CN1472397A CNA031300197A CN03130019A CN1472397A CN 1472397 A CN1472397 A CN 1472397A CN A031300197 A CNA031300197 A CN A031300197A CN 03130019 A CN03130019 A CN 03130019A CN 1472397 A CN1472397 A CN 1472397A
Authority
CN
China
Prior art keywords
stake
target drill
earth
rotation
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA031300197A
Other languages
Chinese (zh)
Inventor
张立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA031300197A priority Critical patent/CN1472397A/en
Publication of CN1472397A publication Critical patent/CN1472397A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A hole-forming method for pile foundation features that a dedicated rotating drill bit is used to squeeze the soil at pile position to form pile hole. Its advantages are high speed, no noise and pollution, and low cost.

Description

The construction technology in a kind of hole
Affiliated technical field
The present invention relates to the building foundation engineering field, especially the pore-forming technique of stake types such as cast-in-place concrete pile, lime soil pile, broken stone pile, CFG stake.
Background technology
In construction foundation working, adopt various pileworks in a large number, in the construction of various stakes, the pore forming process of stake is an important link.It is several that traditional hole forming method has mud off to be drilled to hole, long spiral dry pore-forming, Henan luoyang spade pore-forming, hammering pore-forming, rotary drilling rig pore-forming etc.Wherein the noise of hammering pore-forming and vibration are too big, are unsuitable near the construction residential block, and other hole forming method produces a lot of mud and assorted native contaminated environment, and can not reinforce former ground.In addition, the static pressed pile of rising has now overcome with above-mentioned shortcoming, but has limited its development because of its cost of equipment costliness.
Summary of the invention
The purpose of this invention is to provide that a kind of speed of application is fast, noiseless, pollution-free, cost is low and the job practices that can reinforce former ground again.
The objective of the invention is to realize that by following job practices its step comprises:
A) mobile pile-forming machine perching makes drill bit stake position.
B) adjusting the stake machine makes target drill vertical with ground.
C) target drill is placed on naturally place, stake position, start rig and make the target drill rotation, target drill is under the pressure of deadweight, must creep into downwards by rotation, when preceding two flights of target drill pierce ground as traditional long screw auger, earth between helical blade can upwards slide with respect to helical blade, and when continuing to bore downwards, upwards the earth that slides is subjected to the extruding of the drilling rod that radially strengthens gradually the helical blade bottom from bottom to top and clamp-ons in the stake earth in week again.
D) after helical blade is cut earth fully, continue rotation, whole special-purpose drilling rod will be drawn in the soil by drill bit.
E) wait to get into projected depth after, mention special-purpose drilling rod, finish the work of boring.
Purpose of the present invention can also be implemented by following second method, the steps include:
A) mobile pile-forming machine perching makes drill bit stake position.
B) adjusting the stake machine makes target drill vertical with ground.
C) target drill is placed on naturally place, stake position, start rig and make the target drill rotation, target drill is under the pressure of deadweight, must creep into downwards by rotation, when preceding two flights of target drill pierce ground as traditional long screw auger, earth between helical blade can upwards slide with respect to helical blade, and when continuing to bore downwards, upwards the earth that slides is subjected to the extruding of the drilling rod that radially strengthens gradually the helical blade bottom from bottom to top and clamp-ons in the stake earth in week again.
D) after helical blade is cut earth fully, continue the special-purpose drilling rod of rotation, simultaneously with hydraulic cylinder or assembly pulley to pressing down target drill.
E) wait to get into projected depth after, mention special-purpose drilling rod, finish the work of boring.
Because second method adds hydraulic cylinder or assembly pulley to pressing down drill bit, so its scope of application has strengthened, it can get out the stake hole that diameter is bigger, the degree of depth is darker.
For the stake with above-mentioned two kinds of method pore-formings, its advantage is: whole work continuity is strong, and speed of application is fast; Because pile peripheral earth has been reinforced in compacted effect, the bearing capacity of stake is increased substantially; The pollution of construction civilization, noiselessness and mud; Be particularly suitable for the construction that project is made in the old housing reform of residential block.
In above-mentioned two kinds of methods, the spacing of adjacent studs is to determine according to the spacing of tube-sinking cast-in-situ pile.
In above-mentioned two kinds of methods, before construction, can ram closely knit processing to the top layer soil body at place, stake position, adopt this method can also allow topsoil that stake is produced effect of contraction.
In above-mentioned two kinds of methods, after the stake hole formed, the area of undergauge more than groundwater table and not can directly be carried brill, puts reinforcing cage, concrete perfusion forms reinforced concrete pile.
In above-mentioned two kinds of methods, after the stake hole forms, below groundwater table or the area of undergauge, but brill is carried on the limit, and the limit is carried and being bored when finishing by target drill centre bore concrete perfusion at the bottom of stake, concrete has also been filled the stake hole, according to circumstances sees whether need to insert reinforcing steel bar cage more at last.This practice is similar to the CFG stake, but because in this way during pore-forming, the earth at place, stake position has been extruded in the earth around the stake, so the stake of making in this way is higher by 50% than the bearing capacity of CFG stake.
In above-mentioned two kinds of methods, after the stake hole formed, more than groundwater table and brill can not directly be carried in the area of undergauge, rams dirt with hand hammer and can form lime soil pile; Ram rubble with hand hammer and can form broken stone pile.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing.
Accompanying drawing 1 is the verticality that moves stake machine align piles position and adjust drill bit.
Accompanying drawing 2 is target drill state diagrams when creeping into earth.
Accompanying drawing 3 is state diagrams behind the formation stake hole proposition drill bit.
The specific embodiment
Mobile walking chassis 2 makes target drill 3 align piles positions earlier as shown in Figure 1, and four supporting legs adjusting walking chassis 2 again make drill bit vertical with ground.
Starting rotary drilling-head mechanism 4 as shown in Figure 2 makes target drill 3 rotations and pierces earth; If the difficulty of creeping into can pull down target drill 3. as embodiment 2 usefulness hoist engines 5
After getting into projected depth, propose target drill 3 as shown in Figure 3, so far finish drill tasks.

