CN101158159A - Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process - Google Patents
Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process Download PDFInfo
- Publication number
- CN101158159A CN101158159A CNA2007101564711A CN200710156471A CN101158159A CN 101158159 A CN101158159 A CN 101158159A CN A2007101564711 A CNA2007101564711 A CN A2007101564711A CN 200710156471 A CN200710156471 A CN 200710156471A CN 101158159 A CN101158159 A CN 101158159A
- Authority
- CN
- China
- Prior art keywords
- pile
- hole
- hammering
- depth
- phc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a construction technique of a whole course pre-guide-hole hammering an embedding PHC tube pile ,comprising: adopting a rotary pile machine with a long helix drilling rod according to the depth of a designed pile length; passing through an epipedon, a coarse sands layer and a gravel layer according to a designed and calculated diameter; drilling the pre-guide-hole to the designed depth of H; then reversing the rotary pile machine and taking out the long helix drilling rod to form an effect of making a wall inside the hole; when groundwater level is low, pouring yellow mud into the pre-guide-hole to form a mud protection wall inside the hole and taking out the long helix drilling rod as pouring the mud so as to ensure the hole not to collapse; later, adopting a hammering pile machine to hammer the PHC tube pile to pass through a surface layer into a strata until the designed depth of L of a foundation pile by aligning the full-depth pre-guide-hole. Under the hammering effect of the PHC tube pile, the full-depth pre-guide-hole of the invention smoothly passes through the epipedon and the gravel layer, reduces the pile tip resistance, eliminates the packing construction phenomena of the gravel layer, comes into the designed and required strata and achieves to create a straightway condition for the designed depth of the foundation pile.
Description
Technical field
The present invention relates to a kind of construction work PHC tube pile construction technology, particularly a kind of whole-course hole-preguiding hammering entering-rock PHC tube pile construction technology.
Background technology
At present, need to adopt the pile engineering development of a large amount of foundation piles rapid, and the PHC pile tube of suitability for industrialized production, compare with traditional concrete filling pile have quality directly perceived, be convenient to check, cheap, advantage such as the pile-formation process quality is easy to guarantee, short construction period, environmental protection and become the main force and the developing direction of present stake for building.Existing P HC tube pile construction technology is to rely on hammering stake machine and Pile feeder to adopt hammering method to make the PHC pile tube penetrate topsoil and the bigger coarse sand of thickness, gravelly sand, gravel layer, when entering the rock stratum, often occur because of sand, gravel bed compacted former thereby the stake end occurs and be difficult to penetrate this layer, thereby cause pile sinking can't make the stake end enter the rock stratum of designing requirement, being present in bearing capacity of single pile especially has relatively high expectations, necessarily require stake end to go in the object of construction production of rock in the design, thereby seriously hindered promoting the use of of advanced superior PHC pile tube.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of whole-course hole-preguiding hammering entering-rock PHC tube pile construction technology that can make pile tube penetrate topsoil and gravel layer smoothly.
For solving the problems of the technologies described above, technical scheme of the present invention is: it comprises following process steps;
1. according to the degree of depth of designing pile length, adopt the rotary stake machine that is installed in ground, belt length auger stem, press the design-calculated diameter, penetrate topsoil and coarse sands layer, gravel layer, will draw hole drill in advance to projected depth H; Draw bore dia in advance and determine, do not influence the frictional resistance of PHC pile tube periphery according to the existing mechanics parameter calculating of the thing of different soil;
2. with the long screw drill rod counter-rotating of rotary stake machine, propose long screw drill rod, form the effect of wall building in the hole,,, be difficult for the hole of collapsing by the hydraulic pressure retaining wall for the high stratum of groundwater table from drawing the hole in advance; Be lower than below the layer of sand 2 meters stratum for groundwater table, in screw rod counter-rotating proposition process, simultaneously inject yellow mud in the hole to drawing in advance by the centre bore of grouting pump by slip casting valve, Grouting Pipe and long screw drill rod, in the hole, form mud off, marginal not slurry limit proposes long screw drill rod, guarantees the hole of not collapsing, for the PHC pile tube penetrates topsoil and coarse sands layer, gravel layer smoothly under hammer action, enter the rock stratum, reach projected depth and create conditions;
3. aim at this full degree of depth and draw the hole in advance, employing hammering stake machine and Pile feeder, hammering PHC pile tube penetrate topsoil and coarse sands layer, gravel layer, enter the rock stratum of designing requirement, reach the projected depth L of foundation pile.
The invention has the beneficial effects as follows:
1. the full degree of depth draw in advance the hole be the PHC pile tube under hammer action, penetrate topsoil and coarse sands layer, gravel layer smoothly, enter the rock stratum of designing requirement, reach projected depth and create conditions; Avoid because of sandy gravel stratum compacted former thereby the stake end occurs and be difficult to penetrate this layer, thereby cause pile sinking can't make stake hold a predicament that enters the designing requirement rock stratum; Draw bore dia in advance and determine, do not influence the frictional resistance of PHC pile tube periphery according to the physical and mechanical parameter calculating of different soil.
