CN2610406Y CN 02290128 CN02290128U CN2610406Y CN 2610406 Y CN2610406 Y CN 2610406Y CN 02290128 CN02290128 CN 02290128 CN 02290128 U CN02290128 U CN 02290128U CN 2610406 Y CN2610406 Y CN 2610406Y
Authority
CN
China
Prior art keywords
power supply
proving installation
close
power
control module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02290128
Other languages
Chinese (zh)
Inventor
吴成均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giga Byte Technology Co Ltd
Original Assignee
Giga Byte Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giga Byte Technology Co Ltd filed Critical Giga Byte Technology Co Ltd
Priority to CN 02290128 priority Critical patent/CN2610406Y/en
Application granted granted Critical
Publication of CN2610406Y publication Critical patent/CN2610406Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to an on-off testing device, wherein a setting unit is used to export a testing interval signal, and a triggering unit is utilized to export a triggering signal; and then a controlling unit times according to the testing interval signal and exports a controlling signal to open or close the power supply when timing to the time set by the testing interval signal, which makes the testing device disclosed by the utility model can test the impact of the power supply to the mainboard in cycles according to the testing interval.

Description

The start and close proving installation
Technical field
The utility model relates to a kind of proving installation, particularly a kind of proving installation and method thereof that is applied to the test of computer system host plate start and close.
Background technology
The power supply unit of computer system is the main source of power supply supply, is that peripherals such as the rated voltage supply motherboard of output 12V, 5V and 3.3V and CD-ROM drive, floppy drive, hard disk driver use with after the suitable rectification of civil power process.Existing power supply unit has following problem: the first, and the problem of power deficiency, promptly output power can't reach specified performance number, may can cause computing machine can't start or make some parts in the computing machine not use in some cases; The second, the problem of electromagnetic interference (EMI) is because the electromagnetic action of power supply unit itself and the electronic unit on the motherboard disturb; The 3rd, the problem of power supply shake, when the shake ripple factor was excessive, the composition that exchanges that just mixed in the DC voltage that power supply is exported may cause other parts job insecurity of computing machine, also may cause starting shooting again.Wherein whether normally the 3rd problem to motherboard influence on system operation maximum.
Motherboard equals the main operation core of computing machine, if, usually be difficult to check in out because the problem of power supply makes the chipset on it damage and can't move, and computing machine thereby can't to move be the problem that allows the user perplex most.The annual motherboard order of accepting a large amount of external dealers in Taiwan, and the user of this country is when selecting motherboard, also can be used as selecting according to the degree of stability of its product, therefore, in case take place thisly to make the situation that motherboard damages because of rush of current, injury for brand is difficult to estimate that this offending use experience also can be stayed the consumer in the heart deeply, and deep-rooted being difficult to erases.So, the problem of important consideration when the chipset on the motherboard is exactly design for the degree of bearing of rush of current.When host board testing, if can test its degree of bearing, eliminate the motherboard that does not meet quality requirements to rush of current, just can reduce the generation of above-mentioned condition.
So, but design one Test Host plate bears the devices and methods therefor of rush of current, real technical task for needing to be resolved hurrily.
Summary of the invention
In view of above prior art problems, fundamental purpose of the present utility model is to provide a kind of start and close proving installation, can be according to the time cycle that sets, constantly start and close with measuring current impact on the motherboard or the switching current on the similar printed circuit board (PCB) impact.
Therefore for achieving the above object, the utility model discloses a kind of start and close proving installation, includes a setup unit 100, a control module 200, a trigger element 300 and a power supply switch unit 400.
A setup unit 100 wherein is in order to export a test cycle signal; Control module 200 according to the test cycle signal timing, when timing during to time that this test cycle signal sets, is exported a control signal, makes power supply can input on the motherboard; Trigger element 300 when power-off, causes this control module to pick up counting in order to export a trigger pip; Power supply switch unit 400, in order to export a power supply signal to this control module, power supply switch unit 400 couples with computer system power source and mainboard power supply, in the time of start, promptly the power supply with system moves required power supply as proving installation, in the time of shutdown, system power supply disappears, and just quotes standby (SUSPEND) power supply.
According to proving installation disclosed in the utility model, its method of testing is mainly set a test period by a setup unit; Then, export a trigger pip to trigger a control module by a trigger element when electric power starting or when closing; Again by control module according to this test period timing, during time of setting when timing to this test period, export a control signal, to open or the shutdown system power supply.
Start and close proving installation disclosed in the utility model can be in the motherboard impact of its electric current of Pretesting to its parts of dispatching from the factory.
About feature of the present utility model and performance, conjunction with figs. and most preferred embodiment are described in detail as follows.
Description of drawings
Fig. 1 is the functional block diagram of start and close proving installation disclosed in the utility model; And
Fig. 2 is the preferred embodiment of start and close proving installation disclosed in the utility model.
Wherein, description of reference numerals is as follows:
100 setup units, 200 control modules
300 trigger elements, 400 power supply switch units
101 thumb-acting switch, 201 single-chip microcomputers
202 oscillators, 203 reset switch
204 electric capacity, 301 first diodes
302 second diodes, 303 the first transistors
304 transistor secondses, 305 resistance
306 resistance, 307 resistance
308 resistance 401 the 3rd transistor
402 the 4th transistors, 403 resistance
404 resistance, 405 first power connections
406 second source joints
Embodiment
Please refer to Fig. 1, the functional block diagram of start and close proving installation disclosed in the utility model, it is in order to test rush of current to motherboard during start and close, and proving installation is installed on the clamp, utilize the expansion slot on the motherboard, for example the PCI slot is to test motherboard.
Start and close proving installation disclosed in the utility model includes a setup unit 100, a control module 200, a trigger element 300 and a power supply switch unit 400.
A setup unit 100 wherein is in order to export a test cycle signal; Control module 200 according to the test cycle signal timing, when timing during to time that this test cycle signal sets, is exported a control signal, makes power supply can input on the motherboard; Trigger element 300 when power-off, causes this control module to pick up counting in order to export a trigger pip; Power supply switch unit 400, in order to export a power supply signal to this control module, power supply switch unit 400 couples with computer system power source and mainboard power supply, in the time of start, promptly the power supply with system moves required power supply as proving installation, in the time of shutdown, system power supply disappears, just standby (SUSPEND) power supply in the cited system.
Therefore, above-mentioned function square, function with automatic open and close system power supply makes measuring current that proving installation can go round and begin again in test period to the impact of each component chip on the motherboard, and it mainly is to set a test period with a setup unit; Then, export a trigger pip to trigger a control module by a trigger element when electric power starting or when closing; Again by control module according to this test period timing, during time of setting when timing to this test period, export a control signal, to open or the shutdown system power supply.
Below with a preferred embodiment specific implementation of the present utility model is described.
Please please refer to Fig. 2, preferred embodiment for start and close proving installation disclosed in the utility model, as shown in the figure, the circuit of proving installation is formed mainly can be divided into four parts, is respectively setup unit 100, control module 200, trigger element 300 and power supply switch unit 400.
Wherein setup unit 100 is a thumb-acting switch 101, present embodiment is one or four a thumb-acting switch, each switch has 0N and OFF two states, represent 0 and 1 respectively, therefore the thumb-acting switch of present embodiment can be set 16 kinds of time states, gives up the setting that (0000) does not list test period in, has 15 groups of times, wherein (0001) to represent test period be 1 second, and the time cycle of (1111) representative test is 15 seconds.After setup unit 100 settings finish, will export a test cycle signal and give control module 200.
Including a single-chip microcomputer 201 in the control module 200, is one to be numbered the PIC16C84 single-chip microcomputer in the present embodiment.Its RA0 to RA3 pin is in order to read the set condition of thumb-acting switch 101, oscillator 202 is in order to provide single-chip microcomputer 201 required frequency of operation, reset switch 203 is as the replacement purposes of proving installation, when the system for computer power supply does not cut off, and need reset test period the time, after setting finishes, with the test process of reset switch 203 replacement proving installations.Another using time is for when the proving installation remarkable action, with reset switch 203 replacement test processs.Reset switch 203 is parallel with an electric capacity 204, as the protection purposes.
Include one first diode 301 and one second diode 302 in the trigger element 300, both connect with series system, and the cathode terminal of first diode 301 is connected to power pin in the PCI slot by a resistance 305, in order to the monitoring power supply state.The anode tap of second diode 302 is coupled with a first transistor 303, its emitter-base bandgap grading end ground connection, source terminal is connected to power end by a resistance 306, the source terminal of transistor seconds 304 is connected to power end by a resistance 307 equally, be coupled with a resistance 308 between the base terminal of the source terminal of the first transistor 303 and transistor seconds 304, the output terminal of trigger element 300 is coupled to one of them pin of the single-chip microcomputer 201 in the control module 200.
When power supply disappears, because motherboard capacitance discharges speed can be slow excessively, therefore utilize its current potential of two diode (not shown) filtering earlier, utilize first diode 301 and second diode 302 to do wave shaping again.
Single-chip microcomputer 201 in power supply switch unit 400 and the control module 200 couples, include one the 3rd transistor 401 and the 4th transistor 402, its base terminal (Base) is coupled with a resistance 403 and resistance 404 respectively, the source terminal (Source) of the 3rd transistor 404 and the 4th transistor 402 couples a power connection respectively, first power connection 405 is connected to power switch, another second source joint 406 same source terminals with the 3rd transistor 404 and the 4th transistor 405 couple, second source joint 406 is electrically connected to the power switch of motherboard, make when computer system power-on, proving installation is used the system power supply of power supply unit as working power, and when computing machine cuts out, proving installation then uses standby (suspend) power supply in the power supply unit as working power, and reach the purpose that loop cycle is tested, with the power surges of checking motherboard could bear continuous start and close.
The testing process of proving installation disclosed in the utility model below will be described.
Before beginning test,, and proving installation disclosed in the utility model is installed in the PIC slot, and sets test period the power-off of computer system.
Whole operation at first, proving installation will be monitored the power pin in the PCI slot.Trigger element 300 will send a trigger pip when power supply disappears, cause the single-chip microcomputer 201 in the control module 200 to be started working, after the time that sets when the test period of single-chip microcomputer 201 timing, to export a control signal, cause two pins of electric power starting on the motherboard (POWER ON) to do short circuit, the action of short circuit is exactly the open system power supply.
And the judgement of test result, according to the foundation of the test period that sets as the good and bad judgement of motherboard, when setting test period when being 15 seconds, motherboard can not have long off-mode, maximum duration can not be above 15 seconds, surpass 15 seconds, the part on the expression motherboard has problem and can't start shooting.
Start and close proving installation disclosed in the utility model can be in the motherboard impact of its electric current of Pretesting to its parts of dispatching from the factory.
When the electric power starting of computer system, the computer-internal parts can not accepted the power surges of start and close, yet under this kind situation, its power supply all passes through the prior processing of power supply unit, can't cause too big injury to the part on the motherboard.And the situation of instant cut-off, if not pushing power switch takes place as yet in power supply supply again immediately after outage sometimes, computing machine is start again just, and under this situation, power supply does not then directly enter motherboard by power supply unit by alternating current, in some cases, will cause some parts impaired.Therefore, proving installation disclosed in the utility model, the continuous measuring current of can going round and beginning again is to the impact of motherboard, and the quality of decision motherboard.Say that further the utility model utilizes setup unit as the input of test period, with the analog form input test cycle, more can accurately grasp the test duration compared with prior art, and can judge the quality of motherboard.
Though the utility model with aforesaid preferred embodiment openly as above; right its is not in order to limit the utility model; any those of ordinary skills; in not breaking away from spirit and scope of the present utility model; change when doing some equivalences, therefore scope of patent protection of the present utility model is as the criterion with claim.

