CN100595395C - 施工既有建筑物地下室的静压桩工艺 - Google Patents

施工既有建筑物地下室的静压桩工艺 Download PDF

Info

Publication number
CN100595395C
CN100595395C CN200710116226A CN200710116226A CN100595395C CN 100595395 C CN100595395 C CN 100595395C CN 200710116226 A CN200710116226 A CN 200710116226A CN 200710116226 A CN200710116226 A CN 200710116226A CN 100595395 C CN100595395 C CN 100595395C
Authority
CN
China
Prior art keywords
pile
construction
preformed pile
building
basement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200710116226A
Other languages
English (en)
Other versions
CN101200901A (zh
Inventor
贾强
张鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN200710116226A priority Critical patent/CN100595395C/zh
Publication of CN101200901A publication Critical patent/CN101200901A/zh
Application granted granted Critical
Publication of CN100595395C publication Critical patent/CN100595395C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明提供了一种施工既有建筑物地下室的静压桩工艺,包括以下步骤:(1)施工承台和连系梁,在承台上开设压桩孔;(2)埋设锚杆,安装反力架;(3)吊放预制桩,安装千斤顶;(4)将预制桩逐根压至设计标高,将所有预制桩夹紧、固定;(5)分层开挖土方至新施工地下室下一层楼板板底标高;(6)接长柱、墙等竖向承力构件,浇注下一层的施工承台和连系梁;(7)将预制桩压至下一楼层,并将反力架、千斤顶移至下一楼层;(8)重复以上步骤,待各层地下室施工完毕后进行封桩,拆除反力架。本发明采用锚杆静压桩施工工艺施工既有建筑物地下室,具有无震动、无噪音、无污染等优点,可以最大限度减少对既有建筑物中人们生活的影响。

Description

施工既有建筑物地下室的静压桩工艺
技术领域
本发明涉及既有建筑物地下室的静压桩施工技术,属于土木工程中的地下托换技术领域。
背景技术
开发利用城市地下空间是城市发展过程中的一种必然。目前我国城市都普遍存在基础设施陈旧、土地资源浪费等问题。有序、合理、综合、高效地开发利用城市地下空间资源,是扩充基础设施容量,提高城市综合防灾能力,提高土地利用效率与节约土地资源的最为有效的途径之一。新建建筑物根据新的城市规划和发展,多已考虑到地下空间的合理利用。而没有地下室或地下停车场等设施的已有建筑物在使用功能上的缺陷日益显现出来:例如随着私人汽车的增多,许多没有停车场的住宅小区出现了停车难;又如,类似原有商场也有缺少停车场、库的情况。许多既有旧建筑物有开发利用地下空间的需求,随着城市化进程的发展,这一需求将更进一步显著。
既有建筑物施工地下室最核心的技术是地下托换。在古代,地下托换技术就用于许多大型建筑物的地基基础的处理,到二十世纪30年代兴建美国纽约市的地下铁道时,托换技术才得到迅速发展。此后,地下托换技术在德国、日本等多处地下铁道穿越既有建筑物的基础的工程中发挥作用。我国的广州、深圳地铁施工时都应用了该技术。
将地下托换技术应用到既有建筑物地下空间的开发并获得成功的是北京市音乐堂改建工程。该工程将独立柱基础框架结构的观众厅新增一层6.5m高的地下室;工程选择了人工挖孔灌注桩加连续承台梁的托换方案,北京城建七建设工程有限公司的王雅斋等依此编制了《整体基础托换与地下加层施工工法》(YJGF09-2000)。该工法采用的是灌注桩而不是预制静压桩。
既有建筑物通过基础将荷载传递到地基上。地基的材料强度一般要比建筑物构件的材料强度低,所以竖向构件要通过加大了接触面的基础把荷载传给地基。既有建筑物若要增设地下室,就需要切掉原基础,将竖向传力构件(墙、柱)接长,此时需要运用地下托换技术,托换构件既需要有足够大的承载力支撑上部建筑物的荷载,又需要有小的沉降量,防止上部既有建筑物产生大的附加内力而破坏;同时,要有足够的工作面保证地下室土方开挖和混凝土浇注的顺利进行。桩基础具有承载力大、沉降量小的特点,成为托换构件的首选。然而,传统的桩基础施工因既有建筑物的层高问题多受到限制。北京市音乐堂改建工程虽获得了成功,但人工挖孔灌注桩也需要在无地下水的情况下进行,“两桩托一柱”的方案使开发出来的地下室空间大大减少。
锚杆静压桩是锚杆和静力压桩结合形成的一种桩基施工工艺。它是通过在基础上埋设锚杆固定压桩架,以建(构)筑物所能发挥的自重荷载为桩反力,用千斤顶将桩段从基础中预留或开凿的压桩孔内逐段压入土中,然后将桩与基础连结在一起,从而达到提高地基承载力和控制沉降的目的。现有的锚杆静压桩技术多是应用在地基和基础加固,以及建筑物纠偏等工程中,没有用在施工既有建筑物地下室的实例。
发明内容
本发明针对现有运用地下托换技术施工既有建筑物地下室存在的地下室空间小的不足,提供一种施工既有建筑物地下室的静压桩工艺,能够有足够的工作面保证地下室土方开挖和混凝土浇注的顺利进行,并且所建地下室的空间大。
本发明的施工既有建筑物地下室的静压桩工艺包括以下步骤:
(1)在建筑物一层室内地坪处施工承台和连系梁,在承台上开设至少两个压桩孔;
(2)在压桩孔的外围埋设锚杆,在锚杆上安装反力架,用螺母固定;
(3)吊放预制桩,在反力架横梁和预制桩间安装千斤顶;
(4)将预制桩逐根压至设计标高,由于预制桩的长度小于建筑物层高,在压桩过程需要将预制桩接长,预制桩的接长可采用桩端部预埋钢板上下焊接;预制桩接长时,需停止压桩、撤除千斤顶,此时需将下段预制桩临时固定;采用楔形钢夹片临时固定预制桩:钢夹片在压桩工作状态时与桩体脱开;当停止压桩、撤除千斤顶时,钢夹片依靠和桩体间的摩擦力,将桩体夹紧、固定。
(5)分层开挖土方至新施工地下室下一层楼板板底标高;在开挖土方过程中,对建筑物的沉降情况进行观测;
(6)接长既有建筑物框架柱、墙体及其他竖向承力构件,浇注下一层的施工承台和连系梁;
(7)将预制桩压至下一楼层,在下一楼层将预制桩临时固定后,将反力架、千斤顶移至下一楼层;
(8)重复以上步骤(5)、(6)、(7),待各层地下室施工完毕后进行封桩,拆除反力架。
本发明采用锚杆静压桩施工工艺施工既有建筑物地下室,具有无震动、无噪音、无污染等优点,可以最大限度减少对既有建筑物中人们生活的影响;预制的混凝土桩可分段压入,可不受既有建筑物层高的限制;能够有足够的工作面保证地下室土方开挖和混凝土浇注的顺利进行,并且所建地下室的空间大。
附图说明
图1是本发明中静压桩的平面布置示意图。
图2是静压桩的立面布置示意图。
图3、图4、图5、图6是采用本发明的工艺对框架结构建筑物进行托换的示意图。
图中:1、压桩孔,2、锚杆,3、承台,4、框架柱,5、连系梁,6、反力架,7、框架梁,8、油压千斤顶,9、预制桩,10、反力架横梁,11、油管,12、油泵,13、钢夹片。
具体实施方式
用一独立基础的框架结构建筑物说明本发明的施工既有建筑物地下室的静压桩工艺。包括以下步骤:
1静压桩的施工布置,如图1和图2所示。
a在建筑物一层室内地坪处施工承台3和连系梁5,在承台3上开设四个压桩孔1;
b在四个压桩孔1的外围埋设锚杆2,在锚杆2上安装反力架6,反力架6上安装有反力架横梁10;
c将预制桩9吊放到压桩孔1中,在反力架横梁10和预制桩9间安装油压千斤顶8,并安装好使油压千斤顶8工作的油管11、油泵12等油压系统;
d将预制桩9逐根压至设计标高,在压桩过程中需要接桩时,将预制桩9用钢夹片13夹紧、固定,撤除千斤顶8;接桩完成后,安装千斤顶8继续压桩9。钢夹片13为楔形,在向下压预制桩9时,钢夹片13与预制桩9脱开;当停止下压、撤除千斤顶8时,钢夹片13依靠和预制桩9间的摩擦力,将预制桩9夹紧、固定。
2托换,如图3、图4、图5、图6所示。
a分层开挖土方至新施工地下室下一层楼板板底标高;在开挖土方过程中,对建筑物的沉降情况进行观测,见图3;
b接长既有建筑物框架柱4和墙体等竖向承力构件,浇注下一层的施工承台和连系梁,见图4;
c将桩压至下一楼层,在下一楼层将预制桩9临时固定后,将反力架6、油压千斤顶8等工具移至下一楼层,见图5;
d重复以上步骤,待各层地下室施工完毕后进行封桩,拆除反力架6,见图6。
本发明采用锚杆静压桩施工工艺施工既有建筑物地下室,具有以下优点:
1本发明采用的静压桩技术具有无震动、无噪音、无污染等优点,可以最大限度减少对既有建筑物中人们生活的影响。
2本发明中的混凝土预制桩可分段压入,可不受既有建筑物层高的限制。
3本发明可用于既有建筑物地下空间的开发,对于设计标准低无地下停车场的旧建筑,开拓了增加地下停车场的技术途径。
4本发明使用的预制桩全部压入到开发的地下空间下部,不占用地下空间;同时,预制桩成为既有建筑物基础的一部分,提高了基础承载力。
静压桩是以建(构)筑物所能发挥的自重荷载为压桩反力,不需要另设反力设备。

Claims (1)

1.一种施工既有建筑物地下室的静压桩工艺,其特征是,包括以下步骤:
(1)在建筑物一层室内地坪处施工承台和连系梁,在承台上开设至少两个压桩孔;
(2)在压桩孔的外围埋设锚杆,在锚杆上安装反力架,用螺母固定;
(3)吊放预制桩,在反力架横梁和预制桩间安装千斤顶;
(4)将预制桩逐根压至设计标高,由于预制桩的长度小于建筑物层高,在压桩过程需要将预制桩接长,预制桩的接长采用桩端部预埋钢板上下焊接;预制桩接长时,需停止压桩、撤除千斤顶,此时需将下段预制桩临时固定;采用楔形钢夹片临时固定预制桩:钢夹片在压桩工作状态时与桩体脱开;当停止压桩、撤除千斤顶时,钢夹片依靠和桩体间的摩擦力,将桩体夹紧、固定;
(5)分层开挖土方至新施工地下室下一层楼板板底标高;在开挖土方过程中,对建筑物的沉降情况进行观测;
(6)接长既有建筑物框架柱、墙体及其他竖向承力构件,浇注下一层的施工承台和连系梁;
(7)将预制桩压至下一楼层,在下一楼层将预制桩临时固定后,将反力架、千斤顶移至下一楼层;
(8)重复以上步骤(5)、(6)、(7),待各层地下室施工完毕后进行封桩,拆除反力架。
CN200710116226A 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺 Expired - Fee Related CN100595395C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710116226A CN100595395C (zh) 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710116226A CN100595395C (zh) 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺

Publications (2)

Publication Number Publication Date
CN101200901A CN101200901A (zh) 2008-06-18
CN100595395C true CN100595395C (zh) 2010-03-24

Family

ID=39516241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710116226A Expired - Fee Related CN100595395C (zh) 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺

Country Status (1)

Country Link
CN (1) CN100595395C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561391A (zh) * 2010-12-16 2012-07-11 株式会社高丽工程及咨询 已竣工建筑物的地下室的施工方法

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886479B (zh) * 2010-07-14 2011-09-28 山东建筑大学 框架结构建筑物独立基础逐根托换法地下增层工艺
CN102444142B (zh) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 一种群桩改柱扩建地下室及其施工工法
CN102747741A (zh) * 2012-07-12 2012-10-24 苏州工业园区设计研究院股份有限公司 新型地坪桩与承台连接结构
CN104141297A (zh) * 2014-03-19 2014-11-12 中国建筑第四工程局有限公司 一种弱持力层地基加固方法及结构
CN106284338B (zh) * 2015-06-08 2023-11-17 中铁建工集团有限公司 用于pcmw工法桩间顶入锚杆的机械式钉锚装置及使用方法
CN107035159B (zh) * 2017-05-05 2018-12-21 山东建筑大学 一种适用于框架结构独立基础建筑物地下增层的方法
CN108797586A (zh) * 2018-06-26 2018-11-13 江苏地基工程有限公司 一种锚杆静压桩的施工方法
CN109680687B (zh) * 2019-01-17 2021-02-05 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109610874A (zh) * 2019-01-18 2019-04-12 央固工程科技(上海)有限公司 既有厂房内部增建的地下室及其建筑方法
CN109898882A (zh) * 2019-03-28 2019-06-18 上海勘察设计研究院(集团)有限公司 一种用于既有建筑地下增层的锚杆静压桩组合托换结构及其方法
CN112112153B (zh) * 2019-06-19 2022-02-15 沈军 一种节段桩高效施工方法
CN110439025B (zh) * 2019-08-30 2024-06-28 江苏省地质矿产局第三地质大队 一种狭小空间下门架式建筑物桩基托换结构及施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5474399A (en) * 1993-02-09 1995-12-12 Chia-Hsiung; Huang Open cutting by floor slab braced retaining wall
CN1687536A (zh) * 2005-06-07 2005-10-26 上海市城市建设设计研究院 利用既有地下室顶板作为天然盖板的暗挖加层施工方法
CN1873163A (zh) * 2006-06-30 2006-12-06 山东建筑大学 板式基础托换法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5474399A (en) * 1993-02-09 1995-12-12 Chia-Hsiung; Huang Open cutting by floor slab braced retaining wall
CN1687536A (zh) * 2005-06-07 2005-10-26 上海市城市建设设计研究院 利用既有地下室顶板作为天然盖板的暗挖加层施工方法
CN1873163A (zh) * 2006-06-30 2006-12-06 山东建筑大学 板式基础托换法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561391A (zh) * 2010-12-16 2012-07-11 株式会社高丽工程及咨询 已竣工建筑物的地下室的施工方法

Also Published As

Publication number Publication date
CN101200901A (zh) 2008-06-18

Similar Documents

Publication Publication Date Title
CN100595395C (zh) 施工既有建筑物地下室的静压桩工艺
CN101886479B (zh) 框架结构建筑物独立基础逐根托换法地下增层工艺
CN103437567B (zh) 利用原有桩基础支撑既有建筑地下增层的方法
CN106088650B (zh) 一种适用于砖混结构建筑物地下增层的方法及建筑物
CN109235499B (zh) 一种明挖地下建筑结构装配式施工方法
CN102182325B (zh) 一种框架结构独立基础既有建筑物地下室增层方法
CN101092850A (zh) 一种建筑物或古建筑物/群整体顶升的方法和装置
KR101070426B1 (ko) 마이크로 파일을 이용한 개량형 언더피닝 공법
CN202055270U (zh) 建筑物托换顶升并向下增层系统及方法
JP3644605B2 (ja) 路面下における地下構築物の逆打工法
CN107035159A (zh) 一种适用于框架结构独立基础建筑物地下增层的方法
CN108005399A (zh) 一种既有建筑群下加建多层地下空间的施工方法
CN104652443A (zh) 深基坑临时水平支撑兼作永久结构梁的施工方法
CN106245927B (zh) 一种适用于框架结构建筑物地下增层的方法及建筑物
CN109024662A (zh) 锚杆静压桩托换无地下室建筑地下空间增层的方法
CN109025349B (zh) 砖混结构建筑物纠倾并地下增层的方法
KR101187170B1 (ko) 마이크로파일로 전달하는 경사기둥과 기초부 연장 기둥을 라멘골조로 이용한 수직하향증축 시공방법
CN110499928A (zh) 既有建筑物地下室提高室内高度的施工方法及地下室
KR102294871B1 (ko) 독립케이슨의 코어(core)벽체 구조물을 축조하는 방법
KR101310677B1 (ko) 레이커 및 합벽 선시공을 이용한 경사대지에서의 역타공법
CN108571010B (zh) 一种明挖法工程预制主体结构及支护结构一体化的方法
CN212317545U (zh) 一种用于扩展地下空间的已有基础上下柱连接结构
KR100615149B1 (ko) 콘크리트 지상구조물의 역타설공법
JP2001317217A (ja) 既存建物の基礎下免震構法
CN209924488U (zh) 一种用于既有建筑地下增层的组合墙结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100324

Termination date: 20151227

EXPY Termination of patent right or utility model