CN101135144A - Pile forming method for two-stage club-footed pile - Google Patents

Pile forming method for two-stage club-footed pile Download PDF

Info

Publication number
CN101135144A
CN101135144A CNA2007101572811A CN200710157281A CN101135144A CN 101135144 A CN101135144 A CN 101135144A CN A2007101572811 A CNA2007101572811 A CN A2007101572811A CN 200710157281 A CN200710157281 A CN 200710157281A CN 101135144 A CN101135144 A CN 101135144A
Authority
CN
China
Prior art keywords
immersed tube
pile
equipment
expand
expanded bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101572811A
Other languages
Chinese (zh)
Inventor
童乐天
王国奋
吴伟林
郑新俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007101572811A priority Critical patent/CN101135144A/en
Publication of CN101135144A publication Critical patent/CN101135144A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to construction of building pile foundation engineering, and is especially process of constructing two-stage under-reamed pile. The piling process includes the following steps: 1. immersing the immersed tube with metal pile head into hardpan to design elevation; 2. taking out the metal pile head; 3. forming the lower base space and taking out soil; 4. drawing upwards the immersed tube to one designed distance; 5. forming the upper base space and taking out soil; 6. setting reinforcing bars through the mouth of the immersed tube; 7. pouring flowable concrete; 8. setting the prefabricated pile stem with steel dowels through the mouth of the immersed tube, and connecting to reinforcing bars; and 9. withdrawing the immersed tube and injecting cement mortar to the gap. The present invention has the advantages of small size of pile stem and great bearing capacity.

Description

The piling method of secondary expanded bore pile
Technical field
The present invention relates to the piling method of the secondary expanded bore pile of a kind of construction of building pile foundation engineering, particularly a kind of expanded bore pile.
Background technology
According to the national regulation whole body is cast-in-place expanded bore pile, i.e. pile body Cast-in-place concrete, and base also is a Cast-in-place concrete, its base diameter ratio maximum value is limited in 3-3.5, and pipe sinking prefabricated steel concrete club-footed pile, this stake is the prefabricated concrete of pile body, the base Cast-in-place concrete, obviously this ratio 3-3.5 is broken, generally 3.5-5 can be reached,, requirement of engineering can't be satisfied although bearing capacity is bigger, particularly, the opposite end bearing capacity to give a discount 0.9 when bellout diameter during greater than 1.5 meters.For this reason, immersed tube prefabricated multistage under-reamed pile has appearred again.Existing multiple bearing capacity dish stake technology has two common ground, and first all is to expand the end with positive crossover-circulating type method pore-forming; Second all carries out pile without immersed tube expands the end.This two point-to-points load dish (at the bottom of the multistage expansion) stake is quite unfavorable, in other words, bring two problems, 1), national building code requirement, expand the base end load at the end with positive crossover-circulating type method pile and will take advantage of 0.45 coefficient, because have mud to exist and pile bottom sediment can't be cleaned out, and Zhejiang Province's standard is 0.24 discount, it is too big to give a discount, though a plurality of bases are arranged, loss end bearing capacity is very big; 2); without immersed tube; condition of construction can not get protection; positive in addition crossover-circulating type method is operation under water; expand bottom application worker situation and cannot see, the difficult measurement noted down, when also usually taking place to expand the end under water; top soil body a slice situation that falls down also happens occasionally; also have because the multistage stake of prior art all is the whole body Cast-in-place concrete, and that the intensity of Cast-in-place concrete is done is not high, and difficult quality guarantee; and in water, water concrete; the difficult control of quality adds that the pile capacity of a plurality of bases is all bigger, and its pile body diameter of above factor must be done greatlyyer; and this a plurality of base is afraid of that pile body diameter is big most; development test shows that pile body diameter increases, and its bearing capacity decay is very serious.
Summary of the invention
The problem that the present invention is directed to the prior art existence provides a kind of piling method of secondary expanded bore pile, purpose be process rationally, guarantee pile quality, give full play to the utilization rate of the strength of materials, make bearing capacity of single pile higher, all the time be in work under the most economical state, reduction coefficient reaches 0.9-1.0, obviously improves the cost performance of stake, reaches the Expected Results of design.
Piling method of the present invention comprises following processing step:
A, the immersed tube that has metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, expand the end with mechanical bottom-expanding equipment and form lower base space, and get clean hack; D, pulling out the H distance on the immersed tube; E, expand the end with mechanical bottom-expanding equipment and form upper base space, get clean hack; F, put into reinforcing bar from the immersed tube mouth; G, the mobile concrete of perfusion; H, put into precast pile, and dock with reinforcing bar with joint bar from the immersed tube mouth; I, extract immersed tube, and between the slit, inject cement paste.
It is as follows that the mechanical bottom-expanding equipment expansion of usefulness among described operation c and the e end forms the lower base space concrete steps: take out metal pile head, the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
Getting clean hack among described operation c and the e is to get the hack that is dug down only with inhaling indigenous equipment or mixing method.
The concrete steps that described mixing method is got the hack that is dug down only are as follows: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
The 2-10 that pulls out distance H on the immersed tube among the described operation d and be base diameter doubly.
Also be included in the triangle space that is cross setting that extrudes with extrusion equipment between two Up/down bases among the described operation e.
Described extrusion equipment is that hydraulic pressure props up disc shaping machine.
Compared with prior art owing to do protection and rely on immersed tube, precision, degree of safety, quality that the end is expanded in construction all improve greatly in the present invention, the more important thing is it can direct visual record see below whole work progresss; Because immersed tube prefabricated multistage under-reamed pile has adopted precast pile, steel pipe pile body and prefabricated pile body of answering in advance, these pile body diameters are little, and it is very big that bearing capacity can be done, and quality can be checked and guarantee, adapts to very much the large bearing capacity pile that a plurality of bases are arranged and uses.It is little to meet multistage under-reamed pile requirement pile body diameter fully, and bearing capacity is big, the requirement that quality requirement is high.In addition, in environmental protection, energy-conservation all significantly better than prior art.
Description of drawings
Fig. 1 a-1i is each operation status of processes schematic diagram of the present invention.
Among the figure, 1, metal pile head; 2, immersed tube; H is 2-10 a times of base diameter; 4, lower bottom base; 5, be the crosswise triangle space; 6, reinforcing bar; 7, upper bed-plate; 8, precast pile; 9, joint bar.
The specific embodiment
Embodiments of the invention 1a-1i in conjunction with the accompanying drawings are described in detail.
Piling method of the present invention comprises following processing step:
A, the immersed tube 2 that has metal pile head 1 is sunk to the hardpan design elevation (see Fig. 1 a); B, taking-up metal pile head (Fig. 1 b); C, expand the end with mechanical bottom-expanding equipment and form lower bottom base 4 spaces, get the hack (seeing Fig. 1 c) that is dug down only with suction indigenous equipment or mixing method; D, pulling out the H distance on the immersed tube 2, its H is the 2-10 doubly (seeing Fig. 1 d) of base diameter; E, expand the end with mechanical bottom-expanding equipment and form upper bed-plate 7 spaces (seeing Fig. 1 e), get the hack that is dug down only with inhaling indigenous equipment or mixing method, and prop up the disc shaping machine extruding at the position between two bases 4,7 up and down with YEJ800 type hydraulic pressure and overlook and be the triangle space 5 that crosswise is provided with, with the frictional resistance between increase pile body and the hardpan; F, put into reinforcing bar 6 (seeing Fig. 1 f) from the immersed tube mouth; G, the mobile concrete (seeing Fig. 1 g) of perfusion; H, put into the precast pile 8 that has joint bar 9, and dock (seeing Fig. 1 h) with reinforcing bar 6 from the immersed tube mouth; I, extract immersed tube, in pile body and mud layer slit, inject cement paste or after the inwall of immersed tube injects cement paste, extract immersed tube again, pile (seeing Fig. 1 i).
It is as follows that the mechanical bottom-expanding equipment expansion of above-mentioned operation c and the usefulness among the e end forms the lower base space concrete steps: take out metal pile head, the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
The concrete steps that above-mentioned mixing method is got the hack that is dug down only are as follows: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.

Claims (7)

1. the piling method of secondary expanded bore pile is characterized in that comprising the steps: a, the immersed tube that has metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, expand the end with mechanical bottom-expanding equipment and form lower base space, and get clean hack; D, pulling out the H distance on the immersed tube; E, expand the end with mechanical bottom-expanding equipment and form upper base space, get clean hack; F, put into reinforcing bar from the immersed tube mouth; G, the mobile concrete of perfusion; H, put into precast pile, and dock with reinforcing bar with joint bar from the immersed tube mouth; I, extract immersed tube, and between the slit, inject cement paste, pile.
2. the piling method of secondary expanded bore pile according to claim 1, it is characterized in that the mechanical bottom-expanding equipment expansion of the usefulness end formation lower base space concrete steps among described operation c and the e are as follows: take out metal pile head, the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
3. the piling method of secondary expanded bore pile according to claim 1, it is characterized in that getting among described operation c and the e clean hack is to get the hack that is dug down only with inhaling indigenous equipment or mixing method.
4. the piling method of secondary expanded bore pile according to claim 3, it is as follows to it is characterized in that described mixing method is got the concrete steps of the hack that is dug down only: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
5. the piling method of secondary expanded bore pile according to claim 1, the 2-10 that it is characterized in that pulling out on the immersed tube among the described operation d distance H and be base diameter doubly.
6. the piling method of secondary expanded bore pile according to claim 1 is characterized in that also being included among the described operation e triangle space that is cross setting that extrudes with extrusion equipment between two Up/down bases.
7. the piling method of secondary expanded bore pile according to claim 6 is characterized in that described extrusion equipment is that hydraulic pressure props up disc shaping machine.
CNA2007101572811A 2007-09-29 2007-09-29 Pile forming method for two-stage club-footed pile Pending CN101135144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101572811A CN101135144A (en) 2007-09-29 2007-09-29 Pile forming method for two-stage club-footed pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101572811A CN101135144A (en) 2007-09-29 2007-09-29 Pile forming method for two-stage club-footed pile

Publications (1)

Publication Number Publication Date
CN101135144A true CN101135144A (en) 2008-03-05

Family

ID=39159452

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101572811A Pending CN101135144A (en) 2007-09-29 2007-09-29 Pile forming method for two-stage club-footed pile

Country Status (1)

Country Link
CN (1) CN101135144A (en)

Similar Documents

Publication Publication Date Title
CN101135144A (en) Pile forming method for two-stage club-footed pile
CN101135156B (en) Mechanical pile forming method for high-bearing two-stage bottom expanding prefabricated pile body
CN101397791A (en) Pile-forming method of belled pile
CN101130957A (en) Mixed pile-forming method for multilevel expanding bottom pile with high bearing capacity
CN101397792A (en) Pile-forming method
CN100580186C (en) Pile forming method for high-bearing two-stage bottom expanding prefabricated pile body
CN101135158A (en) Mechanical pile forming method for high-bearing multi-stage club-footed pile
CN101397785A (en) Pile-forming method of immersed tube pile
CN101135165A (en) Extrusion pile forming method for high-bearing three-stage bottom expanding composite pile body
CN101135160A (en) Mixed pile forming method for high-bearing one-stage club-footed pile
CN100580187C (en) Pile forming method for one-stage bottom expanding steel pipe composite pile body
CN101397795A (en) Pile-forming method of belled pile with high bearing ability
CN101135153A (en) Pile forming method for high-bearing two-stage bottom expanding prefabricated pile body
CN101173513A (en) Mechanical piling method for third level bottom-expanded combined pile body
CN101397784A (en) Pile-forming method of immersed tube belled pile
CN101397787A (en) Mixed pile-forming method of prefabricated pile body
CN101397789A (en) Extrusion pile-forming method of belled prefabricated pile body
CN101135150A (en) Mixed pile forming method for high-bearing prefabricated and cast-in-situs steel concrete composite pile body
CN101126236A (en) Blasting pile-forming method for multi-stage club-footed pile
CN101135146A (en) Pile forming method for high-bearing multi-stage club-footed pile
CN101130971A (en) Extruding mixing method for secondary expanding bottom prefabricated pile body with high bearing capacity
CN101397781A (en) Extrusion pile-forming method of belled prefabricated pile body with high bearing ability
CN101130966A (en) Pile-forming method for two-level expanding bottom prefabricated pile body
CN101130968A (en) Pile-forming method for two-level expanding bottom prefabricated pile body
CN101130965A (en) Pile-forming method for three-level expanding bottom combined pile body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20080305