CN101139925B - Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time - Google Patents

Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time Download PDF

Info

Publication number
CN101139925B
CN101139925B CN200610021795XA CN200610021795A CN101139925B CN 101139925 B CN101139925 B CN 101139925B CN 200610021795X A CN200610021795X A CN 200610021795XA CN 200610021795 A CN200610021795 A CN 200610021795A CN 101139925 B CN101139925 B CN 101139925B
Authority
CN
China
Prior art keywords
reservoir
drilling
pressure
leakage
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200610021795XA
Other languages
Chinese (zh)
Other versions
CN101139925A (en
Inventor
孟英峰
李皋
陈一健
赵峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN200610021795XA priority Critical patent/CN101139925B/en
Publication of CN101139925A publication Critical patent/CN101139925A/en
Application granted granted Critical
Publication of CN101139925B publication Critical patent/CN101139925B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A method to perform LWD test on reservoir parameters and characteristics and real-time adjustment on well-drilling measures is provided, which relates to a reservoir well-drilling method. The method is characterized by adjusting drilling fluid column pressure in the air injection mode at a very short well segment when drilling reservoirs, so that the pressure on the reservoir holes can transit from an under-balance status into an over-balance status; during the transition process, performing actual measurement on reservoir aperture pressure, permeation rate, fluid yield properties, leakage characteristics, blocking characteristics and seam development extent; the test results can be used to evaluate safety risks and reservoir protection effects of different well-drilling modes; instructing well-drilling schemes and perform real-time adjustment according to the test results and risk benefit evaluation. The method can be widely utilized in exploration of petroleum and natural gas, reservoir exploitation and well drilling.

Description

The method of a kind of measuring while drilling reservoir parameter characteristic and real-time adjustment drilling method
Technical field
The present invention relates to a kind of reservoir boring method in oil and natural gas exploration, exploitation, particularly a kind ofly bore the method for carrying out reservoir parameter and reservoir characteristics test and the drilling method of decision-making adaptation in real time in the open procedure at reservoir.
Background technology
Indication reservoir of the present invention is the underground stratum of containing movable fluid (oil, gas, water etc.).In the exploration drilling or production drilling of oil and natural gas, the drillng operation that drills reservoir is called the reservoir drilling well.
Reservoir drilling technology the earliest is the overbalance temporary shielding method ,barrier building temporary seal incores, and its technical characterictic is: from the consideration of drilling safety, the bottom pressure of drilling fluid is all the time greater than reservoir pore space pressure, and the oil gas in the reservoir is pressed and can not flows in the well; Shield-temporary plugging then is the reservoir protection means supporting with the overbalance drilling well.Exploration and development difficulty increasing along with complicated reservoirs; Under-balanced drilling technology has appearred; Its technical characterictic is: in the process of reservoir drilling well, keep the drilling fluid bottom pressure all the time less than reservoir pore space pressure, reservoir is that oil gas continues to have in the inflow well of control; And do not have drilling fluid to flow into reservoir, thereby can realize good reservoir protection.Along with the exploration and development difficulty of complicated reservoirs further strengthens, more drilling well new technology as shown in table 1 has appearred.
Various boring methods of table 1 and applicable elements thereof
Boring method Applicable elements
The drilling well of overbalance shield-temporary plugging But 1. reservoir shutoff; 2. the reservoir protection effect can be accepted.
Under balance pressure drilling (UBD) 1. the reservoir characteristics decision should be adopted UBD; 2. well control risk, toxic gas risk, environmental protection risk assessment allow; 3. reservoir protection allows steady kill-job.
The overall process under-balance drilling of the overall process under-balance drilling down hole sleeve valve that makes a trip by force 1. the reservoir characteristics decision should be adopted overall process under-balance drilling; 2. well control risk, toxic gas risk, environmental protection risk assessment allow; 3. make a trip, the safety that removes by force in the process such as completion; 4. well control safety after casing valve is closed and the safety of opening the casing valve operation once more; 5. can guarantee under-balanced state after casing valve is closed.
Controlled pressure drilling (MPD) 1. reservoir characteristics decision can not overbalance, is fit to underbalance; 2. well control, toxic gas, environmental protection risk assessment do not allow underbalance; 3. the reservoir characteristics decision is suitable for MPD.
Mud cap drilling well (Mud Cap Drilling) 1. the pernicious leakage of into not having is caused in huge seam hole; 2. the toxic gas decision should not make gas ejection well head; 3. sufficient water source is arranged, and the stratum can hold injection water and landwaste.
The gas injection pressure-stabilizing drilling well 1. satisfy the applicable elements of MPD, be condensed to a line but 2. leak spray safe pressure window simultaneously.
The continuous circulating drilling of bimetallic tube 1. there is not the seam hole oil and gas reservoir that leaks the spray equalization point; 2. the well control risk after deep-well, atm number and stopping for a long time of causing are circulated.
The controlled under balance pressure drilling of overall process 1. need the reservoir of protection especially meticulously; The situation of the well control safety particular importance that 2. stops for a long time circulating.
Visible by table 1, as to have formed at present multiple alternative boring method, each all has its specific aim and applicability to reservoir.If can know and learn reservoir characteristics and reservoir parameter, then can select boring method targetedly well for use, implementing process reasonable in design, thus realize reservoir drilling well safe, efficient, the good protection reservoir.
Accurately learn the characteristic and the parameter of oil and gas reservoir, be the main target in the oil-gas exploration always, the various characteristic of oil and gas reservoir and method, the technology of parameter asked for, and the development that is accompanied by Oil and Gas Exploration Drilling is developing always.Sum up and get up roughly to have following several big type.
(1) indirect method: indirect method is to add the reaction under the physical field effect outside according to the stratum, asks for formation characteristics and parameter according to zonal empirical statistics relation.Most typical is to utilize measurement means such as seismic wave, mt; At prediction before drilling strata pressure, permeability, degree of porosity etc.; This is the mature technology of industry, and also the someone proposes concrete computational methods or theory improved patent (for example disclosed publication number in 1991 be CN1052530 one Chinese patent application " pore pressure prediction method ") in addition.Another of indirect method is the analysis that utilizes after well-log information (sound wave, density, resistivity etc.) bores for big type; This also is the mature technology of industry, but also the someone declares patent concrete grammar (for example: the one Chinese patent application that disclosed publication number in 2002 is CN1341803 " to the method and system of the characteristic of given stratum prediction well system " is improved; The one Chinese patent application that disclosed publication number in 2004 is CN1540138 " a kind of method of measuring oil field adjustment well sandstone reservoir pore pressure ").What develop rapidly in the indirect method a road is that various sensors are contained on the drill string of nearly drill bit, asks for formation characteristics and parameter in the hope of in drilling well, utilizing collateral information.This method has in the industry cycle also become mature technology at present, has become the core content of geologic steering drilling especially.However, still having the people to declare patent (for example: the one Chinese patent application " While drilling system and method " that disclosed publication number in 2005 is CN1576513) improves method, instrument.Indirect method the most comprehensively surely belongs to the NDS technology (No DrillingSurpreses) that U.S. Schlumberger company released in 2003 at present, and it is " prediction before drilling stratum, understanding stratum in creeping into " that this technology is known as.This technology at first utilizes data predictions such as earthquake, geology to wait to bore formation parameters such as the geological structure of block, pore pressure, caving pressure, fracture pressure, formation fluid; The formation parameter of in creeping into, predicting then through sensor (resistivity, sound wave, the radioactivity etc.) correction that is contained in nearly drill bit place.
The Dc index method of prediction formation pore pressure, shale compacting, comprehensive drillability method etc. also belong to indirect method in ripe the creeping into of using of industry, and the characteristic that it has utilized the stratum in the process of being broken, to show is asked for formation pore pressure.
(2) direct method: directly ask for the method for formation parameter, be divided into two big types of overbalance drilling well and under balance pressure drillings.
The direct method of overbalance, have in creeping into, measure (for example: drill stem testing method, DST-Drill Stem Test; Cable formula retest method, RFT-Repeat Formation Test.They all are after stopping normally to creep into, to be lowered to specialist tools and to measure, and these methods have been the mature technology of industry-wide adoption at present).Also have well completing test or the well testing carried out after boring, this is the formation testing program of carrying out specially after drilling well is accomplished, and this also is the mature technology of industry.In addition, also the someone has proposed some special methods.One Chinese patent application as disclosed publication number in 2005 is CN1648410 " is confirmed the method for strata pressure ", has set forth a kind of method of the RFT of being similar to instrument, under overbalanced conditions, utilizes diafiltration and mud cake to form and asks for strata pressure.And for example: the one Chinese patent application of disclosed publication number CN1266142 in 2000 " detects the method that obtains seepage and stratum integrity detection " with limited down-hole pressure; Set forth dress pressure sensor record circulation in the drill string bottom; Force value during termination of pumping is to ask for the leakage characteristic on leakage pressure and stratum.Also have: the notification number that calendar year 2001 is announced is the Chinese invention patent " method that the limit drilling well is produced as a trial while testing in early days and facility " of CN1065943C; Proposed the method that drilling well successively when many mouthfuls of wells of identical platform (or structure), test and trial throw are produced, purpose is to shorten production cycle.
Underbalance direct method, the earliest be that one procedure-closing well in the well control that generally adopts of industry is asked pressure, refer to that when unexpected underbalance takes place closing well reads upright the pressure immediately, obtains strata pressure thus.After under balance pressure drilling occurs as a kind of new boring method; There is considerable people to inquire into theory and the method for asking for formation parameter under the insufficient balance condition with the hairdo that publishes thesis; These discussions all are based on homogeneous porosity stratum; Its theoretical foundation is the darcy flow law, does not form complete supporting technology.Also the someone declares the patent of asking for strata pressure under the insufficient balance condition; For example: the one Chinese patent application " a kind of underbalanced drilling well bottom pressure automatic control system and method " that disclosed publication number in 2005 is CN1611742; Proposed to survey the upright bottom pressure of pressing, calculate; When bottom pressure calculating value departs from predetermined value, control throttle valve opening regulator solution column pressure automatically and adapt to it.And for example: the one Chinese patent application that disclosed publication number in 2003 is CN1403680 " is confirmed the method for drilling fluid density and the equipment of control drilling fluid density "; This is a kind of method of confirming mud density based on the underbalance well kick; Proposed to describe the simple mathematical model of well kick, controlled reasonable drilling liquid density thus ".
Above-mentioned each class methods are summarized, can find out:
● pore pressure that all kinds of indirect methods can not directly record reservoir and leakage pressure, indirect supposition often and actual value differ bigger.
● the direct method of various overbalance receives under the overbalance injury condition at reservoir and to carry out.Be prone to the injury reservoir for these, this injury has caused the serious deviation of test result, and tests interruption and normally creep into, and is consuming time very long.
● all kinds of underbalance direct methods, based on the theoretical method of homogeneous porous reservoir darcy flow, when reservoir characteristics does not meet darcy flow theory (like fracture development, seam hole reservoir), just this method is unavailable.Ask strata pressure with the upright method of pressing of closing well under the under balance pressure drilling condition, just there is very mistake in itself.Because the annular space gassiness is more during under balance pressure drilling, gas on top the well section expand, slippage, and be drilling fluid with gas not in the drill string; In case closing well stops circulation; Make that drilling fluid injects annular space in the drill string in the drilling rod with the U type tube effect of annular space, make closing well upright be pressed with reduce, cause inaccurate.Therefore, " closing well is asked pressure " in the well control is to be suitable for when gassiness is less in annular space is in time found overflow, annular space.Under the closing well state in the annular space rising of gas borehole pressure is raise, also cause closing well to ask upright difficulty of pressing.For the low pressure oil gas-bearing formation that needs the drilling rod gas injection, closing well is asked the upright more mistake that is pressed with.For the simultaneous reservoir of the spray of leakage (fracture development, the growth of seam hole, high permeability long well section) is arranged, closing well asks upright method of pressing also inapplicable.
● what is more important: usually, often cause the underbalance magnitude of pressure differential improper, even can not cause insufficient balance condition because the fluid column dynamic pressure is too high because reservoir pore space pressure does not know specifically what are.
It is thus clear that; Still do not have a kind of measuring while drilling method at present and can test its state (pore pressure, fluid output, fluid properties etc.) and state under the overbalanced conditions (but missing pressure, leakage characteristics shutoff characteristic, leakage spray) under insufficient balance condition dissimilar reservoirs (pore type, slit formation, crack-pore type, hole-seam-hole type etc.) with depositing characteristic etc.And reservoir be by under-balanced state equilibrium state on a large scale in the characteristic that shows and corresponding reservoir parameter be to select boring method targetedly, implementing process reasonable in design for use, thereby the basis of the reservoir drilling well of the safety of realization, efficient, good protection reservoir.
Summary of the invention
The objective of the invention is: solve that the scope of application that existing indirect method that the characteristic and the parameter of oil and gas reservoir are tested and direct method exist is little, test error is big, length consuming time; And can't open the technical barrier that carries out reservoir parameter test and reservoir characteristics judgement in the reservoir process at brill; Provide a kind of can in reservoir bores the very short well section of opening, the realization reservoir characteristics and parameter to be carried out full test with boring; Carry out security risk evaluations and reservoir protection effect assessment immediately according to test result; Instruct the real-time adjustment of drilling plan with this, be suitable for that the reservoir scope is wide, measuring accuracy is high, the measuring while drilling reservoir parameter of weak point consuming time and the method for characteristic.
For realizing the object of the invention; According to existing known technology; Confirm the parameter area of test reservoir characteristics; Proposition is in drilling course; Regulate the head of liquid of drilling fluid through the high-pressure gas injection mode,, make it to treat equilibrium state excessively has been in the pore pressure realization of boring reservoir from under-balanced state change procedure to reach the difference of regulating between its bottom pressure and the reservoir pore space pressure; And in this change procedure flow, the drilling fluid through the monitoring injecting gas injection rate and return output, return out solid, gas and liquid in the circulating system and return in the output parameters such as hydrocarbon gas content, obtain reservoir characteristics parameter values such as reservoir pore space pressure, permeability, wastage, leak-off velocity.In this observation process, in order to guarantee well head safe, taked the well head blowout prevention procedure to fire or the measure of toxic and harmful with handling.
Concrete technical scheme is:
The method of a kind of measuring while drilling reservoir parameter characteristic and real-time adjustment drilling method, adopt following steps:
(1) gets into reservoir with under-balanced state,, make it to treat brill reservoir pore space pressure and excessively be equilibrium state from under-balanced state with the head of liquid of method of gas injection adjusting drilling fluid;
(2) in under-balanced state; Return out the oil and the hydrocarbon gas concentration and the total gas couette that return out gas of fluid through monitoring, circulatory monitoring obtains a plurality of test points and is depicted on " bottom pressure-fluid flow " figure; Obtain reservoir pore space pressure and permeability, and record gas-oil ratio; Reduce gas injection or stop gas injection, make shaft bottom circulation dynamic pressure be in the overbalance state, monitor the injection of drilling fluid and return output,, confirm the wastage and the leak-off velocity of reservoir according to injection rate and the difference of returning output;
(3) according to the bargraphs of test point on " bottom pressure-fluid flow " figure, the bargraphs pattern of contrast plate is judged reservoir property;
(4), judge the leakage characteristics of reservoir according to reservoir wastage and leak-off velocity;
(5) according to the leakage characteristics of reservoir property and reservoir, select the drilling method that adapts to.
Before the head of liquid of drilling fluid is regulated in the beginning gas injection, can also take following steps:
A. according to the general type of geologic information predicting reservoir medium;
B. the result who obtains according to a estimates to wait to bore the reservoir pressure lower limit and leakage upper pressure limit of reservoir;
C. the result who obtains according to b roughly confirms the density and the maximum gas injection rate of drilling fluid; Shaft bottom dynamic pressure when making maximum gas injection rate is less than the reservoir pressure lower limit; And make when stopping gas injection the shaft bottom dynamic pressure greater than the leakage upper limit of pressure, can carry out underbalance flowing test and overbalance flowing test to guarantee reservoir.
The ground circulating system that is used to monitor the injection of drilling fluid and return output disposes multiphase separator, lighting-off torch and automatic ignition device; Slush pump is connected with well head through one way valve; Well head is connected with multiphase separator through choke valve one; Multiphase separator has gas, liquid, three outlets of solid phase separator, and well head is connected with relief line through choke valve two.
In case oil occurs, then stop to creep into, come into effect the measuring while drilling of reservoir parameter and characteristic.
Method of gas injection adopts the high-pressure gas injection system, and the gas that the high-pressure gas injection system is injected is nitrogen or combustion gas or air.
Said method of gas injection is regulated and is equipped with a complete set of under balance pressure drilling to make up with preventer in the wellhead assembly that adopts in the head of liquid method of drilling fluid, comprises in this combination and selects swivel control head or rotating blowout preventer.
Described high-pressure gas injection system is provided with the device of monitoring injecting gas flow, pressure, temperature.
Be provided with the device that drilling well liquid measure, oily flow, total gas flow rate are returned out in monitoring at said multiphase separator place, the exhaust line that is connected with its gas vent is provided with the pressure of hydrocarbon gas concentration, concentration of hydrogen sulfide, gas concentration lwevel and exhaust line in the monitoring mist and the device of flow.
Chlorine root, total salinity are carried out device for monitoring in said multiphase separator place also is provided with the drilling fluid that separates.
The leakage characteristics of above-mentioned judgement reservoir is according to the leak-off velocity of reservoir and relation, leak-off velocity and the time relation of pressure, judges the leakage characteristics of reservoir.
The drilling method that said selection adapts to is meant; For leakage serious and leak severe leakage reservoir that speed do not reduce in time, leakage obviously and leak the not invalid leakage property reservoir of drilling fluid leak stopping that speed do not reduce in time, leakage is arranged and leak in time that speed reduces to some extent but and non-vanishing drilling fluid leak stopping can reduce the reservoir that leaks speed, but the reservoir of the drilling fluid shutoff that observable leakage and short time leakage stop to be arranged; Should adopt a certain under balance pressure drilling, overall process under-balance drilling, controlled pressure drilling, the gas injection pressure-stabilizing drilling well according to risk assessment, and be not suitable for adopting the overbalance drilling well; For the reservoir of the good leak stopping of drilling fluid that does not have obviously leakage and stop to miss in several minutes, can select the drilling well of overbalance shield-temporary plugging; For the fine and close clastic reservoir rock of the obsolete hyposmosis in crack that does not have leakage basically, can describe and the laboratory core experimental result according to reservoir fine, select water-base drilling fluid balanced drilling or gas under balance pressure drilling.
Said have observable leakage and short time leakage to stop, and be meant 1 cubic metre to several cubic metres of accumulation wastage, and leakage stops in tens of minutes; Said not obviously leakage is meant, total wastage of 10 meters reservoirs is less than 1 cubic metre, or is difficult to observe; Said basic not leakage is meant that 10 meters total wastages of reservoir are less than 0.1 cubic metre.
The present invention regulates the post hydraulic coupling of drilling fluid through the high-pressure gas injection system; To realize regulating the difference excursion between its bottom pressure and the reservoir pore space pressure; Thereby realize reservoir excessively has been equilibrium state by under-balanced state variation; " simulation " reservoir be in the characteristic variations under these two kinds of equilibrium states, thereby set up condition for obtaining its characterisitic parameter; When beginning oil to occur, promptly stop to creep into, and keep circulation, the hydrocarbon gas concentration of gas is returned out in monitoring, sets up several test points and just can obtain reservoir pore space pressure and permeability, weak point consuming time; When the overbalance state, the accurately injection of measuring drilling fluid and return output can be very accurately in the leakage characteristics of judging under the reservoir overbalance state; And through in the change procedure of reservoir bottom pressure from the underbalance to the overbalance in the situation of change of test point parameter line; Contrast corresponding plate; Can judge the character of reservoir; Comprise leakage characteristics (leakage pressure spot (pressure) but, leak-off velocity, wastage, whether pernicious leakage or shutoff), well kick characteristic (controlled well kick or uncontrollable well kick (blowout) or leak spray), toxic gas characteristic (content, type and the extent of injury) and, also foundation is provided with regard to the boring method of which kind of taking adapt for the technician to the differentiation of reservoir pore space media type (slit formation or pore type or crack-pore type or hole-seam-hole type) with layer.According to the judgement of above-mentioned reservoir property, the present invention also provides under the various reservoir situation, the adaptation drilling method that can adjust in real time and choose.
It is thus clear that; Adopt technical scheme of the present invention; Can in reservoir bores the very short well section of opening, realize with boring reservoir characteristics and parameter being carried out full test, and judge reservoir property, the boring method of adaptation is chosen in adjustment in real time; Be suitable for that the reservoir scope is wide, measuring accuracy is high, weak point consuming time, solve in the past direct method and all can not open with indirect method and carry out the problem that reservoir parameter is tested in the reservoir process at brill.Can be widely used in carrying out the measuring while drilling reservoir parameter in oil and natural gas exploration, the drilling well of exploitation reservoir,, foundation is provided for further adopting corresponding boring method to confirm the reservoir type.
Description of drawings
Fig. 1 is that the well head that adopts among the present invention is discharged systematic schematic diagram;
Fig. 2 is a mesohigh gas injection system schematic diagram of the present invention;
Fig. 3 is a underbalance linear flow test sketch map among the present invention;
Fig. 4 and Fig. 5 are well control security risk evaluations sketch mapes under the different reservoir parameter among the present invention;
Fig. 6 and Fig. 7 are reservoir overbalance leakage characteristics test sketch mapes among the present invention;
Fig. 8 and Fig. 9 are the underbalance and the overbalance integration test sketch mapes of complex dielectrics reservoir among the present invention;
Fig. 3-6, the abscissa P among Fig. 8-9 representes bottom pressure, ordinate Q representes fluid flow;
Abscissa t express time among Fig. 7;
Label among the figure, the 1st, slush pump, the 2nd, one way valve one, 3rd, well head, the 4th, choke valve one, 5th, choke valve two; The 6th, multiphase separator, the 6.1st, the solid phase separator outlet of multiphase separator, the 6.2nd, the gas vent of multiphase separator, the 6.3rd, the liquid outlet of multiphase separator, the 7th, lighting-off torch; The 8th, relief line, the 9th, slurry tank, the 10th, slush pump, the 11st, blender, the 12nd, three-way cock valve; The 13rd, one way valve two, 14th, flow meter, the 15th, needle-valve, the 16th, gas-booster, the 17th, source of the gas generator.
The specific embodiment
Below in conjunction with specific embodiment and accompanying drawing the present invention is further described.
Well head in that the well head configuration is as shown in Figure 1 is discharged system and high-pressure gas injection system as shown in Figure 2.
Well head discharge system comprises the slush pump 1 that is connected with well head 3, is provided with one way valve 1 between the two, and well head 3 is connected with the inlet of multiphase separator 6 through choke valve 1, and the gas vent 6.2 of multiphase separator 6 is connected with lighting-off torch 7; Well head 3 is connected with relief line 8 through choke valve 25.
The multiphase separator 6 of well head discharge system is separating oil, gas, drilling fluid and drilling cuttings effectively, and whole system formation sealing and circulating, overflows to prevent pernicious gas; Also be furnished with relief line 8, lighting-off torch 7 and automatic ignition device, so that firing property of safe handling gas and toxic gas.
The well head system that discharges also is equipped with a complete set of under balance pressure drilling preventer combination, comprises and selects control head (RCH) or rotating blowout preventer (RBOP), to guarantee test process security property, avoids blowout.
The well site is equipped with accurate monitoring equipment, and the solid phase separator that can monitor injection flow, annular space returning fluid flow, the multiphase separator 6 of borehole pump returns output, slurry tank 9 liquid levels change, so that accurately judge drilling fluid leakage amount and leak-off velocity.
The high-pressure gas injection system comprises drilling fluid storage body and connected piston high-density pump 10; Piston high-density pump 10 is connected with blender 11; Blender 11 also is connected with three-way cock valve 12, and three-way cock valve 12 is connected with one way valve 2 13, and one way valve 2 13 is connected with flow meter 14; Flow meter 14 is connected with gas-booster 16 with needle-valve 15, and gas-booster 16 is connected with source of the gas generator 17.
Take following measure to carry out the measuring while drilling of reservoir parameter then.
Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9 provide the reservoir to various character, can estimate the corresponding plate of the type and the degree of its well control security risk.
1,, on this basis and with reference to other given data, estimates to wait to bore the reservoir pressure lower limit and leakage upper pressure limit of reservoir according to the general type (pore type, slit developmental pattern, slit formation etc.) of geologic information predicting reservoir medium.Roughly confirm the density and the maximum gas injection rate of used drilling fluid; Shaft bottom dynamic pressure when making maximum gas injection rate is less than the reservoir pressure lower limit; And make when stopping gas injection the shaft bottom dynamic pressure greater than the leakage upper limit of pressure, can carry out underbalance flowing test and overbalance flowing test to guarantee reservoir.
2, open the high-pressure gas injection system; With method of gas injection (mainly is through regulating gas injection rate; Be aided with back pressure control in case of necessity) regulate the head of liquid of drilling fluid, realize changing bottom pressure rapidly, neatly, make it to form and treat the under-balanced state that bores reservoir pore space pressure.Pierce reservoir with this state low speed, the oil of fluid is returned out in monitoring simultaneously.In case oil occurs then stop immediately creeping into; According to stopping drilling time and circulation lagged time, keep circulation, the while is returned out the hydrocarbon gas concentration of gas at the discharge pipe on-line monitoring of the gas vent 6.2 of multiphase separator 6; After treating that this concentration reaches stationary value, as first test point.Reduce (or increasing) gas injection rate, increase (or reducing) bottom pressure, as second test point, circulation and monitoring hydrocarbon gas concentration change until stable.Reduce (or increasing) gas injection rate again, increase (or reducing) bottom pressure again, as the 3rd test point, circulation and monitoring hydrocarbon gas concentration change until stable.Three test points are depicted on " bottom pressure-fluid flow " figure, connect 3 oblique lines and abscissa intersection point P 0For reservoir pore space pressure, slope K then are scaled permeability.As shown in Figure 3.
If boring and opening reservoir is pore type, also can the test of three dotted lines be reduced to the test of two dotted lines.
The used source of the gas of high-pressure gas injection system can be the gas that nitrogen (the available patent No. is the Chinese invention patent disclosed method preparation of ZL00113183.4), tail gas or combustion gas (available publication number is the Chinese invention patent application disclosed method preparation of CN1644491), air or other non-hydrocarbons are suitable for.
The high-pressure gas injection system configuration has the device of monitoring injecting gas flow, pressure and temperature parameter.
3, return out drilling well liquid measure, oily flow, total gas flow rate in the multiphase separator 6 places monitoring of well head discharge system, simultaneously the pressure and the flow of hydrocarbon gas concentration, sulfureted hydrogen gas concentration, density of carbon dioxide gas and the exhaust line in stack on-line monitoring mist.At multiphase separator 6 places the drilling fluid that separates is carried out chlorine root, total salinity monitoring, to judge the intrusion of formation brine.
Because do not contain any hydrocarbon gas in the injecting gas, so return out the volume ratio that the interior hydrocarbon gas concentration of gas can be indicated hydrocarbon gas in the mist; Because the injecting gas flow is known,, just bore the output of opening reservoir under this condition again so can calculate the hydrocarbon gas flow.
Under the monitored known condition of oily flow, gas production and the ratio of oil production are the gas-oil ratio of reservoir.Gas-oil ratio combines with well depth, reservoir pressure, reservoir permeability etc., just can estimate and treat the risk of boring reservoir well control safety under the under-balanced state of design, and determining whether being fit under balance pressure drilling or underbalance pressure reduction thus much is safety.The well control risk assessment also comprises and stops for a long time circulating or the safety evaluation of closing well, the safety evaluation in evaluation and the casing valve of the handling safety well after closing that makes a trip by force.The risk of well control safety both possibly come from big gas production (long reservoir section, high permeability, high gas-oil ratio (HGOR)), also possibly come from the high pressure reservoir.
What represent like Fig. 4 is the well control security risk of uniform pressure, different permeabilities;
What represent like Fig. 5 is the well control security risk of identical permeability, different pressures.
Return out hydrogen sulfide gas and density of carbon dioxide gas monitoring in the gas, can indicate the concentration of toxic gas in the reservoir natural gas.In conjunction with waiting to bore the underbalance pressure reduction that reservoir segment length, pressure, permeability and expectation are adopted; What can provide toxic gas overflows speed and total spill-out; Just can estimate and treat the risk of boring reservoir toxic gas under the under-balanced state of design, determine whether can adopt underbalance and underbalance pressure difference reasonable in design with this.And the monitoring of these sour gas cooperates the salt water intrusion monitoring (chlorine root, total salinity etc.) of drilling fluid, also is the foundation of drill tool corrosion seriousness risk assessment.
4, reduce gas injection or stop gas injection; (for example positive differential pressure 1~3MPa) to make shaft bottom circulation dynamic pressure be in suitable overbalance state; Under this positive differential pressure, keep the sufficiently long time of circulation, the precise monitoring drilling fluid injects and returns output, judges the leakage characteristics of reservoir under overbalanced conditions.What represent like Fig. 6 is the relation of leak-off velocity and pressure, and what represent like Fig. 7 is leak-off velocity and time relation.
According to the reflection of the result who records on Fig. 6 and Fig. 7, can draw following result:
1) leakage is serious, and leaks minimizing in time of speed, belongs to the severe leakage reservoir;
2) leakage is obvious, and leaks minimizing in time of speed, belongs to the invalid leakage property reservoir of drilling fluid leak stopping;
3) leakage is arranged, and leaks speed in time and reduce to some extent, but and non-vanishing, belong to the drilling fluid leak stopping and can reduce the reservoir that leaks speed;
4) there are observable leakage (1 cubic metre to several cubic metres of accumulation wastage) and short time (in tens of minutes) leakage to stop, but belong to the reservoir of drilling fluid shutoff;
5) not obviously leakage (total wastage of 10 meters reservoirs less than 1 cubic metre, or be difficult to observe), and stop leakage in several minutes, belong to the reservoir of the good leak stopping of drilling fluid;
6) basic not leakage (10 meters total wastages of reservoir are less than 0.1 cubic metre) belongs to the fine and close clastic reservoir rock of the obsolete hyposmosis in crack.
For situation 1)~4), should adopt a certain under balance pressure drilling, overall process under-balance drilling, controlled pressure drilling, the gas injection pressure-stabilizing drilling well according to risk assessment, and be not suitable for adopting the overbalance drilling well.
For situation 5), open though generally can accomplish the reservoir brill with the overbalance temporary shielding method ,barrier building temporary seal incores, whether can realize good reservoir protection, also need confirm according to the technological means that reservoir fine is described and laboratory core is tested.
For situation 6); Generally mean the serious positive differential pressure injury of overbalance drilling well; And the water trap of water-base drilling fluid injury, actually or water-base drilling fluid balanced drilling, gas under balance pressure drilling, also need describe the technological means of testing and confirm according to reservoir fine with laboratory core.
5,, can also judge the type of complex dielectrics reservoir according to the different manifestations of above-mentioned parameter on " bottom pressure-fluid flow " figure.
The performance of the result who records on " bottom pressure-fluid flow " such as the figure that Fig. 3~Fig. 7 showed, then the expression reservoir of surveying is the reservoir of pore type or approximate pore type (slit-pore type dual media that promptly has a small amount of slit to grow).Being that the performance of parameter on figure meets above-mentioned graphic result, is pore type or approximate pore type reservoir with regard to decidable.
But for seam hole type reservoir and the pore type reservoir that large fracture in the macroscopic view is arranged; Especially for the reservoir that has in the straight well large fracture and large scale dissolution pore solution cavity in the high angle, the test result of bottom pressure being changed into some pressure spots of overbalance by underbalance then conforms to figure shown in Figure 9 with Fig. 8.The test of three pressure spots is at least respectively arranged in underbalance and overbalance scope.
As shown in Figure 8, owing to have serious gravity displacement property leakage spray, so under under-balanced state, be main but also have leakage to exist with the spray at seam hole type reservoir; And under the overbalance state, be main with leakage, but still have spray (gas cut), belong to and leak spray with a layer type.This types of reservoir can not find and not leak the pressure balance point that does not spray, and is difficult to directly obtain reservoir pressure.Through connecting underbalance curved section tangent line and overbalance curved section tangent line, this tangent line and abscissa intersection point are roughly reservoir pressure.
As shown in Figure 9, the distance of underbalance curved section and overbalance curved section has been represented the order of severity that the leakage spray is deposited together and has been leaked the pressure limit of spraying with depositing.Therefore, can judge that by these characteristics the leakage spray of stitching hole type reservoir is with depositing the order of severity.
For such reservoir, recommend to adopt the controlled under balance pressure drilling of overall process (the continuous circulating drilling of double-deck casing programme).If the danger of high-hydrogen sulfide is arranged, then the bottom pressure state is adjusted into the overall process controlled manner that little overbalance is bored while leaking, or adopts the mud cap drilling technology of the fluid of loseing returns.
It is thus clear that, through embodiment of the invention disclosed method, can obtain the reservoir characteristics parameter, and can be according to the reflection of reservoir characteristics parameter on " bottom pressure-fluid flow " figure, the analysis result that draws the reservoir type and guides drilling plan to adjust in real time.And the measuring while drilling method among the present invention can both be suitable for for various types of reservoirs, in reservoir bores the very short well section of opening, promptly begins test, to little, the consuming time weak point of the injury of reservoir, precision height.
The corresponding drilling technology scheme of taking to various reservoir types among the present invention can supply the person skilled reference.

Claims (9)

1. the measuring while drilling reservoir parameter characteristic and the method for adjustment drilling method in real time, it is characterized in that: said method adopts following steps,
(1) gets into reservoir with under-balanced state,, make it to treat brill reservoir pore space pressure and excessively be equilibrium state from under-balanced state with the head of liquid of method of gas injection adjusting drilling fluid;
(2) in under-balanced state; The oil and the hydrocarbon gas concentration and the total gas couette that return out gas of fluid returned out in monitoring, records gas-oil ratio, through circulatory monitoring; Obtain " bottom pressure-fluid flow " figure of a plurality of test points, obtain reservoir pore space pressure and permeability from this figure; Through reducing gas injection or stopping gas injection, make shaft bottom circulation dynamic pressure be in the overbalance state, monitor the injection of drilling fluid and return output, according to injection rate and the difference of returning output, confirm the wastage and the leak-off velocity of reservoir;
(3) according to the bargraphs of test point on " bottom pressure-fluid flow " figure, the bargraphs pattern of contrast plate is judged reservoir property;
(4), judge the leakage characteristics of reservoir according to reservoir wastage and leak-off velocity;
(5) according to the leakage characteristics of reservoir property and reservoir, the drilling method of adaptation is selected in adjustment in real time.
2. the method for a kind of measuring while drilling reservoir parameter characteristic as claimed in claim 1 and real-time adjustment drilling method is characterized in that: before the head of liquid of drilling fluid is regulated in the beginning gas injection, take following steps,
A. according to the general type of geologic information predicting reservoir medium;
B. the prediction of result that obtains according to a waits to bore the reservoir pressure lower limit and leakage upper pressure limit of reservoir;
C. the result who obtains according to b roughly confirms the density and the maximum gas injection rate of drilling fluid; Shaft bottom dynamic pressure when making maximum gas injection rate is less than the reservoir pressure lower limit; And make when stopping gas injection the shaft bottom dynamic pressure greater than the leakage upper limit of pressure, can carry out underbalance flowing test and overbalance flowing test to guarantee reservoir.
3. the method for a kind of measuring while drilling reservoir parameter characteristic as claimed in claim 2 and real-time adjustment drilling method; It is characterized in that: the ground circulating system that is used to monitor the injection of drilling fluid and return output disposes multiphase separator, lighting-off torch and automatic ignition device; Slush pump is connected with well head through one way valve; Well head is connected with multiphase separator through choke valve one; Multiphase separator has gas, liquid, three outlets of solid phase separator, and well head is connected with relief line through choke valve two.
4. the method for a kind of measuring while drilling reservoir parameter characteristic as claimed in claim 3 and real-time adjustment drilling method; It is characterized in that: be provided with the device that drilling well liquid measure, oily flow, total gas flow rate are returned out in monitoring at said multiphase separator place, the exhaust line that is connected with its gas vent is provided with the pressure of hydrocarbon gas concentration, concentration of hydrogen sulfide, gas concentration lwevel and exhaust line in the monitoring mist and the device of flow.
5. like the method for claim 1 or 2 or 3 or 4 described a kind of measuring while drilling reservoir parameter characteristics and real-time adjustment drilling method, it is characterized in that: in case oil occurs, then stop to creep into, come into effect the measuring while drilling of reservoir parameter and characteristic.
6. the method for a kind of measuring while drilling reservoir parameter characteristic as claimed in claim 5 and real-time adjustment drilling method is characterized in that: method of gas injection adopts the high-pressure gas injection system, and the gas that the high-pressure gas injection system is injected is nitrogen or combustion gas or air or combustion tail gas.
7. like claim 1 or 2 or 3 or 4 described a kind of measuring while drilling reservoir parameter characteristics and the real-time method of adjusting drilling method; It is characterized in that: the leakage characteristics of judging reservoir; Be according to the leak-off velocity of reservoir and relation, leak-off velocity and the time relation of pressure, judge the leakage characteristics of reservoir.
8. like claim 1 or 2 or 3 or 4 described a kind of measuring while drilling reservoir parameter characteristics and the real-time method of adjusting drilling method; It is characterized in that: the drilling method that said real-time adjustment is selected to adapt to is meant; For leakage serious and leak severe leakage reservoir that speed do not reduce in time, leakage obviously and leak the not invalid leakage property reservoir of drilling fluid leak stopping that speed do not reduce in time, leakage is arranged and leak in time that speed reduces to some extent but and non-vanishing drilling fluid leak stopping can reduce the reservoir that leaks speed, but the reservoir of the drilling fluid shutoff that observable leakage and short time leakage stop to be arranged; Should adopt a kind of under balance pressure drilling, overall process under-balance drilling, controlled pressure drilling, the gas injection pressure-stabilizing drilling well according to risk assessment, and be not suitable for adopting the overbalance drilling well; For the reservoir of the good leak stopping of drilling fluid that does not have obviously leakage and stop to miss in several minutes, select the drilling well of overbalance shield-temporary plugging; For the fine and close clastic reservoir rock of the obsolete hyposmosis in crack that does not have leakage basically, describe and the laboratory core experimental result according to reservoir fine, select water-base drilling fluid balanced drilling or gas under balance pressure drilling.
9. the method for a kind of measuring while drilling reservoir parameter characteristic as claimed in claim 8 and real-time adjustment drilling method; It is characterized in that: said have observable leakage and short time leakage to stop; Be meant 1 cubic metre to several cubic metres of accumulation wastage, and leakage stops in tens of minutes; Said not obviously leakage is meant, total wastage of 10 meters reservoirs is less than 1 cubic metre, or is difficult to observe; Said basic not leakage is meant that 10 meters total wastages of reservoir are less than 0.1 cubic metre.
CN200610021795XA 2006-09-08 2006-09-08 Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time Expired - Fee Related CN101139925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610021795XA CN101139925B (en) 2006-09-08 2006-09-08 Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610021795XA CN101139925B (en) 2006-09-08 2006-09-08 Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time

