CN214993929U - Foundation pit support soil nail - Google Patents

Foundation pit support soil nail Download PDF

Info

Publication number
CN214993929U
CN214993929U CN202121717337.6U CN202121717337U CN214993929U CN 214993929 U CN214993929 U CN 214993929U CN 202121717337 U CN202121717337 U CN 202121717337U CN 214993929 U CN214993929 U CN 214993929U
Authority
CN
China
Prior art keywords
anchor rod
grouting anchor
drill bit
hollow grouting
soil nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121717337.6U
Other languages
Chinese (zh)
Inventor
胡跃龙
李慧章
安亚磊
谢金儒
杨晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Modern Survey And Design Institute Co ltd
Original Assignee
China Railway Modern Survey And Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Modern Survey And Design Institute Co ltd filed Critical China Railway Modern Survey And Design Institute Co ltd
Priority to CN202121717337.6U priority Critical patent/CN214993929U/en
Application granted granted Critical
Publication of CN214993929U publication Critical patent/CN214993929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a foundation pit supporting soil nail, which belongs to the field of foundation pit supporting structures and comprises a soil nail main body, a stirring blade and a drill bit, wherein the soil nail main body is a hollow grouting anchor rod; the front end of the hollow grouting anchor rod is fixedly connected with a drill bit, the tail end of the hollow grouting anchor rod is provided with a grouting opening, and the outer wall of one end, close to the drill bit, of the hollow grouting anchor rod is fixedly provided with a stirring blade; the number of the stirring blades is at least two, the stirring blades are arranged at equal intervals and are radially arranged by taking the hollow grouting anchor rod as a center, and the plane where each stirring blade is located is obliquely arranged relative to the axis of the hollow grouting anchor rod; the drill bit is communicated with the inside of the hollow grouting anchor rod, and the drill bit is provided with a jet orifice communicated with the inside of the drill bit. The utility model provides a novel excavation supporting soil nail, what can be better uses in deep basal pit, ground water level are abundant and weak soil stratum.

Description

Foundation pit support soil nail
Technical Field
The utility model relates to a foundation ditch supporting construction field especially relates to a foundation ditch support soil nail.
Background
With the development of national economy, urban population is gathered and increased, the demand of people on public transportation is gradually increased, the demand of urban rail transit construction, particularly subways, is gradually increased due to the unique advantages of the urban rail transit construction, and the problem of foundation pit support, particularly deep foundation pit engineering support, inevitably occurs in the construction of the subways, so that the urban rail transit construction becomes one of the hot problems in the building engineering field of China. Generally, the deep foundation pit engineering has the characteristics of deep excavation depth, complex soil layer conditions, dense adjacent buildings, short construction period, more engineering accidents and the like. Meanwhile, the space-time effect is also considered in the excavation process of the foundation pit, so that the complexity of the supporting work is fully explained.
The traditional soil nailing wall supporting technology has the advantages of simple construction, high economic benefit, short construction period, light and flexible structure and the like, and is widely used in foundation pit supporting. Although the soil nailing wall support has the distinct characteristics, the requirements for deep foundation pit engineering excavation are continuously improved, and the single soil nailing wall cannot meet the requirements of deeper foundation pit support. The traditional soil nailing wall support is suitable for the conditions of good geological conditions or not rich underground water, the drawing force of the soil nails is very high, however, the support effect is not ideal generally for the complex geological conditions with very high water content, particularly in soft soil areas, the drawing force of the soil nails cannot be fully exerted, the resource waste is caused, and the support effect is not obvious.
SUMMERY OF THE UTILITY MODEL
In order to solve the current soil nailing wall and strut the inferior position that has the degree of depth limited, not strong to ground water level suitability, the anchor power of soil nail can not full play in soft soil stratum, the utility model provides a novel excavation supporting soil nail, use in deep basal pit, ground water level abundance and soft soil stratum that can be better.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a foundation ditch support soil nail which characterized in that includes: the soil nail comprises a soil nail main body, stirring blades and a drill bit, wherein the soil nail main body is a hollow grouting anchor rod; the front end of the hollow grouting anchor rod is fixedly connected with a drill bit, the tail end of the hollow grouting anchor rod is provided with a grouting opening, and the outer wall of one end, close to the drill bit, of the hollow grouting anchor rod is fixedly provided with a stirring blade; the number of the stirring blades is at least two, the stirring blades are arranged at equal intervals and are radially arranged by taking the hollow grouting anchor rod as a center, and the plane where each stirring blade is located is obliquely arranged relative to the axis of the hollow grouting anchor rod; the drill bit is communicated with the inside of the hollow grouting anchor rod, and the drill bit is provided with a jet orifice communicated with the inside of the drill bit.
Further, the hollow grouting anchor rod is connected with the stirring blades through welding.
Through the above design scheme, the utility model discloses following beneficial effect can be brought: the utility model provides a foundation ditch support soil nail, the soil nail main part adopts cavity slip casting stock, foundation ditch support soil nail is equipped with the jet, the grout sprayed from the jet can be whole with the cementation of foundation ditch lateral wall soil body, the stability of lateral wall foundation ditch has been improved, stirring vane is mixing the in-process of the soil body, be favorable to the grout fully to consolidate peripheral soil body, the reinforcement soil body curtain that forms simultaneously can play impervious effect, and stirring vane and concrete surface course effect can play fine resistance to plucking effect, provide bigger resistance to plucking. Adopt the utility model provides a reinforced (rfd) foundation ditch lateral wall of underground structure soil nail has improved the stability of foundation ditch lateral wall, and what can be better uses in deep basal pit, ground water level abundance and weak soil stratum, gains good social and economic benefits.
Drawings
Fig. 1 is a schematic view of the foundation pit supporting soil nail applied to the reinforcement of the whole structure of the foundation pit;
fig. 2 is the utility model provides a foundation ditch support soil nail structural schematic.
In the figure: 1-hollow grouting anchor rod; 2-stirring blades; 3-an ejection port; 4-a drill bit; 5-anchor drilling machine.
The same reference numbers in all figures indicate similar or corresponding features or functions.
Detailed Description
In order to make the objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the detailed description.
Referring to fig. 1 and 2, the foundation pit supporting soil nail provided by the utility model is mainly used for supporting a soil nailing wall, and comprises a soil nail main body, a stirring blade 2 and a drill bit 4, wherein the soil nail main body is a hollow grouting anchor rod 1; the front end of the hollow grouting anchor rod 1 is fixedly connected with a drill bit 4, the tail end of the hollow grouting anchor rod 1 is provided with a grouting opening, a center hole of the hollow grouting anchor rod 1 is used as a drilling high-pressure air-water channel and a grouting channel, and the outer wall of one end, close to the drill bit 4, of the hollow grouting anchor rod 1 is fixedly provided with a stirring blade 2; the number of the stirring blades 2 is at least two, the stirring blades 2 are arranged at equal intervals and are radially arranged by taking the hollow grouting anchor rod 1 as a center, and the plane where each stirring blade 2 is located is obliquely arranged relative to the axis of the hollow grouting anchor rod 1; the drill bit 4 is communicated with the inside of the hollow grouting anchor rod 1, and the drill bit 4 is provided with a jet orifice 3 communicated with the inside of the drill bit 4.
Further, the hollow grouting anchor rod 1 is connected with the stirring blade 2 by welding.
The hollow grouting anchor rod 1 is a common hollow grouting anchor rod in the prior art, namely, the anchor rod body of the hollow grouting anchor rod 1 is in a hollow design, the center hole of the anchor rod body is used as a drilling high-pressure air-water channel and a grouting channel, and the outer surface of the anchor rod body is in a full-length standard large-pitch thread structure.
Drill bit 4 is used for cutting, broken soil body, and the soil nail main part adopts cavity slip casting stock 1, allows highly-compressed air and grout to pass through, and cavity slip casting stock 1 is direct to be bored whole excavation supporting soil nail into and is consolidated the soil layer, need not traditional soil nail and need pore-forming alone, when practicing thrift a large amount of time and manpower and materials, the time that exposes after the excavation of foundation ditch lateral wall is shorter, more can guarantee the stability of foundation ditch lateral wall. The stirring blade 2 can fully mix soil around the hollow grouting anchor rod 1 and cement paste, the plane where the stirring blade 2 is located is obliquely arranged relative to the axis of the hollow grouting anchor rod 1, the contact area of the stirring blade and the soil is increased, the anchoring force of the hollow grouting anchor rod 1 can be obviously improved, the formed reinforced soil has a good seepage-proofing effect, and the reinforced soil becomes an seepage-proofing curtain without independent seepage-proofing treatment. The injection port 3 is additionally arranged on the drill bit 4 at the front end of the hollow grouting anchor rod 1, high-pressure air and cement paste are sprayed out from the injection port 3, and the reinforcing range of the soil nail can be ensured to be wider through the applied high-pressure air, so that the using amount of the soil nail is saved. Adopt the utility model provides a reinforced (rfd) foundation ditch lateral wall of underground structure soil nail has improved the stability of foundation ditch lateral wall, and soil nail main part, stirring vane 2 and the soil body constitute a close inseparable whole, and the stability of foundation ditch lateral wall is guaranteed to the combined action.
The utility model provides a process that excavation supporting soil nail was applied to and consolidates the foundation ditch as follows:
1. excavation of a foundation pit:
after mechanical excavation is performed on foundation pit excavation and soil nailing wall construction from top to bottom in a segmented mode according to design requirements, the slope is trimmed manually, the requirement for meeting the flatness and the gradient of the slope is guaranteed, the slope allowable deviation is +/-20 mm, and the slope soil is removed before the slope is sprayed with concrete for supporting.
2. Setting anchor rod drilling machine 5
And after the foundation pit is excavated to the designed depth, leveling the bottom of the foundation pit, and placing an anchor rod drilling machine 5.
3. Preparation of slurry
The grouting material is cement paste, the water cement ratio of the cement paste is preferably 0.5-0.55, the cement paste is uniformly mixed, and the cement mixed at one time is used before initial setting;
4. soil nail installation
Use roofbolter 5 will the utility model relates to an during excavation supporting soil nail bored into the soil layer according to the designing requirement, the limit is bored and is carried out the whitewashing and handle.
5. Shotcrete panel construction
Selecting medium coarse sand as the concrete fine aggregate, wherein the mud content is less than 3%; the coarse aggregate is preferably graded gravel with the particle size of not more than 20 mm; the weight ratio of cement to sand is preferably 1: 4-1: 4.5, the sand rate is preferably 45-55%, and the water-cement ratio is preferably 0.4-0.45; when the admixture such as the accelerating agent and the like is used, a compatibility test of the admixture and the cement and a cement paste condensation test are carried out, and the dosage of the admixture and the doping method are determined through the tests;
the spraying operation should be carried out in sections in sequence, the spraying sequence in the same section should be uniformly sprayed from bottom to top, and the once spraying thickness is preferably 30 mm-80 mm; when the concrete is sprayed, the spray head and the wall surface of the soil nailing wall are kept vertical, and the distance between the spray head and the wall surface of the soil nailing wall is 0.6-1.0 m; and (5) spraying water for curing in time after the sprayed concrete is finally set for 2 hours.

Claims (2)

1. The utility model provides a foundation ditch support soil nail which characterized in that includes: the soil nail comprises a soil nail main body, stirring blades (2) and a drill bit (4), wherein the soil nail main body is a hollow grouting anchor rod (1); the front end of the hollow grouting anchor rod (1) is fixedly connected with a drill bit (4), the tail end of the hollow grouting anchor rod (1) is provided with a grouting opening, and the outer wall of one end, close to the drill bit (4), of the hollow grouting anchor rod (1) is fixedly provided with a stirring blade (2); the number of the stirring blades (2) is at least two, the stirring blades (2) are arranged at equal intervals and are radially arranged by taking the hollow grouting anchor rod (1) as a center, and the plane where each stirring blade (2) is located is obliquely arranged relative to the axis of the hollow grouting anchor rod (1); the drill bit (4) is communicated with the inside of the hollow grouting anchor rod (1), and the drill bit (4) is provided with a jet orifice (3) communicated with the inside of the drill bit.
2. The foundation pit support soil nail of claim 1, wherein: the hollow grouting anchor rod (1) is connected with the stirring blades (2) through welding.
CN202121717337.6U 2021-07-27 2021-07-27 Foundation pit support soil nail Active CN214993929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121717337.6U CN214993929U (en) 2021-07-27 2021-07-27 Foundation pit support soil nail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121717337.6U CN214993929U (en) 2021-07-27 2021-07-27 Foundation pit support soil nail

Publications (1)

Publication Number Publication Date
CN214993929U true CN214993929U (en) 2021-12-03

Family

ID=79124871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121717337.6U Active CN214993929U (en) 2021-07-27 2021-07-27 Foundation pit support soil nail

Country Status (1)

Country Link
CN (1) CN214993929U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030188A (en) * 2022-07-20 2022-09-09 中建八局第二建设有限公司 Self-drilling anchor rod foundation pit supporting method for rock-saltpeter area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030188A (en) * 2022-07-20 2022-09-09 中建八局第二建设有限公司 Self-drilling anchor rod foundation pit supporting method for rock-saltpeter area

Similar Documents

Publication Publication Date Title
CN206956714U (en) Down-the-hole impacts rotating spraying mixture pile construction equipment
CN102518135A (en) Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN101570970A (en) Construction method of cement soil anchor and anchor plate combined member thereof
CN202466594U (en) Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN106368214B (en) A kind of casing formula cement mixing method at pile operation method
CN110387877A (en) A kind of stiff composite pile construction technology
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN102979091B (en) Method for constructing cement jet grouting pile with fine aggregate concrete core
CN214993929U (en) Foundation pit support soil nail
CN107338790A (en) The compound pile construction method of jet mixing
CN116427396A (en) Stirring pile construction method and composite pile construction method thereof
CN101338567B (en) Construction method for underground buildings by rotary-spray shaft digging method cooperating with semi-inverse method
CN211816208U (en) Stirring rock-entering precast pile
CN101514549B (en) Method using intermediate mixing piles for treating three-layer soft foundation
CN1548661A (en) Method of supporting foundation pit in soft layer with brad
CN1046014C (en) Construction method for soil bulkhead structure
CN206220121U (en) Assembled point anchor barricade
CN209687507U (en) A kind of loess tunnel construction preliminary bracing device
CN205062809U (en) End support type screw thread core composite pile
CN103726673A (en) Novel after-rooting composite pile foundation
CN1259604A (en) Cement earth reinforced composite piling method
CN110144978A (en) A kind of anti-float anchor rod construction method
CN203701636U (en) Novel composite rear-rooting pile foundation
CN218204422U (en) Foundation pit supporting structure of PRC tubular pile and prestressed anchorage cable combination