CN101054803A CN 200710061874 CN200710061874A CN101054803A CN 101054803 A CN101054803 A CN 101054803A CN 200710061874 CN200710061874 CN 200710061874 CN 200710061874 A CN200710061874 A CN 200710061874A CN 101054803 A CN101054803 A CN 101054803A
Authority
CN
China
Prior art keywords
case beam
foundation
integral support
ancient architecture
base integral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710061874
Other languages
English (en)
Inventor
强万明
赵士永
边智慧
王平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI PROV ARCHITECTURE SCIENCE ACADEMY
Original Assignee
HEBEI PROV ARCHITECTURE SCIENCE ACADEMY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI PROV ARCHITECTURE SCIENCE ACADEMY filed Critical HEBEI PROV ARCHITECTURE SCIENCE ACADEMY
Priority to CN 200710061874 priority Critical patent/CN101054803A/zh
Publication of CN101054803A publication Critical patent/CN101054803A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

本发明提供一种古建筑物基础整体托换的方法,由如下步骤完成:A.在古建筑基础周边挖开作业基坑;B.采用预制矩形空心箱梁替换原基础下的土体;C.顶推过程中在箱梁内采用人工小幅度挖土,边顶进,边挖土;D.基础托换完成一段,箱梁内部布置钢筋,两端的箱梁口支设档模,灌入免振混凝土;E.基础底部托换完成后,再在四周浇筑一圈钢筋混凝土边梁,将内部各单个受力的梁连接成一个整体。本发明可有效解决因古建筑的基础为松散整体性差的砖石基础,不能满足整体移位的要求的技术难题。是对古建筑整体平移施工技术重要完善,也是对古建筑物保护维修的新尝试,作为古建筑保护一种新的方法在全国范围内推广应用,可以创造很高的社会效益。