Claims (10)

1, the construction technology in a kind of hole, its step comprises:
A) mobile pile-forming machine perching makes drill bit stake position.
B) adjusting the stake machine makes target drill vertical with ground.
C) target drill is placed on naturally place, stake position, start rig and make the target drill rotation, target drill is under the pressure of deadweight, must creep into downwards by rotation, when preceding two flights of target drill pierce ground as traditional long screw auger, earth between helical blade can upwards slide with respect to helical blade, and when continuing to bore downwards, upwards the earth that slides is subjected to the extruding of the drilling rod that radially strengthens gradually the helical blade bottom from bottom to top and clamp-ons in the stake earth in week again.
D) after helical blade is cut earth fully, continue the special-purpose drilling rod of rotation, simultaneously with hydraulic cylinder or assembly pulley to pressing down target drill.
E) wait to get into projected depth after, mention special-purpose drilling rod, finish the work of boring
2, method according to claim 1 is characterized in that: before pile hole construction the shallow-layer soil body in the ground of stake position is carried out consolidation process.
3, reinforcing according to claim 2 is to finish by the deep layer stirring of cement.
4, method according to claim 1, it is characterized in that: after the stake hole forms, below groundwater table or the area of undergauge, but brill is carried on the limit, the limit is by target drill centre bore concrete perfusion at the bottom of stake, carry and boring when finishing, concrete has also been filled the stake hole, according to circumstances sees whether need to insert reinforcing steel bar cage more at last.
5, method according to claim 1 is characterized in that: the rotation of target drill is that the mode by the driven by motor speed changer realizes.
6, method according to claim 1 is characterized in that: the rotation of target drill is to realize by the method that diesel engine drives speed changer.
7, method according to claim 1 is characterized in that: the rotation of target drill was revolved hydraulic motor drive speed changer or was directly made it to rotate by hydraulic motor.
8, method according to claim 1 is characterized in that: the spacing of adjacent studs is to construct according to the spacing of tube-sinking cast-in-situ pile.
9, method according to claim 1, it is characterized in that: the top of target drill is and the isometrical steel pipe in stake hole, the bottom of target drill is the flight that external diameter and top steel pipe are isometrical, internal diameter increases from bottom to top gradually, has just disappeared when this flight carries out the transition to steel pipe.
10, method according to claim 1 is characterized in that: the earth in the stake hole is the rotation by target drill, clamp-ons the ambient earth gradually between the flight of drill bit.
CNA031300197A 2003-06-10 2003-06-10 Constructing technology for pile core Pending CN1472397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA031300197A CN1472397A (en) 2003-06-10 2003-06-10 Constructing technology for pile core

