CN101255799A - Tunnel inner micro-destabilization slip-casting technique - Google Patents

Tunnel inner micro-destabilization slip-casting technique Download PDF

Info

Publication number
CN101255799A
CN101255799A CNA2008100362312A CN200810036231A CN101255799A CN 101255799 A CN101255799 A CN 101255799A CN A2008100362312 A CNA2008100362312 A CN A2008100362312A CN 200810036231 A CN200810036231 A CN 200810036231A CN 101255799 A CN101255799 A CN 101255799A
Authority
CN
China
Prior art keywords
grouting
slip
slurries
tunnel inner
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100362312A
Other languages
Chinese (zh)
Inventor
葛以衡
赵国强
夏晨欢
廖少明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No2 Municipal Engineering Co Ltd
Original Assignee
Shanghai No2 Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Municipal Engineering Co Ltd filed Critical Shanghai No2 Municipal Engineering Co Ltd
Priority to CNA2008100362312A priority Critical patent/CN101255799A/en
Publication of CN101255799A publication Critical patent/CN101255799A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to tunnel construction class which particularly relates to a tiny disturbance grouting control technique in tunnel, which comprises choices of grouting equipment, grouting material and technique parameters, wherein, the grouting material is two slurries with shrinkage no more than 5%, in grouting process, when using synchronous supplement slurry, the pressure of grouting is no more than 0.5Mpa, grouting flux is 15-15L/min, when using replacement grouting and pipe-driving grouting in layers, the pressure of grouting is 0.3-0.5Mpa, grouting flux is 15-25L/min. The present invention injects a special serum around bottom layer by special tiny disturbance control technique in tunnel to act as not only reinforce function, but also least disturbance for soil in grouting process, controls the disturbance in grouting process and stratum displacement by tunnel construction at a little degree, protect efficiently adjacent underground and buildings sensitivity of ground settlement.

Description

Tunnel inner micro-destabilization slip-casting technique
Technical field
The present invention relates to the constructing tunnel class, be specifically related to a kind of tunnel inner micro-destabilization slip-casting technique.
Background technology
Present normally used grouting method comprises compaction grouting, rotary jet grouting, wards off and split slip casting etc., and its worker's method is different, still meets the demands for stratum or ambient conditions preferably; Usually can not take into account peripheral complex environment in the existing slurry injection technique; and generally only consider the final effect of slip casting; and do not consider the perturbed problem of slip casting process; therefore under the high situation of environmental protection requirement; in the time of particularly in distortion need be controlled at the small scope of millimeter level; flow rate of grouting, slip casting number of times, beat important parameter such as pipe-pulling speed and can produce significant relatively self disturbance, so its degree that becomes more meticulous is then most important to the realization of construction control target.Improper as construction process control, often causing with the reinforcing is that the purpose grouting method has caused the disturbance bigger to the stratum on the contrary, makes the control index to be achieved.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of tunnel inner micro-destabilization slip-casting technique is provided, this technology is selected by the optimization to injecting paste material, grouting process parameter and grouting equipment, and the disturbance control to the stratum that is caused in the slip casting process is reduced to minimum degree.
The object of the invention realizes being finished by following technical scheme:
A kind of tunnel inner micro-destabilization slip-casting technique, comprise grouting equipment, injecting paste material and selection of process parameters, wherein grouting equipment comprises the slurries agitator tank, grouting pump, ball valve and Grouting Pipe, slurries in the agitator tank pass through grouting pump, ball valve enters Grouting Pipe, finish slip casting, what it is characterized in that described injecting paste material selection is that shrinkage factor is not more than two slurries of 5%, in the slip casting process, adopt when mending slurry synchronously, its grouting pressure is not more than 0.5Mpa, and flow rate of grouting is 10~15L/min, when adopting replacement grouting and beating the pipe delamination pour slurry, its grouting pressure is 0.3-0.5Mpa, and flow rate of grouting is 15~25L/min.
Described pair of slurries are made up of first liquid and second liquid, wherein comprise cement, flyash, swell soil and water in the first liquid, second liquid comprises 35 ° of water glass, each component shared percentage by weight in slurries is respectively: cement is that 24%-28%, flyash are that 21%-28%, swell soil are that 1.3%-2.8%, 35 ° of water glass are 8%-17%, and all the other are water.
Described synchronous benefit slurry single grouting amount be controlled at 200~500L/ time, replacement grouting be controlled at 200~300L/ time, beat and manage the delamination pour slurry single grouting amount initial stage and be controlled at 150~250L/ time.
Describedly play pipe slip casting and will guarantee that grouting amount is not greater than 40L in every meter tube drawing.
Described technology is installed between grouting pump and ball valve the blowout prevention one way valve is set, to prevent the slurry reflux splash.
Advantage of the present invention is; in the tunnel, inject special slurries to peripheral bottom with the moving control of specific perturbation technology; make the slip casting process when playing the grouting and reinforcing effect; again to the disturbance minimum of the soil body; the formation displacement that slip casting process disturbance and constructing tunnel are caused controls to minimum degree, the effectively contiguous underground and ground settlement sensitive kinds construction of structures of protection.
Description of drawings
Accompanying drawing 1 is grouting equipment structural representation of the present invention;
Accompanying drawing 2 is blowout prevention valve member of the present invention installation site schematic diagram.
The specific embodiment
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
Shown in Fig. 1-2, label 1-15 represents respectively: first liquid agitator tank 1, first liquid grout pump 2, flow meter 3, pressure meter 4, hybrid chamber 5, sealing device 6, one way valve 7, ball valve 8, shield duct piece 9, second liquid agitator tank 10, grouting pump 11, flow meter 12, pressure meter 13, Grouting Pipe 14, shield duct piece built-in fitting 15.
Injecting paste material and technological parameter that present embodiment adopts are as follows:
(1) biliquid slurry proportioning
For reduce of the influence of slip casting process as far as possible to tilting building and surrounding enviroment, according to different geological conditions and construction experience, select for use shrinkage factor less than 5% grout coordinate ratio, specific as follows:
First liquid second liquid
35 ° of water glass
Water: cement: flyash: swell soil (Kg)
(Kg)
100∶(90-100)∶(80-100)∶(5-10) 30-60
The ground tracking grouting initial setting time is determined to be advisable with 10~20 minutes, and the slip casting initial setting time is determined to be advisable in 30~60 seconds in the tunnel.
Need repeatedly open repetition slip casting as injected hole, after two fluid grouting construction finishes, inject an amount of sealing slurry in orifice area, injected hole can be opened smoothly when guaranteeing slip casting once more.
(2) construction technology parameter
Can be divided into synchronous benefit slurry, replacement grouting and beat three kinds of pipe delamination pour slurries according to slip casting purpose difference, the technical data difference that it is corresponding, specific as follows:
Mend the slurry situation synchronously: grouting pressure≤0.5Mpa, flow rate of grouting 10~15L/min; Replacement grouting reaches beats the pipe delamination pour slurry: grouting pressure 0.3-0.5Mpa, flow 15~25L/min.
Mending slurry single grouting amount synchronously is controlled at 200~500L/ time; Replacement grouting is controlled at 200~300L/ time.Beating the pipe delamination pour slurry single grouting amount initial stage is controlled at 150~250L/ time, beat pipe slip casting need adopt on a small quantity, repeatedly, principle uniformly, it is even that pipe-pulling speed is wanted, and combine with flow, guarantee that the interior grouting amount of every meter tube drawing is not greater than 40L.Tube drawing length is decided by grouting amount.
(3) grouting equipment
Grouting equipment comprises first liquid agitator tank 1, first liquid grout pump 2, flow meter 3, pressure meter 4, hybrid chamber 5, sealing device 6, one way valve 7, ball valve 8, second liquid agitator tank 10, grouting pump 11, flow meter 12, pressure meter 13, Grouting Pipe 14, agitator tank 1, slurries in 10 are respectively by first liquid grout pump 2, flow meter 3, pressure meter 4 and grouting pump 11, flow meter 12, pressure meter 13 enters hybrid chamber 5 to be mixed, pass through sealing device 6 more successively, one way valve 7, ball valve 8 enters Grouting Pipe 14, finish slip casting, wherein one way valve 7 is the blowout prevention one way valve, to prevent the slurry reflux splash.

Claims (5)

1. tunnel inner micro-destabilization slip-casting technique, comprise grouting equipment, injecting paste material and selection of process parameters, wherein grouting equipment comprises the slurries agitator tank, grouting pump, ball valve and Grouting Pipe, slurries in the agitator tank pass through grouting pump, ball valve enters Grouting Pipe, finish slip casting, what it is characterized in that described injecting paste material selection is that shrinkage factor is not more than two slurries of 5%, in the slip casting process, adopt when mending slurry synchronously, its grouting pressure is not more than 0.5Mpa, and flow rate of grouting is 10~15L/min, when adopting replacement grouting and beating the pipe delamination pour slurry, its grouting pressure is 0.3-0.5Mpa, and flow rate of grouting is 15~25L/min.
2. a kind of tunnel inner micro-destabilization slip-casting technique according to claim 1, it is characterized in that described pair of slurries are made up of first liquid and second liquid, wherein comprise cement, flyash, swell soil and water in the first liquid, second liquid comprises 35 ° of water glass, each component shared percentage by weight in slurries is respectively: cement is that 24%-28%, flyash are that 21%-28%, swell soil are that 1.3%-2.8%, 35 ° of water glass are 8%-17%, and all the other are water.
3. a kind of tunnel inner micro-destabilization slip-casting technique according to claim 1, it is characterized in that described synchronous benefit slurry single grouting amount be controlled at 200~500L/ time, replacement grouting be controlled at 200~300L/ time, beat and manage the delamination pour slurry single grouting amount initial stage and be controlled at 150~250L/ time.
4. a kind of tunnel inner micro-destabilization slip-casting technique according to claim 1 is characterized in that describedly playing pipe slip casting and will guaranteeing that grouting amount is not greater than 40L in every meter tube drawing.
5. a kind of tunnel inner micro-destabilization slip-casting technique according to claim 1 is characterized in that described technology is installed the blowout prevention one way valve is set, to prevent the slurry reflux splash between grouting pump and ball valve.
CNA2008100362312A 2008-04-18 2008-04-18 Tunnel inner micro-destabilization slip-casting technique Pending CN101255799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100362312A CN101255799A (en) 2008-04-18 2008-04-18 Tunnel inner micro-destabilization slip-casting technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100362312A CN101255799A (en) 2008-04-18 2008-04-18 Tunnel inner micro-destabilization slip-casting technique

Publications (1)

Publication Number Publication Date
CN101255799A true CN101255799A (en) 2008-09-03

Family

ID=39890865

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100362312A Pending CN101255799A (en) 2008-04-18 2008-04-18 Tunnel inner micro-destabilization slip-casting technique

Country Status (1)

Country Link
CN (1) CN101255799A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864968A (en) * 2010-06-23 2010-10-20 广东华隧建设股份有限公司 Anti-spouting device for tunnel bottom stratum consolidation and construction method thereof
CN101654356B (en) * 2009-09-02 2012-07-04 中铁二局股份有限公司 Shield method tunnel synchronous grouting slurry applied to compound stratum with upper soft part and lower hard part
CN102617108A (en) * 2012-04-17 2012-08-01 中铁十二局集团第三工程有限公司 High-performance grouting slurry for karst subgrade of high-speed railway
CN101845955B (en) * 2009-03-27 2012-08-08 株式会社Ntsenc Underground tunnel formation infrastructure establishment method
CN102635368A (en) * 2011-05-09 2012-08-15 上海申通地铁集团有限公司 Dual-liquid micro-disturbance grouting strengthening method for soft-soil subway tunnel
CN102748036A (en) * 2012-07-03 2012-10-24 中铁十二局集团有限公司 Slurry proportioning and construction method for reinforcing dry powder fine sand layer tunnel
CN102758639A (en) * 2012-04-10 2012-10-31 中铁隧道集团三处有限公司 Anti-blowout long tube grouting method for limited-space tunnels
CN102852535A (en) * 2010-12-14 2013-01-02 山东大学 Underground two-fluid grouting device
CN103790603A (en) * 2014-03-03 2014-05-14 中铁十局集团西北工程有限公司 Construction method of hollow anchor rod grouting through double ball valve connecting pipe
CN106285723A (en) * 2016-08-30 2017-01-04 东南大学 Microorganism grouting device and method after a kind of shield tunnel liner wall
CN106437729A (en) * 2016-08-08 2017-02-22 中国矿业大学(北京) Additive for decreasing shrinkage rate of synchronous grouting materials
CN107882040A (en) * 2017-11-23 2018-04-06 北京地矿工程建设有限责任公司 A kind of construction method of foundation ditch prestress anchorage cable
CN108756898A (en) * 2018-06-06 2018-11-06 中铁六局集团有限公司 Using the front pre-grouting construction method of HSC grouting materials
CN110847918A (en) * 2019-11-23 2020-02-28 莫庆锋 Grouting system of shield machine for tunnel construction
CN114233188A (en) * 2021-12-14 2022-03-25 陕西正通煤业有限责任公司 Tree-shaped framework supporting method for coal mine tunnel

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845955B (en) * 2009-03-27 2012-08-08 株式会社Ntsenc Underground tunnel formation infrastructure establishment method
CN101654356B (en) * 2009-09-02 2012-07-04 中铁二局股份有限公司 Shield method tunnel synchronous grouting slurry applied to compound stratum with upper soft part and lower hard part
CN101864968B (en) * 2010-06-23 2013-04-17 广东华隧建设股份有限公司 Anti-spouting device for tunnel bottom stratum consolidation and construction method thereof
CN101864968A (en) * 2010-06-23 2010-10-20 广东华隧建设股份有限公司 Anti-spouting device for tunnel bottom stratum consolidation and construction method thereof
CN102852535A (en) * 2010-12-14 2013-01-02 山东大学 Underground two-fluid grouting device
CN102635368A (en) * 2011-05-09 2012-08-15 上海申通地铁集团有限公司 Dual-liquid micro-disturbance grouting strengthening method for soft-soil subway tunnel
CN102635368B (en) * 2011-05-09 2014-12-03 上海申通地铁集团有限公司 Dual-liquid micro-disturbance grouting strengthening method for soft-soil subway tunnel
CN102758639A (en) * 2012-04-10 2012-10-31 中铁隧道集团三处有限公司 Anti-blowout long tube grouting method for limited-space tunnels
CN102617108A (en) * 2012-04-17 2012-08-01 中铁十二局集团第三工程有限公司 High-performance grouting slurry for karst subgrade of high-speed railway
CN102748036A (en) * 2012-07-03 2012-10-24 中铁十二局集团有限公司 Slurry proportioning and construction method for reinforcing dry powder fine sand layer tunnel
CN102748036B (en) * 2012-07-03 2015-04-22 中铁十二局集团有限公司 Slurry proportioning and construction method for reinforcing dry powder fine sand layer tunnel
CN103790603A (en) * 2014-03-03 2014-05-14 中铁十局集团西北工程有限公司 Construction method of hollow anchor rod grouting through double ball valve connecting pipe
CN106437729A (en) * 2016-08-08 2017-02-22 中国矿业大学(北京) Additive for decreasing shrinkage rate of synchronous grouting materials
CN106285723A (en) * 2016-08-30 2017-01-04 东南大学 Microorganism grouting device and method after a kind of shield tunnel liner wall
CN106285723B (en) * 2016-08-30 2018-05-08 东南大学 Microorganism grouting device and method after a kind of shield tunnel liner wall
CN107882040A (en) * 2017-11-23 2018-04-06 北京地矿工程建设有限责任公司 A kind of construction method of foundation ditch prestress anchorage cable
CN108756898A (en) * 2018-06-06 2018-11-06 中铁六局集团有限公司 Using the front pre-grouting construction method of HSC grouting materials
CN110847918A (en) * 2019-11-23 2020-02-28 莫庆锋 Grouting system of shield machine for tunnel construction
CN114233188A (en) * 2021-12-14 2022-03-25 陕西正通煤业有限责任公司 Tree-shaped framework supporting method for coal mine tunnel

Similar Documents

Publication Publication Date Title
CN101255799A (en) Tunnel inner micro-destabilization slip-casting technique
CN101126319B (en) Shield tunnel lateral cross-over pile base construction method
CN102155241B (en) Karst grouting reinforcement water-stop constructing method
CN103953365A (en) Tunnel single-liquid and double-liquid alternate grouting reinforcement process and device
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN101666234B (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN101694096B (en) Treatment method for grouting sand-layer foundation on the condition of flowing water
CN109083649B (en) It is applicable in the water-rich sand layer pre-grouting reinforcement means of complicated urban environment subway tunnel
CN106592614B (en) The method for blocking of leakage point in foundation pit waterproof of man
CN105986570B (en) The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement
CN101333812A (en) Grouter for back side grouting and its construction method
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN102434174A (en) Bentonite grouting method for construction of shield tunnel
CN106761837A (en) Slip casting structure and supporting grouting method in tunnel excavating process
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN107938649A (en) A kind of solution cavity foundation reinforcement method
CN109630193A (en) Subway Tunnel service channel excavates the administering method for water burst phenomenon occur
CN108130901B (en) The construction method of Karst grouting
CN102838325A (en) Hole sealing grout stop material and grouting hole sealing process
CN110295591A (en) Major diameter ultra-deep bored pile is layered grouting behind shaft or drift lining construction method
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN115030733A (en) Grouting method for preventing stratum soil loss or ground surface settlement
CN106761823B (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting method
CN107386267A (en) Karst foundation grouting serous fluid is controlled to be lost in, the method for polluted underground water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20080903