Description

古建筑物基础整体托换的方法
技术领域
本发明涉及到一种古建筑物基础整体托换的方法,属于建筑施工技术领域。
背景技术
随着经济的发展,旧城的改造、以及道路和高速公路的建设,使得一些既有文物建筑物面临拆除的威胁。这些建筑物具有历史文物保存价值,如果拆除将会造成不可挽回的损失。如何解决许多地方都面临着文物建筑保护和经济发展的矛盾成为我国各地均需要解决的一个重要课题。欧美国家对于有文物价值的建筑物不惜花费重金,运用整体平移的方法将其转移到合适位置进行保护。由于很多古建筑的基础为松散整体性差的砖石基础,不能满足整体移位的要求。
发明内容
本发明的目的是提供一种古建筑物基础整体托换的方法,以确保古建筑在整体移位过程中不发生破坏现象。
本发明的技术方案是这样实现的:这种古建筑物基础整体托换的方法包括如下步骤完成:
A、在古建筑基础周边挖开作业基坑,混凝土浇注基坑护壁,依托基坑护壁设置混凝土千斤顶反力支座;
B、采用预制矩形空心箱梁替换原基础下的土体,用液压千斤顶将空心箱梁从预留基础土坡缓慢顶进,前一箱梁顶进就位后,吊装后续箱梁继续顶进;
C、顶推过程中在箱梁内采用人工小幅度挖土,边顶进,边挖土;
D、基础托换完成一段,箱梁内部布置钢筋,两端的箱梁口支设档模,灌入免振混凝土;
E、基础底部托换完成后,再在四周浇筑一圈钢筋混凝土边梁,将内部各单个受力的梁连接成一个整体。
所述的古建筑物基础整体托换的方法,步骤B所述预制的箱梁为管状矩形,箱梁的两端预埋连接钢板,前一箱梁顶进就位后,吊装后续箱梁与前一箱梁的钢板对焊后继续顶进;
所述的古建筑物基础整体托换的方法,预制的箱梁上下表面设置润滑层。
所述的古建筑物基础整体托换的方法,首先顶进的预制箱梁一个端面设置有顶进刃角,刃角由预埋螺栓固定在箱梁端面上。
所述的古建筑物基础整体托换的方法,所述步骤C顶推过程中在箱梁内设置双向水平尺及照明。
所述的古建筑物基础整体托换的方法,所述步骤D基础托换是在相连的箱梁就位并将土方排出后,内部按设计布置钢筋,钢筋布置完毕,在两端箱梁的端部支设档模,两端上沿分为别进料、出料口,免振混凝土从进料口灌入,直至从出料口压出为止。
所述的古建筑物基础整体托换的方法,其特征在于:所述步骤D基础托换分段进行,每次托换不超过底面积的1/3。
本发明古建筑物基础整体托换的方法,可有效解决因古建筑的基础为松散整体性差的砖石基础,不能满足整体移位的要求的技术难题。是对古建筑整体平移施工技术重要完善,也是对古建筑物保护维修的新尝试,作为古建筑保护一种新的方法在全国范围内推广应用,可以创造很高的社会效益。
附图说明
下面结合实施例和附图详细说明本发明的技术内容:
图1为本发明古建筑物基础整体托换的施工示意图
图2为图1的侧视图
图3为本发明预制空心箱梁预埋件的示意图
图4为图3的侧视图
图5为本发明预制空心箱梁的刃角布置示意图
图6为图5的侧视图
图中:1、古建筑  2、基础土坡3、箱梁  3-1、刃角  3-2、固定螺栓  3-3、预埋钢板  3-4润滑层4、千斤顶  5、混凝土反力支座  6、边梁  7、基坑护壁  8、基坑
具体实施方式
1、制作托换箱梁
首先预制混凝土空心箱梁3,箱梁形式见附图3、4、5、6,其混凝土强度等级不宜低于C40。箱梁两侧和上表面预埋钢板3-3,两箱连接时将钢板对接焊接牢靠。箱梁上下表面做润滑层3-4,可喷涂石蜡或其他润滑剂,以减小顶入阻力。最先顶入的箱梁前端设刃角3-1,刃角为20#角钢,角钢与箱梁前端采用预埋螺栓3-2固定,箱梁底部刃角可与水平面成5度的仰角,防止顶推过程中箱梁扎头;
2、作业准备
在古建筑基础周边挖开作业基坑,混凝土浇注基坑护壁,依托基坑护壁设置混凝土千斤顶反力支座;
3、分段局部托换
采用起重设备将箱梁3吊至作业现场预托换位置,千斤顶4就位,反力架5就位,从预留基础土坡2开始顶进,箱内设开挖人员一名,箱内壁安装双向水平尺及照明设施。,按一定顺序将预制好的混凝土空心箱梁3顶进原基础下,人可在箱梁内进行挖土操作,边挖土边顶进。顶箱前开挖土方应分段进行,只要能满足顶进的工作面即可,切忌大范围开挖。顶进过程中做好观测,发现偏差及时纠正。箱梁布置见附图1、2,箱梁顶推必须按一定的顺序分步顶推,以保证顶推过程中原建筑物的安全。在顶推过程中应加强监控和观测,如有异常现象,及时处理。
前一箱梁顶进就位后,吊装后续箱梁与前一箱梁的钢板4对焊后继续顶进,顶进施工要求不变。基础托换分段进行,每次托换不超过底面积的1/3。
4、内部浇注免振混凝土
相连的箱梁就位并将土方排出后,内部按设计布置钢筋,钢筋布置完毕,相连的几个箱梁两端支设档模,两端上沿分别为进料、出料口,免振混凝土从进料口灌入,直至从出料口压出为止。
5、四周浇筑混凝土边梁
待内部托换部分混凝土浇注完毕,整体浇注四周的边梁,为保证托换的整体性,四周边梁应一次浇注完毕。开挖四周边梁处土方,必须采用人工开挖。严格控制开挖量,不得对非开挖区域挠动过大。从土方开挖直至托梁混凝土浇筑不得有较长时间间歇,尽量缩短此间施工工期。
6、四周钢筋混凝土边梁浇筑完毕,将内部各单个受力的梁连接成一个整体。整体托换完成后,待混凝土强度达到设计要求后,即可开始古建筑的纠偏、移位工作。
上述描述仅作为本发明古建筑物基础整体托换方法的几种技术方案提出,不作为对其施工具体要求和施工预制部件结构的单一限制条件。

Claims (7)