Claims (9)

1. start and close proving installation, the power surges when detecting start and close of going round and beginning again is characterized in that, includes:
The setup unit of one output, one test cycle signal;
One when power-off or unlatching, exports the trigger element of a trigger pip; And
One when receiving this trigger pip, according to this test cycle signal timing, when timing during to time that this test cycle signal sets, export the control module that this power supply was opened or closed to a control signal, this control module is electrically connected with this setup unit and this trigger element respectively.
2. start and close proving installation as claimed in claim 1 is characterized in that, also includes a power supply switch unit, exports a power supply signal to this control module.
3. start and close proving installation as claimed in claim 2 is characterized in that, when start, this power supply signal is from the power supply of a power supply unit, and when shutdown, this power supply signal is from the standby power supply in this power supply supply.
4. start and close proving installation as claimed in claim 1 is characterized in that, this setup unit is a thumb-acting switch.
5. start and close proving installation as claimed in claim 1, it is characterized in that, this trigger element also includes one first diode and one second diode, and both connect with series system, and the cathode terminal of first diode is connected to power pin in the PCI slot by a resistance.
6. start and close proving installation as claimed in claim 1, it is characterized in that, this trigger element more includes a first transistor and a transistor seconds, the first transistor is coupled to the anode tap of second diode, the emitter-base bandgap grading end ground connection of the first transistor, source terminal is connected to power end by a resistance, and the source terminal of transistor seconds is connected to power end by a resistance equally, is coupled with a resistance between the source terminal of the first transistor and the base terminal of transistor seconds.
7. start and close proving installation as claimed in claim 1 is characterized in that this control module also includes a single-chip microcomputer.
8. start and close proving installation as claimed in claim 7 is characterized in that this single-chip microcomputer also includes an oscillator, provides this single-chip microcomputer required frequency of operation.
9. start and close proving installation as claimed in claim 1 is characterized in that this control module also includes a reset switch.
CN 02290128 2002-12-11 2002-12-11 Opening and closedown testing device Expired - Fee Related CN2610406Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02290128 CN2610406Y (en) 2002-12-11 2002-12-11 Opening and closedown testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02290128 CN2610406Y (en) 2002-12-11 2002-12-11 Opening and closedown testing device