Publications (2)

Publication Number Publication Date
CN101139925A CN101139925A (en) 2008-03-12
CN101139925B true CN101139925B (en) 2012-07-04

Family

ID=39192007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610021795XA Expired - Fee Related CN101139925B (en) 2006-09-08 2006-09-08 Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time

Country Status (1)

Country Link
CN (1) CN101139925B (en)

Families Citing this family (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2931189B1 (en) * 2008-05-16 2010-05-14 Total Sa METHOD FOR ESTIMATING PHYSICAL PARAMETERS OF A GEOLOGICAL FORMATION
CN101922285A (en) * 2009-07-31 2010-12-22 中国石油集团川庆钻探工程有限公司钻采工艺技术研究院 Method for safely tripping gas drilling tool in case of encountering air layer
CN101781983A (en) * 2010-03-01 2010-07-21 中国石油集团川庆钻探工程有限公司 Method used for gas drilling drillstem test
CN102418509B (en) * 2010-09-28 2014-07-09 中国石油化工集团公司 Indoor test system and method for managed pressure drilling technology
CN102455438B (en) * 2010-10-26 2014-05-28 中国石油化工股份有限公司 Method for predicting volume of carbonate rock fractured cave type reservoir
CN102230373B (en) * 2011-05-19 2014-04-02 中国石油大学(北京) Method for determining safe drilling fluid density of coal bed based on structural element analysis model
CN102661146B (en) * 2012-05-21 2015-07-08 西南石油大学 Method for discontinuously acquiring underground pressure pulse of inflatable bored well
CN103061753A (en) * 2013-01-18 2013-04-24 西南石油大学 Device for measuring downhole flow while drilling and monitoring early overflow
CN103411750B (en) * 2013-07-13 2015-09-30 西南石油大学 High Temperature High Pressure full-hole core fracture plugging instrument
CN103790568B (en) * 2014-01-07 2016-08-17 西南石油大学 A kind of drilling parameter and efficiency real-time optimization method
CN104806228A (en) * 2015-02-16 2015-07-29 中国石油天然气股份有限公司 Method and device for identifying well control risk grade in engineering design
CN106150485B (en) * 2015-04-08 2019-03-15 中国石油化工股份有限公司 A kind of drilling well leakage forecasting system based on digital rock mass
CN106150484B (en) * 2015-04-08 2019-03-15 中国石油化工股份有限公司 A kind of drilling well leakage prediction technique based on digital rock mass
CN105672997A (en) * 2016-03-18 2016-06-15 西南石油大学 Monitoring method for formation leakage of drilling fluid
CN107689013B (en) * 2016-08-03 2021-06-15 中国石油化工股份有限公司 Method and device for correcting evaluation parameters before drilling of trap resource amount
CN106339549A (en) * 2016-08-29 2017-01-18 中国地质大学(北京) Measuring and calculating method of upwelling speed of oil gas
CN107448192B (en) * 2017-08-04 2020-08-04 中国石油大学(华东) Method for predicting actual drilling pressure at bottom of well of static pushing type rotary steering drilling tool
CN107480899B (en) * 2017-08-21 2020-10-09 中国石油天然气股份有限公司 Reservoir water channeling identification method and device
CN110485992B (en) * 2018-05-14 2021-11-26 中国石油化工股份有限公司 Method for calculating oil gas channeling speed for well drilling and completion
CN109098683A (en) * 2018-08-13 2018-12-28 西南石油大学 A kind of well killing method for eliminating gravity displacement for horizontal well
CN109162705B (en) * 2018-10-31 2023-10-03 秦川机床集团宝鸡仪表有限公司 Hydraulic pressure monitoring system for bottom hole flow pressure of gas well and monitoring method thereof
CN109538154A (en) * 2018-12-19 2019-03-29 中国石油集团川庆钻探工程有限公司 A kind of well-control equipment for high-pressure reservoir nitrogen injection drilling
CN109577902A (en) * 2018-12-19 2019-04-05 中国石油集团川庆钻探工程有限公司 A kind of well control method for high-pressure reservoir nitrogen injection drilling
CN112241510A (en) * 2019-07-16 2021-01-19 中石化石油工程技术服务有限公司 Fault sealing logging evaluation method
CN111058796B (en) * 2019-11-25 2021-11-09 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN113311140B (en) * 2020-02-26 2024-03-01 中国石油天然气股份有限公司 Hydrocarbon reservoir testing system and hydrocarbon reservoir testing method
CN111502640B (en) * 2020-04-22 2022-11-15 中国海洋石油集团有限公司 Device and method for measuring formation pore pressure and leakage pressure
CN111927439A (en) * 2020-09-03 2020-11-13 中国石油天然气集团有限公司 Bottom hole pressure control method
CN111946335B (en) * 2020-09-03 2024-06-25 中国石油天然气集团有限公司 Method for obtaining formation pressure based on underground hydrocarbon detection technology
CN113006769B (en) * 2021-03-17 2022-07-26 中国石油大学(华东) Intelligent well killing method and device for complex pressure system stratum
CN115142836A (en) * 2021-03-30 2022-10-04 中国石油化工股份有限公司 Method, storage medium and equipment for monitoring formation gas yield
CN115704317A (en) * 2021-08-12 2023-02-17 中国石油化工股份有限公司 Portable dynamic monitoring device for annular fluid of annular pressurized well
CN113803063B (en) * 2021-10-29 2023-08-22 中国石油天然气股份有限公司西南油气田分公司勘探开发研究院 Method for defining flow state limit of reservoir cracks of natural gas reservoir
CN114526025B (en) * 2022-01-25 2023-07-25 西南石油大学 Remote intelligent active drilling pressure control system and method
CN114922614A (en) * 2022-06-24 2022-08-19 西南石油大学 Formation pressure monitoring method under pressure control drilling working condition
CN115452681B (en) * 2022-11-11 2023-01-17 中国石油大学(华东) Method for determining relative permeability of reservoir oil gas
CN116398126B (en) * 2023-06-07 2023-08-25 山东万洋石油科技有限公司 Data processing method based on small-diameter while-drilling resistivity of casing windowing horizontal well
CN117888841B (en) * 2024-03-15 2024-05-17 江苏卫东机械有限公司 Intelligent feedback control electric drilling valve

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2337066A (en) * 1998-05-05 1999-11-10 Baker Hughes Inc A method for determination of bit whirl
CN2549154Y (en) * 2002-02-07 2003-05-07 长庆石油勘探局工程技术研究院 Unbalanced air drilling device
CN2729309Y (en) * 2004-09-16 2005-09-28 辽宁工程技术大学 Intelligent drilling monitoring system for oil field

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2337066A (en) * 1998-05-05 1999-11-10 Baker Hughes Inc A method for determination of bit whirl
CN2549154Y (en) * 2002-02-07 2003-05-07 长庆石油勘探局工程技术研究院 Unbalanced air drilling device
CN2729309Y (en) * 2004-09-16 2005-09-28 辽宁工程技术大学 Intelligent drilling monitoring system for oil field

Also Published As

Publication number Publication date
CN101139925A (en) 2008-03-12

Similar Documents

Publication Publication Date Title
CN101139925B (en) Method for while-drilling testing reservoir parameter property and adjusting well drilling action in real time
CA2811046C (en) Method and system for reservoir characterization in connection with drilling operations
CN100402797C (en) Method for in-situ analysis of formation parameters
US9677337B2 (en) Testing while fracturing while drilling
CN100449115C (en) Method for determining stratum diameter of well hole of projection hole finished well
US10138693B2 (en) Method of drilling a subterranean borehole
US8397817B2 (en) Methods for downhole sampling of tight formations
CN106522928B (en) Well testing method for unstable pressure drop of well logging head by stopping pump after acidizing and fracturing
US20230392496A1 (en) Injecting multiple tracer tag fluids into a wellbore
US5156205A (en) Method of determining vertical permeability of a subsurface earth formation
Kuchuk et al. Performance evaluation of horizontal wells
WO2021195171A1 (en) Wellbore quality improvement
US10598010B2 (en) Method for constructing a continuous PVT phase envelope log
Wojtanowicz et al. Strength and fracture gradients for shallow marine sediments
CN114320265A (en) Well leakage early detection method based on underground engineering parameter measurement
EP2397649A1 (en) Method and system for determining relative mass fluxes
Graham et al. Design and Implementation of a Levelland Unit CO2 tertiary pilot
Can et al. Design and execution of a holistic data acquisition program and data evaluation for utica shale
Bender et al. Estimating break-down pressure of upper marine sediments using soil boring data
CN118159715A (en) Surface well testing facility and combination of a cable formation tester and an active circulation system for obtaining inflow and measuring surface formation fluid parameters
Wold et al. The effect of cuttings on annular pressure loss-An analysis of field data in the North Sea
CN113311140A (en) Hydrocarbon reservoir testing system and method
Corwin Exploration Well Testing in Papua New Guinea
Deering et al. Processing of Formation Test Data Improves Sample Pumpout and Capturing Representative Samples in Variably Permeable Zones
Roscher Reservoir characterization through numerical models

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20150908

EXPY Termination of patent right or utility model