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA031300197A CN1472397A (en) 2003-06-10 2003-06-10 Constructing technology for pile core

Publications (1)

Publication Number Publication Date
CN1472397A true CN1472397A (en) 2004-02-04

Family

ID=34153676

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA031300197A Pending CN1472397A (en) 2003-06-10 2003-06-10 Constructing technology for pile core

Country Status (1)

Country Link
CN (1) CN1472397A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100344834C (en) * 2005-05-23 2007-10-24 司建波 Method for constructing hydraulic soil-extruded pile composite foundation
CN100365182C (en) * 2006-09-01 2008-01-30 马伟华 Cotton fiber fabric and manufacture technology thereof
CN102002940A (en) * 2009-08-28 2011-04-06 包尔机械有限公司 Drilling apparatus and method for working the ground
CN103174139A (en) * 2013-04-16 2013-06-26 合肥建工集团有限公司 Construction technology capable of inserting pile through gravel bed via lead hole
CN105544541A (en) * 2016-01-27 2016-05-04 国网浙江省电力公司经济技术研究院 High-frequency opposed light pile driver
CN107842313A (en) * 2017-11-28 2018-03-27 重庆华硕建设有限公司 A kind of rotary drilling rig compact making hole construction technology

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100344834C (en) * 2005-05-23 2007-10-24 司建波 Method for constructing hydraulic soil-extruded pile composite foundation
CN100365182C (en) * 2006-09-01 2008-01-30 马伟华 Cotton fiber fabric and manufacture technology thereof
CN102002940A (en) * 2009-08-28 2011-04-06 包尔机械有限公司 Drilling apparatus and method for working the ground
CN102002940B (en) * 2009-08-28 2012-10-10 包尔机械有限公司 Drilling apparatus and method for working the ground
CN103174139A (en) * 2013-04-16 2013-06-26 合肥建工集团有限公司 Construction technology capable of inserting pile through gravel bed via lead hole
CN105544541A (en) * 2016-01-27 2016-05-04 国网浙江省电力公司经济技术研究院 High-frequency opposed light pile driver
CN107842313A (en) * 2017-11-28 2018-03-27 重庆华硕建设有限公司 A kind of rotary drilling rig compact making hole construction technology
CN107842313B (en) * 2017-11-28 2019-04-30 重庆华硕建设有限公司 A kind of rotary drilling rig compact making hole construction technology

Similar Documents

Publication Publication Date Title
CN1710215A (en) Side downhole soil-extruded foundation treating method and horizontal extruding-spreading device
CN102182399B (en) Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag
CN104763345A (en) Construction device and method for building foundation
CN2767507Y (en) Multifunctional excavator
CN112411529A (en) Rock-entering pore-forming method of hard bedrock socketed pile small-diameter down-the-hole hammer auxiliary rotary drilling rig
CN1472397A (en) Constructing technology for pile core
CN108468334B (en) Gravel stratum dry-excavation clay dado pore-forming bored concrete pile construction device
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN210530738U (en) Pile system is planted in drilling in groups
CN110331936B (en) Combined drilling bottom-expanding pile-planting construction method
CN108360978B (en) Combined construction method of short spiral soil-squeezing bored concrete pile and assembled drilling tool
CN109555127A (en) A kind of construction for the flush type multimedium built pile that drills
CN1085280C (en) Construction method for composite foundation by tamping expanding piles and compacting soil around piles
CN108049401A (en) A kind of screw thread rammed bulb pile and its construction method
CN1117906C (en) Construction method of concrete pile and its construction equipment
CN1024029C (en) Direct sink-and-insert method and equipment for constructing underground building with combined and interlocked prefabricated concrete components
CN212614488U (en) Special rotary drilling equipment for deep concrete block and gravel layer
CN1089835C (en) Multifunction pile-formation machine
CN113969581A (en) Construction method for rock-entering pile planting
CN2646214Y (en) Pile extruder
CN210530745U (en) Combined drilling bottom-expanding pile-planting system
CN220769356U (en) Drilling machine erecting device
CN218712956U (en) Multifunctional full-sleeve pile planting machine
KR19980020441A (en) Pile foundation construction method and device
CN116220028B (en) Integrated square pile hoisting construction device and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication