CN101144260B - 混凝土地道桥施工中的预应力应用方法 - Google Patents

混凝土地道桥施工中的预应力应用方法 Download PDF

Info

Publication number
CN101144260B
CN101144260B CN2007101220954A CN200710122095A CN101144260B CN 101144260 B CN101144260 B CN 101144260B CN 2007101220954 A CN2007101220954 A CN 2007101220954A CN 200710122095 A CN200710122095 A CN 200710122095A CN 101144260 B CN101144260 B CN 101144260B
Authority
CN
China
Prior art keywords
prestressed
concrete
bridge
tunnel bridge
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101220954A
Other languages
English (en)
Other versions
CN101144260A (zh
Inventor
朱尔玉
陈锐
杨永月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN2007101220954A priority Critical patent/CN101144260B/zh
Publication of CN101144260A publication Critical patent/CN101144260A/zh
Application granted granted Critical
Publication of CN101144260B publication Critical patent/CN101144260B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及混凝土地道桥施工中的预应力应用方法,即在框架式混凝土地道桥的顶板、边墙、中墙和底板上,设置直线、折线或抛物线形式的预应力钢筋。这样做的目的是要解决目前地道桥在施工和使用过程中存在的顶、底板挠度过大,顶底板、边中墙的开裂及裂缝超限等问题。实施预应力技术,可改善顶底板的受力性能,有效降低顶底板主筋的应力循环幅度,增加疲劳寿命,减少边、中墙的开裂和裂缝宽度,使框架式预应力混凝土地道桥的整体性能得到提高,整体刚度增大,抗震性能增加。

Description

混凝土地道桥施工中的预应力应用方法
技术领域
本发明涉及土建技术,具体地是混凝土地道桥施工中的预应力应用方法。
背景技术
目前铁路和公路的平交道口普遍改为立交道口,地道桥的应用也相应的变得广泛。为了使地道桥在施工过程中不中断交通,采用预制框架式混凝土地道桥,利用顶进法施工是一个很好的选择,也是地道桥发展的趋势。框架式混凝土地道桥在使用过程中存在的主要问题是顶、底板挠度过大,顶底板、边中墙的开裂及裂缝超限。在顶进法施工中,当框架式混凝土地道桥裂缝宽度超限时,将会使受力钢筋暴露在外,受到腐蚀,其承载力必然下降,地道桥的使用寿命也随之降低;当框架式地道桥的顶、底板挠度过大时,将影响行车的平稳性和安全性。
发明内容
本发明的目的就是提供一种混凝土地道桥施工中的预应力应用方法,顶进法框架式的预应力应用方法,该方法的使用可以有效解决上述地道桥在施工中变形过大和裂缝超限的两个问题,同时还可以减小顶、底板的厚度,降低自重,更有利于施工。
一种混凝土地道桥施工中的预应力应用方法,含有以下步骤;
1.进行结构设计;
2.计算框架式预应力混凝土地道桥的预应力钢筋的数量并设计布置形式:
顶板沿桥跨方向可布置预应力钢筋;
边墙、中墙可沿竖向布置预应力筋,两端锚固在顶底板中,边墙、中墙在桥长方向也可布置预应力筋;
底板沿桥跨方向可布置预应力钢筋;
顶板、底板、边墙和中墙中的预应力钢筋可以采用直线、折线或抛物线的形式布置。
3.施工:
先浇筑框架式混凝土地道桥,待地道桥混凝土达到预期强度后,将预应力钢筋穿入预应力孔道中,利用框架式混凝土地道桥本身作为受力台座进行张拉,在张拉预应力筋的同时,使混凝土地道桥受到预压;
张拉完成后,在锚固端用锚具将预应力筋锚住;
最后在预应力孔道内灌浆,使预应力钢筋和混凝土构成一个整体,形成有粘结后张框架式预应力混凝土地道桥。
当框架式混凝土地道桥的底部地基不良或者有地铁、隧道、管道等通过时,可对底板施加预应力,以改善底板的受力性能。地道桥顶板主要承受的是列车的动荷载,施加预应力可以有效降低顶板主筋的应力循环幅度,增加疲劳寿命。为了减少边、中墙的开裂,也可以对边、中墙施加预应力。通过对顶板、边墙、中墙和底板施加预应力,使框架式预应力混凝土地道桥的整体性能得到了提高,整体刚度增大,抗震性也相应地增加。
附图说明
图1是顶进法框架式混凝土地道桥施工中的预应力应用方法示意图。
具体实施方式
下面通过具体实施例对本发明做进一步说明:
1.结构设计:
根据具体的工程情况,应用相关的软件对顶进法施工的框架式预应力混凝土地道桥进行受力分析和结构设计。计算出框架式预应力混凝土地道桥的整体受力情况,包括弯矩、扭矩、剪力和轴力,通过地道桥的内力组合进行配筋计算。
2.给出框架式预应力混凝土地道桥的预应力钢筋的数量和布置形式:
顶板、底板采用抛物线形预应力钢筋布置,边墙、中墙采用直线形预应力钢筋布置。1为顶板预应力钢筋布置;2为边墙预应力钢筋布置;3为中墙预应力钢筋布置;4为底板预应力钢筋布置。
3.施工工艺:
根据设计图纸对框架式预应力混凝土地道桥进行施工。框架式预应力混凝土地道桥中预应力的施加方式一般采用后张法施工,施工工序为:先浇筑框架式混凝土地道桥,待地道桥混凝土达到预期强度后,将预应力钢筋穿入预应力孔道中,利用框架式混凝土地道桥本身作为受力台座进行张拉,在张拉预应力筋的同时,使混凝土地道桥受到预压。张拉完成后,在锚固端用锚具将预应力筋锚住;最后在预应力孔道内灌浆使预应力钢筋和混凝土构成一个整体,形成有粘结后张框架式预应力混凝土地道桥。

Claims (1)

1.一种混凝土地道桥施工中的预应力应用方法,其特征在于含有以下步骤;
1)进行结构设计;
2)计算框架式预应力混凝土地道桥的预应力钢筋的数量并设计布置形式:
顶板沿桥跨方向布置预应力钢筋;
边墙、中墙沿竖向布置预应力筋,两端锚固在顶底板中,边墙、中墙在桥长方向布置预应力筋;
底板沿桥跨方向布置预应力钢筋;
顶板、底板、边墙和中墙中的预应力钢筋采用直线、折线或抛物线的形式布置;
3)施工:
先浇筑框架式混凝土地道桥,待地道桥混凝土达到预期强度后,将预应力钢筋穿入预应力孔道中,利用框架式混凝土地道桥本身作为受力台座进行张拉,在张拉预应力筋的同时,使混凝土地道桥受到预压;
张拉完成后,在锚固端用锚具将预应力筋锚住;
最后在预应力孔道内灌浆,使预应力钢筋和混凝土构成一个整体,形成有粘结后张框架式预应力混凝土地道桥。
CN2007101220954A 2007-09-21 2007-09-21 混凝土地道桥施工中的预应力应用方法 Active CN101144260B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101220954A CN101144260B (zh) 2007-09-21 2007-09-21 混凝土地道桥施工中的预应力应用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101220954A CN101144260B (zh) 2007-09-21 2007-09-21 混凝土地道桥施工中的预应力应用方法

Publications (2)

Publication Number Publication Date
CN101144260A CN101144260A (zh) 2008-03-19
CN101144260B true CN101144260B (zh) 2010-06-02

Family

ID=39206974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101220954A Active CN101144260B (zh) 2007-09-21 2007-09-21 混凝土地道桥施工中的预应力应用方法

Country Status (1)

Country Link
CN (1) CN101144260B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264725A (zh) * 2014-09-02 2015-01-07 杭永山 预防闸室墙身裂缝的后张预应力加固方法
CN105297612B (zh) * 2015-09-16 2018-11-02 浙江大学 采用预应力提高整体性及耐久性的空心板框架桥的方法
CN106087761A (zh) * 2016-08-05 2016-11-09 中铁六局集团天津铁路建设有限公司 一种地道桥施工缝止水体系施工方法
CN106295086A (zh) * 2016-10-18 2017-01-04 山东理工大学 端部接触式少片抛物线型主副簧限位挠度的设计方法
CN106677215A (zh) * 2017-02-17 2017-05-17 厦门中平公路勘察设计院有限公司 一种后张法预应力混凝土明挖现浇隧道施工工艺
CN108331239A (zh) * 2018-04-18 2018-07-27 福州大学 后张预应力板及使用方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3738291A1 (de) * 1987-02-10 1988-09-22 Dyckerhoff & Widmann Ag Verfahren zum herstellen eines brueckentragwerks aus spannbeton
JP2000309907A (ja) * 1999-04-26 2000-11-07 Sho Bond Constr Co Ltd コンクリートプレキャスト床版の連続一体化方法
CN1427125A (zh) * 2001-12-20 2003-07-02 黑泽建设株式会社 梁式桥
CN1880580A (zh) * 2006-01-18 2006-12-20 秦皇岛市北戴河通联路桥机械有限公司 隧道出口处桥梁便桥配合架桥机的架梁方法
CN1995650A (zh) * 2006-12-30 2007-07-11 上海市城市建设设计研究院 新型预应力混凝土空心板梁及采用其架设路桥的施工工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3738291A1 (de) * 1987-02-10 1988-09-22 Dyckerhoff & Widmann Ag Verfahren zum herstellen eines brueckentragwerks aus spannbeton
JP2000309907A (ja) * 1999-04-26 2000-11-07 Sho Bond Constr Co Ltd コンクリートプレキャスト床版の連続一体化方法
CN1427125A (zh) * 2001-12-20 2003-07-02 黑泽建设株式会社 梁式桥
CN1880580A (zh) * 2006-01-18 2006-12-20 秦皇岛市北戴河通联路桥机械有限公司 隧道出口处桥梁便桥配合架桥机的架梁方法
CN1995650A (zh) * 2006-12-30 2007-07-11 上海市城市建设设计研究院 新型预应力混凝土空心板梁及采用其架设路桥的施工工艺

