CN101130966A - Pile-forming method for two-level expanding bottom prefabricated pile body - Google Patents

Pile-forming method for two-level expanding bottom prefabricated pile body Download PDF

Info

Publication number
CN101130966A
CN101130966A CNA2007101572718A CN200710157271A CN101130966A CN 101130966 A CN101130966 A CN 101130966A CN A2007101572718 A CNA2007101572718 A CN A2007101572718A CN 200710157271 A CN200710157271 A CN 200710157271A CN 101130966 A CN101130966 A CN 101130966A
Authority
CN
China
Prior art keywords
immersed tube
pile
pile body
base
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101572718A
Other languages
Chinese (zh)
Inventor
童乐天
王国奋
吴伟林
郑新俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007101572718A priority Critical patent/CN101130966A/en
Publication of CN101130966A publication Critical patent/CN101130966A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to construction of building pile foundation engineering, and is especially piling process of two-stage under-reamed prefabricated pile stem. The piling process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2. taking out the metal pile head; 3. forming the lower base space with under reaming apparatus, and pouring concrete to form the lower base; 4. immersing the prefabricated solid pile stem with steel dowels in the lower end into the immersed tube; 5. drawing upwards the immersed tube to designed distance, forming the upper base space with under reaming apparatus, passing the steel dowels through the upper base space and connecting to the lower prefabricated pile stem, setting the upper fabricated pile stem into the immersed tube and pouring concrete to form the upper base; and 6. withdrawing the immersed tube and injecting cement mortar to the gap.

Description

The piling method of the bottom-enlarging prefabricated pile body of two-stage
Technical field
The present invention relates to a kind of construction of building pile foundation engineering, the piling method of the bottom-enlarging prefabricated pile body of particularly a kind of two-stage.
Background technology
According to the national regulation whole body be cast-in-place (be the pile body Cast-in-place concrete, base also is a Cast-in-place concrete) its base diameter ratio maximum value of expanded bore pile is limited in 3-3.5, and pipe sinking prefabricated steel concrete club-footed pile, this stake is the prefabricated concrete of pile body, the base Cast-in-place concrete, obviously this ratio 3-3.5 is broken, generally 3.5-5 can be reached,, requirement of engineering can't be satisfied although bearing capacity is bigger, particularly, the opposite end bearing capacity to give a discount 0.9 when bellout diameter during greater than 1.5 meters.For this reason, immersed tube prefabricated multistage under-reamed pile has appearred again.Existing multiple bearing capacity dish stake technology has two common ground, and first all is to expand the end with positive crossover-circulating type method pore-forming; Second all carries out pile without immersed tube expands the end.This two point-to-points load dish (at the bottom of the multistage expansion) stake is quite unfavorable, in other words, bring two problems, 1), national building code requirement, expand the base end load at the end with positive crossover-circulating type method pile and will take advantage of 0.45 coefficient, because have mud existence and pile bottom sediment to clean out, (Zhejiang Province's standard is 0.24 discount) gives a discount too big, though a plurality of bases are arranged, loss end load is very big; 2); without immersed tube; condition of construction can not get protection; positive in addition crossover-circulating type method is operation under water; expand bottom application worker situation and cannot see, the difficult measurement noted down, when also usually taking place to expand the end under water; top soil body a slice situation that falls down also happens occasionally; also have because the multistage stake of prior art all is the whole body Cast-in-place concrete, and that the intensity of Cast-in-place concrete is done is not high, and difficult quality guarantee; and in water, water concrete; the difficult control of quality adds that the pile capacity of a plurality of bases is all bigger, and its pile body diameter of above factor must be done greatlyyer; and this a plurality of base is afraid of that pile body diameter is big most; development test shows that pile body diameter increases, and its bearing capacity decay is very serious.
Summary of the invention
The problem that the present invention is directed to the prior art existence provides the piling method of the bottom-enlarging prefabricated pile body of a kind of two-stage, purpose is to improve the utilization rate and the reduction coefficient of the strength of materials, and pile body and base good concentricity obviously improve single pile bearing capacity, the reliable degree height, and can reduce the pile foundation engineering cost.
The piling method of the bottom-enlarging prefabricated pile body of two-stage of the present invention comprises following processing step: a, the immersed tube that has metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, with mechanical bottom-expanding equipment processing lower base space, with inhaling indigenous equipment exhaustion hack, perfusion concrete cast lower bottom base; D, the lower end is had the following prefabricated solid pile body of joint bar, put into immersed tube until putting in place; E, on pull out immersed tube to setpoint distance H, with mechanical bottom-expanding equipment processing upper base space, joint bar is passed upper base space links to each other with following precast pile, last precast hollow pile body is put into the mesopore injection concrete of immersed tube from last precast pile, pour into a mould upper bed-plate; F, extract immersed tube, between the slit, inject cement paste.
The mechanical bottom-expanding equipment expansion of usefulness among described operation c and e end processing base space concrete steps are as follows: the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
Setpoint distance H among the described operation e is 2-10 a times of base diameter.
The present invention is compared with prior art owing to do protection and rely on immersed tube, prefabricated in addition pile body up and down, and a series of technical measures such as upper bed-plate under the cast-in-place notes steel concrete, and have following advantage and good effect through evidence:
1, the ratio of base diameter and pile body diameter can reach 3.5-5, surpasses state-set standard;
2, the obvious raising of reduction coefficient can reach 0.9-1.0, improves strength of materials utilization rate;
3, do protection and rely on accurate positioning with immersed tube, make the Up/down base and the good concentricity of pile body up and down;
4, improve single pile bearing capacity, reliable degree height;
5, reduce the construction cost of building pile foundation engineering;
6, overcome the existing in prior technology defective.
Description of drawings
Fig. 1 a-Fig. 1 c is each operation status of processes schematic diagram of the present invention.
Among the figure 1, lower base space; 2, immersed tube; 3, following prefabricated solid pile body; 4, upper base space; 5, joint bar; 6, go up the precast hollow pile body.
The specific embodiment
Embodiments of the invention 1a-1c in conjunction with the accompanying drawings are described in detail.
The piling method of the bottom-enlarging prefabricated pile body of two-stage of the present invention comprises following processing step:
A, the immersed tube 2 that has metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, expand the end with mechanical bottom-expanding equipment and process lower base space 1, with inhaling indigenous equipment exhaustion hack, perfusion concrete cast lower bottom base; D, the lower end is had the following prefabricated solid pile body 3 of joint bar, put into immersed tube until putting in place; E, on pull out immersed tube 2 to setpoint distance H, expand the end with mechanical bottom-expanding equipment and process upper base space 4, joint bar 5 is passed upper base space 4 to link to each other with following prefabricated solid pile body 3 epimeres, then will go up precast hollow pile body 6 and put into the mesopore injection concrete cast upper bed-plate of immersed tube 2, as shown in Figure 1a from last precast pile; F, extract immersed tube, between the slit, inject cement paste.
The concrete steps of exhaustion hack are as follows among the above-mentioned operation c: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
The mechanical bottom-expanding equipment of above-mentioned operation c and the usefulness among the e expands the end, and to process upper and lower base space concrete steps as follows: the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.

Claims (4)

1. the piling method of the bottom-enlarging prefabricated pile body of two-stage is characterized in that it comprises following processing step: a, the immersed tube that has metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, with mechanical bottom-expanding equipment processing lower base space, with inhaling indigenous equipment exhaustion hack, perfusion concrete cast lower bottom base; D, the lower end is had the following prefabricated solid pile body of joint bar, put into immersed tube until putting in place; E, on pull out immersed tube to setpoint distance H, with mechanical bottom-expanding equipment processing upper base space, joint bar is passed upper base space links to each other with following precast pile, last precast hollow pile body is put into the mesopore injection concrete of immersed tube from last precast pile, pour into a mould upper bed-plate; F, extract immersed tube, between the slit, inject cement paste.
2. the piling method of the bottom-enlarging prefabricated pile body of two-stage according to claim 1, it is characterized in that the mechanical bottom-expanding equipment expansion of the usefulness end processing base space concrete steps among described operation c and the e are as follows: the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
3. the piling method of the bottom-enlarging prefabricated pile body of two-stage according to claim 1, it is characterized in that setpoint distance H among the described operation e be base diameter 2-10 doubly.
4. the piling method of the bottom-enlarging prefabricated pile body of two-stage according to claim 1, the concrete steps that it is characterized in that among the described operation c exhaustion hack are as follows: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
CNA2007101572718A 2007-09-29 2007-09-29 Pile-forming method for two-level expanding bottom prefabricated pile body Pending CN101130966A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101572718A CN101130966A (en) 2007-09-29 2007-09-29 Pile-forming method for two-level expanding bottom prefabricated pile body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101572718A CN101130966A (en) 2007-09-29 2007-09-29 Pile-forming method for two-level expanding bottom prefabricated pile body

Publications (1)

Publication Number Publication Date
CN101130966A true CN101130966A (en) 2008-02-27

Family

ID=39128365

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101572718A Pending CN101130966A (en) 2007-09-29 2007-09-29 Pile-forming method for two-level expanding bottom prefabricated pile body

Country Status (1)

Country Link
CN (1) CN101130966A (en)

Similar Documents

Publication Publication Date Title
CN101135156B (en) Mechanical pile forming method for high-bearing two-stage bottom expanding prefabricated pile body
CN100580186C (en) Pile forming method for high-bearing two-stage bottom expanding prefabricated pile body
CN101130957A (en) Mixed pile-forming method for multilevel expanding bottom pile with high bearing capacity
CN101130966A (en) Pile-forming method for two-level expanding bottom prefabricated pile body
CN101135153A (en) Pile forming method for high-bearing two-stage bottom expanding prefabricated pile body
CN101135158A (en) Mechanical pile forming method for high-bearing multi-stage club-footed pile
CN100580187C (en) Pile forming method for one-stage bottom expanding steel pipe composite pile body
CN101173513A (en) Mechanical piling method for third level bottom-expanded combined pile body
CN101135165A (en) Extrusion pile forming method for high-bearing three-stage bottom expanding composite pile body
CN101135167A (en) Mechanical pile forming method for two-stage bottom expanding prefabricated pile body
CN101130965A (en) Pile-forming method for three-level expanding bottom combined pile body
CN101135146A (en) Pile forming method for high-bearing multi-stage club-footed pile
CN101397785A (en) Pile-forming method of immersed tube pile
CN101135160A (en) Mixed pile forming method for high-bearing one-stage club-footed pile
CN101130968A (en) Pile-forming method for two-level expanding bottom prefabricated pile body
CN101130967A (en) Pile-forming method for two-level expanding bottom pile of immersed tube
CN101397781A (en) Extrusion pile-forming method of belled prefabricated pile body with high bearing ability
CN101130971A (en) Extruding mixing method for secondary expanding bottom prefabricated pile body with high bearing capacity
CN101130970A (en) Blasting pile-forming method for secondary expanding bottom prefabricated pile body with high bearing capacity
CN101135150A (en) Mixed pile forming method for high-bearing prefabricated and cast-in-situs steel concrete composite pile body
CN101130972A (en) Blasting pile-forming method for two-stage expanding bottom prefabricated pile body with high bearing capacity
CN101135145A (en) Pile forming method for high-bearing one-stage club-footed pile
CN101135162A (en) Mixed pile forming method for multi-stage club-footed pile
CN101130973A (en) Pile-forming method for three-level expanding bottom pile body combined by prefabricated and cast-in-situ steel concrete
CN101130961A (en) Mixed pile-forming method for three-level expanding bottom combined pile body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication