CN113882398A - Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer - Google Patents

Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer Download PDF

Info

Publication number
CN113882398A
CN113882398A CN202111188814.9A CN202111188814A CN113882398A CN 113882398 A CN113882398 A CN 113882398A CN 202111188814 A CN202111188814 A CN 202111188814A CN 113882398 A CN113882398 A CN 113882398A
Authority
CN
China
Prior art keywords
grouting
water
soil layer
casing
sand gravel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111188814.9A
Other languages
Chinese (zh)
Inventor
节志刚
赵灏
白宏州
鲍建文
李世茂
刘建文
徐旭升
张远松
段二强
张伟朋
张国岳
毛丹峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN202111188814.9A priority Critical patent/CN113882398A/en
Publication of CN113882398A publication Critical patent/CN113882398A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0023Slurry
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a construction method for reinforcing a pile foundation casing of a water-rich sand gravel soil layer by grouting, which comprises the steps of determining the embedding depth of a steel casing according to the thickness of the sand gravel soil layer and the height of a water head, embedding the steel casing, backfilling and tamping according to the designed elevation of a backfill layer, driving a grouting pipe around the steel casing, grouting by pressing force, forming grouting body surrounding the steel casing, and drilling by using a drilling machine after the grouting body reaches the consolidation strength. According to the invention, the seepage resistance and the strength of the soil layer are increased by grouting the water-rich sand gravel soil layer around the steel pile casing, the problems of easy hole collapse of the pile foundation at the bottom of the steel pile casing, water leakage of the outer wall of the steel pile casing, displacement and inclination of the steel pile casing and the like in the construction of the water-rich sand gravel soil layer pile foundation are solved, the continuous and effective operation can be carried out during the drilling of the water-rich sand gravel soil layer pile foundation, the construction efficiency is improved, the potential safety hazard caused by hole collapse and water leakage is avoided, and the safety risk is reduced.

Description

Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer
Technical Field
The invention relates to the technical field of bored pile construction, in particular to a construction method for grouting and reinforcing a pile foundation casing of a water-rich sand gravel soil layer.
Background
At present, in the construction process of a water-rich sand gravel soil layer drilled pile, a steel pile casing is inclined due to the fact that a soil layer is greatly disturbed, the outer wall of the steel pile casing is permeable to water or even the hole wall collapses, and therefore construction efficiency is low and safety risk is high.
Disclosure of Invention
In order to solve the problems, the invention provides a construction method for reinforcing and grouting a pile foundation casing of a water-rich sand gravel soil layer, which can specifically adopt the following technical scheme:
the construction method for grouting and reinforcing the pile foundation casing of the water-rich sand gravel soil layer comprises the following steps:
firstly, determining the embedding depth of the steel casing according to the thickness of a sand gravel soil layer and the height of a water head;
embedding a steel pile casing, and backfilling and tamping according to the designed elevation of a backfill layer;
thirdly, driving a grouting pipe around the steel casing, and grouting by pressing force to form grouting body surrounding the steel casing;
and fourthly, after the grouting body reaches the consolidation strength, drilling by using a drilling machine.
The minimum thickness of the sand gravel soil layer is 3 meters, and the water inflow of the sand gravel soil layer is more than 1L/s.m.
The grouting pipe is a PVC sleeve valve pipe with the diameter of 46-150mm and the wall thickness of 2-5 mm.
The grouting pipes are arranged in groups, and each group of grouting pipes is annularly arranged at the outer side of the corresponding steel casing in a circle at uniform intervals.
The distance between the center of each grouting pipe and the outer edge of the corresponding steel casing is 0.6-0.8m, and the center distance between two adjacent grouting pipes is 1.5-1.55 m.
The effective grouting radius of the grouting pipe is 0.8-1.2 m.
The tail end of the grouting pipe is located 0.5-1m below the bottom surface of the steel casing.
And the grouting material used for grouting in the third step is cement-water glass double grout, and the final pressure of grouting is 2-3 MPa.
According to the construction method for grouting and reinforcing the pile foundation casing of the water-rich sand gravel soil layer, provided by the invention, the seepage resistance and the strength of the soil layer are increased by grouting the water-rich sand gravel soil layer around the steel casing, the problems that the pile foundation at the bottom of the steel casing is easy to collapse, the outer wall of the steel casing leaks water, the steel casing is displaced and inclined and the like in the construction of the pile foundation of the water-rich sand gravel soil layer are solved, the operation can be continuously and effectively carried out during the drilling of the pile foundation of the water-rich sand gravel soil layer, the construction efficiency is improved, the potential safety hazard caused by collapse and water leakage is avoided, and the safety risk is reduced.
Drawings
FIG. 1 is a schematic diagram of a steel casing reinforcing structure according to the invention.
FIG. 2 is a geological map of a water-rich sand gravel layer in the example.
Fig. 3 is a schematic view of the relative positions of the steel casing and the grout pipe in section a-a of fig. 1.
Fig. 4 is a schematic diagram of the effective grouting range of the grouting pipe around the single steel casing in fig. 3. .
Detailed Description
The following describes embodiments of the present invention in detail with reference to the drawings, which are implemented on the premise of the technical solution of the present invention, and give detailed implementation manners and specific working procedures, but the scope of the present invention is not limited to the following embodiments.
As shown in fig. 1-4, a bored pile is planned to be constructed in a water-rich sand gravel soil layer on one side of a river channel H, the minimum thickness of the sand gravel soil layer in the area is 3 meters, the water inflow of the sand gravel soil layer is more than 1L/s · m, when the bored pile is constructed according to a traditional method, adverse conditions such as deflection of a steel pile casing, water permeation of the outer wall of the steel pile casing and even collapse of the hole wall are easy to occur, and in order to avoid the conditions, the construction method for grouting and reinforcing the pile casing of the water-rich sand gravel soil layer pile foundation is carried out according to the invention, and specifically comprises the following steps:
step one, determining the thickness and the water head height of a water-rich sand gravel soil layer according to a survey report, and taking the thickness and the water head height as the basis of the burying depth of the steel casing 1;
secondly, embedding the steel pile casing 1, backfilling and tamping according to the designed elevation of the backfill layer 2, and leveling the field around the steel pile casing 1;
thirdly, driving a grouting pipe 3 around the steel casing 1, and grouting by pressing force to form a grouting body 4 surrounding the steel casing 1;
the grouting pipes are made of PVC sleeve valve pipes with the diameter of 46-150mm and the wall thickness of 2-5mm, in the embodiment, the inner diameter of each PVC sleeve valve pipe is 46mm, the wall thickness of each PVC sleeve valve pipe is 2mm, the PVC sleeve valve pipes are arranged around the steel casing 1 in groups when being buried, as shown in figure 3, each group of grouting pipes 3 are circumferentially arranged at intervals uniformly by taking the corresponding steel casing 1 as a circle center, each grouting pipe 3 is vertically arranged, and the tail end of each grouting pipe is located 0.5-1m below the bottom surface of the steel casing 1. Specifically, the distance between the center of each grouting pipe 3 and the outer edge of the corresponding steel casing 1 is 0.6-0.8m, the center distance between two adjacent grouting pipes 3 is 1.5-1.55m, and the effective grouting radius of each grouting pipe 3 is kept at 0.8-1.2 m. When the adjacent steel casings 1 are close to each other, one or more grouting pipes 3 may be shared. In this embodiment, the distance between the center of each grouting pipe 3 and the outer edge of the corresponding steel casing 1 is 1m, the center distance between two adjacent grouting pipes 3 is 1.55m, the grouting material used in grouting is cement-water glass double grout, and the final grouting pressure is 2-3MPa, so that the effective grouting radius is 1.0 m, and a pattern-like grouting body 4 as shown in fig. 4 is formed around each grouting pipe 3.
And fourthly, after the grouting body reaches the consolidation strength, drilling by using a drilling machine to obtain a formed hole 5.
It should be noted that in the description of the present invention, terms of orientation or positional relationship such as "front", "rear", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.

Claims (8)

1. The construction method for grouting and reinforcing the pile foundation casing of the water-rich sand gravel soil layer is characterized by comprising the following steps of:
firstly, determining the embedding depth of the steel casing according to the thickness of a sand gravel soil layer and the height of a water head;
embedding a steel pile casing, and backfilling and tamping according to the designed elevation of a backfill layer;
thirdly, driving a grouting pipe around the steel casing, and grouting by pressing force to form grouting body surrounding the steel casing;
and fourthly, after the grouting body reaches the consolidation strength, drilling by using a drilling machine.
2. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 1, characterized in that: the minimum thickness of the sand gravel soil layer is 3 meters, and the water inflow of the sand gravel soil layer is more than 1L/s.m.
3. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 1, characterized in that: the grouting pipe is a PVC sleeve valve pipe with the diameter of 46-150mm and the wall thickness of 2-5 mm.
4. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 1, characterized in that: the grouting pipes are arranged in groups, and each group of grouting pipes are annularly arranged for a circle at intervals uniformly by taking the corresponding steel casing as a circle center.
5. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 4, characterized in that: the distance between the center of each grouting pipe and the outer edge of the corresponding steel casing is 0.6-0.8m, and the center distance between two adjacent grouting pipes is 1.5-1.55 m.
6. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 1, characterized in that: the effective grouting radius of the grouting pipe is 0.8-1.2 m.
7. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 1, characterized in that: the tail end of the grouting pipe is located 0.5-1m below the bottom surface of the steel casing.
8. The water-rich sand gravel soil layer pile foundation casing grouting reinforcement construction method as claimed in claim 1, characterized in that: and the grouting material used for grouting in the third step is cement-water glass double grout, and the final pressure of grouting is 2-3 MPa.
CN202111188814.9A 2021-10-12 2021-10-12 Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer Pending CN113882398A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111188814.9A CN113882398A (en) 2021-10-12 2021-10-12 Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111188814.9A CN113882398A (en) 2021-10-12 2021-10-12 Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer

Publications (1)

Publication Number Publication Date
CN113882398A true CN113882398A (en) 2022-01-04

Family

ID=79006415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111188814.9A Pending CN113882398A (en) 2021-10-12 2021-10-12 Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer

Country Status (1)

Country Link
CN (1) CN113882398A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118087535A (en) * 2024-04-24 2024-05-28 上海建工二建集团有限公司 Foundation pit bottom surge emergency grouting device and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173516A (en) * 2007-11-29 2008-05-07 中铁大桥局股份有限公司 Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method
CN104499479A (en) * 2014-12-19 2015-04-08 上海申元岩土工程有限公司 Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN107542083A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Percussion Piles wall protecting method in soft sandy ground matter
CN108149682A (en) * 2018-02-05 2018-06-12 北京城建八建设发展有限责任公司 A kind of slip casting casing device and the pile foundation drilling construction method using the casing device
CN108560540A (en) * 2018-06-20 2018-09-21 中国建筑第八工程局有限公司 The means of defence and safeguard structure of artificial digging pile argillaceous siltstoue geology
CN112144517A (en) * 2020-10-16 2020-12-29 中铁十五局集团第五工程有限公司 Method for grouting retaining wall by using steel retaining cylinder for pile foundation in weak stratum

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101173516A (en) * 2007-11-29 2008-05-07 中铁大桥局股份有限公司 Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method
CN104499479A (en) * 2014-12-19 2015-04-08 上海申元岩土工程有限公司 Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN107542083A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Percussion Piles wall protecting method in soft sandy ground matter
CN108149682A (en) * 2018-02-05 2018-06-12 北京城建八建设发展有限责任公司 A kind of slip casting casing device and the pile foundation drilling construction method using the casing device
CN108560540A (en) * 2018-06-20 2018-09-21 中国建筑第八工程局有限公司 The means of defence and safeguard structure of artificial digging pile argillaceous siltstoue geology
CN112144517A (en) * 2020-10-16 2020-12-29 中铁十五局集团第五工程有限公司 Method for grouting retaining wall by using steel retaining cylinder for pile foundation in weak stratum

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118087535A (en) * 2024-04-24 2024-05-28 上海建工二建集团有限公司 Foundation pit bottom surge emergency grouting device and construction method thereof

Similar Documents

Publication Publication Date Title
CN104179174B (en) A kind of multiple holes grouting pipe shaped pile and pile making method thereof
CN111119940B (en) Grouting construction treatment method
CN210858745U (en) Loess tunnel advance reinforced structure based on sleeve valve pipe slip casting
KR20100068597A (en) A shoring method using arch plate pile and h-pile
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN103643705B (en) Steel tank ringwall basic foundation local subsidence reinforcement
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN108756893B (en) A kind of city shallow tunnel vault soil stabilization method
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN109944600A (en) Shield receiving end reinforced construction method
CN110485444B (en) Construction method for seepage prevention and reinforcement of deepwater cofferdam
CN106677791B (en) A kind of construction method of shallow embedding shield driven tunnel crossing highway
CN114033388B (en) Shaft construction method for water-rich silty sand layer underground tunnel roof pipe
CN114482099A (en) Steel sheet pile cofferdam construction method
CN110093927B (en) Method for controlling deformation of tunnel outside foundation pit
CN105971637A (en) Application of WSS construction method in shield end reinforcement of water-rich sand layer
CN109385997A (en) The construction method of PHC tubular pole under narrow site condition
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN113882398A (en) Grouting reinforcement construction method for pile foundation casing of water-rich sand gravel soil layer
CN102817349B (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
CN110144871A (en) A kind of dark creek processing construction method
CN112502743B (en) Advanced grouting reinforcement method for water-rich sand layer shield zone connecting channel
CN105586978A (en) Construction method of soil replacement stir waterproof curtain based on gravels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Jie Zhigang

Inventor after: Duan Erqiang

Inventor after: Zhang Weipeng

Inventor after: Zhang Guoyue

Inventor after: Mao Danfeng

Inventor after: Shi Lei

Inventor after: Zhao Hao

Inventor after: Bai Hongzhou

Inventor after: Bao Jianwen

Inventor after: Li Shimao

Inventor after: Liu Jianwen

Inventor after: Xu Xusheng

Inventor after: Zhang Yuansong

Inventor before: Jie Zhigang

Inventor before: Zhang Weipeng

Inventor before: Zhang Guoyue

Inventor before: Mao Danfeng

Inventor before: Zhao Hao

Inventor before: Bai Hongzhou

Inventor before: Bao Jianwen

Inventor before: Li Shimao

Inventor before: Liu Jianwen

Inventor before: Xu Xusheng

Inventor before: Zhang Yuansong

Inventor before: Duan Erqiang

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20220104