CN101130967A - Pile-forming method for two-level expanding bottom pile of immersed tube - Google Patents
Pile-forming method for two-level expanding bottom pile of immersed tube Download PDFInfo
- Publication number
- CN101130967A CN101130967A CNA2007101572737A CN200710157273A CN101130967A CN 101130967 A CN101130967 A CN 101130967A CN A2007101572737 A CNA2007101572737 A CN A2007101572737A CN 200710157273 A CN200710157273 A CN 200710157273A CN 101130967 A CN101130967 A CN 101130967A
- Authority
- CN
- China
- Prior art keywords
- pile
- immersed tube
- base
- expand
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to construction of building pile foundation engineering, and is especially piling process of two-stage under-reamed pile. The piling process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2. taking out the metal pile head; 3. forming the lower base space and taking out soil; 4. pouring concrete into the immersed tube to design elevation; 5. drawing upwards the immersed tube to designed distance; 6. forming the upper base space mechanically with soil; 6. pouring concrete to form the upper base; 7. immersing the prefabricated solid pile stem with steel dowels and anchoring to the base; and 8. withdrawing the immersed tube and injecting cement mortar to the gap. The present invention has greatly raised under-reamed pile constructing precision, quality and safety.
Description
Technical field
The present invention relates to a kind of construction of building pile foundation engineering, particularly a kind of piling method of immersed tube two-stage expanded bore pile.It is the job practices of the big bearing peg first-selection of multistage base.
Background technology
According to the national regulation whole body be cast-in-place (be the pile body Cast-in-place concrete, base also is a Cast-in-place concrete) its base diameter ratio maximum value of expanded bore pile is limited in 3-3.5, and pipe sinking prefabricated steel concrete club-footed pile, this stake is the prefabricated concrete of pile body, the base Cast-in-place concrete, obviously this ratio 3-3.5 is broken, generally 3.5-5 can be reached,, requirement of engineering can't be satisfied although bearing capacity is bigger, particularly, the opposite end bearing capacity to give a discount 0.9 when bellout diameter during greater than 1.5 meters.For this reason, immersed tube prefabricated multistage under-reamed pile has appearred again.Existing multiple bearing capacity dish stake technology has two common ground, and first all is to expand the end with positive crossover-circulating type method pore-forming; Second all carries out pile without immersed tube expands the end.This two point-to-points load dish (at the bottom of the multistage expansion) stake is quite unfavorable, in other words, bring two problems, 1), national building code requirement, expand the base end load at the end with positive crossover-circulating type method pile and will take advantage of 0.45 coefficient, because have mud existence and pile bottom sediment to clean out, (Zhejiang Province's standard is 0.24 discount) gives a discount too big, though a plurality of bases are arranged, loss end bearing capacity is very big; 2); without immersed tube; condition of construction can not get protection; positive in addition crossover-circulating type method is operation under water; expand bottom application worker situation and cannot see, the difficult measurement noted down, when also usually taking place to expand the end under water; top soil body a slice situation that falls down also happens occasionally; also have because the multistage stake of prior art all is the whole body Cast-in-place concrete, and that the intensity of Cast-in-place concrete is done is not high, and difficult quality guarantee; and in water, water concrete; the difficult control of quality adds that the pile capacity of a plurality of bases is all bigger, and its pile body diameter of above factor must be done greatlyyer; and this a plurality of base is afraid of that pile body diameter is big most; development test shows that pile body diameter increases, and its bearing capacity decay is very serious.
Summary of the invention
The present invention is directed to problem that prior art exists provide a kind of piling method of immersed tube two-stage expanded bore pile, purpose be make process rationally, guarantee the pile foundation engineering quality, obviously improve single pile bearing capacity, improve the strength of materials utilization rate, make stake in most economical state work with improve cost performance.
The piling method of immersed tube two-stage expanded bore pile of the present invention comprises following processing step: a, the immersed tube with metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, expand the end with mechanical bottom-expanding equipment and form lower base space, and get the hack that digs down only; D, put into the concrete that flows to calibrating high L from the immersed tube mouth; E, on pull out immersed tube to setpoint distance H; F, the mouth of pipe of drowning oneself are put into and are contained native well-bucket, expand end formation upper base space with mechanical bottom-expanding equipment, will contain native well-bucket and propose; G, the mobile concrete cast of usefulness upper bed-plate; H, the precast pile and the base anchoring of putting into the band joint bar; I, extract immersed tube, and between the slit, inject cement paste, pile.
It is as follows that the mechanical bottom-expanding equipment expansion of usefulness among the described operation c end forms the lower base space concrete steps: take out metal pile head, the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
The concrete steps of getting clean hack among the described operation c are as follows: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
The last plane that preset elevation L among the described operation d equals lower bottom base to the bottom surface of upper bed-plate deducts contains the high distance of native well-bucket.
Setpoint distance H among the described operation e equal base diameter 2-10 doubly.
Described precast pile 8 is precast hollow pile bodies.
Described precast hollow pile body is pile for prestressed pipe or solid pile body.
The present invention compared with prior art owing to adopt immersed tube to do protection and support, improves so precision, quality and the safety at the end are expanded in construction greatly; Owing to adopted these pile body diameters of precast pile little, it is very big that bearing capacity can be done, and guarantees the pile foundation engineering quality again, reach the Expected Results of design, its reduction coefficient can reach 0.9-1.0, be suitable at the bottom of the multistage expansion large bearing capacity pile foundation and use, this be prior art can't be obtained.This meets the requirement that multistage under-reamed pile body diameter is little, bearing capacity is big, quality requirement is strict fully.
Description of drawings
Fig. 1 a-1g is the construction view of each operation of the present invention.
Among the figure, 2, immersed tube; 4, lower base space; H, equal base diameter 2-10 doubly; 5, mobile concrete; 6, contain native well-bucket; 7, upper base space; 8, precast pile; 9, joint bar.
The specific embodiment
Embodiments of the invention 1a-1g in conjunction with the accompanying drawings are described in detail.
The piling method of immersed tube two-stage expanded bore pile of the present invention comprises following processing step: a, the immersed tube 2 with metal pile head is sunk to the hardpan design elevation; B, taking-up metal pile head; C, make the lower base space 4 of design drawing regulation, and get clean hack with mechanical bottom-expanding equipment; D, put into the concrete 5 that flows to setting height L from the immersed tube mouth, the height that its L equals last plane to the bottom surface of upper bed-plate of lower bottom base deducts the distance of the height of the native well-bucket of Sheng; E, on pull out immersed tube 2 to the distance H of setting, the 2-10 that its H equals base diameter doubly, relevant according to the progression and the diameter of base, if multistage getting the small value, progression is few as have only the 2-3 level to get high value; F, the mouth of pipe of drowning oneself are put into and are contained native well-bucket 6, make upper base space 7 with mechanical bottom-expanding equipment, promote afterwards to contain native well-bucket 6 to 2 mouthfuls of immersed tube; G, the mobile concrete 5 cast upper base space 7 of usefulness; H, put into the precast pile 8 of band joint bar 9, make joint bar 9 and upper bed-plate anchoring; I, extract immersed tube 2, in the slit, inject cement paste, pile.
Above-mentioned precast pile 8 is precast hollow pile bodies, as pile for prestressed pipe or solid pile body.
It is as follows that the mechanical bottom-expanding equipment expansion of usefulness among the above-mentioned operation c end forms the lower base space concrete steps: take out metal pile head, the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
The concrete steps of getting clean hack among the above-mentioned operation c are as follows: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
Secondary expanded bore pile with the inventive method is made has overcome the existing in prior technology defective fully, and intensity height, quality are guaranteed, and can obviously improve reduction coefficient, reduces the building foundation engineering cost, improves strength of materials utilization rate.So satisfy the requirement that multistage under-reamed pile requirement pile body diameter is little, bearing capacity is big, quality requirement is high fully.
Claims (7)
1. the piling method of immersed tube two-stage expanded bore pile comprises following processing step: a), the immersed tube with metal pile head is sunk to the hardpan design elevation; B), take out metal pile head; C), expand the end with mechanical bottom-expanding equipment and form lower base space, and get the hack that digs down only; D), put into the concrete that flows to calibrating high L from the immersed tube mouth; E), pull out immersed tube on to setpoint distance H; F), the mouth of pipe of drowning oneself puts into and contains native well-bucket, expands the end with mechanical bottom-expanding equipment and forms upper base space, will contain native well-bucket proposition; G), with the concrete cast upper bed-plate that flows; H), put into the precast pile and the base anchoring of band joint bar; I), extract immersed tube, and between the slit, inject cement paste, pile.
2. the piling method of immersed tube two-stage expanded bore pile according to claim 1, it is characterized in that the mechanical bottom-expanding equipment expansion of the usefulness end formation lower base space concrete steps among the described operation c are as follows: take out metal pile head, the mark that the detent rail pin of bottom-expanding equipment is aimed on the immersed tube mouth is lowered to immersed tube, start equipment after the equipment upper end is also fixedly positioning and expand the end, expand the end and be vertical earlier expand the end again level expand the end, when reaching, construction stops automatically after design is marked deeply, base cavity pocket is formed on the bottom, expanding the work of undercutting sharpener this moment reaches when designing base diameter, be that power rail reaches predetermined number of revolutions, expand end shoveling and finish, bottom-expanding equipment is hung out ground.
3. the piling method of immersed tube two-stage expanded bore pile according to claim 1, the concrete steps that it is characterized in that getting among the described operation c clean hack are as follows: inhale indigenous equipment with air and fetch earth, when only surplus a small amount of loosing during soil in the base, from immersed tube mouth pouring, pouring limit, limit sops up, and is clean up to fetching earth.
4. the piling method of immersed tube two-stage expanded bore pile according to claim 1 is characterized in that last plane that preset elevation L among the described operation d equals lower bottom base to the bottom surface of upper bed-plate deducts to contain the high distance of native well-bucket.
5. the piling method of immersed tube two-stage expanded bore pile according to claim 1, it is characterized in that setpoint distance H among the described operation e equal base diameter 2-10 doubly.
6. the piling method of immersed tube two-stage expanded bore pile according to claim 1 is characterized in that described precast pile is the precast hollow pile body.
7. the piling method of immersed tube two-stage expanded bore pile according to claim 6 is characterized in that described precast hollow pile body is pile for prestressed pipe or solid pile body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101572737A CN101130967A (en) | 2007-09-29 | 2007-09-29 | Pile-forming method for two-level expanding bottom pile of immersed tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101572737A CN101130967A (en) | 2007-09-29 | 2007-09-29 | Pile-forming method for two-level expanding bottom pile of immersed tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101130967A true CN101130967A (en) | 2008-02-27 |
Family
ID=39128366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007101572737A Pending CN101130967A (en) | 2007-09-29 | 2007-09-29 | Pile-forming method for two-level expanding bottom pile of immersed tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101130967A (en) |
-
2007
- 2007-09-29 CN CNA2007101572737A patent/CN101130967A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101135156B (en) | Mechanical pile forming method for high-bearing two-stage bottom expanding prefabricated pile body | |
CN101130967A (en) | Pile-forming method for two-level expanding bottom pile of immersed tube | |
CN101397785A (en) | Pile-forming method of immersed tube pile | |
CN100580186C (en) | Pile forming method for high-bearing two-stage bottom expanding prefabricated pile body | |
CN101130957A (en) | Mixed pile-forming method for multilevel expanding bottom pile with high bearing capacity | |
CN100580187C (en) | Pile forming method for one-stage bottom expanding steel pipe composite pile body | |
CN101135158A (en) | Mechanical pile forming method for high-bearing multi-stage club-footed pile | |
CN101397784A (en) | Pile-forming method of immersed tube belled pile | |
CN101397794A (en) | Pile-forming method of immersed tube two-stage belled pile with high bearing ability | |
CN101135153A (en) | Pile forming method for high-bearing two-stage bottom expanding prefabricated pile body | |
CN101130968A (en) | Pile-forming method for two-level expanding bottom prefabricated pile body | |
CN101130966A (en) | Pile-forming method for two-level expanding bottom prefabricated pile body | |
CN101135160A (en) | Mixed pile forming method for high-bearing one-stage club-footed pile | |
CN101173513A (en) | Mechanical piling method for third level bottom-expanded combined pile body | |
CN101397787A (en) | Mixed pile-forming method of prefabricated pile body | |
CN101135146A (en) | Pile forming method for high-bearing multi-stage club-footed pile | |
CN101130970A (en) | Blasting pile-forming method for secondary expanding bottom prefabricated pile body with high bearing capacity | |
CN101130972A (en) | Blasting pile-forming method for two-stage expanding bottom prefabricated pile body with high bearing capacity | |
CN101135161A (en) | Mixed pile forming method for one-stage bottom expanding steel pipe composite pile body | |
CN101135145A (en) | Pile forming method for high-bearing one-stage club-footed pile | |
CN101130971A (en) | Extruding mixing method for secondary expanding bottom prefabricated pile body with high bearing capacity | |
CN101130965A (en) | Pile-forming method for three-level expanding bottom combined pile body | |
CN101130961A (en) | Mixed pile-forming method for three-level expanding bottom combined pile body | |
CN101135162A (en) | Mixed pile forming method for multi-stage club-footed pile | |
CN101135144A (en) | Pile forming method for two-stage club-footed pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |