CN101173516B - Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method - Google Patents

Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method Download PDF

Info

Publication number
CN101173516B
CN101173516B CN2007101685167A CN200710168516A CN101173516B CN 101173516 B CN101173516 B CN 101173516B CN 2007101685167 A CN2007101685167 A CN 2007101685167A CN 200710168516 A CN200710168516 A CN 200710168516A CN 101173516 B CN101173516 B CN 101173516B
Authority
CN
China
Prior art keywords
hole
slip casting
steel casing
diameter deep
bored pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101685167A
Other languages
Chinese (zh)
Other versions
CN101173516A (en
Inventor
杨齐海
王喜良
高兴泽
刘晓阳
王鹤
马永强
周启辉
张红涛
张建兵
贾卫中
张继新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2007101685167A priority Critical patent/CN101173516B/en
Publication of CN101173516A publication Critical patent/CN101173516A/en
Application granted granted Critical
Publication of CN101173516B publication Critical patent/CN101173516B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a method of grout curtain to prevent mud leakage and hole collapse of the large diameter deep hole bored cast-in-place pile. A grouting locating ring is arranged on the outside of the steel casing of the bored pile. A plurality of holes are drilled along the circumference at intervals between the steel casing grouting locating ring and the grouting holes are injected with cement slurry. The slurry completely spreads and fills gaps and is fixedly connected with a loose permeable layer, which can form a high strength waterproof curtain. The method can solve the problems of the mud leakage and hole collapse of the large diameter deep hole bored cast-in-place pile. The cement slurry is injected into the loose permeable layer and is fixedly mixed with the loose permeable layer to fill gaps and form a ring of high strength stop water curtain. The invention has the advantages that plugging results are good, problems are solved completely, the problems of mud leakage and hole collapse will not happen again in subsequent construction, the construction speed is rapid, input is low, incident handling costs can be greatly reduced. Meanwhile, the method can be applied to prevent the incidents of mud leakage and hole collapse while loose permeable layers of silty sand, drift sand, pebble soil and other soil are drilled.

Description

The method in the grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage and the hole that collapses
Technical field
The invention belongs to the large-diameter deep-borehole cast-in-situ bored pile job practices, be specifically related to the method in a kind of grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage and the hole that collapses.
Background technology
Along with developing rapidly of Bridges in Our Country construction, the large-diameter deep-borehole cast-in-situ bored pile bridge foundation is widely adopted.Its construction is limited by site plant and geological conditions, the steel casing often can not be inserted and beat deeply to waterproof dense layer, when in loose pervious layers such as flour sand, quicksand, land pebble, creeping into, easy spillage, slurry is in time mended by the very fast or tidal region of, rate of penetration bad as on-the-spot mud control indexes makes in the hole head height not enough, even the more serious hole accident of collapsing can occur.Spillage appears in large-diameter deep-borehole cast-in-situ bored pile and the processing method of hole accident routine of collapsing has following several: strengthen concentration of hydraulic mixture, throw in the hole and bury sawdust and cement carries out leak stopping; The mixture of backfill slabstone and clay is to the last 1~2m in place, hole that collapses, with impacting the compacted hole wall of awl repeated stock; The mixture of backfill sand and clay to the hole site that collapses treat backfill leave standstill closely knit after again boring.Conventional treatment method exists length consuming time, expense height, follow-up boring still may spillage take place once more or shortcoming such as the hole that collapses.
Summary of the invention
The object of the present invention is to provide a kind of speed of application fast, the grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage that expense is low and the method in the hole that collapses are to address the above problem.
Technical scheme of the present invention is: it is a backfill sand in drilled pile steel casing, in steel casing peripheral planar 1~4 circle is set, facade is provided with 1 to 3 layer of slip casting centring ring at interval, in order to the fixing drilling rod of geological drilling rig, between steel casing and slip casting centring ring, bore injected hole with geological drilling rig along the circle spacing, injected hole extends 1~2 meter of waterproof closely knit soil layer, adopt mudjack, pressure with 0.2~0.5MPa, by drilling rod is bottom-up injected hole is pursued hole slip casting, cement paste is fully diffused in the weak pervious layer soil by soil crack, finish when slip casting mouth 1m at the bottom of the steel casing is above, the compressive strength for the treatment of cement paste reaches 3MPa when above, forms the higher water protecting curtain of intensity in steel casing outer ring.
By drilling rod is bottom-up injected hole is pursued hole slip casting, the pressure according to mudjack in the slip casting process changes, and promotes drilling rod with the speed that is no more than 0.5m/min, finishes until slip casting.
In every circle slip casting centring ring injected hole is set all.
Described centring ring to the width or the width between the centring ring of steel casing is: 0.15~0.5 meter.
This method can be handled the spillage of large-diameter deep-borehole cast-in-situ bored pile and the hole accident of collapsing, its cement paste slurry injects loose pervious layer, and mixing fixedly with it, blind has formed a circle intensity higher water-stop curtain, plugging effect is good, handle thoroughly, accident such as the hole that collapses spillage can not appear and in follow-up construction again, and speed of application is fast, less investment, the disposal cost of reduction accident greatly.This method can also be used for preventing spillage and the appearance of the hole accident of collapsing when loose pervious layers such as flour sand, quicksand, land pebble creep into simultaneously.
Description of drawings
Injected hole and centring ring layout schematic diagram during the construction of accompanying drawing grouting curtain method.
The specific embodiment
Present embodiment is used for the explanation to claim of the present invention, and protection scope of the present invention is not limited to the description of the following example.
As shown in drawings, the periphery of steel casing 2 is provided with slip casting centring ring 3, and slip casting centring ring 3 planar can be provided with 1~4 circle, 1 to 3 layer of facade space set.Bore injected hole 1 along the circle spacing in the slip casting centring ring 3.
Concrete construction is as follows:
1, in the accident hole, is backfilled to spillage or the above 1m in the hole site that collapses with sand;
2, lay 2~3 road injected hole drilling rod centring rings 3 in steel casing 2 outsides, centring ring 3 is annulus concentric with steel casing 2, diameter is a centring ring than the big 0.3~1m of steel casing 2 diameters: 0.15~0.5 meter, injected hole 1 is evenly arranged in steel casing 2 borders, the pitch of holes of adjacent injected hole 1 is no more than 0.5m, and injected hole 1 drilling rod is fixed on the centring ring 3.
3, adopt geological drilling rig to bore aperture in injected hole 1 position until waterproof dense layer 1~2m, the system cement paste is mixed at the scene, carry out slip casting with mudjack by drilling rod is bottom-up, grouting pressure is controlled between 0.2~0.5MPa, it is fixed that cement paste is fully spread with weak pervious layer, change slowly lifting drilling rod according to pressure in the slip casting process, the drilling rod hoisting velocity is no more than 0.5m/min, slip casting finishes more than 2 end of steel casing mouth 1m, i.e. institute's slip casting highly is not less than at the bottom of the steel casing 1 meter of the above height of mouth.
4, carry out operation by the hole by ring, finish up to all injected hole 1 slip castings.Treat that cement paste compressive strength reaches more than the 3MPa, at this moment, form the higher water protecting curtain of intensity in steel casing outer ring.Water protecting curtain can prevent spillage effectively, and the hole that collapses is realized administering.Recover drilling construction again.

Claims (4)

1. the method in the grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage and the hole that collapses, it is a backfill sand in drilled pile steel casing, in steel casing peripheral planar 1~4 circle is set, facade is provided with 1 to 3 layer of slip casting centring ring at interval, in order to the fixing drilling rod of geological drilling rig, between steel casing and slip casting centring ring, bore injected hole with geological drilling rig along the circle spacing, injected hole extends 1~2 meter of waterproof closely knit soil layer, adopt mudjack, pressure with 0.2~0.5MPa, by drilling rod is bottom-up injected hole is pursued hole slip casting, cement paste is fully diffused in the weak pervious layer soil by soil crack, finish when slip casting mouth 1m at the bottom of the steel casing is above, the compressive strength for the treatment of cement paste reaches 3MPa when above, forms the higher water protecting curtain of intensity in steel casing outer ring.
2. the method in the grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage and the hole that collapses according to claim 1, it is characterized in that describedly injected hole being pursued hole slip casting by drilling rod is bottom-up, change slowly lifting drilling rod according to pressure in the slip casting process, promote drilling rod with the speed that is no more than 0.5m/mi n, finish until slip casting.
3. the method in the grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage and the hole that collapses according to claim 1 is characterized in that in every circle slip casting centring ring injected hole being set all.
4. the method in the grouting curtain method control large-diameter deep-borehole cast-in-situ bored pile spillage and the hole that collapses according to claim 1 is characterized in that centring ring to the width or the width between the centring ring of steel casing is: 0.15~0.5 meter.
CN2007101685167A 2007-11-29 2007-11-29 Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method Active CN101173516B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101685167A CN101173516B (en) 2007-11-29 2007-11-29 Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101685167A CN101173516B (en) 2007-11-29 2007-11-29 Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method

