CN101210201B - 一种干煤粉气化炉 - Google Patents

一种干煤粉气化炉 Download PDF

Info

Publication number
CN101210201B
CN101210201B CN 200610155855 CN200610155855A CN101210201B CN 101210201 B CN101210201 B CN 101210201B CN 200610155855 CN200610155855 CN 200610155855 CN 200610155855 A CN200610155855 A CN 200610155855A CN 101210201 B CN101210201 B CN 101210201B
Authority
CN
China
Prior art keywords
dirty gas
hot dirty
gasification
heater
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200610155855
Other languages
English (en)
Other versions
CN101210201A (zh
Inventor
周久乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfang Iron & Steel Co Ltd Shenyang City
Original Assignee
Dongfang Iron & Steel Co Ltd Shenyang City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfang Iron & Steel Co Ltd Shenyang City filed Critical Dongfang Iron & Steel Co Ltd Shenyang City
Priority to CN 200610155855 priority Critical patent/CN101210201B/zh
Publication of CN101210201A publication Critical patent/CN101210201A/zh
Application granted granted Critical
Publication of CN101210201B publication Critical patent/CN101210201B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • Y02E20/18Integrated gasification combined cycle [IGCC], e.g. combined with carbon capture and storage [CCS]

Abstract

一种干煤粉气化炉,包括炉体,炉体由热脏煤气气化炉体和热脏煤气重整净化炉体两部分组成,所述的热脏煤气气化炉体内的上部为气化室,其下部为沉降室,热脏煤气气化炉体的上部设置有多个煤粉喷嘴,多个煤粉喷嘴的一端与所述的气化室相连通,其另一端与一喷煤管道相连接,螺旋给料器设置在上料锁斗的底部,热脏煤气气化炉的上部位于煤粉喷嘴的下方设置有多个与所述的气化室相连通的喷气嘴,热脏煤气气化炉体的下部设置有多个与所述的沉降室相连通的降温喷嘴,沉降室内设有水冷壁,热脏煤气重整净化炉体内的中部设有水冷炉篦。本发明流态化和喷嘴结构简单,易于制造、运行可靠、操作简单、煤气成份易控制,可直接制造高压煤气供应用户,不需要加压装置。

Description

一种干煤粉气化炉
技术领域
本发明涉及一种煤气制备设备,具体是一种新型干煤粉气化炉。
背景技术
在冶金和化工合成工业中洁净煤综合利用、煤的气化和生产高热值,高含氢煤气有着广泛的用途,本发明是为在先申请案《高压、高含氢煤气的制备方法》(申请号:200610045968.1)提供一种实施的设备。
发明内容
本发明的目的在于提供一种能够实现高压、高含氢煤气的煤粉气化炉。
采用的技术方案是:
一种干煤粉气化炉,包括炉体,其特征在于所述的炉体由热脏煤气气化炉体和热脏煤气重整净化炉体两部分组成,所述的热脏煤气气化炉体内的上部为气化室,其下部为沉降室,热脏煤气气化炉体的上部设置有多个煤粉喷嘴,多个煤粉喷嘴的一端与所述的气化室相连通,其另一端与一喷煤管道相连接,喷煤管道与一螺旋给料器相连接,螺旋给料器设置在上料锁斗的底部,热脏煤气气化炉的上部位于煤粉喷嘴的下方设置有多个与所述的气化室相连通的喷气嘴,热脏煤气气化炉体的中部位于多个喷气嘴的下方设置有多个与所述的气化室相连通的调节气化喷嘴,热脏煤气气化炉体的下部设置有多个与所述的沉降室相连通的降温喷嘴,沉降室内设有水冷壁,所述气化室的下部通过连接通道与所述的热脏煤气重整净化炉体相连接,且相连通,热脏煤气重整净化炉体的上部设有煤气出口,其顶部设有料钟,其下部设置有多个降温喷嘴,其底部设置有排渣锁斗,热脏煤气重整净化炉体内的中部设有水冷炉篦。
上述的多个喷气嘴、多个调节气体喷嘴及多个降温喷嘴的喷出口均倾斜向上。
本发明的主要优点是:
1、流态化和喷嘴结构简单,易于制造、运行可靠。
2、高温蒸汽和空气或氧气可直接参与造气反应,不需要点火装置。
3、提高了煤气中氢气的含量,降低了纯氧的消耗。
4、操作简单、煤气成份易控制。
5、水冷溶渣低温气化凝固,无废水污染,同时可以回收熔渣余热以重造高温蒸汽。
6、煤气脱硫工艺简便,脱硫除尘效率高。
7、可直接制造高压煤气供应用户,不需要加压装置。
附图说明
图1是本发明一种实施例的结构示意图。
具体实施方式
请参见图1,本发明的煤粉气化炉,包括热脏煤气气化炉体1、热脏煤气重整净化炉体2、热脏煤气气化炉体1为流态化高温炉,流态化采用简易顶部多喷嘴侧喷方式,气化采用蒸汽和氧气或高温空气侧面向上斜吹式,热脏煤气气化炉体1内的上部设置有气化室3,采用耐火材料炉衬,外衬绝热材料,热脏煤气气化炉体1的下部设有沉降室4,沉降室4采用水冷壁内衬。在气化室3的下部有通道5与热脏煤气重整净化炉体2相连接,热脏煤气重整净化炉体2采用耐火材料内衬,外衬绝热材料,煤气由热脏煤气重整净化炉体2顶部排出。热脏煤气气化炉体1的上部设有多个煤气喷嘴9,多个煤气喷嘴9与一喷煤管道8相连接,且相连通,热脏煤气气化炉体1上位于煤气喷嘴9的下方设置有多个向上倾斜并与气化室3相连通的喷气嘴10,热脏煤气气化炉体1的中部位于喷气嘴10的下方设置有多个向上倾斜并与气化室3相连通的调节气化喷嘴11。烘干后的煤经磨煤机破碎后,送入上料锁斗6中,通过螺旋给料器7进入到喷煤管道8中,喷煤管道8中通入高压蒸汽,通过蒸汽把煤粉通过煤气喷嘴9喷入气化室3内,蒸汽通过高效蒸汽预热器预热,空气通过高效热风器预热,预热后的高温空气(或氧气)和水蒸汽从设置在喷煤管道8下方的喷气嘴10喷入气化室3内,由喷气嘴10喷入的高温蒸汽和高温空气在气化室3内将煤粉吹散,充分混合反应。调节气化喷嘴11可以向炉内喷入高温空气(或氧气),以调整气化反应的产物。反应生成的粗煤气经通道进入热脏煤气重整净化炉体2中,粗煤气中含有的灰渣通过重力沉降进入沉降室4中,沉降室4下部设有多个降温喷嘴12,多个降温喷嘴12喷入低温蒸汽,沉降室4设置有水冷壁13,沉降室4的底部设有排渣口14,排渣口14处设有排渣锁斗15,灰渣通过水冷壁13变成固体,固化后的灰渣通过排渣斗15排出炉外,粗煤气通过通道5进入热脏煤气重整净化炉体2中,热脏煤气重整净化炉体2内的中部设有水冷炉篦19,热脏煤气重整净化炉体2的顶部设有上料料钟16,其上部开设有出风口20,通过上料料钟16向炉内加入一定量的焦碳,焦碳中混合部分石灰。粗煤气经过焦炭层还原层可以使粗煤气中未完全反应的水蒸气分解为氢气和一氧化碳,部分二氧化碳可以被焦炭还原为一氧化碳,煤气中的硫化氢可以被石灰所吸收,经过还原的煤气由设置在热脏煤气重整净化炉体2上方的煤气出口20导出炉外。热脏煤气重整净化炉体2底部设有多个降温喷嘴17和排渣锁斗18,通过低温蒸汽把焦炭同煤气反应后的灰分固化并通过排渣锁斗18排出炉外。从热脏煤气重整净化炉体2出来的煤气通过余热回收、布袋除尘、TRT余压发电后进入中压罐储存,以供用户使用。

Claims (2)

1.一种干煤粉气化炉,包括炉体,其特征在于所述的炉体由热脏煤气气化炉体和热脏煤气重整净化炉体两部分组成,所述的热脏煤气气化炉体内的上部为气化室,其下部为沉降室,热脏煤气气化炉体的上部设置有多个煤粉喷嘴,多个煤粉喷嘴的一端与所述的气化室相连通,其另一端与一喷煤管道相连接,喷煤管道与一螺旋给料器相连接,螺旋给料器设置在上料锁斗的底部,热脏煤气气化炉的上部位于煤粉喷嘴的下方设置有多个与所述的气化室相连通的喷气嘴,热脏煤气气化炉体的中部位于多个喷气嘴的下方设置有多个与所述的气化室相连通的调节气化喷嘴,热脏煤气气化炉体的下部设置有多个与所述的沉降室相连通的降温喷嘴,沉降室内设有水冷壁,所述气化室的下部通过连接通道与所述的热脏煤气重整净化炉体相连接,且相连通,热脏煤气重整净化炉体的上部设有煤气出口,其顶部设有料钟,其下部设置有多个降温喷嘴,其底部设置有排渣锁斗,热脏煤气重整净化炉体内的中部设有水冷炉篦。
2.根据权利要求1所述的一种干煤粉气化炉,其特征在于所述的多个煤粉喷嘴、多个调节气化喷嘴及多个降温喷嘴的喷出口均倾斜向上。
CN 200610155855 2006-12-30 2006-12-30 一种干煤粉气化炉 Active CN101210201B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610155855 CN101210201B (zh) 2006-12-30 2006-12-30 一种干煤粉气化炉

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610155855 CN101210201B (zh) 2006-12-30 2006-12-30 一种干煤粉气化炉

Publications (2)

Publication Number Publication Date
CN101210201A CN101210201A (zh) 2008-07-02
CN101210201B true CN101210201B (zh) 2010-09-22

Family

ID=39610458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610155855 Active CN101210201B (zh) 2006-12-30 2006-12-30 一种干煤粉气化炉

Country Status (1)

Country Link
CN (1) CN101210201B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102250642A (zh) * 2011-06-03 2011-11-23 中国中煤能源股份有限公司 干煤粉湿式上料方法及使用该方法的上料系统
CN103242906A (zh) * 2013-05-31 2013-08-14 中国船舶重工集团公司第七一一研究所 含碳物料气化—重整变换转化炉及制备富氢合成气的方法
CN103740411B (zh) * 2014-01-14 2015-02-04 中国矿业大学(北京) 一种新型褐煤气化反应器和气化系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4710202A (en) * 1985-11-12 1987-12-01 Brennstoffinstitut Freiberg Apparatus for gasifying pulverized coal
CN1057289A (zh) * 1990-06-09 1991-12-25 江苏工学院 一种水煤气气化方法及其装置
CN1818032A (zh) * 2006-03-06 2006-08-16 沈阳东方钢铁有限公司 高压、高含氢煤气的制备方法
CN201006867Y (zh) * 2006-12-30 2008-01-16 沈阳东方钢铁有限公司 一种干煤粉气化炉

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4710202A (en) * 1985-11-12 1987-12-01 Brennstoffinstitut Freiberg Apparatus for gasifying pulverized coal
CN1057289A (zh) * 1990-06-09 1991-12-25 江苏工学院 一种水煤气气化方法及其装置
CN1818032A (zh) * 2006-03-06 2006-08-16 沈阳东方钢铁有限公司 高压、高含氢煤气的制备方法
CN201006867Y (zh) * 2006-12-30 2008-01-16 沈阳东方钢铁有限公司 一种干煤粉气化炉

Also Published As

Publication number Publication date
CN101210201A (zh) 2008-07-02

Similar Documents

Publication Publication Date Title
AU2007343509B2 (en) A dry coal powder gasification furnace
CN100366710C (zh) 多喷嘴水煤浆或粉煤气化炉及其工业应用
JP2022535446A (ja) 放出を減らした鋼または溶鉄含有材料を生産する方法及びシステム
CN103666580B (zh) 一种耦合式生物质加压热解工艺及系统
JPS6233284B2 (zh)
US20130047853A1 (en) Method and equipment for separating out molten dust in high temperature gas and use thereof
CN103397127B (zh) 一种熔融还原炼铁设备及炼铁方法
CN101956037A (zh) 间接加热式还原炼铁的方法和装置
CN102260537A (zh) 一种等离子热解及富氧助燃物料制取可燃气的装置
RU2509052C2 (ru) Способ и установка для получения синтез-газа
CN114686633A (zh) 利用直接还原铁炉顶煤气预热变换氢气的方法
CN101210201B (zh) 一种干煤粉气化炉
CN100363461C (zh) 一种生物质/生活垃圾双床式热解制取燃气的方法及装置
CN105084361B (zh) 一种煤气供热多段电石反应器及其工艺
CN204752780U (zh) 熔融还原炼铁装置
RU2005116796A (ru) Способ прямого восстановления оксидов железа и получения расплава железа и установка для его осуществления
CN201006867Y (zh) 一种干煤粉气化炉
CN101556037B (zh) 循环蓄热节能综合利用环保装置
CN208222489U (zh) 一种含酚废水与气化废焦混合焚烧系统
CN104024442B (zh) 铁水制造设备及铁水制造方法
CN109355077A (zh) 一种复合多点进料的气化装置
KR20100082696A (ko) 용광로에서의 철 제조방법 및 이 제조방법으로부터 얻어지는 상부 가스의 사용방법
CN114045373A (zh) 一种气基竖炉直接还原方法
CN207121427U (zh) 一种氢气‑氧气混合喷吹与热能综合利用的电石炉系统
CN111218535A (zh) 熔铁浴煤制气加热循环还原气生产直接还原铁的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20131204

Granted publication date: 20100922

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20150604

Granted publication date: 20100922

PP01 Preservation of patent right

Effective date of registration: 20150604

Granted publication date: 20100922

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20181202

Granted publication date: 20100922

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20181207

Granted publication date: 20100922

PD01 Discharge of preservation of patent

Date of cancellation: 20220607

Granted publication date: 20100922

PD01 Discharge of preservation of patent
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20220607

Granted publication date: 20100922

PD01 Discharge of preservation of patent

Date of cancellation: 20221207

Granted publication date: 20100922

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20221207

Granted publication date: 20100922

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20230607

Granted publication date: 20100922

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20230607

Granted publication date: 20100922

PP01 Preservation of patent right
PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20231207

Granted publication date: 20100922