CN101124380A - 用于高架电线支撑和/或支撑桩地基的施工的模块化系统 - Google Patents

用于高架电线支撑和/或支撑桩地基的施工的模块化系统 Download PDF

Info

Publication number
CN101124380A
CN101124380A CNA2005800461859A CN200580046185A CN101124380A CN 101124380 A CN101124380 A CN 101124380A CN A2005800461859 A CNA2005800461859 A CN A2005800461859A CN 200580046185 A CN200580046185 A CN 200580046185A CN 101124380 A CN101124380 A CN 101124380A
Authority
CN
China
Prior art keywords
construction
block
modular system
overhead wire
supporting pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2005800461859A
Other languages
English (en)
Other versions
CN100529312C (zh
Inventor
安东尼奥·普罗科皮奥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ge P I S R L
CO GE P I 有限责任公司
Original Assignee
Co Ge P I S R L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ge P I S R L filed Critical Co Ge P I S R L
Publication of CN101124380A publication Critical patent/CN101124380A/zh
Application granted granted Critical
Publication of CN100529312C publication Critical patent/CN100529312C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)
  • Supports For Pipes And Cables (AREA)
  • Installation Of Indoor Wiring (AREA)
  • Supports For Plants (AREA)

Abstract

本发明涉及一种用于高架电线支撑和/或支撑桩地基的施工的新的模块化系统,目的在于在施工阶段使得地基的建筑过程较少受限于不可控制的变化,以及同传统的现场地基比较,改善这种地基的技术上的和性质上的特征。本发明包括预制模块(A型、B型和C型):它们具有不同的几何学特征且可按照不同的模式组合以依照所需要的桩的种类和用来锁定完成的块体层的钢棒,来重建块体的整体性以满足各种地基施工的需要。

Description

用于高架电线支撑和/或支撑桩地基的施工的模块化系统
技术领域
本发明涉及模块化的建筑部分。特别地,其在于一种用于高架电线支撑和/或支撑桩地基的施工的新的模块化系统。
背景技术
现有的用于高架电线支撑和/或支撑桩地基的施工的系统在于通过不同的阶段完全在现场实现地基:手工或者机械地挖掘,浇注管的定位,手工混凝土卸料,采用机械方法安装桩。
这样的系统呈现出不利的方面:浇注管对于地基块体的找正误差(miscentring);不遵守挖掘和浇注管基底两者之间的距离导致桩在地面上安装的深度较低;难于控制通常在现场准备或在货栈购买然后运到施工地点的混凝土的质量;由于混凝土卸料,带来浇注管可能的移动;难于使地基块体墙壁一致;由于实现防止雨水流动的斜坡,带来可能的新形成(emerging)的块体表面缺陷。
这些后果,虽然在不同的部分,在专利申请No.US6178714和No.US2004000114中部分地处理和解决。
申请No.US6178714涉及一种用于可移动模块化结构的施工的系统,其包括平的混凝土基底,用来插入及锁定垂直的杆和/或柱的规则间隔的孔;一系列标准尺寸的块体,每个都设有一个或多个固定孔;一系列固定柱和杆,一旦插入,呈现下一个块体的用于装配的锁定元件,这样就生成了墙壁,其不需要使用混凝土且易于拆除。
申请No.US2004000114涉及一种用于块体施工的模块化系统,包括提供为一系列通道的半成品物件。半成品物件可由塑胶制成,用混凝土填充或钢棒加固,以建造路基、地基、梁、墙壁和房顶。
然而,现有的建造技术和这两件专利申请均不能解决上述不利方面。
发明内容
本发明在于一种用于高架电线支撑和/或支撑桩地基的施工的新的模块化系统,目的在于克服现存系统的各种问题和缺点。
特别地,这种新的系统的目的在于通过使地基的施工过程在安装阶段较少受限于由上述不利方面引起的那些不可控制的变化,而使其有效率且有效。
本发明包括三种类型(A、B、C)的预制模块:它们具有不同的几何学特征且可按照不同的模式组合,以依照所需要的桩的种类和用来锁定完成的块体层,以及重建(restore)块体的整体性(monolithicity)的钢棒来满足各种地基施工的需要。下述为上述模块的建造特征。
A型模块:用作模块B和C的基底的预制块体,设有用于完成的块体固定棒(bar)的安装的四个孔(每个角一个),以及必要的用于模块移动的插孔凹口,其中该固定棒可重建块体本身的整体性。
B型模块:用作A型模块顶层的预制块体。采用足够数量的B型模块以达到取决于待安装的桩的地基必需的深度。B型模块设有用于完成的块体固定棒的安装的四个孔(每个角一个),必要的用于模块移动的插孔凹口,用于安装桩的中心孔和接地线凹槽,其中该固定棒可重建块体本身的整体性。
C型模块:用在新形成的块体的顶部的预制块体。C型模块设有用于完成的块体固定棒的安装的四个孔(每个角一个),必要的用于模块移动的插孔凹口,用于安装桩的中心孔和允许雨水流动的表面斜坡,其中该固定棒可重建块体本身的整体性。
钢棒:插入各个模块A、B、C的角孔的圆的元件。各元件通过将高粘附力、易膨胀的水泥浆填入空腔因而固定,为了允许全部块体层的固定(“模块紧密结合”)以及块体本身的整体性的重建,其在低压下注入。
本发明的主要特征为其模块性,同传统的现场技术比较,通过组成预制元件,改善和简化地基施工。本发明使块体地基的施工能够具有高技术性的型面,且解决了传统技术引起的各种后果和不利的方面。
本发明的优点:
1.本发明完全的模块性,通过采用恰当数量的预制模块,能够达到取决于待安装的桩的地基必需的深度。
2.地基块体的高技术性的型面。
3.易于安装,允许桩找正以及生成使雨水流动的恰当的斜坡。
4.支撑桩的插入深度的控制。
5.用于模块施工的混凝土的质量的科学控制,例如直接由混凝土生产设备生产。
6.无混凝土的时效后果。仅在卸料后28天,混凝土可以被认为是“成熟的”:所以,在这28天之前,所有影响地基块体的压力均可导致混凝土成分的崩溃。
7.不需等待混凝土硬化的时间。
8.无惰性物质偏析。
9.无由于工作地点的问题,例如在粗糙的地点施工的地基块体和在平面施工的地基块体质量相同。
10.减少建筑时间。
上述优点在对附图的说明中会更清楚。
图示简单说明
图1显示了用于地基施工的模块组成布置的3D视图:模块A(作为基底)(A),一个或多个模块B层(B),模块C(C)以及连接模块与重建块体的整体性的棒(D)。
图2显示了A型模块的3D视图和纵向的截面图,其以棒插入孔(E)和模块移动插孔(F)为特征。
图3显示B型模块的3D视图和纵向的截面图,其以与图2中同样的孔(E)和插孔(F)、桩插入的中心孔(G)和接地线凹槽(H)为特征。
图4显示C型模块的3D视图和纵向的截面图,其以与前图中同样的孔(E)、插孔(F)和中心孔(G),以及使雨水流动的斜坡(L)表面(I)为特征。
本发明不限于给出的说明,而是可以不超出本发明地修改。
这个发明具有若干优点,且使使用者可以克服许多采用当前可用的系统不能解决的问题。

Claims (13)

1.用于高架电线支撑和/或支撑桩地基的施工的模块化系统包括三种类型的预制模块(A、B、C)和圆钢棒(D),A型模块:用作模块B和C的基底的预制块体,设有用于完成的块体固定棒的安装的四个孔(每个角一个),以及必要的用于模块移动的插孔凹口,其中所述固定棒可重建块体本身的整体性;B型模块:用作A型模块顶层的预制块体,采用足够数量的B型模块以达到取决于待安装的桩的地基必需的深度,B型模块设有用于完成的块体固定棒的安装的四个孔(每个角一个),必要的用于模块移动的插孔凹口,用于安装桩的中心孔和接地线凹槽,其中所述固定棒可重建块体本身的整体性;C型模块:用在新形成的块体的顶部的预制块体,C型模块设有用于完成的块体固定棒的安装的四个孔(每个角一个),必要的用于模块移动的插孔凹口,用于安装桩的中心孔和避免水停滞的表面斜坡,其中所述固定棒可重建块体本身的整体性;钢棒:插入各个模块A、B、C的角孔的圆的元件,各元件通过将高粘附力、易膨胀的水泥浆填入空腔因而固定,为了允许全部块体层固定(“模块紧密结合”)以及重建块体本身的整体性,其在低压下注入。
2.如权利要求1所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,具有源自预制模块的组成和结合的完全的模块性。
3.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,具有源自满足取决于所用桩的种类的地基技术要求的恰当数量的预制B型模块的组成和结合的完全的普遍性。
4.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,采用钢棒,其插入提供的模块孔以及,然后采用高粘附力、易膨胀的水泥浆在低压下注入而固定,允许全部块体层固定(“模块紧密结合”)以及重建块体本身的整体性。
5.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,采用预制元件确保地基块体的施工具有高的技术上的和性质上的特征。
6.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,保证支撑和/或桩相对地基块体地找正。
7.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,具有控制支撑桩插入深度的可能性。
8.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,同传统的现场技术比较,采用预制元件确保较短的建筑时间。
9.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,具有容易的施工过程。
10.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,具有将模块C安装在块体顶部的可能性以便建筑新形成的地基。
11.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,可能使用的桩由cac料、锌片、不同的金属、木材、树脂以及若干合成材料制成。
12.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,无涉及混凝土时效以及惰性物质偏析的问题。
13.如前面的任一项权利要求所述的用于高架电线支撑和/或支撑桩地基的施工的模块化系统,其特征在于,地基施工依照所需的规格,不考虑地点的地质工艺特征。
CNB2005800461859A 2004-11-11 2005-11-11 用于高架电线支撑和/或支撑桩地基的施工的模块化系统 Expired - Fee Related CN100529312C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT000018A ITCZ20040018A1 (it) 2004-11-11 2004-11-11 Sistema modulare per la realizzazione di fondazione per sostegni di linee aeree e/o pali di sostegno
ITCZ2004A000018 2004-11-11

Publications (2)

Publication Number Publication Date
CN101124380A true CN101124380A (zh) 2008-02-13
CN100529312C CN100529312C (zh) 2009-08-19

Family

ID=35788171

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005800461859A Expired - Fee Related CN100529312C (zh) 2004-11-11 2005-11-11 用于高架电线支撑和/或支撑桩地基的施工的模块化系统

Country Status (12)

Country Link
US (1) US20090074515A1 (zh)
EP (1) EP1812667B1 (zh)
JP (1) JP2008519924A (zh)
CN (1) CN100529312C (zh)
AT (1) ATE395485T1 (zh)
BR (1) BRPI0517482A (zh)
DE (1) DE602005006833D1 (zh)
HR (1) HRP20080387T3 (zh)
IT (1) ITCZ20040018A1 (zh)
PL (1) PL1812667T3 (zh)
RU (1) RU2353740C2 (zh)
WO (1) WO2006051575A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201700037472A1 (it) * 2017-04-05 2018-10-05 Metalco Active S R L Pedana esagonale pronta all’uso reversibilmente installabile per una qualsiasi palestra modulare.
CN108842801A (zh) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 用于土木工程的桩基固定装置
CN108951687A (zh) * 2018-08-06 2018-12-07 国网上海市电力公司 一种可移动电杆基础组件

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITCZ20060015A1 (it) * 2006-03-28 2007-09-29 Co Ge Pi Srl Sistema modulare per la realizzazione di fondazioni per sostegni di linee aeree e/o pali di sostegno
MD4096C1 (ro) * 2009-06-01 2011-09-30 Институт Энергетики Академии Наук Молдовы Instalaţie fundament transportabilă
KR101002234B1 (ko) 2010-06-24 2010-12-20 이진영 안내판 지주용 앵커박스 및 그 시공방법
JP5484288B2 (ja) * 2010-10-22 2014-05-07 株式会社Lixil カーポートやテラス等の柱の基礎構造、柱の基礎の施工方法およびプレキャストコンクリートブロック
TW201247971A (en) * 2011-05-24 2012-12-01 Dehan Intellectual Technology Co Ltd Building fundamental pile and construction method thereof
CN103195078B (zh) * 2012-01-04 2015-11-25 赵正义 垂直连接螺栓的模块定位构造
DE102013216343A1 (de) * 2013-08-19 2015-02-19 Wobben Properties Gmbh Windenergieanlagen-Fundament und Windenergieanlage
CN108914718B (zh) * 2018-06-07 2023-11-17 中铁二院工程集团有限责任公司 高速铁路加筋土挡墙路基接触网基础预留孔构造的施工方法
RU203692U1 (ru) * 2020-07-22 2021-04-15 Андрей Сергеевич Шелахаев Штифтовое основание

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US178438A (en) * 1876-06-06 Improvement in composite piers
US762496A (en) * 1901-01-21 1904-06-14 Edmund Augustine Smith Composite pile.
CA1009856A (en) * 1974-12-02 1977-05-10 West's Piling And Construction Company Limited Pile connecting device
AT385553B (de) * 1986-04-07 1988-04-25 Vondra Johann Im erdboden verankertes fundament fuer die befestigung von bauteilen, insbesondere stehern, masten od.dgl.
US5214897A (en) * 1991-03-28 1993-06-01 Nordberg Henry T Concrete block
US5257489A (en) * 1991-10-15 1993-11-02 Angelette A M Railroad crossing signal foundation
US6098357A (en) * 1994-11-07 2000-08-08 Megawall Corporation Modular precast construction block system
US5746036A (en) * 1995-07-10 1998-05-05 Angelette; A. M. Railroad crossing signal foundation and spider and method of producing the same
CA2213831C (en) * 1996-09-09 2001-12-04 Finn A. Rasmussen Modular pillar
US5934837A (en) * 1997-07-18 1999-08-10 Lee; Chen-Fang Multipurpose, combined, pre-casting pile assembly
US6176055B1 (en) * 1999-02-17 2001-01-23 Chen-Wei Fu Modular foundation system
US6178714B1 (en) * 1999-07-06 2001-01-30 Robert S. Carney, Jr. Modular temporary building
IL134724A0 (en) * 2000-02-24 2001-04-30 Giltek Telecomm Ltd Foundation for a tower and a method for its deployment on site
US6609856B1 (en) * 2000-04-07 2003-08-26 David W. Knight Process of installing a precast concrete pile below a structure
US7191571B2 (en) * 2002-06-26 2007-03-20 Schools Jody L Modular construction blocks, building structures, kits, and methods for forming building structures
US6799924B1 (en) * 2003-03-14 2004-10-05 Precision Piling Systems, Llc Segmented concrete piling assembly with steel connecting rods
US20060000179A1 (en) * 2004-06-16 2006-01-05 Albert Abdallah J Building block

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201700037472A1 (it) * 2017-04-05 2018-10-05 Metalco Active S R L Pedana esagonale pronta all’uso reversibilmente installabile per una qualsiasi palestra modulare.
CN108951687A (zh) * 2018-08-06 2018-12-07 国网上海市电力公司 一种可移动电杆基础组件
CN108842801A (zh) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 用于土木工程的桩基固定装置
CN108842801B (zh) * 2018-08-08 2020-09-22 东阳市琰安建筑工程有限公司 用于土木工程的桩基固定装置

Also Published As

Publication number Publication date
WO2006051575A1 (en) 2006-05-18
HRP20080387T3 (en) 2008-11-30
ITCZ20040018A1 (it) 2005-02-11
ATE395485T1 (de) 2008-05-15
CN100529312C (zh) 2009-08-19
BRPI0517482A (pt) 2008-10-14
JP2008519924A (ja) 2008-06-12
US20090074515A1 (en) 2009-03-19
DE602005006833D1 (de) 2008-06-26
EP1812667B1 (en) 2008-05-14
RU2007121699A (ru) 2008-12-20
RU2353740C2 (ru) 2009-04-27
EP1812667A1 (en) 2007-08-01
PL1812667T3 (pl) 2008-12-31

Similar Documents

Publication Publication Date Title
CN100529312C (zh) 用于高架电线支撑和/或支撑桩地基的施工的模块化系统
CN104895092A (zh) 一种内支撑临时格构柱用作永久结构柱的方法
US20130008108A1 (en) Foundation system for bridges and other structures
CN108360678B (zh) 一种装配式梁柱节点卯榫连接结构
CN202706198U (zh) 一种建筑结构
US9695558B2 (en) Foundation system for bridges and other structures
CN104314362B (zh) 全预制装配式围墙
CN111962557A (zh) 一种装配式绿化挡土墙及其施工方法
KR20080077721A (ko) 옹벽용 블록 축조방법
CN113718753B (zh) 锚碇地下连续墙基础装配式中隔墙及施工方法
KR101036177B1 (ko) 피알씨 복합화 공법을 이용한 건축 구조물의 시공방법
KR101703441B1 (ko) 플로팅 도크를 이용한 상향식 프리캐스트 저판형 케이슨 제작방법, 그 시스템, 그 플로팅 도크 및 이를 이용한 케이슨
CN104234258B (zh) 砌块和钢筋混凝土叠合墙体及施工方法
CN105839848A (zh) L型钢-混凝土组合结构构件
KR200291348Y1 (ko) 토목구축물용 구축재, 및 그를 이용하여 제조한 토목구축물
CN115749043A (zh) 一种装配式建筑墙板连接节点结构
CN216552513U (zh) 一种基于直榫的装配式条板墙构造柱预制件
EP2931976A1 (en) Foundation system for bridges and other structures
CN207775868U (zh) 地下连续墙
CN219931019U (zh) 一种边坡防护墙
CN111980059A (zh) 一种配置绿化台的装配式挡土墙及其施工方法
CN112012473A (zh) 污水池扶臂肋梁型墙身一体成型钢模板
CN117071626A (zh) 一种钢钣混凝土混合承台及施工方法
WO2007110892A2 (en) Modular system for the realization of foundations for supports of overhead lines and/or support piles
CN221567387U (zh) 管道混凝土半包封整体施工结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090819

Termination date: 20091211