CN101200901A - 施工既有建筑物地下室的静压桩工艺 - Google Patents

施工既有建筑物地下室的静压桩工艺 Download PDF

Info

Publication number
CN101200901A
CN101200901A CNA2007101162268A CN200710116226A CN101200901A CN 101200901 A CN101200901 A CN 101200901A CN A2007101162268 A CNA2007101162268 A CN A2007101162268A CN 200710116226 A CN200710116226 A CN 200710116226A CN 101200901 A CN101200901 A CN 101200901A
Authority
CN
China
Prior art keywords
pile
construction
preformed pile
building
floor
Prior art date
Application number
CNA2007101162268A
Other languages
English (en)
Other versions
CN100595395C (zh
Inventor
贾强
张鑫
Original Assignee
山东建筑大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山东建筑大学 filed Critical 山东建筑大学
Priority to CN200710116226A priority Critical patent/CN100595395C/zh
Publication of CN101200901A publication Critical patent/CN101200901A/zh
Application granted granted Critical
Publication of CN100595395C publication Critical patent/CN100595395C/zh

Links

Abstract

本发明提供了一种施工既有建筑物地下室的静压桩工艺,包括以下步骤:(1)施工承台和连系梁,在承台上开设压桩孔;(2)埋设锚杆,安装反力架;(3)吊放预制桩,安装千斤顶;(4)将预制桩逐根压至设计标高,将所有预制桩夹紧、固定;(5)分层开挖土方至新施工地下室下一层楼板板底标高;(6)接长柱、墙等竖向承力构件,浇注下一层的施工承台和连系梁;(7)将预制桩压至下一楼层,并将反力架、千斤顶移至下一楼层;(8)重复以上步骤,待各层地下室施工完毕后进行封桩,拆除反力架。本发明采用锚杆静压桩施工工艺施工既有建筑物地下室,具有无震动、无噪音、无污染等优点,可以最大限度减少对既有建筑物中人们生活的影响。

Description

施工既有建筑物地下室的静压桩工艺
技术领域
本发明涉及既有建筑物地下室的静压桩施工技术,属于土木工程中的地下托换技术领域。
背景技术
开发利用城市地下空间是城市发展过程中的一种必然。目前我国城市都普遍存在基础设 施陈旧、土地资源浪费等问题。有序、合理、综合、高效地开发利用城市地下空间资源,是 扩充基础设施容量,提高城市综合防灾能力,提高土地利用效率与节约土地资源的最为有效 的途径之一。新建建筑物根据新的城市规划和发展,多已考虑到地下空间的合理利用。而没 Yf地下审或地下停车场等设施的已有建筑物在使用功能上的缺陷日益显现出来:例如随着私 人汽个:的增多,许多没有停车场的住宅小区出现了停车难;又如,类似原有商场也有缺少停《:场、库的情况。许多既有旧建筑物有开发利用地下空间的需求,随着城市化进程的发展,这一需求将更进一步显著。
既有建筑物施工地下室最核心的技术是地下托换。在古代,地下托换技术就用于许多大型建筑物的地基基础的处理,到二十世纪30年代兴建美国纽约市的地下铁道时,托换技术才得到迅速发展。此后,地下托换技术在德国、日本等多处地下铁道穿越既有建筑物的基础的 工程中发挥作用。我国的广州、深圳地铁施工时都应用了该技术。
将地下托换技术应用到既有建筑物地下空间的开发并获得成功的是北京市音乐堂改建工程。该工程将独立柱基础框架结构的观众厅新增一层6.5m高的地下室;工程选择了人工挖 孔灌注桩加连续承台梁的托换方案,北京城建七建设工程有限公司的王雅斋等依此编制了《整 体基础托换与地下加层施工工法》(YJGF09-2000)。该工法采用的是灌注桩而不是预制静压桩。
既有建筑物通过基础将荷载传递到地基上。地基的材料强度一般要比建筑物构件的材料 强度低,所以竖向构件要通过加大了接触面的基础把荷载传给地基。既有建筑物若要增设地 下室,就需要切掉原基础,将竖向传力构件(墙、柱)接长,此时需要运用地下托换技术, 托换构件既需要有足够大的承载力支撑上部建筑物的荷载,又需要有小的沉降量,防止上部 既有建筑物产生大的附加内力而破坏;同时,要有足够的工作面保证地下室土方开挖和混凝 土浇注的顺利进行。桩基础具有承载力大、沉降量小的特点,成为托换构件的首选。然而, 传统的桩基础施工因既有建筑物的层高问题多受到限制。北京市音乐堂改建工程虽获得了成 功,但人工挖孔灌注桩也需要在无地下水的情况下进行,"两桩托一柱"的方案使开发出来的 地下室空间大大减少。
锚杆静压桩是锚杆和静力压桩结合形成的一种桩基施工工艺。它是通过在基础上埋设锚 杆固定压桩架,以建(构)筑物所能发挥的自重荷载为桩反力,用千斤顶将桩段从基础中预留 或开凿的压桩孔内逐段压入土中,然后将桩与基础连结在一起,从而达到提高地基承载力和 控制沉降的目的。现有的锚杆静压桩技术多是应用在地基和基础加固,以及建筑物纠偏等工 程中,没有用在施工既有建筑物地下室的实例。
发明内容 本发明针对现有运用地下托换技术施工既有建筑物地下室存在的地下室空间小的不足, 提供一种施工既有建筑物地下室的静压桩工艺,能够有足够的工作面保证地下室土方开挖和 混凝土浇注的顺利进行,并且所建地下室的空间大。
本发明的施工既有建筑物地下室的静压桩工艺包括以下步骤:
(1) 在建筑物一层室内地坪处施工承台和连系梁,在承台上开设至少两个压桩孔;
(2) 在压桩孔的外围埋设锚杆,在锚杆上安装反力架,用螺母固定;
(3) 吊放预制桩,在反力架横梁和预制桩间安装千斤顶;
(4) 将预制桩逐根压至设计标高,由于预制桩的长度小于建筑物层高,在压桩过程需要 将预制桩接长,预制桩的接长可采用桩端部预埋钢板上下焊接;预制桩接长时,需停止压桩、 撤除千斤顶,此时需将下段预制桩临时固定;采用楔形钢夹片临时固定预制桩:钢夹片在压 桩工作状态时与桩体脱开;当停止压桩、撤除千斤顶时,钢夹片依靠和桩体间的摩擦力,将 桩体夹紧、固定。
(5) 分层开挖土方至新施工地下室下一层楼板板底标高;.在开挖土方过程中,对建筑物 的沉降情况进行观测;
(6) 接长既有建筑物框架柱、墙体及其他竖向承力构件,浇注下一层的施工承台和连系 梁; '
'(7)将预制桩压至下一楼层,在下r楼层将预制桩临时固定后,将反力架、千斤顶移至
下一楼层;
(8)重复以上步骤,待各层地下室施工完毕后进行封桩,拆除反力架。
本发明采用锚杆静压桩施工工艺施工既有建筑物地下室,具有无震动、无噪音、无污染 等优点,可以最大限度减少对既有建筑物中人们生活的影响;预制的混凝土桩可分段压入, 可不受既有建筑物层高的限制;能够有足够的工作面保证地下室土方开挖和混凝土浇注的顺 利进行,并且所建地下室的空间大。
附图说明 '
图1是本发明中静压桩的平面布置示意图。 图2是静压桩的立面布置示意图。
图3、图4、图5、图6是采用本发明的工艺对框架结构建筑物进行托换的示意图。 图中:1、压桩孔,2、锚杆,3、承台,4、框架柱,5、连系梁,6、反力架,7、
框架梁,8、油压千斤顶,9、预制桩,10、反力架横梁,11、油管,12、油泵,13、钢夹片。
具体实施方式
用一独立基础的框架结构建筑物说明本发明的施工既有建筑物地下室的静压桩工艺。包 括以下步骤:
l静压桩的施工布置,如图1和图2所示。
a在建筑物一层室内地坪处施工承台3和连系梁5,在承台3上开设四个压桩孔1; b在四个压桩孔l的外围埋设锚杆2,在锚杆2上安装反力架6,反力架6上安装有反力
架横梁10;
c将预制桩9吊放到压桩孔l中,在反力架横梁10和预制桩9间安装油压千斤顶8,并 安装好使油压千斤顶8工作的油管11、油泵12等油压系统;
d将预制桩9逐根压至设计标高,在压桩过程中需要接桩时,将预制桩9用钢夹片13夹 紧、固定,撤除千斤顶8;接桩完成后,安装千斤顶8继续压桩9。钢夹片13为楔形,在向 下压预制桩9时,钢夹片13与预制桩9脱开;当停止下压、撤除千斤顶8时,钢夹片13依 靠和预制桩9间的摩擦力,将预制桩9夹紧、固定。
2托换,如图3、图4、图5、图6所示。
a分层开挖土方至新施工地下室下一层楼板板底标高;在开挖土方过程中,对建筑物的 沉降情况进行观测,见图3;
b接长既有建筑物框架柱4和墙体等竖向承力构件,浇注下一层的施工承台和连系梁, 见图4;
c将桩压至下一楼层,在下一楼层将预制桩9临时固定后,将反力架6、油压千斤顶8等
工具移至下一楼层,见图5;
d重复以上步骤,待各层地下室施工完毕后进行封桩,拆除反力架6,见图6。
本发明采用锚杆静压桩施工工艺施工既有建筑物地下室,具有以下优点-
1本发明采用的静压桩技术具有无震动、无噪音、无污染等优点,可以最大限度减少对
既有建筑物中人们生活的影响。
2本发明中的混凝土预制桩可分段压入,可不受既有建筑物层高的限制。
3本发明可用于既有建筑物地下空间的开发,对于设计标准低无地下停车场的旧建筑,
开拓了增加地下停车场的技术途径。
4本发明使用的预制桩全部压入到开发的地下空间下部,不占用地下空间;向时,预制
桩成为既有建筑物基础的一部分,提高了基础承载力。 .
静压桩是以建(构)筑物所能发挥的自重荷载为压桩反力,不需要另设反力设备。

Claims (1)

1.一种施工既有建筑物地下室的静压桩工艺,其特征是,包括以下步骤: (1)在建筑物一层室内地坪处施工承台和连系梁,在承台上开设至少两个压桩孔; (2)在压桩孔的外围埋设锚杆,在锚杆上安装反力架,用螺母固定; (3)吊放预制桩,在反力架横梁和预制桩间安装千斤顶; (4)将预制桩逐根压至设计标高,由于预制桩的长度小于建筑物层高,在压桩过程需要将预制桩接长,预制桩的接长可采用桩端部预埋钢板上下焊接;预制桩接长时,需停止压桩、撤除千斤顶,此时需将下段预制桩临时固定;采用楔形钢夹片临时固定预制桩:钢夹片在压桩工作状态时与桩体脱开;当停止压桩、撤除千斤顶时,钢夹片依靠和桩体间的摩擦力,将桩体夹紧、固定。 (5)分层开挖土方至新施工地下室下一层楼板板底标高;在开挖土方过程中,对建筑物的沉降情况进行观测; (6)接长既有建筑物框架柱、墙体及其他竖向承力构件,浇注下一层的施工承台和连系梁; (7)将预制桩压至下一楼层,在下一楼层将预制桩临时固定后,将反力架、千斤顶移至下一楼层; (8)重复以上步骤,待各层地下室施工完毕后进行封桩,拆除反力架。
CN200710116226A 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺 CN100595395C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710116226A CN100595395C (zh) 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710116226A CN100595395C (zh) 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺

Publications (2)

Publication Number Publication Date
CN101200901A true CN101200901A (zh) 2008-06-18
CN100595395C CN100595395C (zh) 2010-03-24

Family

ID=39516241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710116226A CN100595395C (zh) 2007-12-27 2007-12-27 施工既有建筑物地下室的静压桩工艺

Country Status (1)

Country Link
CN (1) CN100595395C (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886479A (zh) * 2010-07-14 2010-11-17 山东建筑大学 框架结构建筑物独立基础逐根托换法地下增层工艺
CN102444142A (zh) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 一种群桩改柱扩建地下室及其施工工法
CN102747741A (zh) * 2012-07-12 2012-10-24 苏州工业园区设计研究院股份有限公司 新型地坪桩与承台连接结构
CN104141297A (zh) * 2014-03-19 2014-11-12 中国建筑第四工程局有限公司 一种弱持力层地基加固方法及结构
CN107035159A (zh) * 2017-05-05 2017-08-11 山东建筑大学 一种适用于框架结构独立基础建筑物地下增层的方法
CN108797586A (zh) * 2018-06-26 2018-11-13 江苏地基工程有限公司 一种锚杆静压桩的施工方法
CN109680687A (zh) * 2019-01-17 2019-04-26 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109898882A (zh) * 2019-03-28 2019-06-18 上海勘察设计研究院(集团)有限公司 一种用于既有建筑地下增层的锚杆静压桩组合托换结构及其方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101026731B1 (ko) * 2010-12-16 2011-04-08 변항용 준공된 건축물의 지하실 시공방법

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5474399A (en) * 1993-02-09 1995-12-12 Chia-Hsiung; Huang Open cutting by floor slab braced retaining wall
CN100348835C (zh) * 2005-06-07 2007-11-14 上海市城市建设设计研究院 利用既有地下室顶板作为天然盖板的暗挖加层施工方法
CN100357554C (zh) * 2006-06-30 2007-12-26 山东建筑大学 板式基础托换法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886479A (zh) * 2010-07-14 2010-11-17 山东建筑大学 框架结构建筑物独立基础逐根托换法地下增层工艺
CN102444142A (zh) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 一种群桩改柱扩建地下室及其施工工法
CN102444142B (zh) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 一种群桩改柱扩建地下室及其施工工法
CN102747741A (zh) * 2012-07-12 2012-10-24 苏州工业园区设计研究院股份有限公司 新型地坪桩与承台连接结构
CN104141297A (zh) * 2014-03-19 2014-11-12 中国建筑第四工程局有限公司 一种弱持力层地基加固方法及结构
CN107035159A (zh) * 2017-05-05 2017-08-11 山东建筑大学 一种适用于框架结构独立基础建筑物地下增层的方法
CN107035159B (zh) * 2017-05-05 2018-12-21 山东建筑大学 一种适用于框架结构独立基础建筑物地下增层的方法
CN108797586A (zh) * 2018-06-26 2018-11-13 江苏地基工程有限公司 一种锚杆静压桩的施工方法
CN109680687A (zh) * 2019-01-17 2019-04-26 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109680687B (zh) * 2019-01-17 2021-02-05 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109898882A (zh) * 2019-03-28 2019-06-18 上海勘察设计研究院(集团)有限公司 一种用于既有建筑地下增层的锚杆静压桩组合托换结构及其方法

Also Published As

Publication number Publication date
CN100595395C (zh) 2010-03-24

Similar Documents

Publication Publication Date Title
US10815633B2 (en) Apparatus and methods for underground structures and construction thereof
US3184893A (en) Contact foundation method
CN101914925B (zh) 利用优化复合预制拱墙作外墙的地下室
CN105863287B (zh) 框架结构建筑物顶升增层和隔震方法
CN100564700C (zh) 格构式钢柱塔吊基础座的施工方法
CN1167857C (zh) 一种基坑侧壁的柔性支护方法
CN102182325B (zh) 一种框架结构独立基础既有建筑物地下室增层方法
KR100633796B1 (ko) 흙막이 가시설 공사의 중앙 버팀보 연결구조
CN105350527A (zh) 一种基于bim的预应力管桩的施工方法和预应力管桩
CN105862910B (zh) 一种装配式立体地下车库的逆作式建造方法
CN201883438U (zh) 一种坑中坑钢板桩基坑支护结构
CN104453274B (zh) 利用支护结构和托换结构支撑既有建筑物地下增层方法
RU2414563C1 (ru) Способ строительства многоэтажного подземного сооружения
CN101509263A (zh) 钢盖板盖挖法基坑结构及其施工方法
CN102425172A (zh) 紧邻高层建筑开挖深基坑的支护方法
CN101408039A (zh) 一种房屋建筑的竹-木混合结构
CN105839946B (zh) 砖混结构建筑物提升增层方法
CN103397660A (zh) 一种装配施工的地下建筑及其施工方法
CN102864946B (zh) 型钢加水平拉结杆件支撑既有建筑增设多层地下室工艺
CN103306289A (zh) 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法
KR101026731B1 (ko) 준공된 건축물의 지하실 시공방법
CN103437567A (zh) 利用原有桩基础支撑既有建筑地下增层的方法
CN101117800A (zh) 一种地下工程中一桩三用的方法
CN103410152B (zh) 一种用于狭长深基坑土方开挖的施工方法
CN101886479B (zh) 框架结构建筑物独立基础逐根托换法地下增层工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EXPY Termination of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100324

Termination date: 20151227