CN101206600B - Testing device and method for testing open/close machine of computer system - Google Patents

Testing device and method for testing open/close machine of computer system Download PDF

Info

Publication number
CN101206600B
CN101206600B CN2006101732375A CN200610173237A CN101206600B CN 101206600 B CN101206600 B CN 101206600B CN 2006101732375 A CN2006101732375 A CN 2006101732375A CN 200610173237 A CN200610173237 A CN 200610173237A CN 101206600 B CN101206600 B CN 101206600B
Authority
CN
China
Prior art keywords
computer system
mentioned
testing
control unit
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2006101732375A
Other languages
Chinese (zh)
Other versions
CN101206600A (en
Inventor
岩柏志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pegatron Corp
Original Assignee
Pegatron Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pegatron Corp filed Critical Pegatron Corp
Priority to CN2006101732375A priority Critical patent/CN101206600B/en
Publication of CN101206600A publication Critical patent/CN101206600A/en
Application granted granted Critical
Publication of CN101206600B publication Critical patent/CN101206600B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Power Sources (AREA)

Abstract

The invention provides a test device which is used for testing a starting and closing action of a computer system. The test device comprises a power supply control unit and a test control unit, wherein, the power supply control unit is used for receiving a mains supply and selectively outputting the mains supply to a power supply end of the computer system; the test control unit outputs a power control signal to the power control unit, so that the power control unit can be controlled to output the mains supply to the power supply end to lead the test control unit to test the starting and closing action of the computer system; the test control unit receives test result data transmitted from the computer system. The test device can determine that whether the starting and closing action of the computer system is correct according to the test result data transmitted from the computer system.

Description

Proving installation and method for testing open/close machine of computer system
Technical field
The relevant a kind of proving installation of the present invention, and particularly relevant a kind of proving installation that moves in order to the switching on and shutting down of testing a computer system.
Background technology
The computer system product all need carry out a succession of switching on and shutting down motion test before dispatching from the factory, to detect computer system issuable problem when carrying out switching on and shutting down, promote the fiduciary level and the life-span of product.The traditional test device can carry out the switching on and shutting down motion test of robotization to computer system, and does not need to reach the saving cost manually to come open/close machine of computer system, increases the effect of production efficiency.
Yet the traditional test device, is provided with department of computer science and unifies testing power supply in this Preset Time according to the switching on and shutting down action that a Preset Time comes testing computer system, makes computer system carry out the switching on and shutting down action.When Preset Time one arrives, promptly stop to provide testing power supply to computer system, logging test results, and carry out next switching on and shutting down test, so constantly repeat, up to reaching a presumptive test number of times.
Yet when supplying with the computer system testing power supply above the schedule time, no matter whether computer system executes boot action, all stops to provide testing power supply to computer system.Therefore, do not finish switching on and shutting down when computer system in the schedule time and move, the traditional test device promptly has no way of verifying the switching on and shutting down action correctness of this computer system.So the fiduciary level of the switching on and shutting down motion test that the traditional test device is carried out has to be strengthened.
In addition, the traditional test device is directly imported mains supply the power source supply end of computer system and is powered when testing computer system.When mains supply inputs to the power source supply end of computer system, computer system is provided with a standby power always, and makes the part system of computer system, and for example Basic Input or Output System (BIOS), north bridge, south bridge, local LAN are carried out boot action.Therefore, the traditional test device can only be provided with under the situation of standby power in computer system, supplies with the computer system testing power supply, in the mode of warm start computer system is carried out the switching on and shutting down test.So, provide testing power supply to computer system once again at the traditional test device, before carrying out next switching on and shutting down test, the part system of computer system starts shooting already.So the traditional test device only can move in the part of detecting switching on and shutting down, and can't intactly detect all issuable problems of computer system.
In addition, computer system generally adopts Windows at present, and it is necessary therefore carrying out the switching on and shutting down motion test at Windows.Yet the traditional test device only can verify whether disc operating system (DOS) switching on and shutting down action is normal, and can't carry out the switching on and shutting down motion test to Windows.Therefore, use the traditional test device to test that computer system is out-of-date now, do not meet present industry demand.
Summary of the invention
In view of this, the purpose of this invention is to provide a kind of proving installation, transmit and next test result data, judge whether the switching on and shutting down action of this computer system is normal according to computer system by tested person.When the switching on and shutting down action of judging this computer system is normal, then stop to be provided with mains supply computer system so far, make this computer system be not provided with any power source.Thus, when carrying out next switching on and shutting down test, proving installation is intactly tested the switching on and shutting down action of this computer system.
According to purpose of the present invention, a kind of proving installation is proposed, in order to test the switching on and shutting down action of a computer system.Proving installation comprises a power control unit and a unit of testing and controlling.Power control unit is in order to receiving a mains supply, and optionally exports the power source supply end of mains supply to computer system.Unit of testing and controlling is exported a power supply controlling signal to power control unit, exports mains supply to power source supply end so as to the control power control unit, so that the switching on and shutting down of unit of testing and controlling testing computer system action.Unit of testing and controlling receives by computer system and transmits and a next test result data.The corresponding test result data of power supply controlling signal wherein.
According to purpose of the present invention, a kind of method for testing open/close machine of computer system is proposed, be used for a proving installation.Proving installation comprises a power control unit.Method for testing open/close machine of computer system comprises: at first, by power control unit, provide a mains supply to computer system, with the switching on and shutting down action of testing computer system.Then, on computer system, carry out a boot program.Afterwards, judge the computer system success of whether starting shooting.Afterwards, according to judging the computer system successful step of whether starting shooting, the control power control unit is so that computer system and mains supply electrical isolation.
Effect of the present invention is that proving installation transmits and next test result data according to the computer system by tested person, judges whether the switching on and shutting down action of this computer system is normal.So, when carrying out next switching on and shutting down test, proving installation is able to by not being provided with any power source the most initial state of computer system so far, intactly tests the switching on and shutting down action of this computer system.
For above and other objects of the present invention, feature and advantage can be become apparent, below will be especially exemplified by an embodiment, and conjunction with figs. is elaborated.
Description of drawings
Fig. 1 is the calcspar of the proving installation of the embodiment of the invention.。
Fig. 2 is the process flow diagram with the switching on and shutting down action of the disc operating system (DOS) of the proving installation testing computer system of the embodiment of the invention.
Fig. 3 is the process flow diagram with the switching on and shutting down action of the Windows of the proving installation testing computer system of the embodiment of the invention.
Embodiment
Proving installation of the present invention is in order to test the switching on and shutting down action of a computer system.Proving installation of the present invention comprises a power control unit and a unit of testing and controlling.Power control unit is in order to receiving a mains supply, and optionally exports the power source supply end of mains supply to computer system.Unit of testing and controlling is exported a power supply controlling signal to power control unit, exports mains supply to power source supply end so as to the control power control unit, so that the switching on and shutting down of unit of testing and controlling testing computer system action.Unit of testing and controlling receives by computer system and transmits and a next test result data.The corresponding test result data of power supply controlling signal.
Fig. 1 is the calcspar of the proving installation of the embodiment of the invention.Proving installation 100 comprises unit of testing and controlling 110 and power control unit 120, in order to the switching on and shutting down action of testing computer system 130.Unit of testing and controlling 110 for example is a microprocessor unit, and in order to the test procedure that the switching on and shutting down of control computer system 130 are moved, out-put supply controlling signal Sc is to power control unit 120.Power control unit 120 for example is a solid-state relay, couples the power source supply end 131 of computer system 130, and receives mains supply Vp.Whether power control unit 120 is sent to mains supply Vp the power source supply end 131 of computer system 130 according to power supply controlling signal Sc decision.
The proving installation of the embodiment of the invention can carry out the switching on and shutting down motion test of disc operating system (DOS) and Windows at computer system.Below described in detail with two examples respectively.
The DOS switching on and shutting down motion test that 100 pairs of computer systems 130 of proving installation are carried out below is described.Unit of testing and controlling 110 out-put supply controlling signal Sc make power control unit 120 mains supply Vp is sent to the power source supply end 131 of computer system 130 to power control unit 120.So computer system 130 is carried out a DOS boot program, carries out the DOS boot action.
After computer system 130 executed the DOS boot action, computer system 130 can transmit a test result data Dt to unit of testing and controlling 110.Test result data Dt comprises the test result of the DOS boot action of computer system 130.
Unit of testing and controlling 110 judges according to test result data Dt whether the boot action of computer system 130 is normal.Because computer system is after the DOS start, the power supply that only needs directly to cut off computer system can be reached shutdown.Therefore, if the boot action of computer system 130 is normal, unit of testing and controlling 110 out-put supply controlling signal Sc then, control power control unit 120 stops to export mains supply Vp to power source supply end 131, makes mains supply Vp and power source supply end 131 electrical isolation.Unit of testing and controlling 110 is also optionally carried out next switching on and shutting down test to computer system 130.
The Windows switching on and shutting down motion test that 100 pairs of computer systems 130 of proving installation are carried out below is described.Unit of testing and controlling 110 out-put supply controlling signal Sc make power control unit 120 mains supply Vp is sent to the power source supply end 131 of computer system 130 to power control unit 120.So computer system 130 is carried out a Windows boot program, carries out the Windows boot action.
After computer system 130 executed the Windows boot action, computer system 130 can transmit test result data Dt to unit of testing and controlling 110.Test result data Dt comprises the test result of the Windows boot action of computer system 130.
Unit of testing and controlling 110 judges according to test result data Dt whether the boot action of computer system 130 is normal.Because Windows operating system need be carried out Windows shutdown action, after waiting to store user's setting data, the stop supplies power supply begins.Therefore, if the Windows boot action of computer system 130 is normal, unit of testing and controlling 110 is also exported a shutdown controlling signal So, makes computer system 130 carry out Windows shutdown action.In the present embodiment, when computer system 130 receives shutdown controlling signal So, be equivalent to trigger the power key of computer system 130, computer system 130 is promptly carried out Windows shutdown action.
After computer system 130 executed Windows shutdown action, computer system 130 outputed test result data Dt to unit of testing and controlling 110, and this moment, test result data Dt comprised Windows shutdown result's test data.Unit of testing and controlling 110 judges according to test result data Dt whether the shutdown action of computer system 130 is correct.
If the Windows of computer system 130 shutdown action is correct, unit of testing and controlling 110 is out-put supply controlling signal Sc, control power control unit 120 stops to export mains supply Vp to power source supply end 131, makes mains supply Vp and power source supply end 131 electrical isolation.Unit of testing and controlling 110 is also optionally carried out next switching on and shutting down test to computer system 130.
In addition, proving installation 100 also comprises a display unit 140, in order to show the test result of corresponding test result data Dt, for example is the start number of success.
In addition, because computer system 130 needs a period of time just can finish boot action, computer system 130 must be provided with mains supply Vp a period of time.Therefore, proving installation 100 also comprises a time control module 150, and control module 150 is in order to set a power-on time and power-off time.This power-on time is that power control unit 120 continues the time span of output mains supply Vp to power source supply end 131, so that computer system 130 is carried out boot action.This power-off time is that power control unit 120 is isolated the time span of output mains supply Vp to power source supply end 131, so that computer system 130 electrical isolation.
The proving installation of the embodiment of the invention after computer system 130 being carried out switching on and shutting down tests, by control power control unit 120, makes mains supply Vp and computer system 130 electrical isolation at every turn.Therefore, the proving installation 100 of the embodiment of the invention is when optionally carrying out next switching on and shutting down test to computer system 130, be able to begin, computer system 130 is carried out complete switching on and shutting down test by the most initial state that is not provided with computer system 130 any power sources.
In comparison, the traditional test device only carries out the switching on and shutting down test in warm start mode again after computer system being carried out the switching on and shutting down test.Before carrying out next switching on and shutting down test, the traditional test device only is cut off testing power supply, and does not cut off mains supply, makes computer system still be provided with a standby power.Because when computer system is provided with standby power, promptly carry out the part boot action, therefore, the traditional test device can't be tested the boot action when computer system is provided with standby power.From the above, the proving installation of the embodiment of the invention, the intactly switching on and shutting down of authenticating computer system action improves the fiduciary level of test.
In addition, unit of testing and controlling 110 is according to test result data Dt control power control unit 120.The corresponding test result data Dt of the power supply controlling signal Sc that unit of testing and controlling 110 is sent, whether stop supplies mains supply Vp is to computer system 130 with decision power control unit 120.And if come a computer system is tested with the traditional test device, even this computer system is not finished the switching on and shutting down action as yet, as long as the schedule time one arrives, the traditional test device promptly stops to provide testing power supply computer system so far.Therefore, do not finish switching on and shutting down when this computer system in the schedule time and move, the traditional test device promptly has no way of verifying the switching on and shutting down action correctness of this computer system.In comparison, the switching on and shutting down action that the proving installation 100 of the embodiment of the invention, the test result data Dt that is transmitted according to computer system 130 are judged computer system 130 normally whether, the switching on and shutting down of authenticating computer system 130 action more exactly.
In addition, the proving installation of the embodiment of the invention by a standard interface, for example is USB (universal serial bus) or serial port interface, and test result data Dt is sent to proving installation 100 by computer system 130.
Fig. 2 is the process flow diagram with the switching on and shutting down action of the disc operating system (DOS) of the proving installation testing computer system of Fig. 1.At first, in step 210,, provide mains supply Vp, with the switching on and shutting down action of testing computer system 130 to computer system 130 by power control unit 120.Then, in step 220, on computer system 130, carry out a disc operating system (DOS) boot program.Then, in step 230, judge computer system 130 success of whether starting shooting.At last, in step 240, control power control unit 120 makes computer system 130 and mains supply Vp electrical isolation.
Fig. 3 is the process flow diagram with the switching on and shutting down action of the Windows of the proving installation testing computer system of the embodiment of the invention.At first, in step 310,, provide mains supply Vp, with the switching on and shutting down action of testing computer system 130 to computer system 130 by power control unit 120.Then, in step 320, on computer system 130, carry out a Windows boot program.Then, in step 330, judge computer system 130 success of whether starting shooting.Afterwards, in step 340, with computer system 130 shutdown.In step 350, judge computer system 130 success of whether shutting down.At last, in step 360, control power control unit 120 makes computer system 130 and mains supply Vp electrical isolation.
The proving installation of the embodiment of the invention transmits and next test result data according to the computer system by tested person, judges whether the switching on and shutting down action of this computer system is normal.When the switching on and shutting down action of judging the tested person computer system is normal, then stop to export mains supply computer system so far.So come, when carrying out next switching on and shutting down test, proving installation is able to by not being provided with any power source the most initial state of computer system so far, intactly tests the switching on and shutting down action of this computer system.
In addition, the proving installation of the embodiment of the invention not only can be used for the boot action of the disc operating system (DOS) of testing computer system, also can be in order to the boot action of the Windows of testing computer system.And finish the boot action of Windows in computer system after, also shut down, come the shutdown action of authenticating computer system whether normal by the control computer system.Therefore, the switching on and shutting down motion test that the proving installation of the embodiment of the invention carries out computer system is more near the actual operation behavior of the user of computer system.So the testing computer system switching on and shutting down action more exactly of the proving installation of the embodiment of the invention detects computer system issuable mistake when switching on and shutting down.
In sum; though the present invention discloses as above with reasonable embodiment; yet it is not in order to limit the present invention; the people who has common knowledge in the technical field under any; without departing from the spirit and scope of the present invention; can do all change that is equal to and retouching, so protection scope of the present invention should be with being as the criterion that claim was defined.

Claims (12)

1. a proving installation moves in order to the switching on and shutting down of testing a computer system, and above-mentioned proving installation comprises:
One power control unit in order to receiving a mains supply, and is optionally exported the power source supply end of above-mentioned mains supply to above-mentioned computer system; And
One unit of testing and controlling is exported a power supply controlling signal to above-mentioned power control unit;
Wherein above-mentioned unit of testing and controlling receives by above-mentioned computer system and transmits and a next test result data, and judge according to this test result data whether this computer system power-on is normal, if this computer system power-on is normal, unit of testing and controlling is exported this power supply controlling signal, control this power control unit and stop to export this mains supply, make this mains supply and this power source supply end electrical isolation to this power source supply end.
2. proving installation according to claim 1, it is characterized in that, above-mentioned proving installation more comprises a time control module, and in order to set a power-on time, above-mentioned power-on time is that above-mentioned power control unit continues the time span of the above-mentioned mains supply of output to above-mentioned power source supply end.
3. proving installation according to claim 1 is characterized in that, above-mentioned proving installation more comprises a display unit, in order to show the test result of corresponding above-mentioned test result data.
4. proving installation according to claim 1 is characterized in that, wherein, above-mentioned test result data sees through a standard interface and is sent to above-mentioned proving installation by above-mentioned computer system.
5. as the proving installation as described in the claim 4, it is characterized in that wherein, above-mentioned standard interface is a USB (universal serial bus) or serial port interface.
6. proving installation according to claim 1 is characterized in that, wherein, above-mentioned unit of testing and controlling is more exported a shutdown controlling signal to above-mentioned computer system, shuts down to control above-mentioned computer system.
7. a method for testing open/close machine of computer system is used for a proving installation, and above-mentioned proving installation comprises a power control unit, and above-mentioned method for testing open/close machine of computer system comprises:
Import a power supply controlling signal to above-mentioned power control unit,, provide a mains supply, to test the switching on and shutting down action of above-mentioned computer system to above-mentioned computer system to see through above-mentioned power control unit;
On above-mentioned computer system, carry out a boot program;
Judge the success of whether starting shooting of above-mentioned computer system; And
If judge above-mentioned computer system power-on success, import this power supply controlling signal to above-mentioned power control unit, stop to export this mains supply to this computer system to control this power control unit, make this mains supply and this computer system electrical isolation.
8. as the method for testing open/close machine of computer system as described in the claim 7, it is characterized in that, above-mentioned proving installation has more a unit of testing and controlling, in providing above-mentioned mains supply to the step of above-mentioned computer system, above-mentioned unit of testing and controlling is exported this power supply controlling signal, uses the above-mentioned mains supply of the above-mentioned power control unit input of control to above-mentioned computer system.
9. as the method for testing open/close machine of computer system as described in the claim 8, it is characterized in that, in judging whether above-mentioned computer system starts shooting in the successful step, judge the success of whether starting shooting of above-mentioned computer system by above-mentioned unit of testing and controlling.
10. as the method for testing open/close machine of computer system as described in the claim 7, it is characterized in that in the step of carrying out above-mentioned boot program, above-mentioned boot program is the disc operating system (DOS) boot program.
11. the method for testing open/close machine of computer system as described in the claim 7 is characterized in that, in the step of carrying out above-mentioned boot program, above-mentioned boot program is the Windows boot program.
12. the method for testing open/close machine of computer system as described in the claim 11 is characterized in that, wherein, the step of above-mentioned computer system and above-mentioned mains supply electrical isolation is more comprised:
With above-mentioned computer system shutdown;
Judge the success of whether shutting down of above-mentioned computer system;
Control above-mentioned power control unit, make above-mentioned computer system and above-mentioned mains supply electrical isolation.
CN2006101732375A 2006-12-22 2006-12-22 Testing device and method for testing open/close machine of computer system Expired - Fee Related CN101206600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006101732375A CN101206600B (en) 2006-12-22 2006-12-22 Testing device and method for testing open/close machine of computer system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006101732375A CN101206600B (en) 2006-12-22 2006-12-22 Testing device and method for testing open/close machine of computer system

Publications (2)

Publication Number Publication Date
CN101206600A CN101206600A (en) 2008-06-25
CN101206600B true CN101206600B (en) 2011-08-24

Family

ID=39566831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006101732375A Expired - Fee Related CN101206600B (en) 2006-12-22 2006-12-22 Testing device and method for testing open/close machine of computer system

Country Status (1)

Country Link
CN (1) CN101206600B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101751304B (en) * 2008-12-19 2012-06-13 鸿富锦精密工业(深圳)有限公司 Computer startup test system and method
CN102200558A (en) * 2010-03-25 2011-09-28 鸿富锦精密工业(深圳)有限公司 Starting-up/shutdown detection circuit
TWM423295U (en) * 2011-09-29 2012-02-21 Wistron Corp Testing appararus
CN104866418B (en) * 2014-02-26 2019-01-04 研祥智能科技股份有限公司 Automated testing method and system
CN104407950A (en) * 2014-11-04 2015-03-11 浪潮电子信息产业股份有限公司 Novel power-off on-off testing method based on program-controlled variable frequency power supply
CN104881341B (en) * 2015-06-16 2019-03-05 深圳市金泰克半导体有限公司 The test method and its test macro of a kind of server, hard disc of computer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630142A (en) * 1994-09-07 1997-05-13 International Business Machines Corporation Multifunction power switch and feedback led for suspend systems
US6114870A (en) * 1996-10-04 2000-09-05 Texas Instruments Incorporated Test system and process with a microcomputer at each test location
CN1484147A (en) * 2002-09-20 2004-03-24 联想(北京)有限公司 System and method for realizing automatic on/off test of computer
CN2610406Y (en) * 2002-12-11 2004-04-07 技嘉科技股份有限公司 Opening and closedown testing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630142A (en) * 1994-09-07 1997-05-13 International Business Machines Corporation Multifunction power switch and feedback led for suspend systems
US6114870A (en) * 1996-10-04 2000-09-05 Texas Instruments Incorporated Test system and process with a microcomputer at each test location
CN1484147A (en) * 2002-09-20 2004-03-24 联想(北京)有限公司 System and method for realizing automatic on/off test of computer
CN2610406Y (en) * 2002-12-11 2004-04-07 技嘉科技股份有限公司 Opening and closedown testing device

Also Published As

Publication number Publication date
CN101206600A (en) 2008-06-25

Similar Documents

Publication Publication Date Title
CN101206600B (en) Testing device and method for testing open/close machine of computer system
CN101727156B (en) Starting-up time sequence control device of computer and control method thereof
CN106055440B (en) A kind of test method and system for realizing server exception power-off by BMC
CN101436154B (en) Startup and closedown test system and method of computer mainboard
CN102508755B (en) Device and method for simulating interface card hot-plugging
CN104866418A (en) Automatic testing method and system
CN1979438A (en) Computer main-board on-off testing system and method
CN108037298A (en) Automatic analyzer and its wake-up control method and control system
CN1971528A (en) Automated computer on-off operation testing device and method
CN103914123B (en) Computer device and power management method thereof
CN104353992B (en) Screw locking control system and operational approach thereof
TWI303318B (en) Testing apparatus and method for testing boot and shut-down process of computer system
CN102045211A (en) Power supply circulating pressure testing method
CN104538058A (en) Semi-automatic burning device and method
CN106649018B (en) A kind of test method of the storage system stability with extension cabinet
CN101604275A (en) BIOS test macro and method of testing thereof
CN103702107B (en) A kind of intelligent television switching on and shutting down high speed test method
CN104268044A (en) Method and device for performing loop test on normal startup and shutdown of server system
CN110459260A (en) Automatic test switching device, method and system
CN101819460B (en) Linked switch device of host computer and display and control method thereof
CN101377753A (en) Accessory test device and method
CN102681872A (en) Automatic cold boot method of notebook computer
CN103106358A (en) Method and device for distributing computer system permissions
CN205863558U (en) A kind of smart jack with speech identifying function
CN101303616A (en) Computer, power supply apparatus system used thereon as well as power supply feed method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HESHUO JOINT SCIENCE AND TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: HUASHUO COMPUTER CO LTD

Effective date: 20100511

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: HOUSE 4, NO.150, LIDE ROAD, BEITOU DISTRICT, TAIPEI CITY, TAIWAN PROVINCE, CHINA TO: 5/F, NO.76 LIGONG STREET, BEITOU DISTRICT, TAIPEI CITY, TAIWAN PROVINCE, CHINA

TA01 Transfer of patent application right

Effective date of registration: 20100511

Address after: Taiwan Taipei City Beitou District China meritorious Street No. 76 5 floor

Applicant after: Pegatron Corporation

Address before: Taiwan Taipei City Beitou District China Road No. 150 4 floor

Applicant before: Huashuo Computer Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824

Termination date: 20111222