Publications (2)

Publication Number Publication Date
CN101173516A CN101173516A (en) 2008-05-07
CN101173516B true CN101173516B (en) 2010-10-06

Family

ID=39422249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101685167A Active CN101173516B (en) 2007-11-29 2007-11-29 Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method

Country Status (1)

Country Link
CN (1) CN101173516B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535457B (en) * 2012-03-07 2014-05-28 中铁十局集团有限公司 Method for treating slurry leakage of perforated holes of offshore pile foundation in process of utilizing steel casing to carry out pile foundation construction
CN103696775B (en) * 2013-12-20 2016-02-24 中煤第五建设有限公司 The descending slip casting method of the high many group aquifer segmentations of large section
CN105156017B (en) * 2015-08-12 2017-10-10 中铁三局集团有限公司 A kind of impacting with high pressure whitewashing rig for applying to collapse hole stratum and construction method
CN107859034B (en) * 2017-11-14 2019-07-26 中铁十一局集团第一工程有限公司 Large diameter pile foundation spillage immediate processing method
CN108169100B (en) * 2018-01-17 2020-10-30 长安大学 Device and method for in-situ measurement of rainfall infiltration parameters
CN109209287B (en) * 2018-09-12 2019-12-27 中国矿业大学 Sectional curtain grouting construction method for fault working face with overlarge inclination angle of vertical shaft
CN109763493A (en) * 2018-12-18 2019-05-17 中铁广州工程局集团有限公司 A kind of plateau river valley rockfills region large diameter, deep borehole stake hand excavation's method
CN110130328B (en) * 2019-05-09 2021-06-11 中铁四局集团第二工程有限公司 Drilling chemical leakage stopping method applied to construction of overwater drilling pile
CN111851480B (en) * 2020-07-30 2022-06-21 上海市机械施工集团有限公司 Cast-in-place pile construction method
CN112127831B (en) * 2020-08-24 2022-11-22 青海凹口凸钾镁盐技术有限公司 Construction method of brine recovery well in salt lake
CN113550306A (en) * 2021-07-22 2021-10-26 江西基业科技集团有限公司 Earth-rock wall protection construction method
CN113882398A (en) * 2021-10-12 2022-01-04 中铁七局集团郑州工程有限公司 Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer

Also Published As

Publication number Publication date
CN101173516A (en) 2008-05-07

Similar Documents

Publication Publication Date Title
CN101173516B (en) Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
Yang et al. Pre-grouting reinforcement of underwater karst area for shield tunneling passing through Xiangjiang River in Changsha, China
CN110821503A (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN102286984A (en) Water-stop curtain and construction method thereof
CN103758123A (en) Method for constructing protecting wall lining of cast-in-place manual hole digging pile
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN101200897A (en) Construction method for grouting curtain combined with steel reinforced concrete guard ring
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN113431045B (en) Construction method for rotary drilling pore-forming karst leaking stoppage
CN110685272A (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
JP2019015100A (en) Removing method of earth retaining wall
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN103343534A (en) Closed precipitation method for foundation pit construction
CN110821498B (en) Safe and rapid water plugging and reinforcing method in strong water-rich soft surrounding rock of operation tunnel
CN105569041B (en) Borehole wall-protection method in the deep sand-pebble layer in karst area
CN115949084B (en) Fiber cloth bag grouting and plugging method applied to water burst in karst area
CN112012746A (en) Construction method of railway tunnel deep and large vertical shaft under condition of thick-layer water-rich broken zone
CN105350544B (en) For water-stop curtain and its construction method containing block stone region
CN106337418A (en) Supporting structure and supporting method of deep foundation pit in narrow area
CN105544547A (en) Covering type soil filled and soft soil stratum segmented reinforcing device and method
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN111851480B (en) Cast-in-place pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150211

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150211

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.