Publications (1)

Publication Number Publication Date
CN2610406Y true CN2610406Y (en) 2004-04-07

Family

ID=34151349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02290128 Expired - Fee Related CN2610406Y (en) 2002-12-11 2002-12-11 Opening and closedown testing device

Country Status (1)

Country Link
CN (1) CN2610406Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100412812C (en) * 2005-11-11 2008-08-20 鸿富锦精密工业(深圳)有限公司 Cold boot apparatus of mainboard
CN100458723C (en) * 2005-10-13 2009-02-04 光宝科技股份有限公司 AC electric source testing method when main machine board turn on
CN100478839C (en) * 2006-09-25 2009-04-15 佛山市顺德区顺达电脑厂有限公司 Periodic switch control device of electric power supply
CN101206600B (en) * 2006-12-22 2011-08-24 和硕联合科技股份有限公司 Testing device and method for testing open/close machine of computer system
CN101482842B (en) * 2008-01-09 2011-11-30 鸿富锦精密工业(深圳)有限公司 Computer power on/off test device
CN102999410A (en) * 2011-09-08 2013-03-27 鸿富锦精密工业(武汉)有限公司 Computer startup and shutdown control system
CN105279072A (en) * 2015-10-26 2016-01-27 广东威创视讯科技股份有限公司 Electronic product turn-on power-down test method, apparatus and system
CN106849246A (en) * 2017-03-01 2017-06-13 顺丰科技有限公司 Charging inlet short-circuit detecting device, mobile terminal and method for detecting short circuit

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100458723C (en) * 2005-10-13 2009-02-04 光宝科技股份有限公司 AC electric source testing method when main machine board turn on
CN100412812C (en) * 2005-11-11 2008-08-20 鸿富锦精密工业(深圳)有限公司 Cold boot apparatus of mainboard
CN100478839C (en) * 2006-09-25 2009-04-15 佛山市顺德区顺达电脑厂有限公司 Periodic switch control device of electric power supply
CN101206600B (en) * 2006-12-22 2011-08-24 和硕联合科技股份有限公司 Testing device and method for testing open/close machine of computer system
CN101482842B (en) * 2008-01-09 2011-11-30 鸿富锦精密工业(深圳)有限公司 Computer power on/off test device
CN102999410A (en) * 2011-09-08 2013-03-27 鸿富锦精密工业(武汉)有限公司 Computer startup and shutdown control system
CN105279072A (en) * 2015-10-26 2016-01-27 广东威创视讯科技股份有限公司 Electronic product turn-on power-down test method, apparatus and system
CN106849246A (en) * 2017-03-01 2017-06-13 顺丰科技有限公司 Charging inlet short-circuit detecting device, mobile terminal and method for detecting short circuit

Similar Documents

Publication Publication Date Title
CN1979439A (en) USB end-port testing device
CN2610406Y (en) Opening and closedown testing device
CN101739319B (en) Computer device
CN210804315U (en) Automatic power-on circuit and mainboard
CN2385344Y (en) Device for testing circuit board function
CN101750578A (en) Automatic test system for integrated circuit board electrodes
CN104993469A (en) Fool-proof protection circuit
CN104461816A (en) Novel automatic startup and shutdown testing card for computer mainboard
CN108693457A (en) For eliminating the chip detecting method and its system that power on overshoot
CN111077420A (en) System and method for automatically testing voltage sag tolerance capability of sensitive equipment
CN1992068A (en) Battery quantity of electricity monitoring system and method
CN101047374A (en) Testing system
CN100470493C (en) Automatic reset system and method
CN2898939Y (en) Automatic counter for testing power-supply switch state circulation
CN106354592A (en) Computer automatic startup and shutdown testing device
CN207396677U (en) PCBA board detection device
CN100346549C (en) Detecting and protective device for preventing device frmo forming short circuit on circuit board
CN1223942C (en) Automatic periodic test system and method for power switch of computer equipment
CN202815171U (en) Mainboard automatic detection device
CN201886091U (en) Tester of frequency converter
CN215498237U (en) Mainboard voltage overvoltage protection circuit and device
CN101727136A (en) Method for protecting main board of computer, computer and constituent elements of computer
CN1125333A (en) Electricity-saving device automatically controlling power supply of computer monitor
CN2857089Y (en) Mains delayed turn-off device of computer system power supplying device
CN200979689Y (en) A CPU base testing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040407