1、古建筑物基础整体托换的方法,其特征在于:基础托换包括如下步骤完成:
A、在古建筑基础周边挖开作业基坑(8),混凝土浇注基坑护壁(7),依托基坑护壁设置混凝土千斤顶反力支座(5);
B、采用预制矩形空心箱梁(3)替换原基础下的土体,用液压千斤顶(4)将空心箱梁从预留基础土坡(2)缓慢顶进,前一箱梁顶进就位后,吊装后续箱梁继续顶进;
C、顶推过程中在箱梁内采用人工小幅度挖土,边顶进,边挖土;
D、基础托换完成一段,箱梁内部布置钢筋,两端的箱梁口支设档模,灌入免振混凝土;
E、基础底部托换完成后,再在四周浇筑一圈钢筋混凝土边梁(6),将内部各单个受力的梁连接成一个整体。
2、根据权利要求1所述的古建筑物基础整体托换的方法,其特征在于:步骤B所述预制的箱梁(3)为管状矩形,箱梁的两端预埋连接钢板(3-3),前一箱梁顶进就位后,吊装后续箱梁与前一箱梁的钢板对焊后继续顶进。
3、根据权利要求2所述的古建筑物基础整体托换的方法,其特征在于:预制的箱梁(3)上下表面设置润滑层(3-4)。
4、根据权利要求1所述的古建筑物基础整体托换的方法,其特征在于:首先顶进的预制箱梁一个端面设置有顶进刃角(3-1),刃角由预埋螺栓(3-2)固定在箱梁端面上。
5、根据权利要求1所述的古建筑物基础整体托换的方法,其特征在于:所述步骤C顶推过程中在箱梁内设置双向水平尺及照明。
6、根据权利要求1所述的古建筑物基础整体托换的方法,其特征在于:所述步骤D基础托换是在相连的箱梁(3)就位并将土方排出后,内部按设计布置钢筋,钢筋布置完毕,在两端箱梁的端部支设档模,两端上沿分别为进料、出料口,免振混凝土从进料口灌入,直至从出料口压出为止。
7、根据权利要求1所述的古建筑物基础整体托换的方法,其特征在于:所述步骤D基础托换分段进行,每次托换不超过底面积的1/3。
CN 200710061874 2007-05-15 2007-05-15 古建筑物基础整体托换的方法 Pending CN101054803A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710061874 CN101054803A (zh) 2007-05-15 2007-05-15 古建筑物基础整体托换的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710061874 CN101054803A (zh) 2007-05-15 2007-05-15 古建筑物基础整体托换的方法

Publications (1)

Publication Number Publication Date
CN101054803A true CN101054803A (zh) 2007-10-17

Family

ID=38794833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710061874 Pending CN101054803A (zh) 2007-05-15 2007-05-15 古建筑物基础整体托换的方法

Country Status (1)

Country Link
CN (1) CN101054803A (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704705A (zh) * 2012-06-06 2012-10-03 河北省建筑科学研究院 建筑物长行程无回降多点同步顶升方法
CN103233588A (zh) * 2013-04-18 2013-08-07 叶长青 带筏板基础建筑物的平移方法
CN104047306A (zh) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 对沉陷的房屋进行抬升并扶正的方法
CN107100216A (zh) * 2017-03-27 2017-08-29 扬州市建筑安全监察站 单片砖墙单侧基础桩基悬挑托换施工方法
CN108252533A (zh) * 2018-01-15 2018-07-06 上海建工四建集团有限公司 一种离散型砖砌平台的整体托换方法
CN108457303A (zh) * 2018-03-28 2018-08-28 四川省建筑科学研究院 一种在既有建筑物下新增地下停车场的方法
CN108798065A (zh) * 2018-06-20 2018-11-13 桐乡市乌镇内利仿古园林建设有限公司 一种古建筑物整体顶升方法
CN109667295A (zh) * 2018-11-23 2019-04-23 河海大学 一种既有建筑物基底下部暗挖拼装式托换结构及其施工方法
CN110700625A (zh) * 2019-10-15 2020-01-17 福建省闽鑫建设工程有限公司 一种建筑物整体平移基础加固处理方法
CN111335670A (zh) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 在既有保留建筑下方原位施工基坑及新增地下结构的方法
CN112227758A (zh) * 2019-05-28 2021-01-15 江苏工程职业技术学院 一种建筑物整体同步下降的施工装置的施工方法
CN112610022A (zh) * 2020-12-04 2021-04-06 中国建筑第八工程局有限公司 临近深基坑的老建筑平移施工方法
CN112854813A (zh) * 2021-01-12 2021-05-28 杭州圣基建筑特种工程有限公司 一种古建筑平移用型钢托盘结构及托换方法
CN113294010A (zh) * 2021-06-09 2021-08-24 广州市鲁班建筑科技集团股份有限公司 一种对古墓室底部进行分离的结构及其施工方法

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704705A (zh) * 2012-06-06 2012-10-03 河北省建筑科学研究院 建筑物长行程无回降多点同步顶升方法
CN102704705B (zh) * 2012-06-06 2014-08-06 河北省建筑科学研究院 建筑物长行程无回降多点同步顶升方法
CN103233588A (zh) * 2013-04-18 2013-08-07 叶长青 带筏板基础建筑物的平移方法
CN103233588B (zh) * 2013-04-18 2015-07-29 叶长青 带筏板基础建筑物的平移方法
CN104047306A (zh) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 对沉陷的房屋进行抬升并扶正的方法
CN107100216A (zh) * 2017-03-27 2017-08-29 扬州市建筑安全监察站 单片砖墙单侧基础桩基悬挑托换施工方法
CN108252533A (zh) * 2018-01-15 2018-07-06 上海建工四建集团有限公司 一种离散型砖砌平台的整体托换方法
CN108252533B (zh) * 2018-01-15 2020-03-10 上海建工四建集团有限公司 一种离散型砖砌平台的整体托换方法
CN108457303A (zh) * 2018-03-28 2018-08-28 四川省建筑科学研究院 一种在既有建筑物下新增地下停车场的方法
CN108798065A (zh) * 2018-06-20 2018-11-13 桐乡市乌镇内利仿古园林建设有限公司 一种古建筑物整体顶升方法
CN108798065B (zh) * 2018-06-20 2020-08-07 桐乡市乌镇内利仿古园林建设有限公司 一种古建筑物整体顶升方法
CN109667295A (zh) * 2018-11-23 2019-04-23 河海大学 一种既有建筑物基底下部暗挖拼装式托换结构及其施工方法
CN109667295B (zh) * 2018-11-23 2020-11-10 河海大学 一种既有建筑物基底下部暗挖拼装式托换结构及其施工方法
CN112227758A (zh) * 2019-05-28 2021-01-15 江苏工程职业技术学院 一种建筑物整体同步下降的施工装置的施工方法
CN110700625A (zh) * 2019-10-15 2020-01-17 福建省闽鑫建设工程有限公司 一种建筑物整体平移基础加固处理方法
CN110700625B (zh) * 2019-10-15 2021-11-02 福建省闽鑫建设工程有限公司 一种建筑物整体平移基础加固处理方法
CN111335670A (zh) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 在既有保留建筑下方原位施工基坑及新增地下结构的方法
CN112610022A (zh) * 2020-12-04 2021-04-06 中国建筑第八工程局有限公司 临近深基坑的老建筑平移施工方法
CN112610022B (zh) * 2020-12-04 2022-06-14 中国建筑第八工程局有限公司 临近深基坑的老建筑平移施工方法
CN112854813A (zh) * 2021-01-12 2021-05-28 杭州圣基建筑特种工程有限公司 一种古建筑平移用型钢托盘结构及托换方法
CN113294010A (zh) * 2021-06-09 2021-08-24 广州市鲁班建筑科技集团股份有限公司 一种对古墓室底部进行分离的结构及其施工方法

Similar Documents

Publication Publication Date Title
CN101054803A (zh) 古建筑物基础整体托换的方法
CN107059667B (zh) 门形装配式钢筋混凝土箱型涵洞及其施工方法
US4697955A (en) Method of constructing reinforced concrete works such as underground galleries, road tunnels, et cetera; pre-fabricated contrete elements for constructing such works
CN109252874B (zh) 一种隧道基底及其施工工法
CN103821523A (zh) 一种既有单洞两车道隧道扩建为四车道隧道的开挖方法
CN206495233U (zh) 门形装配式钢筋混凝土箱型涵洞
CN1900467A (zh) 用于地下建筑物改造的水平力转换方法
CN111676824B (zh) 一种桥梁施工方法
CN113027463B (zh) 一种悬挂式逆作墙工作井支护结构及施工方法
CN114837088A (zh) 一种公路上承台的施工方法
CN106812131A (zh) 一种永久板桩地下结构及其施工方法
CN109083184A (zh) 一种陆上分块式预制承台及其生产和安装方法
CN112081118A (zh) 一种桩锚支护基坑增深加固支护结构及其施工方法
CN109610338B (zh) 一种悬索桥塔柱底口防漏浆施工方法
KR20040039271A (ko) 교량 우물통 기초신설 및 기초보수 보강을 위한(철재형틀)슈가물막이 공법.
CN108487072B (zh) 一种上跨营业线铁路现浇框架桥快速施工方法
CN110344440A (zh) 一种采用钢筋混凝土托梁原位保护管线的方法及结构
CN108005119A (zh) 支护墙廊一体化的混凝土管廊及其安装方法
CN110685307B (zh) 桅杆吊臂架下铰点基座的修复方法
CN112813852A (zh) 一种在役桥梁桥面沉陷的修复加固方法
CN110552540A (zh) 一种紧邻既有建筑物的旋流池倒挂护壁支护结构施工方法
CN114908673B (zh) 一种深水基础栈桥及钻孔平台施工方法
CN110629613B (zh) 一种适用于大型综合体场内永临结合道路加固方法
CN215948100U (zh) 一种暗渠加固组合体系
CN117188347B (zh) 贯通式的桥梁拆装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication