横截面,所述夯头包括朝其下端处的部位逐渐变细的一般角锥形主体或圆锥形主体,并且在其上端处具有为所述孔横截面的至少约90%的横截面。
11.如权利要求10所述的夯头,其还包括安装在所述角锥形或圆锥形主体的上端处的圆形限制盘,所述限制盘具有实质上等于或大于所述角锥形或圆锥形主体的上端的最长尺寸的直径。
12.如权利要求10所述的夯头,其中所述下端被钝化,具有不大于其上端的面积20%的钝化面积。
13.如权利要求10所述的夯头,其中所述一般角锥形主体或圆锥形主体的所述上端具有等于所述孔的直径的约90%和约110%之间的最大尺寸。
14.如权利要求10所述的夯头,其中所述一般角锥形主体或圆锥形主体以与水平面成约45度到约75度的角度逐渐变细。
15.如权利要求14所述的夯头,其中所述一般角锥形主体或圆锥形主体以与水平面成约60度的角度逐渐变细。
16.如权利要求10所述的夯头,其中所述夯头具有圆锥形状。
17.如权利要求10所述的夯头,其中所述夯头具有角锥形状。
18.如权利要求17所述的夯头,其中所述角锥形状的横截面是六边形。
19.如权利要求17所述的夯头,其中所述角锥形状的横截面是八边形。
20.如权利要求10所述的夯头,其中所述夯头的上端具有与所述腔的直径大约相同的直径。
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US72159405P | 2005-09-29 | 2005-09-29 | |
US60/721,594 | 2005-09-29 | ||
US11/528,686 | 2006-09-28 | ||
US11/528,686 US7488139B2 (en) | 2005-09-29 | 2006-09-28 | Pyramidal or conical shaped tamper heads and method of use for making rammed aggregate piers |
PCT/US2006/037932 WO2007041250A2 (en) | 2005-09-29 | 2006-09-29 | Tamper heads and method of use |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101305135A true CN101305135A (zh) | 2008-11-12 |
CN101305135B CN101305135B (zh) | 2010-12-22 |
Family
ID=37902114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2006800414458A Expired - Fee Related CN101305135B (zh) | 2005-09-29 | 2006-09-29 | 角锥或圆锥形夯头及用于建造夯实的集料墩的方法 |
Country Status (12)
Country | Link |
---|---|
US (1) | US7488139B2 (zh) |
EP (1) | EP1937900B1 (zh) |
JP (1) | JP2009510290A (zh) |
KR (1) | KR20080075098A (zh) |
CN (1) | CN101305135B (zh) |
AU (1) | AU2006297200B2 (zh) |
CA (1) | CA2623763C (zh) |
MA (1) | MA29889B1 (zh) |
MX (1) | MX2008004330A (zh) |
MY (1) | MY148818A (zh) |
RU (1) | RU2408765C2 (zh) |
WO (1) | WO2007041250A2 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482006A (zh) * | 2022-02-21 | 2022-05-13 | 中轻(广州)设计工程有限公司 | 一种土洞处理方法 |
Families Citing this family (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2680508C (en) * | 2007-02-22 | 2010-07-20 | Geopier Foundation Company, Inc. | Method and apparatus for creating support columns using a hollow mandrel with upward flow restrictors |
GB0712329D0 (en) * | 2007-06-26 | 2007-08-01 | Roxbury Patents Ltd | Ground compaction |
WO2010014668A2 (en) * | 2008-07-29 | 2010-02-04 | Geopier Foundation Company, Inc. | Shielded tamper and method of use for making aggregate columns |
US8562258B2 (en) | 2008-07-29 | 2013-10-22 | Geopier Foundation Company, Inc. | Shielded tamper and method of use for making aggregate columns |
MX2011007297A (es) * | 2009-01-09 | 2011-11-29 | Geopier Foundation Co Inc | Aparato y metodo para probar coeficientes de construccion. |
US9567723B2 (en) * | 2010-09-13 | 2017-02-14 | Geopier Foundation Company, Inc. | Open-end extensible shells and related methods for constructing a support pier |
US20130022404A1 (en) * | 2011-07-21 | 2013-01-24 | Norm Stinson | Method and system for creating a flood barrier |
US9207000B2 (en) | 2011-08-22 | 2015-12-08 | Darin Kruse | Solar apparatus support structures and systems |
US8920077B2 (en) | 2011-08-22 | 2014-12-30 | Darin Kruse | Post tensioned foundations, apparatus and associated methods |
DK3392412T3 (da) * | 2013-09-05 | 2020-06-08 | Geopier Found Co Inc | Fremgangsmåder og anordninger til komprimering af jord og kornede materialer |
US11773555B2 (en) | 2013-09-05 | 2023-10-03 | Geopier Foundation Company, Inc. | Methods and apparatuses for compacting soil and granular materials |
RU2601630C2 (ru) * | 2014-10-16 | 2016-11-10 | Александр Семёнович Ковалёв | Способ устройства забивной сваи |
AU2016298233B2 (en) * | 2015-07-27 | 2021-08-12 | Geopier Foundation Company, Inc. | Open-bottom extensible shells and related methods for constructing a support pier |
US10858796B2 (en) | 2015-07-27 | 2020-12-08 | Geopier Foundation Company, Inc. | Extensible shells and related methods for constructing a ductile support pier |
US9915051B2 (en) * | 2015-09-01 | 2018-03-13 | Bahman Niroumand | Mandrel for forming an aggregate pier, and aggregate pier compacting system and method |
CA3011557C (en) * | 2016-02-24 | 2021-01-12 | Ingios Geotechnics, Inc. | Systems and methods to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity |
US9765534B1 (en) * | 2016-11-14 | 2017-09-19 | Albert DiLuzio | Concrete work tool, method of making, and applications |
US10233607B2 (en) * | 2017-02-12 | 2019-03-19 | Bahman Niroumand | Comprehensive excavation process |
RU2640467C1 (ru) * | 2017-04-10 | 2018-01-09 | Александр Семёнович Ковалёв | Способ устройства забивной сваи |
US11124938B2 (en) * | 2018-09-04 | 2021-09-21 | Ojjo, Inc. | Expanding foundation components and related systems and methods |
US10640945B1 (en) * | 2019-05-03 | 2020-05-05 | Bahman Niroumand | Systems and methods for making compacted aggregate piers in a soil matrix |
US10669687B1 (en) * | 2019-05-03 | 2020-06-02 | Bahman Niroumand | Systems and methods for constructing retaining wall structure and well point in granular soils under groundwater level |
CN115038842A (zh) * | 2019-11-29 | 2022-09-09 | 杰米生命有限公司 | 用于在钻孔中逐层填充和压实粘性建筑材料的方法和装置 |
WO2022029587A1 (en) * | 2020-08-01 | 2022-02-10 | Bahman Niroumand | Mandrel for soil compaction |
Family Cites Families (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB369816A (en) | 1930-06-21 | 1932-03-31 | Frankignoul Pieux Armes | Improvements in and relating to the making of concrete piles in situ |
US2036355A (en) | 1934-03-01 | 1936-04-07 | Union Metal Mfg Co | Method and apparatus for driving piles |
US2437043A (en) | 1945-11-02 | 1948-03-02 | Union Metal Mfg Co | Collapsible pile-driving mandrel |
US2917979A (en) | 1956-02-27 | 1959-12-22 | Garlinghouse Brothers | Compactor |
US3027724A (en) | 1958-12-17 | 1962-04-03 | Raymond Int Inc | Method for making and installing concrete piles and the like |
US3204414A (en) * | 1960-08-23 | 1965-09-07 | Steuerman Sergey | Method and means for compacting sandy materials |
US3309877A (en) * | 1960-09-07 | 1967-03-21 | Degen Wilhelm | Vibrator for compacting soil |
US3206935A (en) | 1962-03-01 | 1965-09-21 | Raymond Int Inc | Methods and apparatus for producing cast-in-place shells and piles |
US3274908A (en) | 1964-07-22 | 1966-09-27 | Caterpillar Tractor Co | Tamping device |
US3327483A (en) | 1964-10-02 | 1967-06-27 | Union Metal Mfg Co | Pile driving mandrel construction and method for driving extensible piles |
SE446467B (sv) | 1985-02-25 | 1986-09-15 | Edvin Lindell | Forfarande vid palning samt anordning for utforande av forfarandet |
US5797705A (en) * | 1990-12-12 | 1998-08-25 | Willibald Kellner | Method for manufacturing a tubular foundation in the ground |
US5249892A (en) * | 1991-03-20 | 1993-10-05 | Fox Nathaniel S | Short aggregate piers and method and apparatus for producing same |
CN2144666Y (zh) * | 1992-12-21 | 1993-10-27 | 司炳文 | 锥形强夯重锤 |
GB2286613B (en) | 1994-02-18 | 1998-05-13 | Roxbury Ltd | Improvements in or relating to methods and apparatus for improving the condition of ground |
ATE272149T1 (de) * | 1997-08-20 | 2004-08-15 | Roxbury Ltd | Baugrundbehandlung |
US7073980B2 (en) | 1998-05-27 | 2006-07-11 | Stanley Merjan | Piling |
US6354766B1 (en) | 1999-02-09 | 2002-03-12 | Geotechnical Reinforcement Company, Inc. | Methods for forming a short aggregate pier and a product formed from said methods |
US6354768B1 (en) | 2000-01-24 | 2002-03-12 | Geotechnical Reinforcement Company, Inc. | Soil reinforcement method and apparatus |
WO2001096669A1 (en) | 2000-06-15 | 2001-12-20 | Geotechnical Reinforcement Company, Inc. | Lateral displacement pier and method of installing the same |
DE10108602A1 (de) | 2001-02-22 | 2002-09-12 | Keller Grundbau Gmbh | Verfahren zum Herstellen von Säulen |
CN2622250Y (zh) * | 2003-06-10 | 2004-06-30 | 湖南省建科高新技术建设工程有限公司 | 组合夯锤 |
GB2403964B (en) | 2003-07-18 | 2006-09-27 | Roxbury Ltd | Ground improvement |
US7326004B2 (en) | 2004-10-27 | 2008-02-05 | Geopier Foundation Company, Inc. | Apparatus for providing a rammed aggregate pier |
-
2006
- 2006-09-28 US US11/528,686 patent/US7488139B2/en active Active
- 2006-09-29 KR KR1020087010333A patent/KR20080075098A/ko not_active Application Discontinuation
- 2006-09-29 MX MX2008004330A patent/MX2008004330A/es active IP Right Grant
- 2006-09-29 RU RU2008115903/03A patent/RU2408765C2/ru not_active IP Right Cessation
- 2006-09-29 MY MYPI20080894A patent/MY148818A/en unknown
- 2006-09-29 CA CA2623763A patent/CA2623763C/en active Active
- 2006-09-29 EP EP06815717.1A patent/EP1937900B1/en active Active
- 2006-09-29 JP JP2008533613A patent/JP2009510290A/ja active Pending
- 2006-09-29 AU AU2006297200A patent/AU2006297200B2/en not_active Ceased
- 2006-09-29 CN CN2006800414458A patent/CN101305135B/zh not_active Expired - Fee Related
- 2006-09-29 WO PCT/US2006/037932 patent/WO2007041250A2/en active Search and Examination
-
2008
- 2008-04-28 MA MA30884A patent/MA29889B1/fr unknown
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482006A (zh) * | 2022-02-21 | 2022-05-13 | 中轻(广州)设计工程有限公司 | 一种土洞处理方法 |
CN114482006B (zh) * | 2022-02-21 | 2024-04-30 | 中轻(广州)设计工程有限公司 | 一种土洞处理方法 |
Also Published As
Publication number | Publication date |
---|---|
RU2008115903A (ru) | 2009-11-10 |
US7488139B2 (en) | 2009-02-10 |
KR20080075098A (ko) | 2008-08-14 |
MY148818A (en) | 2013-06-14 |
WO2007041250A3 (en) | 2007-05-31 |
RU2408765C2 (ru) | 2011-01-10 |
WO2007041250A2 (en) | 2007-04-12 |
MX2008004330A (es) | 2008-10-09 |
US20070077128A1 (en) | 2007-04-05 |
CA2623763C (en) | 2012-12-18 |
CA2623763A1 (en) | 2007-04-12 |
MA29889B1 (fr) | 2008-10-03 |
EP1937900B1 (en) | 2013-09-11 |
JP2009510290A (ja) | 2009-03-12 |
EP1937900A2 (en) | 2008-07-02 |
EP1937900A4 (en) | 2008-10-15 |
CN101305135B (zh) | 2010-12-22 |
AU2006297200B2 (en) | 2011-07-28 |
AU2006297200A1 (en) | 2007-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101305135B (zh) | 角锥或圆锥形夯头及用于建造夯实的集料墩的方法 | |
US8128319B2 (en) | Shielded tamper and method of use for making aggregate columns | |
US6688815B2 (en) | Lateral displacement pier and method of installing the same | |
US8221034B2 (en) | Methods of providing a support column | |
CN108487231B (zh) | 雪花型钢板桩及其加工方法 | |
US10941534B2 (en) | Methods and apparatuses for compacting soil and granular materials | |
US20210164185A1 (en) | Methods and apparatuses for compacting soil and granular materials | |
US8360689B2 (en) | Method for ground improvement with hardened inclusions | |
EP1382750B1 (en) | Ground improvement | |
US8562258B2 (en) | Shielded tamper and method of use for making aggregate columns | |
CN216948224U (zh) | 一种钢筋混凝土预制桩的复合地基结构 | |
CN108914942A (zh) | 一种深基坑支护体系及其施工方法 | |
CN102619218B (zh) | 后插钢筋笼水泥粉煤灰碎石桩及其成桩方法 | |
CN114808999B (zh) | 应用锚固方式的高承载力基坑斜桩支撑结构及施工方法 | |
CN212223839U (zh) | 一种预制型实心cfg桩的复合地基结构 | |
CN201801859U (zh) | 管桩岩用桩尖 | |
CN115821668A (zh) | 一种软土路基及其施工方法 | |
CN118187046A (zh) | 一种用于上土下岩的复合桩基础及其使用方法 | |
CN114182593A (zh) | 一种增强路基抗震性能的地基加固结构及施工方法 | |
CN111962532A (zh) | 一种既有铁路路基边坡斜打高压旋喷桩加固的施工方法 | |
CN101899835A (zh) | 管桩岩用桩尖 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101222 Termination date: 20110929 |