CN101250885A CNA2008100356294A CN200810035629A CN101250885A CN 101250885 A CN101250885 A CN 101250885A CN A2008100356294 A CNA2008100356294 A CN A2008100356294A CN 200810035629 A CN200810035629 A CN 200810035629A CN 101250885 A CN101250885 A CN 101250885A
Authority
CN
China
Prior art keywords
construction
subway station
soil body
reinforcing
mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100356294A
Other languages
Chinese (zh)
Inventor
姜向红
朱毅敏
乔恒昌
李筠
梅英宝
周臻全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai First Construction Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CNA2008100356294A priority Critical patent/CN101250885A/en
Publication of CN101250885A publication Critical patent/CN101250885A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a construction method for reinforcing soil body on one side of a metro station, which comprises the following steps: V1ing, the soil body on one side of the metro station is divided into construction blocks, and the construction blocks are sectionally divided on the longitudinal length of the reinforced soil body. V2ing, the construction blocks are orderly done with a stirring pile reinforcement construction, and a jumping bin construction mode is used when each construction block is constructed. V3ing, when each construction block is constructed, a row of piles which are close to one side of the metro station is firstly constructed and are used as isolation piles, after the row of piles are formed, the outer side of the metro station is constructed, and a jump beating mode is used when the row of piles are constructed. Through optimizing a reinforcing process of a stirring pile soil body, the construction method of the invention uses the mode of partition construction and jumping pin construction, the effect to the metro station when the soil body on one side of the metro station which is reinforced is capable of being effectively solved, and the deformation of the metro station is reduced.

Description

Construction method for reinforcing subway station side soil body
Technical field
The present invention relates to a kind of construction techniques, be specifically related to a kind of newly-built underground construction is carried out soil stabilization in existing subway station one side job practices.
Background technology
Along with the development in city, population increases sharply, and causes vehicle to increase, and brings a series of problems such as traffic congestion, environment pollution and energy crisis to the city.And subway is compared with other vehicles in the city, except avoiding urban ground to crowd and making full use of the space, also has advantages such as freight volume is big, quick and pollution-free.Yet build in the subway station, when especially existing subway station one side being constructed newly-built underground construction, often need to carry out soil stabilization.Conventional soil stabilization job practices has cement mixing method, high-pressure rotary jet grouting pile etc.But the job practices of above-mentioned routine does not all have the deformed Control Technology to existing subway station, will exert an influence to existing subway station in the construction.
Summary of the invention
Technical problem to be solved by this invention provides a kind of construction method for reinforcing subway station side soil body that can effectively solve the subway station distortion, to overcome the above-mentioned defective that prior art exists.
The technical scheme of technical solution problem of the present invention is as follows:
A kind of construction method for reinforcing subway station side soil body is characterized in that, comprises the steps:
(1) the subway station one side soil body is divided the construction piece, carry out segmentation with the longitudinal length for the treatment of soil mass consolidation and divide the construction piece;
(2) successively each construction piece is carried out the agitation pile strengthening construction, adopt the mode of " jumping storehouse " construction when piece is respectively constructed in construction;
(3) each construction piece when construction, a campshed of the most close subway station of construction one side earlier, as isolation pile, treat that this campshed forms after, again to the outside, subway station propelling construction, adopt the mode of beating of jumping during every campshed construction.
By above disclosed technical scheme as can be known, the present invention is by being optimized traditional agitation pile soil stabilization technology, actual conditions in conjunction with the subway station, adopt block construction, jump the storehouse construction also in conjunction with jumping pile driving construction, the method that cooperates Reasonable Parameters, reduced the soil compaction pressure of subway station one side, reduced of the influence of existing reinforcing subway station side soil body, thereby effectively controlled the subway station distortion the station.
Description of drawings
Fig. 1 is a construction sequence flow chart of the present invention.
The specific embodiment
Further specify the present invention below in conjunction with accompanying drawing.
As shown in Figure 1, construction method for reinforcing subway station side soil body of the present invention comprises the steps:
(1) the subway station one side soil body is divided the construction piece, carry out segmentation because the longitudinal length of reinforcing scope is long with the longitudinal length for the treatment of soil mass consolidation and divide the construction piece.
(2) successively each construction piece is carried out the agitation pile strengthening construction, adopt the mode of " jumping storehouse " construction when piece is respectively constructed in construction;
(3) each construction piece when construction, a campshed of the most close subway station of construction one side earlier, as isolation pile, treat that this campshed forms after, again to the outside, subway station propelling construction, adopt the mode of beating of jumping during every campshed construction.The jumping mode of beating of described every campshed adopts the mode of " do and jump five ", and with good conditionsi the employing " done one and jumped eight ".
Described mixing pile construction comprises the steps:
(a) setting-out location is according to construction plot, the position of accurately making each agitation pile;
(b) stir sinking in advance: start mixer motor, mixer is stirred along saddle cut the soil sinking;
(c) stirring whitewashing promotes: after mixer sinks to arriving projected depth, open mortar pump cement paste is pressed in the ground, the rotation while spraying promotes mixer in strict accordance with the hoisting velocity that design is determined simultaneously;
(d) secondary stirs: when mixer is promoted to the end face absolute altitude of the design reinforcement degree of depth, sink to mixer in the soil while rotating once more;
(e) secondary stirs whitewashing and promotes: the mixer secondary is lifted out ground with mixer after sinking down into the design reinforcement degree of depth again, the whipping process mud of spraying water simultaneously;
(f) displacement repeats above-mentioned (a)~(e) step, carries out the construction of next pile again.
Owing to, therefore need to determine rational mixing pile construction parameter, with the influence that reduces to construct to the station near carrying out soil stabilization in the subway station.The appropriate to the occasion construction parameter of routine that adopts earlier of constructing is constructed, and simultaneously the subway station is monitored, and according to monitored data construction parameter is adjusted then.More rational construction parameter is as follows:
Sequence number Technical data Index
1 Cement (32.5) mixes ratio 20%
2 For the slurry flow 160L/min~180L/min
3 Grout coordinate ratio (water: cement) 1.6~2.0∶1
4 Subsidence velocity 0.25m/min
5 Hoisting velocity 0.5m/min
6 Mixing speed Stirring-head: 14.5rpm/min in the middle of both sides stirring-head: the 26.0rpm/min
7 Air pressure 0.5Mpa
8 Slurry is pressed 0.3~0.7Mpa
By adopting above-mentioned a series of working measure and cooperating above-mentioned construction parameter, can effectively reduce in the reinforcing subway station side soil body process influence to the subway station.

Claims (5)

1. a construction method for reinforcing subway station side soil body is characterized in that, comprises the steps:
(1) the subway station one side soil body is divided the construction piece, carry out segmentation with the longitudinal length for the treatment of soil mass consolidation and divide the construction piece;
(2) successively each construction piece is carried out the agitation pile strengthening construction, adopt the mode of " jumping storehouse " construction when piece is respectively constructed in construction;
(3) each construction piece when construction, a campshed of the most close subway station of construction one side earlier, as isolation pile, treat that this campshed forms after, again to the outside, subway station propelling construction, adopt the mode of beating of jumping during every campshed construction.
2. construction method for reinforcing subway station side soil body according to claim 1 is characterized in that, the jumping mode of beating of described every campshed adopts the mode of doing a jumping five.
3. construction method for reinforcing subway station side soil body according to claim 1 is characterized in that, the jumping mode of beating of described every campshed adopts the mode of doing a jumping eight.
4. according to claim 2 or 3 described construction method for reinforcing subway station side soil body, it is characterized in that described mixing pile construction comprises the steps:
(a) setting-out location, the position of accurately making each agitation pile;
(b) stir sinking in advance;
(c) stirring whitewashing promotes;
(d) secondary stirs;
(e) secondary stirs the whitewashing lifting;
(f) displacement repeats above-mentioned (a)~(e) step, carries out the construction of next pile again.
5. construction method for reinforcing subway station side soil body according to claim 4, it is characterized in that, described step (3) whitewashing promotes and the whitewashing of step (5) secondary promotes, include slurry preparation and carry out the slip casting step, the major parameter scope is as follows in described slurry preparation and the slip casting process: cement mixed ratio is 20%; For the slurry flow is 160L/min~180L/min; The grout coordinate ratio of water and cement is 1.6~2.0: 1; It is 0.3~0.7Mpa that slurry is pressed.
CNA2008100356294A 2008-04-03 2008-04-03 Construction method for reinforcing subway station side soil body Pending CN101250885A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100356294A CN101250885A (en) 2008-04-03 2008-04-03 Construction method for reinforcing subway station side soil body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100356294A CN101250885A (en) 2008-04-03 2008-04-03 Construction method for reinforcing subway station side soil body

Publications (1)

Publication Number Publication Date
CN101250885A true CN101250885A (en) 2008-08-27

Family

ID=39954468

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100356294A Pending CN101250885A (en) 2008-04-03 2008-04-03 Construction method for reinforcing subway station side soil body

Country Status (1)

Country Link
CN (1) CN101250885A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550692B (en) * 2009-05-05 2011-05-04 上海隧道工程股份有限公司 Constructing method for reinforcing mixing stake around built shield tunnel
CN102465526A (en) * 2010-11-05 2012-05-23 中铁五局(集团)有限公司 Construction method for CFG (Cement Fly-ash Grave) pile in deep and loose soft soil layer and soft soil layer
CN102535444A (en) * 2011-12-06 2012-07-04 中铁十八局集团第五工程有限公司 Cavern-pile mechanical construction method for shallow subsurface excavated metro station at water-rich sandy stratum
CN102926303A (en) * 2012-11-22 2013-02-13 河海大学 Method for reinforcing soft soil foundation settlement control pile foundation bracket of high-grade highway in use
CN104032736A (en) * 2014-06-25 2014-09-10 上海市建工设计研究院有限公司 Construction method of cement-soil mixed pile in coral-reef limestone stratum

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550692B (en) * 2009-05-05 2011-05-04 上海隧道工程股份有限公司 Constructing method for reinforcing mixing stake around built shield tunnel
CN102465526A (en) * 2010-11-05 2012-05-23 中铁五局(集团)有限公司 Construction method for CFG (Cement Fly-ash Grave) pile in deep and loose soft soil layer and soft soil layer
CN102535444A (en) * 2011-12-06 2012-07-04 中铁十八局集团第五工程有限公司 Cavern-pile mechanical construction method for shallow subsurface excavated metro station at water-rich sandy stratum
CN102535444B (en) * 2011-12-06 2016-01-13 中铁十八局集团第五工程有限公司 Shallow subsurface excavated metro station at water-rich sandy stratum stake mechanical execution method
CN102926303A (en) * 2012-11-22 2013-02-13 河海大学 Method for reinforcing soft soil foundation settlement control pile foundation bracket of high-grade highway in use
CN104032736A (en) * 2014-06-25 2014-09-10 上海市建工设计研究院有限公司 Construction method of cement-soil mixed pile in coral-reef limestone stratum
CN104032736B (en) * 2014-06-25 2016-05-18 上海市建工设计研究院有限公司 The construction method of cement mixing method in Coral Reef Rock stratum

Similar Documents

Publication Publication Date Title
CN103556631B (en) The one-tenth pile operation method of agitation pile
CN104863131A (en) Polygonal cement-soil stirring pile and formation method thereof
CN101250885A (en) Construction method for reinforcing subway station side soil body
CN204023578U (en) Retaining Structure with Double-row Piles
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN101239803B (en) Ultra-fine cement slurry for reinforcing powder fine sand and preparation method thereof
CN106948828A (en) A kind of device that secondary grouting is carried out using shield synchronization slip casting equipment
CN110387877A (en) A kind of stiff composite pile construction technology
CN100386483C (en) High-performance cement soil continuous wall construction method
CN101538855A (en) Method for treating three-layer soft foundation by using I-shaped mixing pile
CN105862872B (en) A kind of deep footing groove enclosing structure joint seal construction method
CN104480932B (en) The soft base cement mixing pile construction method of saline alkali mud matter
CN101649614A (en) Variable-diameter multi-direction anchor pile
CN101962950B (en) Long-spiral spray stirring vibration pipe sinking CFG (Cement Flyash Gravel) pile construction method and CFG composite file therefrom
CN211816208U (en) Stirring rock-entering precast pile
CN103174130B (en) A kind of layer of sand anti-collapse method of Punching Borehole Cast-in-place Concrete Pile
CN205205811U (en) Drilling bit of deep submerged agitation pile
CN101514549B (en) Method using intermediate mixing piles for treating three-layer soft foundation
CN102235008A (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN101514550A (en) Method using belled mixing piles for treating double-layer soft foundation
CN201288325Y (en) High voltage rotary spraying enlarged footing pre-stress pipe pile
CN111170711A (en) Set-time-controllable grouting slurry for wall back grouting, grouting process and grouting device
CN214993929U (en) Foundation pit support soil nail
CN202247910U (en) Soil retaining structure with different inclination angles of anti-skid cement soil pile
CN107975027A (en) The construction method that shield launching is reinforced with reaching end soil body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080827