2. in design stake depth bounds, adopt the rotary stake machine whole process of belt length auger stem that sandy gravel stratum is stirred pine, and utilize long screw drill rod to take out partly gravel, sand, end resistance when minimizing PHC pile tube penetrates this layer, and the compacted phenomenon of the construction of having eliminated sandy gravel stratum makes the PHC pile tube go into the rock standard what following of hammer action end can reach designing requirement.
3. when groundwater table is low, inject yellow mud in the hole to drawing in advance, form mud off in the hole, marginal not slurry limit proposes long screw drill rod, guarantees the hole of not collapsing.
Description of drawings
Fig. 1 is that the long screw auger bar drill of rotary stake machine draws the schematic diagram in hole in advance.
Fig. 2 is the schematic diagram that the long screw drill rod of rotary stake machine is drilled into the projected depth of drawing the hole in advance.
Schematic diagram when Fig. 3 is the long screw drill rod counter-rotating of rotary stake machine.
Schematic diagram when Fig. 4 is the long screw drill rod counter-rotating of rotary stake machine and slip casting.
Fig. 5 is that hammering stake machine hammering PHC pile tube is along the schematic diagram that draws hole piling in advance.
Fig. 6 is the schematic diagram that hammering stake machine hammering PHC pile tube enters the design rock stratum.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described in further detail.
1. according to the degree of depth of designing pile length, employing is installed in ground (3), the strip length rotary stake machine (1) greater than 20 meters auger stem (2), press the design-calculated diameter, penetrate topsoil (4) and coarse sands layer (6), gravel layer (7), will draw hole (9) in advance and be drilled into the projected depth H that draws the hole in advance; Screw rod
2. with long screw drill rod (2) counter-rotating of rotary stake machine (1), propose long screw drill rod (2), form the effect of wall building in the hole,,, be difficult for the hole of collapsing by the hydraulic pressure retaining wall for the high stratum of groundwater table from drawing hole (9) in advance;
3. aim at this full degree of depth and draw hole (9) in advance, adopt hammer force greater than 6.2 tons hammering stake machine (13) and Pile feeder (14), hammering PHC pile tube (15) penetrates topsoil (4) and coarse sands layer (6), gravel layer (7), enters the rock stratum (8) of designing requirement, reaches the projected depth L of foundation pile.
1. according to the degree of depth of designing pile length, employing is installed in ground (3), the strip length rotary stake machine (1) greater than 20 meters long screw drill rod (2), press the design-calculated diameter, penetrate topsoil (4) and coarse sands layer (6), gravel layer (7), will draw hole (9) in advance and be drilled into the projected depth H that draws the hole in advance;
2. the long screw drill rod (2) with rotary stake machine (1) reverses, from drawing hole (9) in advance long screw drill rod (2) is proposed, be lower than below the layer of sand 2 meters stratum for groundwater table, in screw rod counter-rotating proposition process, be that the centre bore of grouting pump (10) by slip casting valve (11), Grouting Pipe (12) and long screw drill rod (2) of 1-2Mpa injects yellow mud in drawing hole (9) in advance simultaneously by grouting pressure, form mud off in the hole, marginal not slurry limit proposes long screw drill rod (2); Guarantee the hole of not collapsing, for the PHC pile tube penetrates topsoil and coarse sands layer, gravel layer smoothly under hammer action, enter the rock stratum, the projected depth that reaches foundation pile creates conditions;
3. aim at this full degree of depth and draw hole (9) in advance, employing hammering stake machine (13) and Pile feeder (14), hammering PHC pile tube (15) penetrate topsoil (4) and coarse sands layer (6), gravel layer (7), enter the rock stratum (8) of designing requirement, reach the projected depth L of foundation pile.
Claims (1)
1. the present invention relates to a kind of whole-course hole-preguiding hammering entering-rock PHC tube pile construction technology, comprise and adopt hammering stake machine, Pile feeder and hammering method to make the PHC pile tube enter the rock stratum, it is characterized in that: it also comprises following process steps;
1. according to the degree of depth of designing pile length, adopt the rotary stake machine (1) that is installed in ground (3), belt length auger stem (2), press the design-calculated diameter, penetrate topsoil (4) and coarse sands layer (6), gravel layer (7), will draw hole (9) drilling to completion H in advance;
2. the long screw drill rod (2) with rotary stake machine (1) reverses, propose long screw drill rod (2) or inject yellow mud by the centre bore of grouting pump (10) by slip casting valve (11), Grouting Pipe (12) and long screw drill rod (2) in drawing hole (9) in advance simultaneously from draw hole (9) in advance, marginal not is starched limit proposition long screw drill rod (2);
3. aim at this full degree of depth and draw hole (9) in advance, employing hammering stake machine (13) and Pile feeder (14), hammering PHC pile tube (15) penetrate topsoil (4) and coarse sands layer (6), gravel layer (7), enter the rock stratum (8) of designing requirement, reach the projected depth L of foundation pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101564711A CN101158159A (en) | 2007-10-31 | 2007-10-31 | Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101564711A CN101158159A (en) | 2007-10-31 | 2007-10-31 | Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101158159A true CN101158159A (en) | 2008-04-09 |
Family
ID=39306382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007101564711A Pending CN101158159A (en) | 2007-10-31 | 2007-10-31 | Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101158159A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587371A (en) * | 2012-02-27 | 2012-07-18 | 侯隆飙 | Construction method for burying hollow wall-protecting pile |
CN103174139A (en) * | 2013-04-16 | 2013-06-26 | 合肥建工集团有限公司 | Construction technology capable of inserting pile through gravel bed via lead hole |
CN106968594A (en) * | 2017-03-16 | 2017-07-21 | 中铁建设集团有限公司 | Three axial length twist bits and construction method of interlocking pile |
CN109610342A (en) * | 2019-01-18 | 2019-04-12 | 中铁上海工程局集团有限公司 | A kind of high-speed railway bridge major diameter prefabricated tubular pile long spire drawing hole construction method |
CN110528519A (en) * | 2019-08-05 | 2019-12-03 | 浙江二十冶建设有限公司 | A kind of new epeirogenetic of rubble mounding for sea-reclamation long spire pilot hole add the construction method of hammer piling |
CN113832957A (en) * | 2021-09-09 | 2021-12-24 | 西北水利水电工程有限责任公司 | Construction method of loess layer photovoltaic module support PHC pipe pile |
-
2007
- 2007-10-31 CN CNA2007101564711A patent/CN101158159A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587371A (en) * | 2012-02-27 | 2012-07-18 | 侯隆飙 | Construction method for burying hollow wall-protecting pile |
CN103174139A (en) * | 2013-04-16 | 2013-06-26 | 合肥建工集团有限公司 | Construction technology capable of inserting pile through gravel bed via lead hole |
CN106968594A (en) * | 2017-03-16 | 2017-07-21 | 中铁建设集团有限公司 | Three axial length twist bits and construction method of interlocking pile |
CN106968594B (en) * | 2017-03-16 | 2021-04-02 | 中铁建设集团有限公司 | Three-axis long spiral drilling machine and secant pile construction method |
CN109610342A (en) * | 2019-01-18 | 2019-04-12 | 中铁上海工程局集团有限公司 | A kind of high-speed railway bridge major diameter prefabricated tubular pile long spire drawing hole construction method |
CN110528519A (en) * | 2019-08-05 | 2019-12-03 | 浙江二十冶建设有限公司 | A kind of new epeirogenetic of rubble mounding for sea-reclamation long spire pilot hole add the construction method of hammer piling |
CN113832957A (en) * | 2021-09-09 | 2021-12-24 | 西北水利水电工程有限责任公司 | Construction method of loess layer photovoltaic module support PHC pipe pile |
CN113832957B (en) * | 2021-09-09 | 2023-02-03 | 西北水利水电工程有限责任公司 | Construction method of loess layer photovoltaic module support PHC pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102691296B (en) | Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN100501011C (en) | Hole drilling mudjack pile construction method | |
CN101812976B (en) | Adjustable multiple coil extruding and expanding drilling tool | |
CN1657711A (en) | Rotary spray anchoring pile construction process | |
CN101158159A (en) | Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process | |
CN101130991A (en) | Caisson cofferdam based on prepacked foundation bed | |
Brown | Practical considerations in the selection and use of continuous flight auger and drilled displacement piles | |
CN110761265A (en) | Karst cave disposal method for deep foundation pit pile foundation construction in karst area | |
CN103556551B (en) | Reinforce the construction method of the dumb-bell shape drilled pile composite foundation structure of embankment widening | |
CN103556554A (en) | Bored pile composite foundation structure used for reinforcing soft foundations of embankment and construction method thereof | |
CN105239564A (en) | Construction method of cast-in-place pile with combination of full-sleeve and mud protecting wall | |
CN103174133A (en) | Pile-forming device and method of steel tube dado super embedded rock filling piles | |
CN103015408A (en) | Cast-in-place pile synchronous casing hole-forming constructing method | |
CN102817361B (en) | Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover | |
JP4416568B2 (en) | Slope landslide prevention method | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN106192987B (en) | It is a kind of to be crushed the construction method that geology is reinforced to stake periphery | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN201183950Y (en) | Self-propelling type anchor rod of seamless steel pipe | |
CN100545357C (en) | A kind of cement-soil build-in piling wall and job practices thereof that is used for pattern foundation pit supporting structure | |
CN203514140U (en) | Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment | |
CN103821140B (en) | A kind of construction method of reinforcing soft foundation | |
CN215482928U (en) | Fill and silt district pressure-bearing type anti-floating anchor rod | |
CN106337418A (en) | Supporting structure and supporting method of deep foundation pit in narrow area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |