CN103174139A - Construction technology capable of inserting pile through gravel bed via lead hole - Google Patents

Construction technology capable of inserting pile through gravel bed via lead hole Download PDF

Info

Publication number
CN103174139A
CN103174139A CN2013101299590A CN201310129959A CN103174139A CN 103174139 A CN103174139 A CN 103174139A CN 2013101299590 A CN2013101299590 A CN 2013101299590A CN 201310129959 A CN201310129959 A CN 201310129959A CN 103174139 A CN103174139 A CN 103174139A
Authority
CN
China
Prior art keywords
pile
lead hole
hole
gravel bed
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101299590A
Other languages
Chinese (zh)
Inventor
刘国福
王圣煌
袁中利
张明明
徐优斌
徐霞
方克舟
汤金荣
张静波
汪剑琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical HEFEI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN2013101299590A priority Critical patent/CN103174139A/en
Publication of CN103174139A publication Critical patent/CN103174139A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction technology capable of inserting a pile through a gravel bed via a lead hole, and belongs to constructional engineering. An upper soil layer, a gravel bed, a lower soil layer and a lead hole are arranged. The technology is characterized in that the lead hole is vertical, the lower end of the lead hole is ended in the joining part of the gravel bed and the lower soil layer, and the lead hole is a cavity blind hole with the diameter slightly less than the diameter of a pile. Compared with the prior art, the construction technology capable of inserting the pile through the gravel bed via the lead hole breaks through a bottleneck that a pile-sinking technology cannot be applied to construct foundations because the soil layer density is uneven and the pile cannot penetrate through the dense gravel bed under complicated geological conditions, therefore, the technology has good popularization and use values.

Description

Draw the hole pile sinking and pass through the sandy gravel stratum construction technology
One, technical field:
The present invention relates to construction work, relate to specifically a kind of hole pile sinking that draws and pass through the sandy gravel stratum construction technology.
Two, background technology:
The static pressure pile-sinking technology is few because of its pile pipe reliable in quality, the construction amount of breaking ground, stake position, direction, accurately easily control of the degree of depth, on-the-spot clean and tidy, press the cultivation noiselessness, progress of implementation is fast, the duration is short, cost is low etc., and numerous advantages are favored by industry extensively, be widely used, but often because of the region complex geologic conditions of constructing, soil density inequality, layer compression is larger than difference, can not penetrate compacted zone (as the sandy gravel stratum that hardens) to pile pipe, construct pile foundation and use other method instead.
Three, summary of the invention:
The objective of the invention is for above problem, provide a kind of pile pipe to pass through smoothly compacted zone, the hole pile sinking that draws that reaches the engine request degree of depth and bearing strength passes through the sandy gravel stratum construction technology.
The objective of the invention is to be achieved through the following technical solutions:
A kind of hole pile sinking that draws passes through the sandy gravel stratum construction technology, comprises topsoil, sandy gravel stratum, subsoil and draws the hole, it is characterized in that drawing the hole and be vertical, draw the lower end, hole end at sandy gravel stratum and subsoil joint portion, diameter is slightly less than the empty blind hole of pile pipe diameter.
The hole pile sinking that draws of the present invention passes through the sandy gravel stratum construction technology, be difficult to penetrate the low compression ratio compacted zones such as sandy gravel stratum for static pressure pile-sinking, do not reach the engine request degree of depth, helplessly use the situation that other constructs pile foundation instead, penetrate the hole technology of drawing of compacted zone with drill hole of drilling machine, realize pile pipe smoothly by compacted zone, break and hinder the application bottleneck of using static pressure pile-sinking, open the range of application that expands the static pressure pile-sinking technology, thereby have good value for applications.
Four, description of drawings:
Fig. 1 be draw that the hole pile sinking passes through the sandy gravel stratum construction technology draw hole side generalized section.
In figure: 1 topsoil, 2 sandy gravel stratums, 3 subsoils, 4 draw the hole.
Five, the specific embodiment:
As shown in Figure 1, the degree of depth, the thickness of the sandy gravel stratum 2 that the Accurate Determining pile pipe is difficult to pass through, unwrapping wire location, rigging up, its drilling rod gradient must not be greater than 0.5%, drill hole, bore topsoil 1 and return to bore to sandy gravel stratum 2 and subsoil 3 joint portions and withdraw from, clearly now draw the interior mud in hole 4 and the surface is on-the-spot, cover to seal pile sinking to be pressed.
Except the described technical characterictic of manual, be the known technology of those skilled in the art.

Claims (1)

1. one kind is drawn the hole pile sinking and passes through the sandy gravel stratum construction technology, comprises topsoil, sandy gravel stratum, subsoil and draws the hole, it is characterized in that drawing the hole and be vertical, draw the lower end, hole end at sandy gravel stratum and subsoil joint portion, diameter is slightly less than the empty blind hole of pile pipe diameter.
CN2013101299590A 2013-04-16 2013-04-16 Construction technology capable of inserting pile through gravel bed via lead hole Pending CN103174139A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101299590A CN103174139A (en) 2013-04-16 2013-04-16 Construction technology capable of inserting pile through gravel bed via lead hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101299590A CN103174139A (en) 2013-04-16 2013-04-16 Construction technology capable of inserting pile through gravel bed via lead hole

Publications (1)

Publication Number Publication Date
CN103174139A true CN103174139A (en) 2013-06-26

Family

ID=48634294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101299590A Pending CN103174139A (en) 2013-04-16 2013-04-16 Construction technology capable of inserting pile through gravel bed via lead hole

Country Status (1)

Country Link
CN (1) CN103174139A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631470A (en) * 2014-12-26 2015-05-20 合肥建工集团有限公司 Deep foundation pit combination retaining and protecting construction method for geology with high water level and large particle size sand gravel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1078760A (en) * 1993-02-22 1993-11-24 陶义 Driving pre-fabricated pile is gone into job practices in the stratum
US5904447A (en) * 1997-07-02 1999-05-18 Integrated Stabilization Technologies Inc. Drive device used for soil stabilization
CN1352340A (en) * 2001-11-30 2002-06-05 叶长生 Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile
CN1472397A (en) * 2003-06-10 2004-02-04 张立军 Constructing technology for pile core
CN1528988A (en) * 2003-10-20 2004-09-15 建研地基基础工程有限责任公司 Long spiral drilling and concrete pumping pile-forming rear-insertion reinforcement cage construction process and reinforcement cage guiding device
CN101158159A (en) * 2007-10-31 2008-04-09 刘小檀 Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process
CN203229953U (en) * 2013-04-16 2013-10-09 合肥建工集团有限公司 Construction structure with guide hole and gravel bed penetrated by sunk pile

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1078760A (en) * 1993-02-22 1993-11-24 陶义 Driving pre-fabricated pile is gone into job practices in the stratum
US5904447A (en) * 1997-07-02 1999-05-18 Integrated Stabilization Technologies Inc. Drive device used for soil stabilization
CN1352340A (en) * 2001-11-30 2002-06-05 叶长生 Process for drilling hole and soil taking and transplanting pile for steel reinforced concrete prefabricated pile
CN1472397A (en) * 2003-06-10 2004-02-04 张立军 Constructing technology for pile core
CN1528988A (en) * 2003-10-20 2004-09-15 建研地基基础工程有限责任公司 Long spiral drilling and concrete pumping pile-forming rear-insertion reinforcement cage construction process and reinforcement cage guiding device
CN101158159A (en) * 2007-10-31 2008-04-09 刘小檀 Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process
CN203229953U (en) * 2013-04-16 2013-10-09 合肥建工集团有限公司 Construction structure with guide hole and gravel bed penetrated by sunk pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631470A (en) * 2014-12-26 2015-05-20 合肥建工集团有限公司 Deep foundation pit combination retaining and protecting construction method for geology with high water level and large particle size sand gravel

Similar Documents

Publication Publication Date Title
CN105970911B (en) A kind of processing method of big thickness collapsible loess
JP6093453B2 (en) Ground improvement method
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN101812976B (en) Adjustable multiple coil extruding and expanding drilling tool
CN104762972A (en) Sectioned grouting pipe and construction method thereof for soft soil stratum reinforcement
CN103603342A (en) Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN105586865A (en) Earth pressure cell drilling embedding method and device
CN102926413A (en) Embedded pipe for sampling pile tip of filling pile
CN108842802A (en) Piles in Karst Region base construction method
CN105257318B (en) A kind of lining cutting localized seepage causes the method for security protection that tunnel structure is deformed
CN105649010A (en) Grouting pile construction technology
CN203229953U (en) Construction structure with guide hole and gravel bed penetrated by sunk pile
CN106087998B (en) A kind of construction method for combining multiple tube pile foundation
CN105421324B (en) Burying method for pore water pressure gauges
CN204551481U (en) For the segmenting slip casting pipe that soft soil layer is reinforced
CN101158159A (en) Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process
CN104196488B (en) Underwater exploration hole hole-sealing technology
CN103174139A (en) Construction technology capable of inserting pile through gravel bed via lead hole
CN105275005A (en) Method for detecting post grouting quality of pile foundation through electric method well logging system
CN102134861A (en) Method for testing precast pile in soil body
CN104819700B (en) A kind of method for embedding of filling body settlement monitoring with sedimentation magnet ring
CN100545357C (en) A kind of cement-soil build-in piling wall and job practices thereof that is used for pattern foundation pit supporting structure
CN106337418A (en) Supporting structure and supporting method of deep foundation pit in narrow area
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN103967025B (en) Manually digging hole expanding method and manually digging hole reaming rock-steady structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130626