CN203514140U - Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment - Google Patents
Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment Download PDFInfo
- Publication number
- CN203514140U CN203514140U CN201320624097.4U CN201320624097U CN203514140U CN 203514140 U CN203514140 U CN 203514140U CN 201320624097 U CN201320624097 U CN 201320624097U CN 203514140 U CN203514140 U CN 203514140U
- Authority
- CN
- China
- Prior art keywords
- embankment
- diameter section
- drill bit
- composite foundation
- scalable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320624097.4U CN203514140U (en) | 2013-10-09 | 2013-10-09 | Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320624097.4U CN203514140U (en) | 2013-10-09 | 2013-10-09 | Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203514140U true CN203514140U (en) | 2014-04-02 |
Family
ID=50373095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320624097.4U Expired - Fee Related CN203514140U (en) | 2013-10-09 | 2013-10-09 | Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203514140U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556551A (en) * | 2013-10-09 | 2014-02-05 | 广州市市政集团有限公司 | Dumbbell-shaped bored pile composite foundation structure used for reinforcing soft foundations of embankment and construction method thereof |
CN110195379A (en) * | 2019-05-17 | 2019-09-03 | 中铁二院工程集团有限责任公司 | Consider non-fragment orbit coarse grain salt marsh dirt road embankment structure and construction method that violent temperature influences |
CN111691278A (en) * | 2020-07-03 | 2020-09-22 | 西安科技大学 | I-shaped pile type cement pavement repairing structure and method |
-
2013
- 2013-10-09 CN CN201320624097.4U patent/CN203514140U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556551A (en) * | 2013-10-09 | 2014-02-05 | 广州市市政集团有限公司 | Dumbbell-shaped bored pile composite foundation structure used for reinforcing soft foundations of embankment and construction method thereof |
CN103556551B (en) * | 2013-10-09 | 2016-03-09 | 广州市市政集团有限公司 | Reinforce the construction method of the dumb-bell shape drilled pile composite foundation structure of embankment widening |
CN110195379A (en) * | 2019-05-17 | 2019-09-03 | 中铁二院工程集团有限责任公司 | Consider non-fragment orbit coarse grain salt marsh dirt road embankment structure and construction method that violent temperature influences |
CN110195379B (en) * | 2019-05-17 | 2023-09-22 | 中铁二院工程集团有限责任公司 | Ballastless track coarse-grain salty soil embankment structure considering severe air temperature influence and construction method |
CN111691278A (en) * | 2020-07-03 | 2020-09-22 | 西安科技大学 | I-shaped pile type cement pavement repairing structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556551B (en) | Reinforce the construction method of the dumb-bell shape drilled pile composite foundation structure of embankment widening | |
CN103184734B (en) | A kind of construction method implanting slip casting compound pile | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN103556554B (en) | Reinforce the construction method of the drilled pile composite foundation structure of the soft base of embankment | |
CN102839650B (en) | Integral drilling and filling top-bottom high-pressure impact extrusion grouting system | |
CN110438998B (en) | Structure and method for improving pile bearing capacity through external drilling grouting | |
CN103556628B (en) | Spiral conical soil compaction pile construction method | |
CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
CN101205721A (en) | Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction | |
CN1657711A (en) | Rotary spray anchoring pile construction process | |
CN103321244A (en) | Construction method for additionally arranged basement in existing building on sand foundation | |
CN105350988A (en) | Tunnel base reinforcing method | |
CN203213101U (en) | Embedding grouting combined pile | |
CN103806433A (en) | Foundation backfill reinforcement method | |
CN107191188A (en) | The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, constructing device and method | |
CN203514140U (en) | Dumbbell-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment | |
CN109183790A (en) | A kind of Screw Pile and its construction tool and construction method | |
CN202767084U (en) | Drilling-filling top-down high pressure impact extrusion grouting system | |
CN103556555A (en) | Nail-shaped bored pile compound foundation structure for reinforcing embankment soft foundation, and construction method thereof | |
CN203514141U (en) | Drilling pile composite foundation structure for reinforcing soft ground under highway embankment | |
CN101158159A (en) | Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process | |
CN201874482U (en) | Semi-spiral drill rod | |
CN202672132U (en) | Reinforcing structure for basement backfilling | |
CN205062810U (en) | End support type screw thread core composite pile's construction equipment | |
CN203514142U (en) | T-shaped drilling pile composite foundation structure for reinforcing soft ground under highway embankment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CRCC HARBOUR + CHANNEL ENGINEERING BUREAU GROUP CO Effective date: 20140514 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20140514 Address after: 510060, Guangzhou, Guangdong province Yuexiu District Ring East Road No. 338 silver Zheng mansion 23 building Patentee after: Guangzhou Municipal Engineering Co., Ltd. Patentee after: China iron Jian Ganghangju Group Co.,Ltd Address before: 510060, Guangzhou, Guangdong province Tianhe District Ring East Road No. 338 silver Zheng mansion 23 building Patentee before: Guangzhou Municipal Engineering Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140402 Termination date: 20171009 |
|
CF01 | Termination of patent right due to non-payment of annual fee |