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
方立志.拼装式框架地道桥研究.桥梁建设 4.1997,(4),40-43页.
方立志.拼装式框架地道桥研究.桥梁建设 4.1997,(4),40-43页. *

Also Published As

Publication number Publication date
CN101144260A (zh) 2008-03-19

Similar Documents

Publication Publication Date Title
CN104233942B (zh) 一种提高装配式斜交预应力空心板梁桥整体受力的方法
CN103485287B (zh) 混凝土框架箱涵施工中的预应力应用方法
CN102587267A (zh) 一种中设横隔张拉装配的预应力空心板梁桥及施工方法
CN103821079A (zh) 一种组合箱梁跨海大桥及其施工方法
CN108316131A (zh) 一种分块预制式全预应力墩结构及其建造方法
CN1322202C (zh) 钢-混凝土组合梁负弯矩区抗裂的方法
CN207553438U (zh) 共张预应力混凝土叠合梁
CN101144260B (zh) 混凝土地道桥施工中的预应力应用方法
CN101769042A (zh) 匹配预制混凝土空心板梁结构
CN111733692A (zh) 一种节段预压装配式混凝土桥墩结构及其施工方法
CN102409619B (zh) 一种提高多梁式组合小箱梁桥桥面结构横向整体性的方法
CN207228402U (zh) 内置预应力钢斜撑的钢筋混凝土剪力墙
CN106930436B (zh) 一种内置预应力钢斜撑的钢筋混凝土剪力墙
CN107905091A (zh) 一种采用sma‑预应力筋系统的节段拼装frp增强钢管混凝土桥墩
CN110878513A (zh) 一种预制预应力混凝土梁与钢混组合梁拼接桥及施工方法
CN110409283B (zh) 一种基于缓粘结预应力uhpc永久模板的无腹筋预应力自养护组合梁及施工方法
CN102561199A (zh) 一种独柱混凝土桥墩负弯矩拉力区竖向抗裂的方法
CN111424525A (zh) 高速铁路大跨度叠合梁及其施工方法
CN110409282B (zh) 一种基于永久性后张预应力uhpc套装模板的无腹筋预应力自养护组合梁及施工方法
CN105625571B (zh) 一种采用中强预应力筋的预制混凝土梁柱节点
CN208362941U (zh) 一种通过实腹现浇板加固单孔旧空心板桥构造
CN116356721A (zh) 一种装配式空心板斜截面抗剪加固装置及施工方法
CN212223643U (zh) 一种独柱墩拉压组合抗倾覆结构
CN105297612B (zh) 采用预应力提高整体性及耐久性的空心板框架桥的方法
CN204530507U (zh) 大跨径叠合梁斜拉桥边钢箱临时锚固体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Jiaotong University

Assignor: China Construction Municipal Construction Corporation Limitd

Contract record no.: 2010990000870

Denomination of invention: Prestressing applying method for concrete genuine bridge construction

Granted publication date: 20100602

License type: Exclusive License

Open date: 20080319

Record date: 20101103

EE01 Entry into force of recordation of patent licensing contract

Assignee: China Construction Municipal Construction Corporation Limitd

Assignor: Beijing Jiaotong University

Contract record no.: 2010990000870

Denomination of invention: Prestressing applying method for concrete genuine bridge construction

Granted publication date: 20100602

License type: Exclusive License

Open date: 20080319

Record date: 20101103