CN101085500A - Preparation method for railway freight car coupler tail frame integral forging - Google Patents

Preparation method for railway freight car coupler tail frame integral forging Download PDF

Info

Publication number
CN101085500A
CN101085500A CN 200710025083 CN200710025083A CN101085500A CN 101085500 A CN101085500 A CN 101085500A CN 200710025083 CN200710025083 CN 200710025083 CN 200710025083 A CN200710025083 A CN 200710025083A CN 101085500 A CN101085500 A CN 101085500A
Authority
CN
China
Prior art keywords
forging
tail frame
scale
steel
shaping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200710025083
Other languages
Chinese (zh)
Other versions
CN101085500B (en
Inventor
胡其江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NAJING ZHONGSHENG RAIL VEHICLES ACCESSORIES CO Ltd
Original Assignee
NAJING ZHONGSHENG RAIL VEHICLES ACCESSORIES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAJING ZHONGSHENG RAIL VEHICLES ACCESSORIES CO Ltd filed Critical NAJING ZHONGSHENG RAIL VEHICLES ACCESSORIES CO Ltd
Priority to CN200710025083XA priority Critical patent/CN101085500B/en
Publication of CN101085500A publication Critical patent/CN101085500A/en
Application granted granted Critical
Publication of CN101085500B publication Critical patent/CN101085500B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The high strength alloy steel blank is made through blank making, casting, rectifying, cutting, machining, heat treatment, pill thrusting, and it excels with greatly reduced defects rate, improved in comprehensive feature, doubly increased in part strength and durability. The anti stretch strength reaches 850N/mm2. The impact power Akvj reaches over 27. Through static charge testing, stresses for all the parts are within the allowable scope, increasing fatigue 80%, and durability two times.

Description

The preparation method of railway freight car coupler tail frame integral forging
Technical field
The present invention relates to the railway freight car coupler tail frame that former casting technique is produced, under the prerequisite that does not change function of use, use the method for solid forging instead.
Background technology
Hook tail frame is a key components and parts in the railway vehicle coupler buffer unit, directly finishes the transmission of longitudinal force between the vehicle.The hook tail frame that uses on the past rolling stock is a steel-casting always.Because the inevitable pore of steel-casting, be mingled with, defective such as shrinkage porosite, intensity is difficult to improve.In recent years, the defective that transport capacity enforcement is raised speed because railway is for improving, there is casting hook tail frame in heavy duty has exposed, in use too early appearance fatigue crack, and the brisement accident takes place frequently, bring potential safety hazard to railway transportation, be difficult to adapt to the safety of railway transportation needs.Though know the good product quality of forging effect than casting perfectly well, because the shape of hook tail frame own is the sealing frame type of a hollow, adopting to forge has very big difficulty.
Summary of the invention
The objective of the invention is low for the cast steel hook tail frame intensity that overcomes present use, fatigue life short, problems such as crackle, fracture take place in the utilization process often, provide a kind of employing novel high-strength steel alloy steel billet, by the preparation method that base, forging, shaping, cutting, machine add, operation such as heat treatment, ball blast is finished railway freight car coupler tail frame integral forging.
The preparation method of railway freight car coupler tail frame integral forging of the present invention mainly comprises the steps:
(1) select new material for use: forging hook tail frame will be selected the superior alloy steel steel billet for use, new material will with the cast steel material intensity of present use quite or be higher than cast steel material, as select the 35CrMo milling round steel for use;
(2) accurately calculate material and blanking: it is heavy accurately to calculate material, avoids die cavity to be not fully filled or does not lean on;
(3) base: the round base heating back after the blanking forges on swage block with the above forging hammer of 5T, makes round base preliminary deformation, obtains approaching to give the rectangle blank of forging die cavity;
(4) give forging: the blank that makes is hit preliminarily forming with giving forging mould on large-scale friction press;
(5) finish-forging: put into the finish-forging mould after the forging heating after the forging and forge (generally hitting three shapings) giving once more with large-scale friction press, the design of forging mold is the key of a key, help metal flow, die cavity can be full of, and does not produce folding phenomenon;
(6) cut edge: cut overlap on the forging with large-scale bead cutter and shear mould;
(7) punching the wad hole: wash away the middle excess stock of forging with large-scale friction press and perforating die and make the framework hollow forming;
(8) shaping: with the shaping mold forging is carried out shaping and eliminate the forging distortion that produces owing to operations such as side cut, punching recesses;
(9) ball blast: remove the forging surface scale with special equipment;
(10) go out the frame mouth and reserve allowance with the imitative type cutter cuts of flame;
(11) go out pin-and-hole with the imitative type cutter cuts of flame;
(12) machining: to by forging and cutting does not reach the place of drawing requirement and cutting heat affected area and reaches with the way of machining or remove;
(13) heat treatment: forging is heat-treated the comprehensive mechanical performance of giving full play to steel alloy with the special specification of heat treatment of formulating;
(14) ball blast: surface peening improves the fatigue strength of hook tail frame;
(15) flaw detection.
Beneficial effect:
Use the forging in the present technique invention and process whole hook tail frame and following outstanding advantage is arranged: owing to adopt high-intensity its latent defect of steel alloy stocking to significantly reduce than steel-casting than casting hook tail frame, comprehensive mechanical performance improves, and by forging, press secondary operations can make hook tail frame material form full fibr tissue the intensity of part and service life is significantly improved.Solid forging hook tail frame forges with combined type and compares, and globality is strong, material property is consistent, so hook tail frame each several part intensity can be guaranteed.And combined hook tail frame is to be welded by two connecting plates and the deckle board after bending, and weld seam exists defective to become weak link as founding materials easily, cracks so that fracture at the weld seam position in the utilization.
The present invention can reach 850N/mm through its tensile strength of evidence 2Ballistic work AkvJ (test temperature-40 ℃) can reach more than 27.Through static load test, each position stress value improves 80% all in permissible range as fatigue life ratio casting hook tail frame; Life-span is improved 2 times.
Description of drawings
Fig. 1 is a process chart of the present invention;
Fig. 2 is blanking figure of the present invention;
Fig. 3 is base figure of the present invention;
Fig. 4 is the forging figure that gives of the present invention;
Fig. 5 is finish-forging of the present invention, side cut, punching figure;
Fig. 6 is integer of the present invention, cutting drawing;
Fig. 7 is a stereogram of the present invention.
The specific embodiment
Referring to accompanying drawing, existing be set at hook tail frame overall dimensions: it is as follows that length 932mm, width 200mm, height 366mm, deckle board thickness 28mm are that example is further described:
(1) adopt sawing machine to see Fig. 2 by process blanking (φ 185mm circle guiding principle);
(2) base: forging stock is the round steel heating with blanking, uses the swage block open die forging then on 5 tons of satin hammers, is swaged into and gives the similar first base of forging blank shape, the fine or not quality that directly influences rough forging of first base, first base profile such as Fig. 3;
(3) give forging: need forging forces to reach 8000 ton large-scale friction presses with giving the forging die forging because satin spare size and weight reach 150 kilograms more greatly, after the moulding as Fig. 4;
(4) finish-forging
Put into the finish-forging mould after forging after the forging heats once more and forge after (generally hitting three shapings) moulding as Fig. 5 giving with large-scale 8000 tons of friction presses;
The design of finish-forging forging mold is the key of a key, help metal flow, and die cavity can be full of, and does not produce folding phenomenon;
(5) cut edge: cut overlap on the forging with large-scale 1250 tons of bead cutters and shaving die;
(6) punching the wad hole: wash away in the middle of the forging excess stock with large-scale friction press and perforating die and make behind the framework hollow forming as Fig. 6 (C);
(7) shaping
With shaping mould and special tooling, there is fixed die (straightening die) centre, about template is arranged, afterbody has and pushes up after correcting mould, about and afterbody promote clamping with an oil cylinder respectively, finish the body heat shaping of hook tail circle such as Fig. 6;
(8) ball blast: remove the forging surface scale with special equipment and be beneficial to machining;
(9) cutting: go out the frame mouth and reserve allowance such as Fig. 5 (B) with the imitative type cutter cuts of oxycetylene flame;
And cut out pin-and-hole such as Fig. 6 (E) but because the precision of cutting is not high, next step will reach the figure paper size and remove the heat affected area by machining to have the heat affected area simultaneously;
(10) machining: processes such as employing is milled, brill reach the drawing dimensional requirement and remove the heat affected area;
(11) heat treatment: with the special specification of heat treatment of formulating forging is carried out modified heat treatment, give full play to the comprehensive mechanical performance of 35CrMo steel alloy;
(12) ball blast: use shot-blasting machine, the shot of selecting 1-1.5mm for use is thrown hook tail frame and is beaten, and strengthens the fatigue strength that hook tail frame table face improves hook tail frame;
(13) flaw detection: hook tail frame table face is detected a flaw with large-scale professional magnaflux.
With above-mentioned process produced hook tail frame such as Fig. 7.

Claims (1)

1, a kind of preparation method of railway freight car coupler tail frame integral forging comprises the steps:
(1) select new material for use: forging hook tail frame will be selected the superior alloy steel steel billet for use, new material will with the cast steel material intensity of present use quite or be higher than cast steel material, as select the 35CrMo milling round steel for use;
(2) accurately calculate material and blanking: it is heavy accurately to calculate material, avoids die cavity to be not fully filled or does not lean on;
(3) base: the round base heating back after the blanking forges on swage block with the above forging hammer of 5T, makes round base preliminary deformation, obtains approaching to give the rectangle blank of forging die cavity;
(4) give forging: the blank that makes is hit preliminarily forming with giving forging mould on large-scale friction press;
(5) finish-forging: put into the finish-forging mould after the forging heating after the forging and forge (generally hitting three shapings) giving once more with large-scale friction press, the design of forging mold is the key of a key, help metal flow, die cavity can be full of, and does not produce folding phenomenon;
(6) cut edge: cut overlap on the forging with large-scale bead cutter and shear mould;
(7) punching the wad hole: wash away the middle excess stock of forging with large-scale friction press and perforating die and make the framework hollow forming;
(8) shaping: with the shaping mold forging is carried out shaping and eliminate the forging distortion that produces owing to operations such as side cut, punching recesses;
(9) ball blast: remove the forging surface scale with special equipment;
(10) go out the frame mouth and reserve allowance with the imitative type cutter cuts of flame;
(11) go out pin-and-hole with the imitative type cutter cuts of flame;
(12) machining: to by forging and cutting does not reach the place of drawing requirement and cutting heat affected area and reaches with the way of machining or remove;
(13) heat treatment: forging is heat-treated the comprehensive mechanical performance of giving full play to steel alloy with the special specification of heat treatment of formulating;
(14) ball blast: surface peening improves the fatigue strength of hook tail frame;
(15) flaw detection.
CN200710025083XA 2007-07-12 2007-07-12 Preparation method for railway freight car coupler tail frame integral forging Expired - Fee Related CN101085500B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710025083XA CN101085500B (en) 2007-07-12 2007-07-12 Preparation method for railway freight car coupler tail frame integral forging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710025083XA CN101085500B (en) 2007-07-12 2007-07-12 Preparation method for railway freight car coupler tail frame integral forging

Publications (2)

Publication Number Publication Date
CN101085500A true CN101085500A (en) 2007-12-12
CN101085500B CN101085500B (en) 2011-11-23

Family

ID=38936764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710025083XA Expired - Fee Related CN101085500B (en) 2007-07-12 2007-07-12 Preparation method for railway freight car coupler tail frame integral forging

Country Status (1)

Country Link
CN (1) CN101085500B (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101444816B (en) * 2008-12-24 2010-06-16 南车四方车辆有限公司 Process for forging I-shaped part
CN102198481A (en) * 2011-04-20 2011-09-28 大连大高阀门有限公司 Technology for integrally forging valve with flange
CN102029352B (en) * 2009-09-30 2012-05-30 西安轨道交通装备有限责任公司 Method for manufacturing pressboard for rail wagon
CN102886643A (en) * 2012-09-11 2013-01-23 昌利锻造有限公司 Method for manufacturing sliding fork for automobile
CN102886645A (en) * 2012-09-11 2013-01-23 昌利锻造有限公司 Forging method of railway wagon buffer thrust cone
CN103252622A (en) * 2013-05-03 2013-08-21 重庆市江津区通达机械厂 Hook tail frame body machining technology
CN103264137A (en) * 2012-08-17 2013-08-28 大连大高阀门股份有限公司 Flange ball valve body forging technology
CN103978342A (en) * 2014-04-08 2014-08-13 南阳二机石油装备(集团)有限公司 Manufacturing method of hook body of large hook for polar region drilling machine
CN104959503A (en) * 2015-05-23 2015-10-07 锦州捷通铁路机械制造有限公司 Preparation process of modern track low-floor motor train large-scale integral forging axle
CN104972029A (en) * 2015-05-26 2015-10-14 江苏亚太安信达铝业有限公司 Forging method of wire clamp body for high voltage iron tower
CN105177407A (en) * 2015-09-17 2015-12-23 温州三联锻造有限公司 High-precision automobile gear shifting clutch friction plate forge piece and forging method thereof
CN105220064A (en) * 2015-09-17 2016-01-06 温州三联锻造有限公司 A kind of automobile eight-speed transmissions case gear forgings and forging method thereof
CN105234327A (en) * 2015-11-16 2016-01-13 南车资阳机车有限公司 Large-scale suspension joint forging tool and process for metros
CN105313961A (en) * 2015-09-17 2016-02-10 温州三联锻造有限公司 Automobile steering device yoke forge piece and forging method thereof
CN105414895A (en) * 2015-12-08 2016-03-23 哈尔滨东安发动机(集团)有限公司 Machining method of flange plate taper sleeve
CN106077380A (en) * 2016-05-21 2016-11-09 吉林大学 Railway vehicle truck coupler knuckle near net method for forging and molding
CN106427549A (en) * 2015-08-13 2017-02-22 温州三联锻造有限公司 Retaining ring of automobile damper and forging method of retaining ring
CN106862477A (en) * 2017-04-12 2017-06-20 中车齐齐哈尔车辆有限公司 The forging method of hook bolt
WO2018045752A1 (en) * 2016-09-10 2018-03-15 吉林大学 Near net shape forging and moulding method for railway vehicle coupler knuckle
CN109227044A (en) * 2018-09-29 2019-01-18 河北博途仓储设备有限公司 Novel upright post for shelf processing technology
CN109807281A (en) * 2018-12-21 2019-05-28 株洲中车天力锻业有限公司 A kind of K3 brake beam end forging technology
CN110102978A (en) * 2019-05-06 2019-08-09 中车长春轨道客车股份有限公司 The routing hole machining process of large-scale cavity plate material
CN111889975A (en) * 2020-07-29 2020-11-06 临沂宏森轨道交通材料有限公司 Forging process of front axle of heavy truck
CN113059099A (en) * 2021-03-17 2021-07-02 无锡透平叶片有限公司 Method for improving tensile strength and uniformity of high-temperature alloy and titanium alloy forged piece
CN113618340A (en) * 2021-08-20 2021-11-09 浙江同兴金属锻件股份有限公司 Processing method of high-strength motorcycle pedal bracket
CN114472793A (en) * 2022-01-06 2022-05-13 安徽安簧机械股份有限公司 Hot and cold combined forging forming process for spherical pin, forging die and cold coining die
CN114733990A (en) * 2020-11-27 2022-07-12 山西春光锻造有限公司 Method for forging rotary coupler yoke of railway wagon and production line thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2754443A1 (en) * 1977-12-07 1979-06-13 Hahn Hermann Dr Ing Forging press for making cylindrical follow workpieces - has anvil and ram for cylindrical blank with internal expanding tools
CN1111103C (en) * 2000-09-11 2003-06-11 沈阳黎明航空发动机集团公司 Method for forming fan-shape polygon frame forge piece
JP4483578B2 (en) * 2002-07-12 2010-06-16 三菱マテリアル株式会社 Manufacturing method of frame
CN100486760C (en) * 2006-02-21 2009-05-13 重庆长征重工有限责任公司 Method for forging combined forged steel coupler yoke for railway vehicles
CN100460101C (en) * 2006-12-28 2009-02-11 曾德文 Coupler yoke bending forming method and apparatus thereof

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101444816B (en) * 2008-12-24 2010-06-16 南车四方车辆有限公司 Process for forging I-shaped part
CN102029352B (en) * 2009-09-30 2012-05-30 西安轨道交通装备有限责任公司 Method for manufacturing pressboard for rail wagon
CN102198481A (en) * 2011-04-20 2011-09-28 大连大高阀门有限公司 Technology for integrally forging valve with flange
CN103264137A (en) * 2012-08-17 2013-08-28 大连大高阀门股份有限公司 Flange ball valve body forging technology
CN102886643A (en) * 2012-09-11 2013-01-23 昌利锻造有限公司 Method for manufacturing sliding fork for automobile
CN102886645A (en) * 2012-09-11 2013-01-23 昌利锻造有限公司 Forging method of railway wagon buffer thrust cone
CN103252622A (en) * 2013-05-03 2013-08-21 重庆市江津区通达机械厂 Hook tail frame body machining technology
CN103978342A (en) * 2014-04-08 2014-08-13 南阳二机石油装备(集团)有限公司 Manufacturing method of hook body of large hook for polar region drilling machine
CN104959503A (en) * 2015-05-23 2015-10-07 锦州捷通铁路机械制造有限公司 Preparation process of modern track low-floor motor train large-scale integral forging axle
CN104959503B (en) * 2015-05-23 2016-08-24 锦州捷通铁路机械制造有限公司 The preparation technology of modern railway low-floor motor-car large-scale solid forging axle bridge
CN104972029A (en) * 2015-05-26 2015-10-14 江苏亚太安信达铝业有限公司 Forging method of wire clamp body for high voltage iron tower
CN106427549A (en) * 2015-08-13 2017-02-22 温州三联锻造有限公司 Retaining ring of automobile damper and forging method of retaining ring
CN105177407A (en) * 2015-09-17 2015-12-23 温州三联锻造有限公司 High-precision automobile gear shifting clutch friction plate forge piece and forging method thereof
CN105220064A (en) * 2015-09-17 2016-01-06 温州三联锻造有限公司 A kind of automobile eight-speed transmissions case gear forgings and forging method thereof
CN105313961A (en) * 2015-09-17 2016-02-10 温州三联锻造有限公司 Automobile steering device yoke forge piece and forging method thereof
CN105234327A (en) * 2015-11-16 2016-01-13 南车资阳机车有限公司 Large-scale suspension joint forging tool and process for metros
CN105414895B (en) * 2015-12-08 2020-04-24 哈尔滨东安发动机(集团)有限公司 Machining method of flange taper sleeve
CN105414895A (en) * 2015-12-08 2016-03-23 哈尔滨东安发动机(集团)有限公司 Machining method of flange plate taper sleeve
CN106077380B (en) * 2016-05-21 2019-08-20 吉林大学 Railway vehicle truck coupler knuckle near net method for forging and molding
CN106077380A (en) * 2016-05-21 2016-11-09 吉林大学 Railway vehicle truck coupler knuckle near net method for forging and molding
WO2018045752A1 (en) * 2016-09-10 2018-03-15 吉林大学 Near net shape forging and moulding method for railway vehicle coupler knuckle
CN106862477A (en) * 2017-04-12 2017-06-20 中车齐齐哈尔车辆有限公司 The forging method of hook bolt
CN109227044A (en) * 2018-09-29 2019-01-18 河北博途仓储设备有限公司 Novel upright post for shelf processing technology
CN109807281A (en) * 2018-12-21 2019-05-28 株洲中车天力锻业有限公司 A kind of K3 brake beam end forging technology
CN109807281B (en) * 2018-12-21 2020-07-07 株洲中车天力锻业有限公司 K3 brake beam end forging process
CN110102978A (en) * 2019-05-06 2019-08-09 中车长春轨道客车股份有限公司 The routing hole machining process of large-scale cavity plate material
CN110102978B (en) * 2019-05-06 2021-02-05 中车长春轨道客车股份有限公司 Machining method for wiring hole of large-sized cavity plate
CN111889975A (en) * 2020-07-29 2020-11-06 临沂宏森轨道交通材料有限公司 Forging process of front axle of heavy truck
CN114733990A (en) * 2020-11-27 2022-07-12 山西春光锻造有限公司 Method for forging rotary coupler yoke of railway wagon and production line thereof
CN113059099A (en) * 2021-03-17 2021-07-02 无锡透平叶片有限公司 Method for improving tensile strength and uniformity of high-temperature alloy and titanium alloy forged piece
CN113618340A (en) * 2021-08-20 2021-11-09 浙江同兴金属锻件股份有限公司 Processing method of high-strength motorcycle pedal bracket
CN114472793A (en) * 2022-01-06 2022-05-13 安徽安簧机械股份有限公司 Hot and cold combined forging forming process for spherical pin, forging die and cold coining die

Also Published As

Publication number Publication date
CN101085500B (en) 2011-11-23

Similar Documents

Publication Publication Date Title
CN101085500B (en) Preparation method for railway freight car coupler tail frame integral forging
CN102615478B (en) Forging process of wind power main shaft
CN100431775C (en) Fast precise semi-axle casing extruding formation process
CN100486760C (en) Method for forging combined forged steel coupler yoke for railway vehicles
CN101559555A (en) Forging method of coupler knuckle for railway vehicle
CN104741499B (en) Sandwich layer forging die and preparation method of forging die sandwich layer surfacing
CN103252622A (en) Hook tail frame body machining technology
CN102162574A (en) Ultrahigh-strength steel laser tailor welded blank and forming process thereof
CN104907475A (en) Integral forging mold of valve body with flanges, and forging method
CN109590419A (en) A kind of secondary forging method of belt track iron tooth
CN102019336B (en) Die forging shaping technology specially used for manufacturing petroleum drilling machine elevator movable wing plates
CN102601195B (en) Pier thickness stamping process of separated pull ring and pier thickness stamping die
CN102672418B (en) Forming process for stand column of stainless steel car body side wall
CN207709655U (en) A kind of diel for car roof rear cross part
CN105855383A (en) Connection method and hole punching and flanging die for carbon fibers and light alloy
CN111872293B (en) Preparation method of forging-rolling lining plate with longitudinal flow line
CN111014537B (en) Forging method of large multi-rib complex 7050 aluminum alloy forging
CN102962291A (en) Method for forging and forming pipe die blank by pilgrim mill
CN102266892A (en) Turning point improving method for reshaping vehicle longitudinal beam type stamping part and device special for method
CN102974743A (en) Manufacturing method of coupler knuckle
CN110076252A (en) The manufacturing process of middle heavy wall integral automobile driving axle housing bridge arch
CN101869946A (en) Drawing and shaping mold structure
CN204276780U (en) A kind of inclined-plane anvil of the connecting rod rough forging transition conical surface
CN111230416B (en) Chain plate forging process
CN117139536B (en) Forging method for all-fiber bending upsetting combined crankshaft and crank forging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20140712

EXPY Termination of patent right or utility model