- CN101125362A CN101125362A CNA2007101332201A CN200710133220A CN101125362A CN 101125362 A CN101125362 A CN 101125362A CN A2007101332201 A CNA2007101332201 A CN A2007101332201A CN 200710133220 A CN200710133220 A CN 200710133220A CN 101125362 A CN101125362 A CN 101125362A
- Authority
- CN
- China
- Prior art keywords
- mold
- composite
- metal
- water
- composite material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Continuous Casting (AREA)
Abstract
The present invention discloses a technique and relative equipment for casting laminated and composite metal material. Target material is heated to 300 DEG C to 1200 DEG C by an electromagnetic induction heater installed on exterior of a casting die or a water cooling crystallizer. Molten electroslag liquid is poured in the casting die or the water cooling crystallizer, and an electrode is inserted in for heating. The metal liquid is poured in the casting die or the water cooling crystallizer by top casting mode or bottom casting mode. After casting, the induction heater and the electrode conduct continuous heating for 3 to 20 minutes, then heating is stopped, and layered composite material with plane gradient, laminated composite material and coated composite material of all geometric shapes can be produced. The present invention can simplify production procedures of composite material and can realize the dynamic regulation of all technical parameters during composition. The interface of the composite layer is under eay control so as to achieve excelllent metallurgical combination. The present invention has wide optional range about materal of the composite layer, high productivity, simple production technique and low cost.
Description
Technical field
The invention belongs to laminate shape metallic composite, what technical field related generally to is a kind of casting method for manufacturing layered metal composite material technology and equipment.
Background technology
Laminate shape metallic composite is to utilize various complex techniques to make two or more physics, chemistry, the metal material that mechanical property is different carries out layering combination makes it realize firm metallurgical binding and the various bilayers or the multi-gradient laminar composite that are prepared on the interface, laminate shape composite and cladded type laminar composite, although prepared each layer of composite metal still keeps primary characteristic separately, but its physics, chemistry, mechanical property is much more superior than single metal material, make the different parts of material have different performances, thereby overcome the shortcoming separately of different metal material, performance advantage separately, make material have special performances, to be suitable for and the instructions for use of satisfying various different operating modes.Reported " the compound plied timber of bimetallic prepares present situation and progress " in document " casting " magazine (second phase 103-107 page or leaf in 2005), several bimetallic plied timber technologies of preparing have been opened in the report altogether, it is roll-bonding method, the explosive welding composite algorithm, the jet deposition composite algorithm, complex techniques such as casting composite algorithm, wherein roll-bonding method is to be assembled together after the surface of metallic plate is handled by cleaning, rolling deformation by heavy reduction, what make double layer of metal treats composite surface generation plastic deformation, surface metal-layer is broken, make peace and quiet and the activation metal level expose from the metal surface of breaking, under the crunch effect, form plane metallurgical binding.After the long diffusion annealing of follow-up low temperature is handled, obtain desirable composite interface structures, form firm combination.But owing to do not spread fully and chemical reaction in the rolling recombination process, so the excessive layer structure of compound interface realizes fully that to a great extent still there is shortcoming in bond strength.This technology and be only applicable to prepare the compound of sheet metal product.
The blast composite algorithm is to drive composite plate high velocity impact substrate by the high-strength chemical energy that blast produces, the instantaneous pressure that the point of impingement produces forms skim exposing on the fresh metal surface, welding transition district with plastic deformation, fusing, diffusion and wave character, thus the metal solder that realizes strong combination is compound.Though the blast composite algorithm can be fit to prepare individual area more greatly, the production of thicker composite board or composite plate blanks, multilayer composite sheet, the composite algorithm of exploding mechanization degree is low, working condition is poor, and has certain danger, the distortion of preparation bimetallic is bigger, out-of-flatness, production cost height.
The jet deposition composite algorithm be after the high pressure draught of metal liquid by inert gas is atomized into particle jet deposition to metallic matrix, thereby formation double metallic composite material, prepared material composition uniform formation is tiny, can produce the joint product of different-thickness flexibly, but the spray atomization and deposition process is complicated, and the density of composite material is poor, the production cost height, the equipment complexity, technical difficulty is big, only use to some extent on non-ferrous metal at present, the application on ferrous metal is less.
The casting composite algorithm be with two or more metal material by the casting method it is combined into one.This technology compare with above-mentioned various combination process have the investment little, combination process is simple, production cost is low, characteristics applied widely.Introduced a kind of manufacture method of clad steel in the document, be about to by composite by surface treatment after, coat and a certain amount ofly prevent the coating of oxidation and make it dry, place it in the casting mold then, with uphill casting composite metal-liquid is poured in the type, it is coated on by composite material.Than higher, if the temperature height of casting metal is then big by the melting loss of the bottom of composite, if the excessive velocities of injecting or cross the slag inclusion that will increase slowly on the interface and can only be poured into a mould a product at every turn, production efficiency is low to the requirement of technological parameter for the method.This technology is not owing to carried out preheating by composite, thereby can only prepare compound ratio greater than the product 8.0 or more, also introduced the composite algorithm of using core in the document simultaneously, in order to production clad double metallic composite material.But because core casting composite algorithm does not still solve interface problem, when causing the composite skin to solidify, gas and impurity easily are enriched in the interface, thereby influenced product quality, and complex process, technical difficulty is big, the production cost height, narrow application range is only applicable to prepare the clad composite, and is not suitable for preparation gradient laminated-metal composite, laminate shape metallic composite.
Summary of the invention
The objective of the invention is to: at the deficiency of present prior art, provide a kind of technology easy, the appropriate products scope is wide, and production equipment is simple, good product performance, and cost is low, invests little casting method for manufacturing layered metal composite material technology and equipment.
The equipment scheme that solves its technical problem is: this equipment has a plant bottom case; on the next door of plant bottom case electroslag furnace and electrode holde are installed; mold is installed on plant bottom case or has the water mold of water inlet pipe and water outlet pipe; outside at mold or water mold is equipped with electromagnetic induction heater; top or side at mold or water mold are equipped with depositing funnel and cast flow path groove; base plate or end water tank are installed in the bottom of mold or water mold; water mold and end water tank are separately installed with water inlet pipe and outlet pipe; on plant bottom case or mold or water mold, ultrasonic wave or mechanical vibrator are installed, are installed on base plate or end water tank and the workbench by composite.
Outside at the said equipment also is connected with vacuum (-tight) housing, on vacuum (-tight) housing, be connected with the inert gas jar, be connected with the ventilating control valve in the centre of inert gas jar and vacuum (-tight) housing, vacuum (-tight) housing is connected with vavuum pump by pipeline, is connected with control valve in the middle of vacuum (-tight) housing and vavuum pump.
Solving the process technology scheme that its technical problem adopts is: at first with a mold or water mold independently or the assembly of a plurality of mold or water mold be square; rectangle; rectangle; arrangements such as circle are installed on the plant bottom case; outside at mold or water mold is equipped with electromagnetic induction heater; one or more are undertaken after cleaning surfaces handles by composite; contain alkali metal oxides such as borax at its surface-coated one deck; chloride; melt the antioxidizing paint that salt is formed; require to be fixed on the bottom of required compound size in mold or the water mold after drying according to combination process; side or centre position; or one or more are spaced apart certain size by composite material as required in the centre of mold or water mold are arranged in mold or the water mold; to pour in the pouring ladle after the required compound metal material melting; starting the electromagnetic induction heater that is installed in mold or water mold outside heats the surface of being undertaken by composite in mold or the water mold; to be heated after 300-1200 ℃ temperature; the liquid electric slag that fusing is good is poured in mold or the water mold; non-consumable electrode or consutrode are inserted in mold or the water mold; start electroslag furnace power supply K; the liquid electric slag that is poured into is heated; or low melting point or spontaneous heating covering slag put into mold; make it under the high temperature of composite metal-liquid, be fused into liquid state; thereby composition metal is protected, to prevent the oxidation of composition metal.Composite metal-liquid is poured in mold or the water mold by teeming formula or bottom filling; simultaneously electrode is upwards progressively promoted; start ultrasonic wave or mechanical oscillation treatment facility the molten metal that is poured into is carried out vibration processing; with refinement with improve crystalline structure; after pouring metal melt finishes; electromagnetic induction heater and electrode are proceeded to heat after 3-20 minute and are being stopped heating; be beneficial to the mobile feeding of molten metal; when adopting multimode to arrange; its pouring type can adopt depositing funnel to carry out runner boxing by the multithread flow path groove in the mode of teeming formula or bottom filling; also can adopt single mode cast respectively one by one; thereby realize the compound of one or more complexs; after treating metal freezing; after opening mold or water mold compound good product being taken out; heat-treat by required Technology for Heating Processing, when making the multilayer laminar composite of multiple heterogeneity, can realize that by repeating above-mentioned technology repeatedly the multilayer stratiform of multiple different materials is compound as needs.Promptly can manufacture the plane gradient laminar composite and the plane gradient multilayer laminar composite of various geometries by the shape that changes mold or water mold; as products such as disintegrating machine composite hammer head, compound bars; laminated shape composite; as Hubei Province plate, liner plate, various bimetallic stratiform composite board and multiple-layer laminated shape metallic composite panel, rectangle composite, coat various forms of laminated-metal composites and products such as shape roll shaft class composite and coating shape tubing composite.
In recombination process, start vavuum pump the equipment complex that is installed in the vacuum protection cover is vacuumized, make equipment be in work under the vacuum state; Perhaps after vacuumizing, opens equipment valve; equipment in the vacuum protection cover charges into inert gas; make it pouring into a mould compound production under the low-pressure inert gas guard mode or under the vacuum state, repeat above-mentioned technology, can produce above-mentioned various layered metal composite material.
Slag in the water mold is the slag system that monobasic or multi-component are formed, and its material is CaF
2, Al
2O
3, CaO, TiO
2, MnO, SiO
2, RE, RexOy, Na
2B
4O
7, Na
2O, SiCa, K
2O, Al etc., low melting point or spontaneous heating covering slag are by CaO, SiO
2, Al
2O
3Deng oxide and Na
2CO
3, CaF
2NaCl, the aluminium powder of alkali metal such as NaF or alkaline-earth metal or fluoride etc. and doses, silicon calcium powder exothermic mixture and potassium nitrate, compositions such as oxidant such as sodium oxide molybdena, composite material quality is compound between the ferrous metal of the ferrous metal of various materials of various applying working conditions and various materials, compound between the ferrous metal of various materials and the non-ferrous metal of various materials, the ferrous metal of the compound and various materials between the non-ferrous metal of various materials and the non-ferrous metal of various materials, the non-ferrous metal of various materials and the carbide alloy of various materials, steel bonded carbide and pottery, compound between cermet.By the composition of composite material surface antioxidizing paint is Na
2B
4O
7, Na
2O, SiO
2, Al
2O
3, K
2O, B
2O
3, CaO, etc.
Beneficial effect: in the such scheme, when using this invention to produce layered metal composite material, the production efficiency height, the simple easy operating of technology, power consumption is low, and production cost is low, and equipment is simply invested little, is suitable for producing in batches; The high purity of composite bed metal material, crystalline structure is good, no component segregation, joint product is to going up consecutive solidification down, help the feeding of metal, simplified the composite production process, realized the dynamic adjustment of various technological parameters in the recombination process, the product quality of being produced is easy to control, can be undertaken compound by composite according to what the composite of unlike material and different performance were selected in different instructions for uses freely, and the range of choice by composite material and composite material is wide, the composite bed interface is easy to control, the composite bed interface quality is good, can realize the excellent metallurgical combination, can make the laminar composite and the product of the various layered composite structures of various use industrial and mineral requirement.
Description of drawings
Fig. 1 is the structure chart of first embodiment of the invention.
Fig. 2 is the structure chart of second embodiment of the invention.
Fig. 3 is the structure chart of third embodiment of the invention.
Fig. 4 is the structure chart of fourth embodiment of the invention.
Fig. 5 is the structure chart of fifth embodiment of the invention.
Fig. 6 is the structure chart of sixth embodiment of the invention.
Fig. 7 is the structure chart of seventh embodiment of the invention.
Fig. 8 is the structure chart of eighth embodiment of the invention.
Fig. 9 is the structure chart of ninth embodiment of the invention.
Figure 10 is the structure chart of tenth embodiment of the invention.
The specific embodiment
Embodiment 1: in Fig. 1, this equipment has a plant bottom case 15, on the next door of plant bottom case 15 electroslag furnace 1 is installed, electrode holde 3 is installed on electroslag furnace 1, electrode 2 is installed on electrode holde 3, end water tank 13 is installed on plant bottom case 15, bottom in arbitrary side of end water tank 13 is equipped with water inlet pipe 16, top in arbitrary side of end water tank 13 is equipped with outlet pipe 14, water mold 8 is installed on end water tank 13, bottom in arbitrary side of water mold 8 is equipped with water inlet pipe 10, top in arbitrary side of water mold 8 is equipped with outlet pipe 11, in the outside of water mold 8 electromagnetic induction heater 6 is installed, passed through the center fixation of end water tank 13 on plant bottom case 15 by composite material 9, ultrasonic wave or mechanical vibration equipment 22 are installed on plant bottom case 15, on electrode holde 3 and end water tank 13, are connected with power supply K.
During the work beginning, after the metal material 9 that needs are compound carries out surface treatment, at the anti-oxidation coating of its surface-coated one deck, be installed in the center of water mold 8 after the drying, the centre bore that passes end water tank 13 is fixed on the plant bottom case 15.To pour ladle 4 into behind the required compound metal molten, the fetch boiling water water inlet pipe and water outlet pipe 10 and 11 and the water inlet pipe and water outlet pipe 16 and 14 of end water tank 13 of cooling crystallizer 8, starting 6 pairs of electromagnetic induction heaters being installed in water mold 8 outsides is heated by compound metal material 9, to be heated after 300-1200 ℃ temperature, the liquid electric slag 7 that fusing is good is poured in the water mold 8, non-consumable electrode or consutrode 2 are inserted in the water mold 8, start electroslag furnace power supply K, the liquid electric slag 7 that is poured into is heated, composite metal-liquid 5 is poured in the water mold 8, simultaneously electrode 2 is upwards progressively promoted by electrode holde 3, start ultrasonic wave or 22 pairs of molten metals that poured into of mechanical oscillation treatment facility and carry out vibration processing, with refinement with improve crystalline structure, after molten metal 5 cast finish, electromagnetic induction heater 6 and electrode 2 are proceeded to heat after 3-20 minute and are being stopped heating, be beneficial to the mobile feeding of molten metal, after treating that composition metal 12 solidifies, promptly can manufacture the plane gradient composite.After the cooling crystallizer 8 of fetching boiling water takes out compound good product, send in the heat-treatment furnace, heat-treat by required Technology for Heating Processing.
Embodiment 2: in Fig. 2, with the difference of Fig. 1 for be fixed on by composite 9 end water tank 15 above, be installed in the side of crystallizer 8, the combination process that repeats embodiment 1 promptly can be combined into composite and products such as ply-metal.Other process and equipment and embodiment 1 omit together.
Embodiment 3: in Fig. 3, with the difference of Fig. 2 for be fixed on by composite 9 end water tank 15 above, be installed in the centre of crystallizer 8, be connected with electrode 2 and electrode 18 on the electrode holde 3, after the work beginning, electrode 2 and electrode 18 be inserted into respectively carried out the electroslag heating by the both sides of composite 9 in the crystallizer, the combination process that repeats embodiment 1 promptly can be combined into the multiple-layer laminated shape metallic composite that contains metallic composite 17 and 9 and 12.Other process and equipment and embodiment 1 omit together.
Embodiment 4: in Fig. 4, with the difference of Fig. 3 for by composite 9 and be fixed on after the certain at interval respectively distance of composite 21 end water tank 15 above, be installed in the center of crystallizer 8, and leave the interval of required size respectively by the composite requirement on the both sides of crystallizer 8, be connected with electrode 2 and electrode 18 and electrode 19 on the electrode holde 3, after the work beginning, with electrode 2, electrode 18 and electrode 19 are inserted into respectively and are installed in neutralizing by composite 9 with by the interval of composite 21 in the crystallizer and carry out the electroslag heating in the interval of all the other crystallizer inwalls, and the combination process that repeats embodiment 1 promptly can be combined into the multiple-layer laminated shape metallic composite that contains metallic composite 17 and 9 and 12 and 20.Other process and equipment and embodiment 1 omit together.
Embodiment 5: in Fig. 5, with the difference of Fig. 2 for executing plate or the block tubing 23 that is made into hollow shape by composite 9 in the example 2, and be fixed in the center of crystallizer, repeat the combination process process of embodiment 1, can prepare the composite bimetal pipe material, repeat the combination process process of embodiment 1 repeatedly, promptly can prepare multilayer stratiform metal composite pipe material.Other process and equipment and embodiment 1 omit together.
Embodiment 6: in Fig. 6, with the difference of Fig. 4 for executing the both sides that are installed in crystallizer by composite 9 and 21 respectively in the example 4, the casting metal complex liquid 20 therebetween, repeat the technical process of embodiment 4, can prepare the composite that will contain the multiple-layer laminated shape of composite material therein.Other process and equipment and embodiment 4 omit together.
Embodiment 7: in Fig. 7, with the difference of the various embodiments described above for the compound combination that makes a plurality of molds into of the single mold of the various embodiments described above is compound jointly, the assembly that is about to two or more water molds or mold 8 requires to be square according to pouring technology, rectangle, rectangle, arrangements such as circle are installed on the plant bottom case 15, cast flow path groove supporter 26 is installed in the centre of the assembly of water mold or mold 8, on cast flow path groove supporter 26, multithread flow path groove 25 is installed, depositing funnel 24 is installed on multithread flow path groove 25, cast ladle 23 in the middle of on depositing funnel 24, being equipped with, can be jointly in the outside of water mold or mold 8 assemblys or electromagnetic induction heater 6 is installed respectively, in cast ladle 23 in the middle of pouring into behind the required compound metal molten, composite metal-liquid 5 is entered multithread flow path groove 25 by depositing funnel 24 carry out runner boxing and pour in water mold or the mold 8, the combination process that repeats embodiment 1 promptly can once produce a plurality of composites and joint product.Other process and equipment and embodiment 1 and embodiment 2 omit together.
Embodiment 8: in Fig. 8, the mold 26 of difference with the various embodiments described above for the water mold in the various embodiments described above 8 being made into make with refractory material, end water tank 15 made into the base plate 27 made with refractory material, depositing funnel 25 is installed on mold 26, with mold 26 and base plate 27 be installed in plant bottom case 15 above, will be during the work beginning by CaO, SiO
2, Al
2O
3Deng oxide and Na
2CO
3, CaF
2NaCl; the aluminium powder of alkali metal such as NaF or alkaline-earth metal or fluoride etc. and doses; silicon calcium powder exothermic mixture and potassium nitrate; the low melting point of compositions such as oxidant such as sodium oxide molybdena or spontaneous heating covering slag 28 are put into mold 26; starting 6 pairs of electromagnetic induction heaters being installed in mold 26 outsides is heated by compound metal material 9; to be heated after 300-1200 ℃ temperature; composite metal-liquid 5 in the steel ladle 4 is poured in the depositing funnel 25; by depositing funnel 25 composite metal-liquid 5 is poured into mold 26; low melting point or spontaneous heating covering slag 28 are fused into liquid state under the high temperature of composite metal-liquid 5; thereby composition metal 12 is protected, to prevent the oxidation of composition metal.After cast finished, electromagnetic induction heater 6 was proceeded to heat after 3-20 minute stopping heating, is beneficial to the mobile feeding of molten metal, treat that composition metal 12 solidifies after, promptly can manufacture various forms of laminar composites.
Embodiment 9: in 9, with the difference of executing Fig. 8 for will be placed on the centre of mold 26 by composite 9, depositing funnel 25 is installed on the cast flow path groove 29, cast flow path groove 29 is installed in the bottom of mold 26 both sides, composite metal-liquid 5 pours in the mold 26 by depositing funnel 25 and the bottom of cast flow path groove 29 by mold 26 both sides, repeats the combination process of embodiment 8 and promptly can make various laminar composites and product.Other process and equipment and embodiment 8 omit together.
Embodiment 10: in Figure 10, with the difference of above-mentioned each enforcement figure for to be connected with seal box 31 in device external, on seal box 31, be connected with inert gas jar 30 with by-pass valve control 29 by pipeline 28, it charges into the flow of inert gas in seal box 31 by control valve 29 controls, seal box 31 is connected with vavuum pump 33 with by-pass valve control 32 by pipeline 34, thereby to vacuumizing in the seal box 31.
During work, at first start 33 pairs of equipment of vavuum pump and vacuumize, at this moment equipment is in work under the vacuum state; Perhaps after vacuumizing, opens equipment valve 29; in equipment, charge into inert gas; it is being produced under low-pressure inert gas guard mode or under the vacuum state; to reduce in the pernicious gas access arrangement; prevent composite metal-liquid 5 and, improve compound interface quality and product quality by the oxidation of composite 9.Other technical process and equipment and embodiment 1,2,8,9 omit together.
Claims (11)
1. casting method for manufacturing layered metal composite material technology; it is characterized in that: at first with a mold or water mold independently or the assembly of a plurality of mold or water mold be square; rectangle; rectangle; arrangements such as circle are installed on the plant bottom case; next door at plant bottom case is equipped with electroslag furnace; outside at mold or water mold is equipped with electromagnetic induction heater; one or more are undertaken after cleaning surfaces handles by composite; contain alkali metal oxides such as borax at its surface-coated one deck; chloride; melt the antioxidizing paint that salt is formed; require to be fixed on the bottom of required compound size in mold or the water mold after drying according to combination process; side or centre position; or one or more are spaced apart certain size as required by composite material are arranged in mold or the water mold in mold or water mold; to pour in the pouring ladle after the required compound metal material melting; starting the electromagnetic induction heater that is installed in mold or water mold outside heats the surface of being undertaken by composite in mold or the water mold; to be heated after 300-1200 ℃ temperature; the liquid electric slag that fusing is good is poured in mold or the water mold; non-consumable electrode or consutrode are inserted in mold or the water mold; start electroslag furnace power supply K; the liquid electric slag that is poured into is heated; composite metal-liquid is poured in mold or the water mold by teeming formula or bottom filling; simultaneously electrode is upwards progressively promoted; start ultrasonic wave or mechanical oscillation treatment facility the molten metal that is poured into is carried out vibration processing; with refinement with improve crystalline structure; after pouring metal melt finishes; electromagnetic induction heater and electrode are proceeded to heat after 3-20 minute and are being stopped heating; be beneficial to the mobile feeding of molten metal; when adopting multimode to arrange; its pouring type can adopt depositing funnel to carry out runner boxing by the multithread flow path groove in the mode of teeming formula or bottom filling; also can adopt single mode cast respectively one by one; thereby realize the compound of one or more complexs; when making the multilayer laminar composite of multiple heterogeneity, can realize that by repeating above-mentioned technology repeatedly the multilayer stratiform of multiple different materials is compound as needs.Promptly can manufacture the plane gradient laminar composite and the plane gradient multilayer laminar composite of various geometries by the shape that changes mold or water mold; as products such as disintegrating machine composite hammer head, compound bars; laminated shape composite; as Hubei Province plate, liner plate, various bimetallic stratiform composite board and multiple-layer laminated shape metallic composite panel, rectangle composite, coat shape roll shaft class composite and coat shape hollow tube composite.
2. a casting method for manufacturing layered metal composite material technology is characterized in that: start vavuum pump in recombination process the equipment complex that is installed in the vacuum protection cover is vacuumized, make equipment be in work under the vacuum state; Perhaps after vacuumizing, opens equipment valve; equipment in the vacuum protection cover charges into inert gas; make it pouring into a mould compound production under the low-pressure inert gas guard mode or under the vacuum state, repeat above-mentioned technology, can produce above-mentioned various layered metal composite material.
3. casting method for manufacturing layered metal composite material technology according to claim 1 is characterized in that: will be by CaO, SiO
2, Al
2O
3Deng oxide and Na
2CO
3, CaF
2NaCl; alkali metal such as NaF or alkaline-earth metal or fluoride etc. and doses aluminium powder; silicon calcium powder exothermic mixture and potassium nitrate; the low melting point of compositions such as oxidant such as sodium oxide molybdena or spontaneous heating covering slag 28 are put into mold 26; starting 6 pairs of electromagnetic induction heaters being installed in mold 26 outsides is heated by compound metal material 9; to be heated after 300-1200 ℃ temperature; composite metal-liquid 5 in the steel ladle 4 is poured in the depositing funnel 25; by depositing funnel 25 composite metal-liquid 5 is poured into mold 26; low melting point or spontaneous heating covering slag 28 are fused into liquid state under the high temperature of composite metal-liquid 5; thereby composition metal 12 is protected; to prevent the oxidation of composition metal; after cast finishes; electromagnetic induction heater 6 is proceeded to heat after 3-20 minute and is being stopped heating; be beneficial to the mobile feeding of molten metal; after treating that composition metal 12 solidifies, promptly can manufacture various forms of laminar composites.
4. casting method for manufacturing layered metal composite material technology according to claim 1, it is characterized in that: induction heater is not installed in the outside of water mold, directly adopt liquid metal Bohler electroslag tapping technology to make layered metal composite material, repeat above-mentioned technology and can produce various layered metal composite materials and multilayer laminar composite and product.
5. casting method for manufacturing layered metal composite material technology according to claim 1, it is characterized in that: composite material quality is compound between the ferrous metal of the ferrous metal of various materials of various applying working conditions and various materials, compound between the ferrous metal of various materials and the non-ferrous metal of various materials, compound between the non-ferrous metal of the compound and ferrous metal of various materials between the non-ferrous metal of various materials and the non-ferrous metal of various materials, various materials and carbide alloy, steel bonded carbide and the pottery of various materials, cermet, intermetallic compound.
6. casting method for manufacturing layered metal composite material technology according to claim 1 is characterized in that: the slag in the water mold is the slag system that monobasic or multi-component are formed, and its material is CaF
2, Al
2O
3, CaO, TiO
2, MnO, SiO
2, RE, RexOy, Na
2B
4O
7, Na
2O, SiCa, K
2O, Al etc. are Na by the composition of composite material surface antioxidizing paint
2B
4O
7, Na
2O, SiO
2, Al
2O
3,, K
2O, B
2O
3, CaO, etc.
7. equipment of realizing casting method for manufacturing layered metal composite material technology, it is characterized in that: this equipment has a plant bottom case, on the next door of plant bottom case electroslag furnace and electrode holde are installed, mold is installed on plant bottom case or has the water mold of water inlet pipe and water outlet pipe, outside at mold or water mold is equipped with electromagnetic induction heater, top or side at mold or water mold are equipped with depositing funnel and cast flow path groove, base plate or end water tank are installed in the bottom of mold or water mold, water mold and end water tank are separately installed with water inlet pipe and outlet pipe, on plant bottom case or mold or water mold, ultrasonic wave or mechanical vibrator are installed, are installed on base plate or end water tank and the plant bottom case by composite; Outside at the said equipment also is connected with vacuum (-tight) housing, on vacuum (-tight) housing, be connected with the inert gas jar, be connected with the ventilating control valve in the centre of inert gas jar and vacuum (-tight) housing, vacuum (-tight) housing is connected with vavuum pump by pipeline, is connected with control valve in the middle of vacuum (-tight) housing and vavuum pump.
8. the equipment of casting method for manufacturing layered metal composite material technology according to claim 7; it is characterized in that: consumable or non-consumable electrode are installed on electrode holde; power supply K is connected on electrode holde and the end water tank; below depositing funnel, be connected with the cast flow path groove; on the cast flow path groove, be connected with the multithread flow path groove; mold or the water mold that has a water inlet pipe and water outlet pipe promptly can be geometries such as rectangle, square, rectangle and circle; its structure promptly can be an overall structure, can also be that duplex is breathed out in two foldings.
9. the equipment of casting method for manufacturing layered metal composite material technology according to claim 8, it is characterized in that: water mold by 3-20 or more the water-cooled casing of polylith form, on each water-cooled case, all be connected with water inlet pipe and outlet pipe, between each water-cooled case, separate with refractory material or high-temperature insulation material, the structure of water-cooled casing is arc, rectangle, various geometries such as square, and the model that adopts the water-cooled casing to be formed is various required shapes such as circular, square, rectangle, rectangle, semicircle, ellipse and abnormal shape.
10. the equipment of casting method for manufacturing layered metal composite material technology according to claim 7 is characterized in that: mold materials promptly can be made by resistant to elevated temperatures refractory material, also can adopt water-cooled magnetic conductor material or graphite material to make.
11. the equipment of casting method for manufacturing layered metal composite material technology according to claim 7 is characterized in that: the induction power supply of electromagnetic induction heater is line-frequency induction power supply, medium frequency induction power supply or high frequency induction power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101332201A CN101125362A (en) | 2007-10-11 | 2007-10-11 | Casting method for manufacturing layered metal composite material technology and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101332201A CN101125362A (en) | 2007-10-11 | 2007-10-11 | Casting method for manufacturing layered metal composite material technology and equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101125362A true CN101125362A (en) | 2008-02-20 |
Family
ID=39093541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007101332201A Pending CN101125362A (en) | 2007-10-11 | 2007-10-11 | Casting method for manufacturing layered metal composite material technology and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101125362A (en) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102165295A (en) * | 2008-09-23 | 2011-08-24 | 恩德莱斯和豪瑟尔韦泽两合公司 | Method for producing a measuring device, and method for casting a mold |
CN102029378B (en) * | 2009-09-29 | 2012-11-14 | 宝山钢铁股份有限公司 | Method for manufacturing super-thick super-huge single steel ingot |
CN102886509A (en) * | 2011-07-20 | 2013-01-23 | 宝山钢铁股份有限公司 | Production method for extra large/thick ingots |
CN103282144A (en) * | 2010-11-17 | 2013-09-04 | 费罗法克塔有限公司 | Diecasting die and diecasting method |
CN103409639A (en) * | 2013-07-31 | 2013-11-27 | 沈阳化工大学 | Optimal control and diagnosis system for fusing rate of electrode in electroslag furnace |
CN104226956A (en) * | 2014-09-25 | 2014-12-24 | 镁联科技(芜湖)有限公司 | Internal-closed ring cast part and preparation method thereof |
CN105312540A (en) * | 2015-11-12 | 2016-02-10 | 丹阳恒庆复合材料科技有限公司 | Technique and device for manufacturing composite roller with recyclable roller core |
CN105312541A (en) * | 2015-11-12 | 2016-02-10 | 丹阳恒庆复合材料科技有限公司 | Improved technique and device for manufacturing nickel-chromium molybdenum alloy cast iron composite roller in forged steel roller neck |
CN105328168A (en) * | 2015-11-12 | 2016-02-17 | 丹阳恒庆复合材料科技有限公司 | Manufacturing process and equipment for nickel-chromium-molybdenum alloy cast iron composite roller in forged steel roller neck |
CN105397067A (en) * | 2015-11-11 | 2016-03-16 | 丹阳恒庆复合材料科技有限公司 | Manufacturing technology and device of forged steel roller neck alloy nodular cast iron composite roller |
CN105436475A (en) * | 2015-11-12 | 2016-03-30 | 丹阳恒庆复合材料科技有限公司 | Modified manufacturing process for high-chromium cast iron composite roll through forged steel roll neck and equipment |
CN105441937A (en) * | 2015-11-12 | 2016-03-30 | 丹阳恒庆复合材料科技有限公司 | Repairing technique and device for cast cladding layer of waste roller |
CN105522126A (en) * | 2015-11-11 | 2016-04-27 | 丹阳恒庆复合材料科技有限公司 | Manufacturing technique and equipment for high-performance composite roller shaft |
CN105562647A (en) * | 2015-11-12 | 2016-05-11 | 丹阳恒庆复合材料科技有限公司 | Forged steel roll journal indefinite chill high nickel-chromium-molybdenum composite roll process and equipment |
TWI551843B (en) * | 2015-01-19 | 2016-10-01 | 深圳興奇宏科技有限公司 | Cold plate structure and manufacuring method |
CN106392026A (en) * | 2016-11-07 | 2017-02-15 | 南昌专腾科技有限公司 | Metal composite material forming device and process |
CN106944606A (en) * | 2017-04-05 | 2017-07-14 | 哈尔滨理工大学 | It is a kind of to utilize the apparatus and method for inlaying casting preparation large scale alloy functionally gradient material (FGM) |
CN108326261A (en) * | 2018-01-31 | 2018-07-27 | 广东工业大学 | A kind of device and technique making high-entropy alloy laminated plate |
CN109158556A (en) * | 2018-10-18 | 2019-01-08 | 广东华劲金属型材有限公司 | A kind of preparation method of the quick ingot casting of metal |
CN110421149A (en) * | 2019-08-22 | 2019-11-08 | 东营市泰达石油装备有限责任公司 | Double metallic composite material and its preparation method and application, abrasion-proof accessories, winning equipment |
CN111168035A (en) * | 2020-01-16 | 2020-05-19 | 青岛力晨新材料科技有限公司 | Pouring system and pouring process for stainless steel/carbon steel composite plate |
CN114082923A (en) * | 2021-09-28 | 2022-02-25 | 材谷金带(佛山)金属复合材料有限公司 | 1050 aluminum/08 AL steel composite plate heat treatment method |
CN114231751A (en) * | 2021-12-22 | 2022-03-25 | 武汉科技大学 | Multifunctional gradient metal composite material electroslag fusion welding method preparation device and use method |
-
2007
- 2007-10-11 CN CNA2007101332201A patent/CN101125362A/en active Pending
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9228904B2 (en) | 2008-09-23 | 2016-01-05 | Endress + Hauser Wetzer Gmbh + Co. Kg | Method for manufacturing a measuring apparatus and method for casting in a mold |
CN102165295A (en) * | 2008-09-23 | 2011-08-24 | 恩德莱斯和豪瑟尔韦泽两合公司 | Method for producing a measuring device, and method for casting a mold |
CN102029378B (en) * | 2009-09-29 | 2012-11-14 | 宝山钢铁股份有限公司 | Method for manufacturing super-thick super-huge single steel ingot |
CN103282144B (en) * | 2010-11-17 | 2016-04-27 | 费罗法克塔有限公司 | For the pressure casting method without cast gate die casting |
CN103282144A (en) * | 2010-11-17 | 2013-09-04 | 费罗法克塔有限公司 | Diecasting die and diecasting method |
CN102886509A (en) * | 2011-07-20 | 2013-01-23 | 宝山钢铁股份有限公司 | Production method for extra large/thick ingots |
CN103409639B (en) * | 2013-07-31 | 2015-03-18 | 沈阳化工大学 | Optimal control and diagnosis system for fusing rate of electrode in electroslag furnace |
CN103409639A (en) * | 2013-07-31 | 2013-11-27 | 沈阳化工大学 | Optimal control and diagnosis system for fusing rate of electrode in electroslag furnace |
CN104226956A (en) * | 2014-09-25 | 2014-12-24 | 镁联科技(芜湖)有限公司 | Internal-closed ring cast part and preparation method thereof |
TWI551843B (en) * | 2015-01-19 | 2016-10-01 | 深圳興奇宏科技有限公司 | Cold plate structure and manufacuring method |
CN105522126B (en) * | 2015-11-11 | 2018-04-06 | 丹阳恒庆复合材料科技有限公司 | The compound roll shaft manufacturing process of high-performance and equipment |
CN105397067B (en) * | 2015-11-11 | 2018-01-16 | 丹阳恒庆复合材料科技有限公司 | Forged steel roll neck alloy nodular cast iron composite roll manufacturing process and equipment |
CN105397067A (en) * | 2015-11-11 | 2016-03-16 | 丹阳恒庆复合材料科技有限公司 | Manufacturing technology and device of forged steel roller neck alloy nodular cast iron composite roller |
CN105522126A (en) * | 2015-11-11 | 2016-04-27 | 丹阳恒庆复合材料科技有限公司 | Manufacturing technique and equipment for high-performance composite roller shaft |
CN105328168A (en) * | 2015-11-12 | 2016-02-17 | 丹阳恒庆复合材料科技有限公司 | Manufacturing process and equipment for nickel-chromium-molybdenum alloy cast iron composite roller in forged steel roller neck |
CN105441937B (en) * | 2015-11-12 | 2018-10-30 | 丹阳恒庆复合材料科技有限公司 | A kind of waste or old roll founding clad renovation technique and equipment |
CN105562647A (en) * | 2015-11-12 | 2016-05-11 | 丹阳恒庆复合材料科技有限公司 | Forged steel roll journal indefinite chill high nickel-chromium-molybdenum composite roll process and equipment |
CN105436475A (en) * | 2015-11-12 | 2016-03-30 | 丹阳恒庆复合材料科技有限公司 | Modified manufacturing process for high-chromium cast iron composite roll through forged steel roll neck and equipment |
CN105441937A (en) * | 2015-11-12 | 2016-03-30 | 丹阳恒庆复合材料科技有限公司 | Repairing technique and device for cast cladding layer of waste roller |
CN105312540B (en) * | 2015-11-12 | 2017-12-22 | 丹阳恒庆复合材料科技有限公司 | The composite roll manufacturing process and equipment of a kind of reusable edible roller core |
CN105312541A (en) * | 2015-11-12 | 2016-02-10 | 丹阳恒庆复合材料科技有限公司 | Improved technique and device for manufacturing nickel-chromium molybdenum alloy cast iron composite roller in forged steel roller neck |
CN105312540A (en) * | 2015-11-12 | 2016-02-10 | 丹阳恒庆复合材料科技有限公司 | Technique and device for manufacturing composite roller with recyclable roller core |
CN106392026A (en) * | 2016-11-07 | 2017-02-15 | 南昌专腾科技有限公司 | Metal composite material forming device and process |
CN106392026B (en) * | 2016-11-07 | 2018-05-08 | 南昌专腾科技有限公司 | Metallic composite molding machine and technique |
CN106944606A (en) * | 2017-04-05 | 2017-07-14 | 哈尔滨理工大学 | It is a kind of to utilize the apparatus and method for inlaying casting preparation large scale alloy functionally gradient material (FGM) |
CN108326261A (en) * | 2018-01-31 | 2018-07-27 | 广东工业大学 | A kind of device and technique making high-entropy alloy laminated plate |
CN109158556A (en) * | 2018-10-18 | 2019-01-08 | 广东华劲金属型材有限公司 | A kind of preparation method of the quick ingot casting of metal |
CN110421149A (en) * | 2019-08-22 | 2019-11-08 | 东营市泰达石油装备有限责任公司 | Double metallic composite material and its preparation method and application, abrasion-proof accessories, winning equipment |
CN111168035A (en) * | 2020-01-16 | 2020-05-19 | 青岛力晨新材料科技有限公司 | Pouring system and pouring process for stainless steel/carbon steel composite plate |
CN114082923A (en) * | 2021-09-28 | 2022-02-25 | 材谷金带(佛山)金属复合材料有限公司 | 1050 aluminum/08 AL steel composite plate heat treatment method |
CN114231751A (en) * | 2021-12-22 | 2022-03-25 | 武汉科技大学 | Multifunctional gradient metal composite material electroslag fusion welding method preparation device and use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101125362A (en) | Casting method for manufacturing layered metal composite material technology and equipment | |
CN106601324B (en) | A kind of high bond strength Copper-Aluminum compound conductive material and preparation method thereof | |
CN101898241B (en) | Micro-nano-alloy bimetal composite material preparation technique and device thereof | |
CN101914767B (en) | Preparation process and device of nano-particle reinforced bimetal composite | |
CN102240860B (en) | Method and equipment for manufacturing gradient material mould | |
CN104646421B (en) | The solid liquid casting and rolling installation of a kind of ply-metal electricimpulse and method | |
CN101254529A (en) | Production method of large-sized duplex metal composite board and device thereof | |
CN106862534A (en) | One kind manufacture metallurgical binding ply-metal Processes and apparatus | |
CN101314145A (en) | Grinder hammerhead with ceramic wearing coat and casting method thereof | |
KR20210020130A (en) | Apparatus and method for continuous production of metal clad strip | |
CN106086544B (en) | A kind of alloying element strengthens high aluminium silicon composite material and preparation method thereof | |
CN103691910B (en) | A kind of aluminum bag magnesium composite plate material preparation method | |
CN101774010A (en) | Bimetallic metallurgical composite wear-resisting tube blank and manufacturing method thereof | |
JP2021527569A (en) | Production equipment and methods for manufacturing metal composite plates in a short process | |
CN106544604B (en) | The preparation method and device of a kind of fiber-reinforced metal matrix composite | |
CN110343913A (en) | A kind of aluminium base high strength composite and preparation method thereof | |
CN106636933A (en) | Method for preparing multi-phase reinforced ferrite alloy | |
CN106755724B (en) | A kind of smelting technology being suitable for 3 tons of intermediate frequency furnace production nodulizers | |
CN106424620A (en) | Preparation device and preparation method of metal-metal ceramic layered composite material | |
CN101780530A (en) | Method and device for preparing double-sided composite plate blanks | |
CN108149182A (en) | The method that powder core aluminium wire material electric arc spraying prepares silicon carbide aluminum matrix composite | |
CN201157894Y (en) | Apparatus for preparing metal laminated composite material | |
CN106119663A (en) | Intermediate zone inner surface alloy powder, preparation and coating thereof on cement rotary kiln | |
CN101928909B (en) | Method for preparing niobium titanium aluminum alloy coating by utilizing detonation spraying | |
CN113798786A (en) | Preparation method of bimetal composite board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |